Albert G Lane Technical High School 2501 W Addison St Chicago, IL 60618 Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual observation only; they do not test operability or perform destructive testing inside walls, ceilings or floors. The rankings below reflect the assessors’ visual evaluations of the property condition as of that date. For additional information, you may review the detailed assessment report linked on this school’s profile page and visit the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/About_CPS/Policies_and_guidelines/Pages/facilitystandards.aspx. Condition Rankings and Descriptions Rank 7: The item/system is new or in good condition and no work is required. Rank 6: The item/system requires general cleaning and/or routine maintenance. Rank 5: The item/system requires repairs and has not reached the end of its serviceable life. Rank 4: The item/system has reached its expected useful life, but is still fully operational. CPS will maintain until replacement occurs. Rank 3: The item/system has surpassed its expected useful life and has limited operability. CPS will maintain until replacement occurs. Rank 2: The item/system has surpassed its expected useful life and has low operability. CPS will maintain until replacement occurs. Rank 1: The item’s/system’s failure leads to an immediate life safety condition for occupants or to the potential of an uninhabitable facility.¹ Total Quantity Unit means a basic estimate for each item needing some level of repair or replacement. Cost does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes. Definitions means, for each item, the total number (or amount) of that item that exists and was evaluated. Within that Total Quantity, different portions may have different rankings. means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement “EA” for “each.” Other items, like chimneys, are measured in terms of linear feet (“LF”). Still other items, like flooring, are generally measured in square feet (“SF”). Cost For the same reason, the Total Campus Need listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features. Total Campus Need also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs. EXTERIOR CANOPY Assessed Item Composite Rank Unit Total Quantity Cost Rank 7 Qty Rank 6 Qty Rank 5 Qty Rank 4 Qty Rank 3 Qty Rank 2 Qty Rank 1 Qty BLU Metal Canopy SF 81 $4,289 5 81 $4,289 CHIMNEY Assessed Item Composite Rank Unit Total Quantity Cost Rank 7 Qty Rank 6 Qty Rank 5 Qty Rank 4 Qty Rank 3 Qty Rank 2 Qty Rank 1 Qty GRE Brick Chimney - Concrete/ Mortar Liner LF 120 $60,060 6 120 GRE Metal Flue LF 120 $8,923 6 12 102 6 $68,983 Assessment Date: 3/11/2013 Page 1 of 23

Transcript of Albert G Lane Technical High Schoolschoolreports.cps.edu/Assessment_PDF_Summary/1440.pdf ·...

Page 1: Albert G Lane Technical High Schoolschoolreports.cps.edu/Assessment_PDF_Summary/1440.pdf · 2014-01-15 · Albert G Lane Technical High School 2501 W Addison St Chicago, IL 60618

Albert G Lane Technical High School

2501 W Addison St Chicago, IL 60618

Facility Assessment SummaryThis report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual observation only; they do not test operability or perform destructive testing inside walls, ceilings or floors. The rankings below reflect the assessors’ visual evaluations of the property condition as of that date. For additional information, you may review the detailed assessment report linked on this school’s profile page and visit the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/About_CPS/Policies_and_guidelines/Pages/facilitystandards.aspx.

Condition Rankings and Descriptions

Rank 7: The item/system is new or in good condition and no work is required.

Rank 6: The item/system requires general cleaning and/or routine maintenance.

Rank 5: The item/system requires repairs and has not reached the end of its serviceable life.

Rank 4: The item/system has reached its expected useful life, but is still fully operational. CPS will maintain until replacement occurs.

Rank 3: The item/system has surpassed its expected useful life and has limited operability. CPS will maintain until replacement occurs.

Rank 2: The item/system has surpassed its expected useful life and has low operability. CPS will maintain until replacement occurs.

Rank 1: The item’s/system’s failure leads to an immediate life safety condition for occupants or to the potential of an uninhabitable facility.¹

Total Quantity

Unit

means a basic estimate for each item needing some level of repair or replacement. Cost does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes.

Definitions

means, for each item, the total number (or amount) of that item that exists and was evaluated. Within that Total Quantity, different portions may have different rankings.

means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement “EA” for “each.” Other items, like chimneys, are measured in terms of linear feet (“LF”). Still other items, like flooring, are generally measured in square feet (“SF”).

Cost

For the same reason, the Total Campus Need listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features.

Total Campus Need also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs.

EXTERIOR

CANOPY

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

BLUMetal Canopy SF81 $4,2895 81

$4,289

CHIMNEY

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREBrick Chimney - Concrete/ Mortar Liner LF120 $60,0606 120

GREMetal Flue LF120 $8,9236 121026

$68,983

Assessment Date: 3/11/2013 Page 1 of 23

Page 2: Albert G Lane Technical High Schoolschoolreports.cps.edu/Assessment_PDF_Summary/1440.pdf · 2014-01-15 · Albert G Lane Technical High School 2501 W Addison St Chicago, IL 60618

Albert G Lane Technical High School

2501 W Addison St Chicago, IL 60618

DOORS

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREExterior FRP Door EA8 $07 8

GREExterior Stainless Steel Door EA10 $5,0976 10

BLUExterior Steel Door EA40 $48,3935 17158

BLUExterior Wood Door EA60 $51,5355 512421

GREOverhead Rolling / Garage Door EA15 $18,4836 7521

GREStore Front Door EA2 $07 2

GRETransom Lite EA69 $39,2156 112335

$162,723

ENTRANCE

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREConcrete Exterior Stairs LF289 $24,2396 13314214

GREConcrete Ramp LF280 $07 280

GREEntrance Controls - Audio and Video EA6 $07 6

GREPower Door Operator and Controls EA5 $07 5

GRERamp Handrails LF466 $07 466

GREStair Handrails LF267 $06 24720

GREStone Stairs LF1,125 $228,5146 156748221

$252,753

FOUNDATION

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREConcrete Foundation LF4,888 $07 4,888

$0

LIGHTING

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREExterior Lights - Parapet or Roof Mounted EA5 $07 5

GREExterior Lights - Wall Mounted EA118 $24,3826 17992

$24,382

Assessment Date: 3/11/2013 Page 2 of 23

Page 3: Albert G Lane Technical High Schoolschoolreports.cps.edu/Assessment_PDF_Summary/1440.pdf · 2014-01-15 · Albert G Lane Technical High School 2501 W Addison St Chicago, IL 60618

Albert G Lane Technical High School

2501 W Addison St Chicago, IL 60618

LINTELS

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GRELintels - Brick LF9 $07 9

YELLintels - Concrete LF40 $13,9684 40

YELLintels - Steel LF7,438 $3,216,1964 707,368

YELLintels - Terra Cotta LF2,635 $2,072,4284 2,635

$5,302,592

PARAPET

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

BLUCoping - Metal LF2,608 $47,7325 3805251,703

GRECoping - Terra Cotta LF8,358 $217,9216 7,1581,16040

GREParapet < 16" Height LF3,772 $587,4026 3,772

GREParapet > 30" Height LF1,497 $440,4956 1,130367

GREParapet 16" to 30" Height LF2,580 $555,7096 2,54040

$1,849,259

ROOF SYSTEM

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

BLUAsphalt Gravel Ballast Roof SF170,780 $2,344,6035 157,54413,236

GREExterior Downspouts LF231 $8,1386 1832424

GREInterior Downspouts LF3,487 $15,4446 3,343144

GREMetal Roof SF3,243 $34,8116 2,2431,000

GREModified Bitumen Roof SF29,053 $207,3036 28,953100

GRERoof Structure: Concrete SF2,370 $07 2,370

GRERoof Structure: Steel with Clay Tile Arch SF223,775 $07 223,775

GRESlate Shingle Roof SF22,139 $135,8166 22,139

$2,746,115

SUPERSTRUCTURE

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GRESlab on Grade SF7,630 $07 7,630

Assessment Date: 3/11/2013 Page 3 of 23

Page 4: Albert G Lane Technical High Schoolschoolreports.cps.edu/Assessment_PDF_Summary/1440.pdf · 2014-01-15 · Albert G Lane Technical High School 2501 W Addison St Chicago, IL 60618

Albert G Lane Technical High School

2501 W Addison St Chicago, IL 60618

GRESteel with Clay Tile Arch SF709,000 $07 709,000

$0

WALLS

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREBrick SF216,478 $2,998,3036 149,26357,9509,265

BLUConcrete Block SF1,127 $21,7575 1,127

BLUPrefabricated Metal Panel Wall SF1,338 $37,8215 360768210

GREStone - Cut SF4,919 $125,7406 4,563200156

BLUTerra Cotta SF25,075 $4,414,0605 15,9743,2285,873

$7,597,679

WINDOWS

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

BLUSkylite - Glass Single-Pane SF3,135 $176,2755 1,0261,933176

YELSkylite - Lexan SF216 $46,0734 216

GREStorefront Windows SF160 $07 160

BLUWindow - Guards wire guard SF7,525 $189,8205 7,525

YELWindows - Casement Lexan SF460 $52,9664 460

YELWindows - Casement Steel SF334 $91,4164 334

GREWindows - Decorative SF588 $3,3636 588

YELWindows - Sash Aluminum Double-pane SF93,528 $16,134,0304 12093,408

YELWindows - Sash Lexan SF30 $5,1814 30

$16,699,125

$34,707,900EXTERIOR Total

ELECTRICAL

EMERGENCY SYSTEM

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREAutomatic Transfer switch EA5 $8,8666 41

GREEmergency A/C power - Auditorium and aisle lighting SF23,695 $07 23,695

GREEmergency A/C power - Corridors and Stairs SF89,929 $1,1786 89,546383

Assessment Date: 3/11/2013 Page 4 of 23

Page 5: Albert G Lane Technical High Schoolschoolreports.cps.edu/Assessment_PDF_Summary/1440.pdf · 2014-01-15 · Albert G Lane Technical High School 2501 W Addison St Chicago, IL 60618

Albert G Lane Technical High School

2501 W Addison St Chicago, IL 60618

GREEmergency A/C power - Gym and Lunch rooms SF44,993 $07 44,993

GREEmergency Battery Packs - Lunchroom and Gym EA2 $2156 2

GREEmergency generator 200 -250 KW diesel - Outdoor EA1 $07 1

GREExit Signs - Auditorium EA16 $6996 133

GREExit Signs - Corridors and Stairs EA197 $13,0446 150443

GREExit Signs - Lunchroom - Gym - multipurpose rooms EA37 $2,3316 2710

GREIndependent Electrical Service for emergency power EA2 $5,0056 11

BLUPublic Announcement System SF709,000 $1,013,8705 709,000

$1,045,208

MAIN SERVICE

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREMain Electrical service 1200 A 120/208/3PH EA1 $7,1506 1

GREMain Electrical service 1600 A 120/208/3PH EA1 $9,2956 1

GREMain Electrical service 2000 A 120/208/3PH EA1 $12,1556 1

GREMain Electrical service 2000 to 3000 A 120/208/3PH EA2 $48,6206 2

GREMain Electrical service 800 A and below 120/208/3PH EA1 $3,5756 1

$80,795

POWER DISTRIBUTION

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GRELighting and power panels EA135 $282,5686 503847

GREMain distribution panels 400-600 amp EA13 $60,7756 85

GREMain distribution panels above 600 amp EA4 $18,5906 31

GREMain distribution panels less than 400 amp EA3 $07 3

BLUTransformers 277/480-120/208 EA8 $111,5405 35

$473,473

$1,599,476ELECTRICAL Total

Assessment Date: 3/11/2013 Page 5 of 23

Page 6: Albert G Lane Technical High Schoolschoolreports.cps.edu/Assessment_PDF_Summary/1440.pdf · 2014-01-15 · Albert G Lane Technical High School 2501 W Addison St Chicago, IL 60618

Albert G Lane Technical High School

2501 W Addison St Chicago, IL 60618

FIRE PROTECTION

FIRE ALARM

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREFire Alarm Strobe Lights SF709,000 $07 709,000

GREFire Alarm System SF709,000 $861,7906 709,000

$861,790

$861,790FIRE PROTECTION Total

MECHANICAL

AIR CONDITIONING

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GRECondensing Unit - Roof Mounted 5 to 10 tons EA1 $07 1

GREWindow A/C Unit EA92 $49,3356 39251513

$49,335

AIR HANDLING SYSTEMS

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

BLUAir Handling Unit Package - Multi Zone - Steam less than 6,000 cfm EA1 $15,7305 1

BLUAir Handling Unit Package - Single Zone - Steam 4,000 to 8,000 cfm EA2 $31,4605 2

GREAir Intake - Built Up Air Handling Unit EA10 $27,4566 181

GREAir intake for all Air Handling Units except built up AHU EA3 $8,5806 21

GREFan Coil Unit - Electric EA1 $1,1876 1

BLUMulti Zone Built Up Air Handling Unit - Steam 15,001 to 25,000 cfm EA1 $35,7505 1

BLUMulti Zone Built Up Air Handling Unit - Steam 25,001 to 35,000 cfm EA2 $85,8005 2

GREMulti Zone Built Up Air Handling Unit - Steam 8,000 to 15,000 cfm EA1 $7,5796 1

BLUMulti Zone Built Up Air Handling Unit - Steam above 35,000 cfm EA6 $303,1605 15

BLUMulti Zone Built Up Air Handling Unit Auxiliaries - Steam 15,001 to 25,000 cfm EA1 $12,8705 1

YELMulti Zone Built Up Air Handling Unit Auxiliaries - Steam 25,001 to 35,000 cfm EA2 $57,2004 11

GREMulti Zone Built Up Air Handling Unit Auxiliaries - Steam 8,000 to 15,000 cfm EA1 $07 1

BLUMulti Zone Built Up Air Handling Unit Auxiliaries - Steam above 35,000 cfm EA6 $157,3005 132

GREReheat Boxes With Steam Coils EA64 $66,8106 64

Assessment Date: 3/11/2013 Page 6 of 23

Page 7: Albert G Lane Technical High Schoolschoolreports.cps.edu/Assessment_PDF_Summary/1440.pdf · 2014-01-15 · Albert G Lane Technical High School 2501 W Addison St Chicago, IL 60618

Albert G Lane Technical High School

2501 W Addison St Chicago, IL 60618

GREReturn Duct Work - Indoor - Vertical Shaft and Ducts LF80 $07 80

YELReturn Duct Work - Masonry and Ducts - Existing or Missing Exterior Shaft LF1,000 $2,645,5004 1,000

GRERoof Top Unit - Single Zone - Electric 11 to 20 tons EA1 $4,2906 1

$3,460,672

BOILER SYSTEMS

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREBoiler Assembly - Steam - Flexible Tube Boiler less than 50 HP EA1 $14,3006 1

BLUBoiler Assembly - Steam - High Pressure Scotch Marine Boiler greater than 200 HP EA4 $400,4005 4

BLUBoiler Assembly - Steam - Low Pressure Scotch Marine Boiler 151 - 200 HP EA1 $68,6405 1

BLUBoiler Auxiliary - Steam Boiler 101-150 HP EA1 $11,4405 1

BLUBoiler Auxiliary - Steam Boiler greater than 200 HP EA4 $65,7805 4

GREBoiler Auxiliary - Steam Boiler less than 50 HP EA1 $07 1

GREChemical Feeder - Steam Boiler EA2 $6016 2

GRECombustion Dampers EA3 $8586 3

BLUFeed Water Pumps and Tank - Steam Boilers EA1 $19,3055 1

$581,324

HEAT EXCHANGERS

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

YELHeat Exchanger - Steam to Hot Water Shell Type EA2 $25,8834 11

$25,883

HEATING DEVICES

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

BLUCabinet Heaters With Steam Coils EA9 $16,7315 9

GREFin Tube Electric LF40 $07 40

GREFin Tube Hot Water LF138 $2,0086 75576

GRERadiators - Steam EA233 $41,9056 218132

GREUnit Heater - Gas EA2 $2,1456 11

GREUnit Heater - Hot Water EA2 $2,8606 2

GREWall Heater - Electric EA30 $7,0016 12882

$72,650

Assessment Date: 3/11/2013 Page 7 of 23

Page 8: Albert G Lane Technical High Schoolschoolreports.cps.edu/Assessment_PDF_Summary/1440.pdf · 2014-01-15 · Albert G Lane Technical High School 2501 W Addison St Chicago, IL 60618

Albert G Lane Technical High School

2501 W Addison St Chicago, IL 60618

MECHANICAL PLUMBING

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GRECondensate Assembly - Pumps and Tank EA10 $31,1746 343

YELPiping - Condensate - Steel or Galvanized LF3,000 $293,8654 3,000

BLUPiping - Steam - Steel or Galvanized LF3,000 $148,4345 3,000

$473,473

TEMPERATURE CONTROL

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

BLUPneumatic System SF709,000 $3,041,6105 709,000

GREThermostats - Pneumatic EA225 $37,3236 21510

GREZone Dampers EA279 $39,8976 279

$3,118,830

UNIT VENTILATION

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

BLUUnit Ventilators - Self Contained Electric Heating and Cooling EA6 $51,4805 6

$51,480

VENTILATION

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

YELExhaust Fan - Indoor EA38 $191,9784 14294

GREExhaust Fans - Roof Mounted 1,501 to 8,000 cfm EA4 $4,5056 13

BLUExhaust Fans - Roof Mounted 500 to 1,500 cfm EA9 $9,4675 27

BLUExhaust Fans - Roof mounted less than 500 CFM EA7 $7,7515 61

YELLab Exhaust Hood EA5 $131,5604 113

GREType I Exhaust Hood - Kitchen or Culinary Arts EA3 $5,1486 3

$350,407

$8,184,053MECHANICAL Total

Assessment Date: 3/11/2013 Page 8 of 23

Page 9: Albert G Lane Technical High Schoolschoolreports.cps.edu/Assessment_PDF_Summary/1440.pdf · 2014-01-15 · Albert G Lane Technical High School 2501 W Addison St Chicago, IL 60618

Albert G Lane Technical High School

2501 W Addison St Chicago, IL 60618

PLUMBING

HOT WATER

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREHot Water Heater - Electric less than 50 KW EA1 $1,4016 1

GREStorage Tank more than 500 gallons EA1 $7,4366 1

$8,837

PIPING

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREDomestic Piping - Cold Water from Risers to Fixtures SF716,630 $1,3096 709,0007,630

YELDomestic Piping - Cold Water Risers SF716,630 $458,7514 7,630709,000

GREDomestic Piping - Hot Water from Riser to fixtures SF716,630 $8,7296 709,0007,630

YELDomestic Piping - Hot Water Return Risers SF716,630 $326,0754 7,630709,000

YELDomestic Piping - Hot Water Risers SF716,630 $387,2354 7,630709,000

YELDomestic Piping Cold Water Horizontal lines SF716,630 $1,699,9284 7,630709,000

YELDomestic Piping Hot Water Horizontal lines SF716,630 $1,403,1784 7,630709,000

YELDomestic Piping Hot Water Return Lines SF716,630 $815,2424 7,630709,000

BLUSanitary Piping SF716,630 $439,0195 7,630709,000

BLUStorm Piping SF716,630 $340,0335 709,0007,630

BLUVent Piping SF716,630 $254,6685 7,630709,000

$6,134,165

POOL SYSTEMS

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREPool Drain Piping LF60 $07 60

GREPool Filtration System EA1 $27,8856 1

GREPool Hot Water Heater - Gas Fired EA1 $3,7186 1

GREPool Supply and Return Piping LF610 $07 610

$31,603

Assessment Date: 3/11/2013 Page 9 of 23

Page 10: Albert G Lane Technical High Schoolschoolreports.cps.edu/Assessment_PDF_Summary/1440.pdf · 2014-01-15 · Albert G Lane Technical High School 2501 W Addison St Chicago, IL 60618

Albert G Lane Technical High School

2501 W Addison St Chicago, IL 60618

PUMPS

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREDomestic Booster Pump simplex EA2 $3,4326 2

GREEjector Pump EA2 $07 2

BLUSump Pump EA10 $36,3225 46

$39,754

$6,214,360PLUMBING Total

INTERIOR

ADMINISTRATIVE SUITES

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GRECeiling - Exposed SF1,140 $5956 825315

GRECeiling - Lay-In SF2,333 $1726 2,25380

GRECeiling - Plaster/Drywall SF23,181 $35,9286 12,3548,9651,862

GRECeiling - Splined SF5,190 $9,0416 9754,215

GREFlooring - Carpet SF9,493 $10,5966 3,6064,8721,015

GREFlooring - Terrazzo SF356 $07 356

GREFlooring - Tile Ceramic/Porcelain SF207 $5276 207

GREFlooring - Tile/Sheet SF8,371 $24,2956 2,5213,6541,415781

GREFlooring - Wood SF12,494 $76,0136 4,6995,1982,597

GRELighting - Lay-In SF30 $16 282

GRELighting - Pendant/Surface SF473 $3616 3379145

GRELighting - Wall Mounted EA186 $07 186

GREWalls - Concrete Block SF1,468 $4,7366 614365489

GREWalls - Plaster/Drywall SF46,384 $96,0916 7,08637,8711,427

GREWalls - Structural Glazed Tile SF11,633 $53,1756 4,1967,437

$311,529

AUDITORIUM - DEDICATED

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

BLUBalcony Seating EA902 $109,5615 902

Assessment Date: 3/11/2013 Page 10 of 23

Page 11: Albert G Lane Technical High Schoolschoolreports.cps.edu/Assessment_PDF_Summary/1440.pdf · 2014-01-15 · Albert G Lane Technical High School 2501 W Addison St Chicago, IL 60618

Albert G Lane Technical High School

2501 W Addison St Chicago, IL 60618

GREChandelier - Incandescent EA18 $5,7926 18

GREMain Floor Seating EA1,201 $07 1,201

GRESound System EA1 $35,7506 1

BLUStage Curtains EA9 $05 9

GREStage Lighting System EA1 $07 1

$151,102

CHORAL ROOM

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GRERisers LF90 $07 90

$0

CORRIDOR

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREStair Handrails LF770 $06 770

GREStairs - Asphalt LF595 $4,2546 595

GREStairs - Terrazzo LF34 $3856 34

GREStairs - Wood LF44 $8186 44

$5,457

DOORS

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREInterior Steel Doors incl hw EA209 $60,1206 618914

GREInterior Wood Doors incl hw EA760 $315,2296 16934421037

GRESide-lite SF435 $8,0876 435

GRETransom Window SF4,320 $80,3096 4,320

$463,745

DRINKING FOUNTAINS

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GRESingle Fountain EA43 $30,1166 25315

$30,116

Assessment Date: 3/11/2013 Page 11 of 23

Page 12: Albert G Lane Technical High Schoolschoolreports.cps.edu/Assessment_PDF_Summary/1440.pdf · 2014-01-15 · Albert G Lane Technical High School 2501 W Addison St Chicago, IL 60618

Albert G Lane Technical High School

2501 W Addison St Chicago, IL 60618

GYMNASIUM - STANDARD DEDICATED

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREScoreboards EA1 $07 1

$0

GYMNASIUM / AUDITORIUM

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREBleacher Seating EA1,029 $24,8686 1,029

GRECeiling - Plaster/Drywall SF28,587 $244,6346 28,467120

GREFlooring - Tile/Sheet SF4,765 $6,8146 4,765

GREFlooring - Wood SF13,310 $38,5076 8,2105,100

GRELighting - Metal Halide/Sodium Vapor EA73 $13,0496 73

GRELighting - Pendant/Surface EA48 $5,8346 48

GREScoreboards EA3 $6,2296 3

GRESound System EA2 $10,0106 2

BLUWalls - Plaster/Drywall SF1,235 $17,6615 1,235

GREWalls - Structural Glazed Tile SF24,305 $412,8206 18,3355,970

$780,425

KITCHEN

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GRECeiling - Plaster/Drywall SF2,600 $9,8166 2,600

BLUFlooring - Tile/Sheet SF2,600 $18,1215 2,200400

GRELighting - Pendant/Surface SF27 $396 216

GREWall - Plaster/Drywall SF870 $2,0536 870

GREWall - Structural Glazed Tile SF4,320 $30,8886 4,320

$60,917

LIBRARY

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GRECasework LF402 $12,3316 402

GRECeiling - Splined SF4,212 $07 4,212

Assessment Date: 3/11/2013 Page 12 of 23

Page 13: Albert G Lane Technical High Schoolschoolreports.cps.edu/Assessment_PDF_Summary/1440.pdf · 2014-01-15 · Albert G Lane Technical High School 2501 W Addison St Chicago, IL 60618

Albert G Lane Technical High School

2501 W Addison St Chicago, IL 60618

GREFlooring Tile/ Sheet SF5,265 $7,5296 5,265

GRELighting - Pendant/ Surface SF24 $176 24

$19,877

LOCKER/SHOWER ROOM

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREBenches LF479 $2,8776 4781

GRELockers EA1,755 $132,5496 271,60816104

GREShowers EA99 $41,5706 2266110

$176,996

LUNCHROOM

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

BLUCeiling - Exposed SF3,256 $6,1465 2163,040

GRECeiling - Lay-In SF16,406 $35,1916 16,406

GRECeiling - Plaster/Drywall SF9,505 $29,1696 1,8564,9962,653

GRECeiling - Splined SF682 $1,4636 682

GREFlooring - Tile/Sheet SF22,748 $45,3976 19,7083,040

GRELighting - Lay-In SF62 $07 62

GRELighting - Pendant/Surface SF130 $2596 633136

GREServing Line LF250 $07 250

GREWall - Concrete Block SF830 $1,7766 209621

BLUWall - Plaster/Drywall SF18,227 $66,1985 2117,97610,040

GREWall - Structural Glazed Tile SF6,848 $22,4516 3,7083,140

$208,050

MDF/IDF

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREFinishes SF325 $1,1066 325

GREVentilation and Cooling EA1 $1,4016 1

$2,508

Assessment Date: 3/11/2013 Page 13 of 23

Page 14: Albert G Lane Technical High Schoolschoolreports.cps.edu/Assessment_PDF_Summary/1440.pdf · 2014-01-15 · Albert G Lane Technical High School 2501 W Addison St Chicago, IL 60618

Albert G Lane Technical High School

2501 W Addison St Chicago, IL 60618

MECHANICAL/SERVICE ROOMS

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREJanitor's Closet SF10 $476 10

GREMechanical/Service Rooms SF5,888 $38,2146 1,9908983,000

GREStorage Room SF17,747 $57,4596 5,57112,176

$95,720

PHYSICAL EDUCATION ROOMS

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

BLUWall Mirrors SF36 $4265 36

$426

STAFF RESTROOM

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREAccessories SF19,816 $30,8076 16,5972,884335

GRECeiling - Lay-In SF7,252 $10,4356 3,7232,929400200

GRECeiling - Plaster/Drywall SF21,552 $58,6626 3,94915,7331,403467

GREFloor Drain EA72 $12,9136 49185

GREFlooring - Concrete SF4,683 $22,0996 4,683

GREFlooring - Tile Ceramic/Porcelain SF17,127 $64,5146 8,6345,4642,837192

BLUFlooring - Tile/Sheet SF5,786 $24,5275 4241,3793,983

GREHand Dryer EA61 $9,2476 50623

GRELavatory EA110 $34,9496 682913

YELLighting - Lay-In SF864 $2,7854 815778

GRELighting - Pendant/ Surface SF285 $1326 2263425

GRELighting - Wall Mounted EA4 $6446 22

GREPartitions EA216 $43,4436 8297334

GREUrinals EA151 $20,4496 14011

GREWall - Concrete Block SF4,633 $1,8306 3,993640

GREWall - Plaster/Drywall SF27,606 $65,5406 2,97221,4913,143

GREWall - Structural Glazed Tile SF24,609 $99,7936 10,65213,957

GREWall - Tile Ceramic/ Porcelain SF4,118 $29,8286 1202,7461,048204

Assessment Date: 3/11/2013 Page 14 of 23

Page 15: Albert G Lane Technical High Schoolschoolreports.cps.edu/Assessment_PDF_Summary/1440.pdf · 2014-01-15 · Albert G Lane Technical High School 2501 W Addison St Chicago, IL 60618

Albert G Lane Technical High School

2501 W Addison St Chicago, IL 60618

GREWater Closet EA210 $40,5266 17519142

$573,123

SWIMMING POOL

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREAccessories SF7,530 $07 7,530

GREBleacher Seating/Plank seating EA146 $2,0676 146

GREFloor Tile SF7,530 $25,6286 7,530

GRELighting - Pendant/ Surface SF61 $656 4021

GREPool Basin SF3,000 $07 3,000

GREPool Deck SF3,383 $22,3506 3,383

GREPool deck drains EA8 $07 8

GRESplined Ceiling including access SF7,530 $80,7596 7,530

GREWall Tile SF5,784 $07 5,784

$130,868

THEATER

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GRECeiling - Exposed SF2,410 $07 2,410

GRECeiling - Plaster/Drywall SF9,885 $07 9,885

GRECeiling - Splined SF11,704 $92,0526 11,704

GREFlooring - Concrete SF12,978 $61,2436 12,978

GREFlooring - Tile/Sheet SF3,685 $5,2706 3,685

GREFlooring - Wood SF3,473 $29,1296 3,033440

GRELighting - Chandelier, Incandescent EA4 $1,2876 4

GRELighting - Pendant/ Surface SF49 $1136 3982

GRELighting - Wall Mounted EA15 $07 15

GREStage SF2,790 $11,8496 2,790

GREWall - Plaster/Drywall SF22,078 $189,4296 22,078

$390,373

Assessment Date: 3/11/2013 Page 15 of 23

Page 16: Albert G Lane Technical High Schoolschoolreports.cps.edu/Assessment_PDF_Summary/1440.pdf · 2014-01-15 · Albert G Lane Technical High School 2501 W Addison St Chicago, IL 60618

Albert G Lane Technical High School

2501 W Addison St Chicago, IL 60618

VERTICAL CONVEYANCE

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREElevator - Roped Holeless Hydraulic EA1 $17,1606 1

GREElevator - Traction EA2 $42,9006 2

GREStage Lift EA1 $07 1

$60,060

VOCATIONAL SHOP

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREWork Sink EA131 $96,1396 148433

$96,139

$3,557,431INTERIOR Total

ROOM

ADMIN_FLOOR

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREAdministrative Office Floor SF416 $5956 416

$595

ADMIN_LIGHT

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREAdministrative Office Lighting EA8 $07 8

$0

ADMIN_WALL

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREAdministrative Office Walls SF5,768 $6,7176 2,9212,847

$6,717

Assessment Date: 3/11/2013 Page 16 of 23

Page 17: Albert G Lane Technical High Schoolschoolreports.cps.edu/Assessment_PDF_Summary/1440.pdf · 2014-01-15 · Albert G Lane Technical High School 2501 W Addison St Chicago, IL 60618

Albert G Lane Technical High School

2501 W Addison St Chicago, IL 60618

CASEWORK

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GRECasework LF5,878 $258,1156 3265,135417

$258,115

CEILING

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GRECeiling SF840 $2,3786 840

GREExposed Ceiling SF3,439 $2,4586 2,1371,302

GRELay-In/Drop SF13,120 $20,8926 3,5779,423120

GREPlaster/Drywall SF156,765 $307,2896 52,400100,2014,164

GRESplined Ceiling SF9,411 $13,1446 4,4694,219723

$346,161

CHALK BOARD

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

YELChalk Board LF2,856 $344,7164 202,836

$344,716

CLASSROOM

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREScience Lab Elements SF192 $4,3936 192

$4,393

CORRIDORS

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREConcrete Block SF1,242 $3,5526 1,242

GREConcrete Epoxy/Painted SF1,072 $5,0596 1,072

GREDrop/Lay-In SF943 $2,0236 943

GREExposed SF140 $07 140

GREFloors SF4,322 $07 4,322

GRELay-In EA945 $2866 5603832

Assessment Date: 3/11/2013 Page 17 of 23

Page 18: Albert G Lane Technical High Schoolschoolreports.cps.edu/Assessment_PDF_Summary/1440.pdf · 2014-01-15 · Albert G Lane Technical High School 2501 W Addison St Chicago, IL 60618

Albert G Lane Technical High School

2501 W Addison St Chicago, IL 60618

GRELighting EA29 $2,6966 29

GREPendant/Surface EA81,696 $2,2046 80,3608424922

GREPlaster/Drywall SF95,778 $226,0266 3,00389,7563,019

GRESingle Water Cooler EA10 $4,3046 721

GREStair Handrails LF2,146 $06 1,915231

GREStructural Glazed Tile SF91,289 $734,5306 20089,0102,079

GREStudent Lockers EA3,539 $6,8646 3,49148

GRETerrazzo SF38,040 $81,0406 23,72914,311

GRETile/Sheet Flooring SF62,466 $39,0986 35,12527,341

GREWalls SF11,563 $16,4766 4,9386,267358

$1,124,158

CORRIDORS CEILING

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREPlaster/Drywall SF105,476 $298,1446 6,85991,9356,682

$298,144

FLOOR

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GRECarpet SF7,014 $10,5516 1,8263,7281,460

GREConcrete SF8,368 $23,9256 3,2981,6583,412

GREFloor SF1,926 $5,1616 7231,203

GRETile/Sheet SF50,957 $178,3546 9,80317,61721,1972,340

GREWood SF113,903 $910,2736 14,52775,25924,06750

$1,128,264

GYM_FLOOR

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREGymnasia Floor SF10,512 $97,4116 8,3882,124

$97,411

Assessment Date: 3/11/2013 Page 18 of 23

Page 19: Albert G Lane Technical High Schoolschoolreports.cps.edu/Assessment_PDF_Summary/1440.pdf · 2014-01-15 · Albert G Lane Technical High School 2501 W Addison St Chicago, IL 60618

Albert G Lane Technical High School

2501 W Addison St Chicago, IL 60618

GYM_WALL

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREGymnasia Walls SF300 $2,5746 300

$2,574

LIBRARY_CEILING

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREPlaster/Drywall SF1,053 $07 1,053

$0

LIBRARY_WALL

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREPlaster/Drywall 5,245 $12,3766 5,245

$12,376

LIGHTING

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GRELay-In EA96 $7,0796 45348

GRELighting EA15 $07 15

GREPendant/Surface EA3,219 $62,2056 2,64650766

$69,284

LUNCH_FLOOR

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GRELunchroom Floor SF5,737 $17,7636 1,1681,9162,653

$17,763

LUNCH_WALL

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GRELunchroom Walls SF7,526 $16,8546 1,6335,893

$16,854

Assessment Date: 3/11/2013 Page 19 of 23

Page 20: Albert G Lane Technical High Schoolschoolreports.cps.edu/Assessment_PDF_Summary/1440.pdf · 2014-01-15 · Albert G Lane Technical High School 2501 W Addison St Chicago, IL 60618

Albert G Lane Technical High School

2501 W Addison St Chicago, IL 60618

MARKER BOARD

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREMarker Board LF1,640 $3,8326 1,5347828

$3,832

RESTROOM_FLOOR

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GRERestroom Floor SF1,208 $1,8286 490718

$1,828

RESTROOM_WALL

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GRERestroom Walls SF4,404 $4,8116 2,8661,47068

$4,811

STAIRS

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GRETerrazzo SF1,131 $12,8096 1,131

$12,809

THEATER_FLOOR

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREAuditorium Floor SF3,559 $07 3,559

$0

THEATER_WALL

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREAuditorium Walls SF15,462 $25,1106 3,35212,110

$25,110

Assessment Date: 3/11/2013 Page 20 of 23

Page 21: Albert G Lane Technical High Schoolschoolreports.cps.edu/Assessment_PDF_Summary/1440.pdf · 2014-01-15 · Albert G Lane Technical High School 2501 W Addison St Chicago, IL 60618

Albert G Lane Technical High School

2501 W Addison St Chicago, IL 60618

WALL

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

BLUConcrete Block SF4,441 $24,2025 1,9892,452

GREMetal/Folding Panel SF5,688 $12,3576 4515,237

GREPlaster/Drywall SF182,983 $428,5686 4,782174,7673,434

GREStructural Glazed Tile SF46,373 $281,4606 7,00839,365

$746,586

$4,522,501ROOM Total

SITE

CIVIL/DRAINAGE

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GRECatch Basin EA17 $24,5826 1313

GRESite Manhole EA34 $1,2166 331

$25,797

FENCING

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

YELChain Link LF1,085 $94,9164 300785

GREOrnamental Iron LF700 $07 700

$94,916

LANDSCAPE

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREAsphalt Play Area/Hardscape SF15,000 $30,8886 6,0006,0003,000

GREBenches EA23 $18,8766 158

GREHardscape - Concrete SF88,900 $294,3916 81,3002007,400

GREHardscape - Pavers SF4,740 $07 4,740

GREIrrigation SF365,950 $07 365,950

GREParkway trees EA21 $2,4546 201

GREPlanting Beds/ Areas SF14,000 $07 14,000

Assessment Date: 3/11/2013 Page 21 of 23

Page 22: Albert G Lane Technical High Schoolschoolreports.cps.edu/Assessment_PDF_Summary/1440.pdf · 2014-01-15 · Albert G Lane Technical High School 2501 W Addison St Chicago, IL 60618

Albert G Lane Technical High School

2501 W Addison St Chicago, IL 60618

GRERetaining Wall - Concrete SF9,880 $379,8806 2,0604,2203,600

GRERetaining Wall - Masonry SF400 $5,6636 400

GRETrash Receptacles EA36 $9,8676 306

$742,018

PARKING LOT

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREAsphalt SF248,280 $349,7936 225,0007,48015,800

GREConcrete SF11,235 $06 11,235

GRETrash Compactor EA1 $07 1

GRETrash Enclosure SF1,435 $07 1,435

GREVehicular Screening LF1,800 $07 1,800

$349,793

SIDEWALKS

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREInternal Walks LF460 $2,8316 43030

GREPerimeter Sidewalks SF27,000 $18,8766 26,0001,000

$21,707

SIGNAGE

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREFlag Pole EA1 $07 1

GREMarquee - Free Standing Back Lighted w/ LED EA1 $07 1

$0

$1,234,232SITE Total

Assessment Date: 3/11/2013 Page 22 of 23

Page 23: Albert G Lane Technical High Schoolschoolreports.cps.edu/Assessment_PDF_Summary/1440.pdf · 2014-01-15 · Albert G Lane Technical High School 2501 W Addison St Chicago, IL 60618

Albert G Lane Technical High School

2501 W Addison St Chicago, IL 60618

$60,881,743Total Campus Need ² ³

² As stated above, Total Assessed Campus Need does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Total Assessed Campus Need includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost.

³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below.

¹ It is very rare for an assessor to find a feature in this condition. If they do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked “1” in summary reports; by the time the report is compiled, they have been resolved.

Assessment Date: 3/11/2013 Page 23 of 23