Alberta to Alaska Railway Study Commissioned by the Van Horne Institute Presented by John Falcetta President Alberta Alaska Rail Development Corp

Transcript of Alberta to Alaska Rail Study - PNWER€¦ · Canada or the U.S. as freight could be interchanged to...

Page 1: Alberta to Alaska Rail Study - PNWER€¦ · Canada or the U.S. as freight could be interchanged to the Alaska Railway utilizing ports in Alaska. Positive Impacts of the Project:

Alberta to Alaska Railway

Study Commissioned by the Van Horne Institute

Presented by John Falcetta

President – Alberta Alaska Rail Development Corp

Page 2: Alberta to Alaska Rail Study - PNWER€¦ · Canada or the U.S. as freight could be interchanged to the Alaska Railway utilizing ports in Alaska. Positive Impacts of the Project:

Design, Permit, Build & Operate a multipurpose railway from Alberta to tidewater

Capacity to move commodities, goods people & data (fibre optics)

Potential to also connect Alaska to lower 48 states

First Nations engaged will be full partners in the project

Page 3: Alberta to Alaska Rail Study - PNWER€¦ · Canada or the U.S. as freight could be interchanged to the Alaska Railway utilizing ports in Alaska. Positive Impacts of the Project:

1. Evidence: Project design and scope began with VHI study on the project concept

2. Long term Structure: First Nations are not just “being consulted” on our project. This will be their project too, through an innovative ownership structure.

We will connect Alberta to tidewater & also connect Nations to the economic activity around them.

3. Talent: Team assembled to execute

Page 4: Alberta to Alaska Rail Study - PNWER€¦ · Canada or the U.S. as freight could be interchanged to the Alaska Railway utilizing ports in Alaska. Positive Impacts of the Project:

Van Horne Institute A2A Study

Participants

Commissioned by Peter Wallis – VHI

Participants – AECOM, U of Alaska, Michigan Tech, G7G, Shiroco

Government of Alberta

Purpose of the study

Government of Alberta asked VHI to determine the feasibility (study level) & the viability of moving bitumen on a purpose built railways

VHI wanted to explore the possibility of a new mineral supply chain that would be facilitated by a railway

Business opportunities for First Nations

Page 5: Alberta to Alaska Rail Study - PNWER€¦ · Canada or the U.S. as freight could be interchanged to the Alaska Railway utilizing ports in Alaska. Positive Impacts of the Project:

The Findings

• Favourable Alignment was discovered between Fort McMurray Alberta and Delta Junction Alaska, the Trans Alaska Pipeline system TAPS pipeline .

Delta Junction could be a interchange point from Rail to Pipe

• End point of Valdez, is one of the worlds safest ports that handles petrochemical

• Reverse flow of goods could be moved from the Asia Pacific to Canada or the U.S. as freight could be interchanged to the Alaska Railway utilizing ports in Alaska.

Page 6: Alberta to Alaska Rail Study - PNWER€¦ · Canada or the U.S. as freight could be interchanged to the Alaska Railway utilizing ports in Alaska. Positive Impacts of the Project:

Positive Impacts of the Project: Canadian & US economy improved position to export & import

Additional route into and out of North America

Landlocked commodities can be

moved to market

First Nation’s real & substantial ownership of a major enterprise

Page 7: Alberta to Alaska Rail Study - PNWER€¦ · Canada or the U.S. as freight could be interchanged to the Alaska Railway utilizing ports in Alaska. Positive Impacts of the Project:

A2A: Economic & Financial Highlights

NPV/barrel : $8 - $10 a barrel for the rail portion modelling 1.5 and 1.0 mpbd

NPV tested using high hurdle of 10.2% - increase capital cost of 50% and operating cost increase of 50% under scenarios of 1 mbp.

All in capital cost range $14 Billion - $20 million

Page 8: Alberta to Alaska Rail Study - PNWER€¦ · Canada or the U.S. as freight could be interchanged to the Alaska Railway utilizing ports in Alaska. Positive Impacts of the Project:

A2A: Operating Highlights Utilizing 6 distributed locomotives in train,

ECP braking, and driver assist technology

Barrels per

year?

8 to 12 trains loaded trains (16 to 24 total

trains) operating per day (350/yr.)

630 barrels per car or 315,000

gross tons per car Trains hauling 192 cars per

trains

Page 9: Alberta to Alaska Rail Study - PNWER€¦ · Canada or the U.S. as freight could be interchanged to the Alaska Railway utilizing ports in Alaska. Positive Impacts of the Project:

Team: Full Project lifecycle experience • The project team members have a direct proven track record in

conceiving and implementing major infrastructure developments

John Falcetta

Sean McCoshen

David Sharpe

Mead Treadwell

Carole Anne Hilton

Page 10: Alberta to Alaska Rail Study - PNWER€¦ · Canada or the U.S. as freight could be interchanged to the Alaska Railway utilizing ports in Alaska. Positive Impacts of the Project:

A2A Proposed Timeline

Concept Informal Outreach

Identify corridor

Speak with stakeholders

Cost Estimates Revenue

Projections

CTA,STB Pre-Filing

Governmental Affairs

Refine Corridor

Engage with Stakeholders

Operating Plan Business Plan

CTA,STB Application

Formal Outreach

Conceptual Engineering

Update Stakeholders

Constraints & Alternatives

Secure Equity

CTA –CEAA

STB EIS Respond to

issues raised Preliminary Engineering

Commercial MoU’s

Prepare for RoW

Acquisition Achieve RoW

CTA, STB Permit

Final Engineering

Tendering & Procurement

Commercial Contracts

RoW Acquisition

Construction Financing

Build Other Permitting

Commence Construction

Finalize Haulage

Contracts Test & License

Operate

2017

2018

2019

2016

2015

2020

2022

Page 11: Alberta to Alaska Rail Study - PNWER€¦ · Canada or the U.S. as freight could be interchanged to the Alaska Railway utilizing ports in Alaska. Positive Impacts of the Project: