Alfa Tech VestAsia 2012

39
Engineering Excellence Delivered Globally Alfa Tech VestAsia Pte Ltd. Zach Wilson +6598249604 [email protected] http://www.atce.com.sg ALFA TECH VestAsia

description

We are turnkey project managers. View our company profile and project portfolio to know more.

Transcript of Alfa Tech VestAsia 2012

Page 1: Alfa Tech VestAsia 2012

Engineering Excellence Delivered Globally

Alfa Tech VestAsia Pte Ltd.

Zach Wilson +6598249604

[email protected]://www.atce.com.sg

ALFA TECH VestAsia

Page 2: Alfa Tech VestAsia 2012

Outline of Presentation

• History of Alfa Tech• Alfa Tech Services• Our Approach to Project Design & Management• Partial Client List and 2010-2012 Singapore

Projects• Selected Relevant Projects Worldwide• Key Team Members

Page 3: Alfa Tech VestAsia 2012

Alfa Tech VestAsia Background

Established in Silicon Valley in 1987 Headquartered in San Jose, CA ASEAN and Asia HQ, Singapore: 75 Bukit Timah Road Over 250 employees and affiliates worldwide Other Offices:

• San Francisco• Los Angeles• Singapore• Bangkok• Sydney• Dublin• Melbourne• London

Page 4: Alfa Tech VestAsia 2012

Alfa Tech VestAsia Services Overview

Design Architectural programming Sustainable design & documentation Mechanical design Electrical design Plumbing design

Technology IT Program Requirements Data Center Layout Infrastructure Planning Low Voltage Network Topology Security Server Migration Equipment procurement and install

Project Delivery Program development Site selection & due

diligence Budgeting & cost

estimating Scheduling Constructability Review Turnkey project

management

Facility Management Ongoing care and support 24/7/365 BMS monitoring 24 Hour attendant service Comprehensive service and

warranty Preventative maintenance

Page 5: Alfa Tech VestAsia 2012

Our Integrated Project Delivery

Seamless Management

Through a Project’s Lifecycle

Page 6: Alfa Tech VestAsia 2012

Our Approach for the Optimal Project

Teamwork – integrate all stakeholders Prioritizing the “Drivers”

Program and plan around your business applications Establish measureable project objectives

Identify the “controllable risks” and manage them Creative Problem Solving

Develop the base-line criteria Evaluate innovations and emerging technologies

Cost vs. Benefit Analysis Evaluate capital cost vs. operating expense savings

Make Critical Decisions early Don’t lose focus on the objectives

Page 7: Alfa Tech VestAsia 2012

Why Alfa Tech VestAsia?

Integrated Project Services Permanent Physical

Presence in Asia-Pac and US Knowledge and Experience Proven Track Record Awards in Sustainable and

Mission Critical Design Focus on Emerging

Technologies Risk and Cost/Benefit

Management

Strong Industry Relationships

Commitment to Our Clients

Alternate Project Delivery Methods

Page 8: Alfa Tech VestAsia 2012

Alfa Tech in Asia-Pac

Facebook - Prineville, OR

JDSU– Singapore, Malaysia, Beijing

Ultratech – Singapore Ultratech Phase II – Singapore Seagate – Bangkok, Thailand,

Singapore Lucasfilms – Singapore Cable & Wireless – Singapore Oracle – Sydney, Bangalore,

Seoul Advanced Micro Devices –

Suzhou, China Symantec – China Logitech – China

Page 9: Alfa Tech VestAsia 2012

Partial Client List• Genentech• Abbott Labs• JDSU• Symantec• Seagate • Facebook• Ultratech • Adobe• Savvis• Lucas Films• Stanford University• Embry Riddle Aeronautical University• Silecs• Ichor Systems• Cummins

Page 10: Alfa Tech VestAsia 2012

Selected Portfolio

2012, IN PROGRESSProject Role Type/Size Completion

Ichor Systems, Singapore At Risk, Turnkey Design Builder US 10 Million Cleanroom and regional HQ Phase 1, Q3 ’12Phase 2, Q1 ’13

Cummins Power Generation, Singapore

Project Coordinator and Full Technical Design of MEPS, Architecture and Process

US 3.5 Million factory upgrade and placement of new business unit

Q2 ’12

Savvis, Singapore Project Coordinator and Full Technical Design of MEPS, Technology and Architecture

US 20 Million 3.6 MW Tier 3 datacenter. Q4 ‘ 12

Silecs, Singapore At Risk, Turnkey Design Builder Boutique chemical production, Class 10 Cleanroom

Q2 ‘12

Embry Riddle Aeronautical University

At Risk, Turnkey Design Builder Regional HQ and Seminar Facility Q3 ‘ 12

JDSU, Singapore At Risk, Turnkey Design Builder Datacenter consolidation and design build of lab area

Q3 ‘ 12

Charles Schwab, Singapore Project Manager Office renovation Q3 ‘ 12

UltraTech, Singapore At Risk, Turnkey Design Builder 10,000 square foot Cleanroom expansion and utility upgrade

Q1 ‘ 13

KLA Tencor Development Manager 1 additional storey on existing building for 50,000sf of Cleanroom and ancillary space.

Q4 ‘ 13

Page 11: Alfa Tech VestAsia 2012

2012 Portfolio / JDSU

JDS Uniphase• 830 SF Datacenter• 600 SF Lab are

Scope of Work• Consolidation of

datacenter• Design build of lab

area• Turnkey design and

project delivery at risk

Page 12: Alfa Tech VestAsia 2012

2012 Portfolio / JDSU

JDSU Project Highlights• Tier 1 Data center• Consolidation from 2600

SF to 830 SF• Relocation of full IT

Equipment Suite and integration throughout the project

• Completely redesigned MEP systems

• Project completed in 4 weeks on 24/7 work schedule

Page 13: Alfa Tech VestAsia 2012

2012 Portfolio / Savvis

Savvis• 53,000 SF facility• 3.6 MW datacenter

Scope of Work• Turnkey design and

construction administration

Page 14: Alfa Tech VestAsia 2012

2012 Portfolio / Savvis

Savvis Project Highlights

• Tier 3 Data center• IT Capacity of 3.6 MW• 32,000 SF of raised

floor space• Enterprise-class co-

location, managed hosting, cloud computing and network services

Page 15: Alfa Tech VestAsia 2012

2012 Portfolio / Embry Riddle Aeronautical University HQ

Embry Riddle• 5,000 SF • Regional

Headquarters • Seminar Center

Scope of Work• Turnkey Design and

Build

Page 16: Alfa Tech VestAsia 2012

Embry Riddle Project Highlights

• Full IT integration for the project

• Aviation based theme throughout

• Completely customized carpentry package library and student processing areas

2012 Portfolio / Embry Riddle Aeronautical University HQ

Page 17: Alfa Tech VestAsia 2012

2012 Portfolio / Silecs

Silecs International• 10,000 SF Cleanroom• 1,500 SF Support

Office Scope of Work

• Turnkey Design and Build

• Complete authority approvals

• Facility management

Page 18: Alfa Tech VestAsia 2012

2012 Portfolio / Silecs

Silecs International Project Highlights

• Class 100 Cleanroom• Class 1 electronics

RO/DI system• Process chilled water• Multiple hazardous

storage groups• Water treatment

system• Process gas delivery

systems

Page 19: Alfa Tech VestAsia 2012

2012 Portfolio / Ichor

Ichor systems• 20,000 SF Cleanroom• 20,000 SF Support

Office Scope of Work

• Turnkey design and project delivery at risk

• Complete authority approvals

• Facility management

Page 20: Alfa Tech VestAsia 2012

2012 Portfolio / Ichor

Ichor Systems Project Highlights

• Class 10,000 Cleanroom

• Full Quantitative-risk analysis for Hydrogen process gas

• Multiple hazardous storage groups

• Process gas delivery systems

Page 21: Alfa Tech VestAsia 2012

2012 Portfolio / Charles Schwab

Charles Schwab•OptionsXpress – subsidiary in Singapore

Scope of Work•Renovation of office; IT consultation

Project Highlights•Heightened brand visibility•Total office migration•Access control system

Page 22: Alfa Tech VestAsia 2012

2011 Portfolio / Ultratech Phase 2

Ultratech Singapore• Full Production

Facility Expansion

Scope of Work• 5,000sf facility expansion,

cleanroom and utility• Executed full turnkey

design, project delivery and facility management

• Environmental Licensing

Page 23: Alfa Tech VestAsia 2012

2011 Portfolio / Ultratech Phase 2

Ultratech Project Highlights

• N2 Gas• Clean Dry Air System• Process vacuum• RO/DI Water System

Page 24: Alfa Tech VestAsia 2012

2011 Portfolio / Jotun Regional HQ

Jotun Singapore• 70,000 SF Facility• Regional Headquarters• Central Offices, Training

Center, Quality Lab, Warehousing Facility

Scope of Work• MEP, Fire Suppression• Vertical Transportation

Page 25: Alfa Tech VestAsia 2012

2011 Portfolio / Jotun Regional HQ

Jotun Singapore Project Highlights

• 30,000 SF High Bay Chem Storage

• Sand blasting and spray booths

• Foam Based Fire Suppression

• Stringent Indoor Air Quality System

• Green Mark Certified

Page 26: Alfa Tech VestAsia 2012

2011 Portfolio / Ngee Ann Polytechnic

Ngee Ann Polytechnic• Higher Education• Classrooms, Digital

Arts, Media Center

Scope of Work• MEP, Fire Suppression• Vertical Transportation

Page 27: Alfa Tech VestAsia 2012

2010 Portfolio / Ultratech

Ultratech Singapore• Regional Headquarters• Full Production Facility

Scope of Work• 17,000sf facility• 7,000sf Headquarter office• 10,000sf Cleanroom and

Utility• Executed full turnkey

design, project delivery and facility management

• Environmental Licensing

Page 28: Alfa Tech VestAsia 2012

2010 Portfolio / Ultratech

Ultratech Project Highlights

• N2 Gas• Clean Dry Air System• Process vacuum• RO/DI Water System• Class 10,000

Cleanroom• Full Production Facility• Construction Complete

in 7 Weeks

Page 29: Alfa Tech VestAsia 2012

2010 Portfolio / Ultratech

Page 30: Alfa Tech VestAsia 2012

2010 Portfolio / JDSU Singapore

JDSU Singapore• Regional Headquarters• R&D Lab• Mission Critical

Scope of Work• 20,000sf Facility with 500KW

Server Room and R&D Lab• Architecture, MEP,

Technology, Migration Plan, Const. Assist

• Complete Data, Lab and Systems Migration

Page 31: Alfa Tech VestAsia 2012

2010 Portfolio / JDSU Singapore

JDSU Singapore Project Highlights

• 66 Racks• Close Coupled Cooling• Separate IT

Infrastructure• Completed in 8 Weeks• Move Management

Page 32: Alfa Tech VestAsia 2012

2010 Portfolio / JDSU Singapore

Page 33: Alfa Tech VestAsia 2012

2010 Portfolio / JDSU Penang

JDSU Penang• Country Headquarters• Business Services Unit

Scope of Work• 20,000sf Office• Arch, MEP, Technology,

Migration Plan, Construction Assistance

Page 34: Alfa Tech VestAsia 2012

2010 Portfolio / JDSU Penang

Page 35: Alfa Tech VestAsia 2012

2010 Portfolio / JDSU Beijing

JDSU Beijing• Regional Headquarters• R&D Lab• Mission Critical

Scope of Work• 50,000sf Facility with 1MW

Server Room and R&D Lab• Architecture, MEP,

Technology, Migration Plan, Const. Assist

• Complete Data, Lab and Systems Migration

Page 36: Alfa Tech VestAsia 2012

2010 Portfolio / JDSU Beijing

JDSU Beijing Project Highlights

• 150 Racks• Raised Floor with CRAC

Units• Independent• Complete Planning and

Execution of a Critical Server Migration

Page 37: Alfa Tech VestAsia 2012

2010 Portfolio / JDSU Beijing

Page 38: Alfa Tech VestAsia 2012

Alfa Tech Singapore : Management

Zach Wilson is managing director of the Singapore offices of Alfa Tech Consulting Enterprise a US based engineering and project management firm that designs and builds over US $1 Billion in projects each year. He has over 10 years of experience in practical engineering, construction and real estate development related to infrastructure works and projects.

 

He has a specialization in cleantech, energy efficiency and hi-tech challenges such as for manufacturing, cleanrooms, data centers, medical facilities, and project execution in emerging markets. In addition to his projects in Singapore, Malaysia and China Mr. Wilson developed over 2 million square feet of mixed use real estate projects in San Francisco prior to his immigration to SE Asia. He also acts as an advisor to a regional infrastructure fund and is a director of a renewable energy firm called Greenpower Fuels. In this capacity he has worked to develop varying projects throughout Asia including a biomass power plant, biofuel commoditization supply chain, algal based energy development and biological water treatments projects.

He is a LEED (Leadership in Energy and Environmental Design) Accredited Professional and has an MS in Civil and Environmental Engineering from Stanford University and a B.S. in Construction Engineering Technology from Montana State University.

Paul Lim, Director:  As a trained mechanical and fire safety engineer and manager, Mr. Lim brings over twenty years of professional experience to every project.  He has conducted engineering and project management in Singapore, Malaysia and China.  Having started and operated his engineering firm Gims and Associates since 1994, he has established his name in the marketplace as a trustworthy, mechanical building services specialist. Eric Ng, Advisor: With twenty years of experience in project, facilities and real estate management Mr. Ng is a veteran in his field. The first seven years of his career in the project development and construction industry as coordination engineer and project manager for design, planning, cost control and construction of office, infrastructure and residential developments representing OCBC Property Services and Nishimatsu Construction Co. He served as head of project management at Jones Lang and DTZ. At Citigroup Mr. Ng held the position of cluster head in Malaysia, Indonesia and Thailand (with 1.5 million sq ft space) and senior asset manager for Asia Pacific (10 million sq ft space). Mr. Ng holds both a Bachelors and a Masters in Science in building and project management respectively. Ashley Wee, Advisor: An expert property consultant with nineteen years experience in the real estate industry and a strong history of directorial success makes Mr. Wee a critical asset to Alfa Tech Singapore. Mr. Wee has served as Director for DTZ Debenham Tie Leung, Associate Director for JLW and currently is Managing Director of VestAsia. Mr. Wee’s work experience is international having worked in Singapore, Indonesia, Australia and New Zealand. Mr. Lee’s consultation experience is also extremely extensive, he has advised UOB, The United States Government and DTZ in marketing, business development and serving on their financial evaluation panel among other services. MR. Wee graduated from the National University of Singapore with a Bachelor Degree in Real Estate Management.

Page 39: Alfa Tech VestAsia 2012

Engineering Excellence Delivered Globally

Alfa Tech VestAsia Pte Ltd.

Zach Wilson: +65 9824 9604Singapore: www.atce.com.sgUSA: www.atce.com

ALFA TECH-VestAsia