Massachusetts Water Resources Authority
Alewife Brook Pump Station Rehabilitation Design/CA/RE Services
Contract 7034 – Amendment No. 3
April 12, 2017
![Page 2: Alewife Brook Pump Station Rehabilitation Design/CA/RE ...- Reduction in bypass pumping time - Less traffic maintenance (Police and devices) • Lower overhead with lining company](https://reader035.fdocuments.in/reader035/viewer/2022071211/6022ec2292ed910dfe3fc594/html5/thumbnails/2.jpg)
14
Alewife Brook Pump Station
![Page 3: Alewife Brook Pump Station Rehabilitation Design/CA/RE ...- Reduction in bypass pumping time - Less traffic maintenance (Police and devices) • Lower overhead with lining company](https://reader035.fdocuments.in/reader035/viewer/2022071211/6022ec2292ed910dfe3fc594/html5/thumbnails/3.jpg)
Work to date: • Installation of flood control measures at exterior openings • Construction of bypass pumping system discharge vault
– Will later serve as the Alewife Brook Conduit meter vault • Installation of bypass pumping system pumps, piping and valves • Commencement of PCB remediation
Upcoming work: • Full bypass, then station rehabilitation Substantial Completion May 2018
15
Rehabilitation
![Page 4: Alewife Brook Pump Station Rehabilitation Design/CA/RE ...- Reduction in bypass pumping time - Less traffic maintenance (Police and devices) • Lower overhead with lining company](https://reader035.fdocuments.in/reader035/viewer/2022071211/6022ec2292ed910dfe3fc594/html5/thumbnails/4.jpg)
16
Work to Date
Bypass Pumping Discharge Lines
![Page 5: Alewife Brook Pump Station Rehabilitation Design/CA/RE ...- Reduction in bypass pumping time - Less traffic maintenance (Police and devices) • Lower overhead with lining company](https://reader035.fdocuments.in/reader035/viewer/2022071211/6022ec2292ed910dfe3fc594/html5/thumbnails/5.jpg)
17
Work to Date
Construction of Bypass System Discharge Vault
Flood Plank Frames Installed at Screen Room Door
Installation of Bypass System Pumps and Suction Lines
![Page 6: Alewife Brook Pump Station Rehabilitation Design/CA/RE ...- Reduction in bypass pumping time - Less traffic maintenance (Police and devices) • Lower overhead with lining company](https://reader035.fdocuments.in/reader035/viewer/2022071211/6022ec2292ed910dfe3fc594/html5/thumbnails/6.jpg)
Additional Contractor Submittal Review Services $95,266 • Contract quantity of 220 has been reached • Additional 167 submittals projected to be reviewed • Cost based on actual incurred for the initial 220 submittals
18
Contract 7034 Amendment No. 3
![Page 7: Alewife Brook Pump Station Rehabilitation Design/CA/RE ...- Reduction in bypass pumping time - Less traffic maintenance (Police and devices) • Lower overhead with lining company](https://reader035.fdocuments.in/reader035/viewer/2022071211/6022ec2292ed910dfe3fc594/html5/thumbnails/7.jpg)
Massachusetts Water Resources Authority
Reading Extension Sewer and Metropolitan Sewer Rehabilitation
Contract 7164
April 12, 2017
![Page 8: Alewife Brook Pump Station Rehabilitation Design/CA/RE ...- Reduction in bypass pumping time - Less traffic maintenance (Police and devices) • Lower overhead with lining company](https://reader035.fdocuments.in/reader035/viewer/2022071211/6022ec2292ed910dfe3fc594/html5/thumbnails/8.jpg)
Original Construction circa 1919
5
Construction of a Section of the Reading Extension Sewer (circa. 1919) along Prospect Street near the Stoneham/Wakefield town line.
![Page 9: Alewife Brook Pump Station Rehabilitation Design/CA/RE ...- Reduction in bypass pumping time - Less traffic maintenance (Police and devices) • Lower overhead with lining company](https://reader035.fdocuments.in/reader035/viewer/2022071211/6022ec2292ed910dfe3fc594/html5/thumbnails/9.jpg)
7164 Project Limits (Stoneham, Woburn and Wakefield)
6
![Page 10: Alewife Brook Pump Station Rehabilitation Design/CA/RE ...- Reduction in bypass pumping time - Less traffic maintenance (Police and devices) • Lower overhead with lining company](https://reader035.fdocuments.in/reader035/viewer/2022071211/6022ec2292ed910dfe3fc594/html5/thumbnails/10.jpg)
7164 Project Information and Summary
7
• Reading Extension Sewer – 12,240 feet of 15, 18, 20-in VC constructed in 1919
• Metropolitan Sewer – 2,280 ft of 15-in VC constructed in 1890s
• Both sewers revealed both structural and non-structural deficiencies during CCTV inspections
![Page 11: Alewife Brook Pump Station Rehabilitation Design/CA/RE ...- Reduction in bypass pumping time - Less traffic maintenance (Police and devices) • Lower overhead with lining company](https://reader035.fdocuments.in/reader035/viewer/2022071211/6022ec2292ed910dfe3fc594/html5/thumbnails/11.jpg)
7164 Project Information and Summary
8
• Rehabilitation of 13,100 ft of pipe utilizing Cured-in-Place Pipe (CIPP) and lining 62 manholes and structures
• Bypass pumping and flow diversions
• Coordination with other projects (MWRA NIH, Eversource Energy and Rail Trail)
![Page 12: Alewife Brook Pump Station Rehabilitation Design/CA/RE ...- Reduction in bypass pumping time - Less traffic maintenance (Police and devices) • Lower overhead with lining company](https://reader035.fdocuments.in/reader035/viewer/2022071211/6022ec2292ed910dfe3fc594/html5/thumbnails/12.jpg)
Contract 7164 – Bid Tabulation
9
• Bids opened on February 23, 2017 Contractor Bid Amount Green Mountain Pipeline Services, Inc. $2,048,945 Insituform Technologies, LLC $2,154,000 Layne Inliner, LLC $2,891,160 Engineer’s Estimate $4,240,000
• Staff recommend to award Contract 7164 to Green Mountain Pipeline Services, Inc.
![Page 13: Alewife Brook Pump Station Rehabilitation Design/CA/RE ...- Reduction in bypass pumping time - Less traffic maintenance (Police and devices) • Lower overhead with lining company](https://reader035.fdocuments.in/reader035/viewer/2022071211/6022ec2292ed910dfe3fc594/html5/thumbnails/13.jpg)
7164 Estimate Differences
10
• More Aggressive Installation Rate (fewer lining setups):
- Insertion lengths longer than assumed - Lower equipment time/labor hours - Reduction in bypass pumping time - Less traffic maintenance (Police and devices)
• Lower overhead with lining company General Contractor
• More aggressive bid as a past General Contractor and subcontractor for MWRA
• Close range of bids indicates correct level of effort to successfully complete project
![Page 14: Alewife Brook Pump Station Rehabilitation Design/CA/RE ...- Reduction in bypass pumping time - Less traffic maintenance (Police and devices) • Lower overhead with lining company](https://reader035.fdocuments.in/reader035/viewer/2022071211/6022ec2292ed910dfe3fc594/html5/thumbnails/14.jpg)
7164 Schedule and Award Summary
11
Contract Award to: Green Mountain Pipeline Services, Inc. Contract Bid: $2,048,945 Notice to Proceed: May 2017 Contract Substantial Completion: August 2018 Contract Duration: 487 calendar days
![Page 15: Alewife Brook Pump Station Rehabilitation Design/CA/RE ...- Reduction in bypass pumping time - Less traffic maintenance (Police and devices) • Lower overhead with lining company](https://reader035.fdocuments.in/reader035/viewer/2022071211/6022ec2292ed910dfe3fc594/html5/thumbnails/15.jpg)
Massachusetts Water Resources Authority
Section 80 Repair MWRA Contract No. 7532
Construction Update
April 12, 2017
![Page 16: Alewife Brook Pump Station Rehabilitation Design/CA/RE ...- Reduction in bypass pumping time - Less traffic maintenance (Police and devices) • Lower overhead with lining company](https://reader035.fdocuments.in/reader035/viewer/2022071211/6022ec2292ed910dfe3fc594/html5/thumbnails/16.jpg)
34
Section 80 Repair Locus Plan
![Page 17: Alewife Brook Pump Station Rehabilitation Design/CA/RE ...- Reduction in bypass pumping time - Less traffic maintenance (Police and devices) • Lower overhead with lining company](https://reader035.fdocuments.in/reader035/viewer/2022071211/6022ec2292ed910dfe3fc594/html5/thumbnails/17.jpg)
Section 80 Emergency Repair MWRA Contract No. OP-352
Construction Update April 2-3, 2017
35
![Page 18: Alewife Brook Pump Station Rehabilitation Design/CA/RE ...- Reduction in bypass pumping time - Less traffic maintenance (Police and devices) • Lower overhead with lining company](https://reader035.fdocuments.in/reader035/viewer/2022071211/6022ec2292ed910dfe3fc594/html5/thumbnails/18.jpg)
36
Section 80 Emergency Repair
![Page 19: Alewife Brook Pump Station Rehabilitation Design/CA/RE ...- Reduction in bypass pumping time - Less traffic maintenance (Police and devices) • Lower overhead with lining company](https://reader035.fdocuments.in/reader035/viewer/2022071211/6022ec2292ed910dfe3fc594/html5/thumbnails/19.jpg)
37
Section 80 Emergency Repair
Cutting pavement in lane 4/2, 10:15 P.M.
Buried manhole cover found 4/2, 10:45 P.M.
![Page 20: Alewife Brook Pump Station Rehabilitation Design/CA/RE ...- Reduction in bypass pumping time - Less traffic maintenance (Police and devices) • Lower overhead with lining company](https://reader035.fdocuments.in/reader035/viewer/2022071211/6022ec2292ed910dfe3fc594/html5/thumbnails/20.jpg)
38
Section 80 Emergency Repair
38
Air Release Valve Assembly (mounted on flanged plate)
Air Release Valve assembly installed on existing pipe
4/2, 11:55 P.M.
Automatic Air Release Valve
Manual Air Release Valve
![Page 21: Alewife Brook Pump Station Rehabilitation Design/CA/RE ...- Reduction in bypass pumping time - Less traffic maintenance (Police and devices) • Lower overhead with lining company](https://reader035.fdocuments.in/reader035/viewer/2022071211/6022ec2292ed910dfe3fc594/html5/thumbnails/21.jpg)
39
Section 80 Emergency Repair
39
New Flange Plate installed 4/3, 12:40 A.M.
Top of Flange without A.R.V 4/3, 12:05 A.M.
![Page 22: Alewife Brook Pump Station Rehabilitation Design/CA/RE ...- Reduction in bypass pumping time - Less traffic maintenance (Police and devices) • Lower overhead with lining company](https://reader035.fdocuments.in/reader035/viewer/2022071211/6022ec2292ed910dfe3fc594/html5/thumbnails/22.jpg)
40
Section 80 Emergency Repair
40
Prepared Trench 4/3, 1:20 A.M.
Backfilled with CDF 4/3, 1:30 A.M.
![Page 23: Alewife Brook Pump Station Rehabilitation Design/CA/RE ...- Reduction in bypass pumping time - Less traffic maintenance (Police and devices) • Lower overhead with lining company](https://reader035.fdocuments.in/reader035/viewer/2022071211/6022ec2292ed910dfe3fc594/html5/thumbnails/23.jpg)
41
Section 80 Emergency Repair
41
Temporary Trench paving 4/3, 2:40 A.M.
![Page 24: Alewife Brook Pump Station Rehabilitation Design/CA/RE ...- Reduction in bypass pumping time - Less traffic maintenance (Police and devices) • Lower overhead with lining company](https://reader035.fdocuments.in/reader035/viewer/2022071211/6022ec2292ed910dfe3fc594/html5/thumbnails/24.jpg)
42
Section 80 at Recreation Road, Weston – April 8-9
• Leak at 6:00 on pipe between removed thrust block and coupling
![Page 25: Alewife Brook Pump Station Rehabilitation Design/CA/RE ...- Reduction in bypass pumping time - Less traffic maintenance (Police and devices) • Lower overhead with lining company](https://reader035.fdocuments.in/reader035/viewer/2022071211/6022ec2292ed910dfe3fc594/html5/thumbnails/25.jpg)
43
Excavation and Repair
![Page 26: Alewife Brook Pump Station Rehabilitation Design/CA/RE ...- Reduction in bypass pumping time - Less traffic maintenance (Police and devices) • Lower overhead with lining company](https://reader035.fdocuments.in/reader035/viewer/2022071211/6022ec2292ed910dfe3fc594/html5/thumbnails/26.jpg)
44
Form for Thrust Block
![Page 27: Alewife Brook Pump Station Rehabilitation Design/CA/RE ...- Reduction in bypass pumping time - Less traffic maintenance (Police and devices) • Lower overhead with lining company](https://reader035.fdocuments.in/reader035/viewer/2022071211/6022ec2292ed910dfe3fc594/html5/thumbnails/27.jpg)
Massachusetts Water Resources Authority
Quabbin Reservoir and Drought Status Update
April 12, 2017
![Page 28: Alewife Brook Pump Station Rehabilitation Design/CA/RE ...- Reduction in bypass pumping time - Less traffic maintenance (Police and devices) • Lower overhead with lining company](https://reader035.fdocuments.in/reader035/viewer/2022071211/6022ec2292ed910dfe3fc594/html5/thumbnails/28.jpg)
Massachusetts Drought Status March 1, 2017
21
![Page 29: Alewife Brook Pump Station Rehabilitation Design/CA/RE ...- Reduction in bypass pumping time - Less traffic maintenance (Police and devices) • Lower overhead with lining company](https://reader035.fdocuments.in/reader035/viewer/2022071211/6022ec2292ed910dfe3fc594/html5/thumbnails/29.jpg)
National Drought Mitigation Center Intensity Map April 4, 2017
22
![Page 30: Alewife Brook Pump Station Rehabilitation Design/CA/RE ...- Reduction in bypass pumping time - Less traffic maintenance (Police and devices) • Lower overhead with lining company](https://reader035.fdocuments.in/reader035/viewer/2022071211/6022ec2292ed910dfe3fc594/html5/thumbnails/30.jpg)
60
70
80
90
100
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
% F
ull
20002001200220032004200520062007200820092010201120122013201420152016
23
Quabbin Volume 1/1/2000 to 4/11/2017
Below Normal 2016
2002 2003
2017
![Page 31: Alewife Brook Pump Station Rehabilitation Design/CA/RE ...- Reduction in bypass pumping time - Less traffic maintenance (Police and devices) • Lower overhead with lining company](https://reader035.fdocuments.in/reader035/viewer/2022071211/6022ec2292ed910dfe3fc594/html5/thumbnails/31.jpg)
• Staff contacted community elected officials and water superintendents with pointers to water conservation
• MWRA sent out Public Service Announcements asking residents and businesses to conserve water
• MWRA used its website and social media to draw awareness of the need to conserve
• The target is to keep water usage at previous year levels without issuing mandatory restrictions
24
Quabbin Has Been Below Normal Since November 12, 2016
![Page 32: Alewife Brook Pump Station Rehabilitation Design/CA/RE ...- Reduction in bypass pumping time - Less traffic maintenance (Police and devices) • Lower overhead with lining company](https://reader035.fdocuments.in/reader035/viewer/2022071211/6022ec2292ed910dfe3fc594/html5/thumbnails/32.jpg)
25
Overall Demand Tracking Lower Than Last Year
Fully Supplied Communities Partially Supplied Communities
100
120
140
160
180
200
220
240
260
1/1 2/1 3/1 4/1 5/1 6/1 7/1 8/1 9/1 10/1 11/1 12/1
MGD 2016
2017
0
10
20
30
40
50
60
1/1 2/1 3/1 4/1 5/1 6/1 7/1 8/1 9/1 10/1 11/1 12/1
2016
2017
![Page 33: Alewife Brook Pump Station Rehabilitation Design/CA/RE ...- Reduction in bypass pumping time - Less traffic maintenance (Police and devices) • Lower overhead with lining company](https://reader035.fdocuments.in/reader035/viewer/2022071211/6022ec2292ed910dfe3fc594/html5/thumbnails/33.jpg)
26
Quabbin Watershed Yields
5%
25%
95%
75%
50% (Median)
2017 1965
2016
![Page 34: Alewife Brook Pump Station Rehabilitation Design/CA/RE ...- Reduction in bypass pumping time - Less traffic maintenance (Police and devices) • Lower overhead with lining company](https://reader035.fdocuments.in/reader035/viewer/2022071211/6022ec2292ed910dfe3fc594/html5/thumbnails/34.jpg)
27
Status Looking Forward from April 1, 2017
1-Month
3-Months
6-Months
12-Months
Median Yield
Below Normal
Normal
Normal
Normal
Dry
(75th Percentile)
Below Normal
Below Normal
Normal
Below Normal
Driest
(of Record)
Below Normal
Below Normal
Below Normal
Drought Warning
![Page 35: Alewife Brook Pump Station Rehabilitation Design/CA/RE ...- Reduction in bypass pumping time - Less traffic maintenance (Police and devices) • Lower overhead with lining company](https://reader035.fdocuments.in/reader035/viewer/2022071211/6022ec2292ed910dfe3fc594/html5/thumbnails/35.jpg)
28
MWRA Drought Management Stages
Stage
Target Water Use Reduction
Normal Operation Below Normal Drought Warning
0 Previous year’s use (Voluntary)
5% (Primarily Voluntary)
Drought Emergency Stage 1 Stage 2 Stage 3
(Mandatory Restrictions) 10% 15% 30%
![Page 36: Alewife Brook Pump Station Rehabilitation Design/CA/RE ...- Reduction in bypass pumping time - Less traffic maintenance (Police and devices) • Lower overhead with lining company](https://reader035.fdocuments.in/reader035/viewer/2022071211/6022ec2292ed910dfe3fc594/html5/thumbnails/36.jpg)
29
Quabbin’s Long-term Track
/demand & supply/saw tooth with bands.xls
0%
20%
40%
60%
80%
100% Ja
n-48
Jan-
52
Jan-
56
Jan-
60
Jan-
64
Jan-
68
Jan-
72
Jan-
76
Jan-
80
Jan-
84
Jan-
88
Jan-
92
Jan-
96
Jan-
00
Jan-
04
Jan-
08
Jan-
12
Jan-
16
Qua
bbin
-Per
cent
Ful
l
Normal
Below Normal
Below 25%
Drought Emergency Stage 3
Below 38% Drought Emergency Stage 2
Below ~55% Drought Emergency Stage 1
Warning
![Page 37: Alewife Brook Pump Station Rehabilitation Design/CA/RE ...- Reduction in bypass pumping time - Less traffic maintenance (Police and devices) • Lower overhead with lining company](https://reader035.fdocuments.in/reader035/viewer/2022071211/6022ec2292ed910dfe3fc594/html5/thumbnails/37.jpg)
Rainfall Deficit Reducing In The Service Area
30
5%
50%
25%
95%
75%
7.4” Deficit
![Page 38: Alewife Brook Pump Station Rehabilitation Design/CA/RE ...- Reduction in bypass pumping time - Less traffic maintenance (Police and devices) • Lower overhead with lining company](https://reader035.fdocuments.in/reader035/viewer/2022071211/6022ec2292ed910dfe3fc594/html5/thumbnails/38.jpg)
Wachusett Elevation 2017
31
387
388
389
390
391
392
393
394
395
396
1/1/2017 2/1/2017 3/1/2017 4/1/2017
Elev
atio
n (fe
et)
Elevation Lower limit of operating band Upper limit of operating band Spillway Elevation