ALEJANDRA MEJIA JULY 2 ND, 2015 History and Current State of DEER.
-
Upload
denis-higgins -
Category
Documents
-
view
213 -
download
1
Transcript of ALEJANDRA MEJIA JULY 2 ND, 2015 History and Current State of DEER.
![Page 1: ALEJANDRA MEJIA JULY 2 ND, 2015 History and Current State of DEER.](https://reader036.fdocuments.in/reader036/viewer/2022083005/56649f205503460f94c39189/html5/thumbnails/1.jpg)
A L E J A N D R A M E J I A
J U LY 2 N D , 2 0 1 5
History and Current State of DEER
![Page 2: ALEJANDRA MEJIA JULY 2 ND, 2015 History and Current State of DEER.](https://reader036.fdocuments.in/reader036/viewer/2022083005/56649f205503460f94c39189/html5/thumbnails/2.jpg)
History and Current State of DEER
2
A Brief History of DEER
July 2, 2015
1990
Today
![Page 3: ALEJANDRA MEJIA JULY 2 ND, 2015 History and Current State of DEER.](https://reader036.fdocuments.in/reader036/viewer/2022083005/56649f205503460f94c39189/html5/thumbnails/3.jpg)
History and Current State of DEER
3
Non-DEER Workpapers
July 2, 2015
Drastically increased in number and complexity after 2005
Commission referred to them as “second tier” of ex ante framework Began issuing formal guidance in 2008
Very difficult to track Review and decisions on non-public website Large majority given ‘pass through’ approval
Or months of back and forth revisions
![Page 4: ALEJANDRA MEJIA JULY 2 ND, 2015 History and Current State of DEER.](https://reader036.fdocuments.in/reader036/viewer/2022083005/56649f205503460f94c39189/html5/thumbnails/4.jpg)
History and Current State of DEER
4
Current State of DEER: Process
July 2, 2015
Every few years Timed to program cycle
Interim updates based on code changes No established calendar/process Recent updates have focused on small subset of measures DEER values not frozen; updating process chaotic and unpredictable
Since January 2015, ten updates so far (change log); two impacted DEER 2015; six 2014; two impacted 2011
Utilities/others not notified of changes – need to look at change log Lighting disposition updated 7x in past 1.5 years
Limited opportunity to provide input Program cycle updates – take comments before workshop. Other updates: no real opportunity to
provide input.
Outdated measures often removed rather than updated E.g. Ag and water pumping; clothes washers Staff just removed all IMCs from DEER
Utility updates required at significant cost, even if new values don’t change by more than 10% and may not be statistically different from old values.
Are DEER resources used cost-efficiently (magnitude and allocation)?
![Page 5: ALEJANDRA MEJIA JULY 2 ND, 2015 History and Current State of DEER.](https://reader036.fdocuments.in/reader036/viewer/2022083005/56649f205503460f94c39189/html5/thumbnails/5.jpg)
History and Current State of DEER
5
Current State of DEER: Structure
July 2, 2015
Documentation for measure parameters not linked to values
Support for measure parameters difficult to find Measure parameters not easily reproducible. In some cases not
reproducible at all.
All measure parameters for particular measure not linked (savings, EUL, IMC, NTG) Measure IDs not always used consistently Not super-obvious which EULs/NTG are for which measures READI not intuitive to use – user-unfriendly
DEER includes 56 fields for each measure Why?
![Page 6: ALEJANDRA MEJIA JULY 2 ND, 2015 History and Current State of DEER.](https://reader036.fdocuments.in/reader036/viewer/2022083005/56649f205503460f94c39189/html5/thumbnails/6.jpg)
History and Current State of DEER
6
Current State of DEER: Content
July 2, 2015
DEER measures: What’s included? Currently about 600,000 measure combinations in READI About 50 distinct measures in DEER (Another – approx. 160 non-DEER WP)
70% overlap with workpapers DEER measures about 8% of portfolio (statewide)
54% of deemed savings use DEER values or DEER methodologies (PG&E)
DEER measures: What’s missing? Clothes washers Ag pumping Majority of portfolio deemed measures
Deemed about 40% of portfolio savings (estimate)(PG&E) 1/3 of savings for Edison custom; rest deemed (estimate)(SCE)
Cost to maintain/update DEER over past 5 years Multiple millions of dollars?
Example: $1.6 million budget PG&E/year/deemed alone – 8 engineers plus $600K WP budget/annum
![Page 7: ALEJANDRA MEJIA JULY 2 ND, 2015 History and Current State of DEER.](https://reader036.fdocuments.in/reader036/viewer/2022083005/56649f205503460f94c39189/html5/thumbnails/7.jpg)
History and Current State of DEER
7
Current State of DEER: Conclusions
July 2, 2015
Uncertainty about responsibilities, performance of various parties Ex ante value development/program design/regulatory or
stakeholder oversight?
Ongoing need for finality, confidence in values Difficulty maintaining a collaborative process
Formal review is resource intensive Informal updates are impossible for stakeholders to track
Does not support a common set of mutually understood values
![Page 8: ALEJANDRA MEJIA JULY 2 ND, 2015 History and Current State of DEER.](https://reader036.fdocuments.in/reader036/viewer/2022083005/56649f205503460f94c39189/html5/thumbnails/8.jpg)
History and Current State of DEER
8
Original Purpose Added Throughout the Years
July 2, 2015
Consolidated database of ex ante values
“Preeminent resource for program planning and portfolio management”
ESPI EAR ScoringNavigant Potential and
Goals ModelReporting?
Discussion: Other Uses of DEER