Route CR-18 ProjectDescription
RESURFACING AND TRAFFIC STRIPE ON CR-18 (SNOWDOUN CHAMBERS ROAD) FROM CR-61 (HOBBIE ROAD) TO CR-39 (WOODLEY ROAD)
Type of Work RESURFACING
Project Length in Miles 5.380 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067620 STPMN 5118 () PRELIMINARY ENGINEERING
RESURFACING
2019 $4 $1 $5
100067621 STPMN 5118 () CONSTRUCTION
RESURFACING
2019 $751 $188 $939
TOTAL COST: $755 $189 $944
12/2/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
1 of 28
HIGHWAY PROJECTS - MONTGOMERY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-2120 ProjectDescription
RESURFACING AND TRAFFIC STRIPE ON CR-2120 (ALABAMA RIVER PARKWAY) FROM JACKSON FERRY ROAD TO THE MONTGOMERY CITY LIMITS
Type of Work RESURFACING
Project Length in Miles 1.890 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067622 STPMN 5118 () PRELIMINARY ENGINEERING
RESURFACING
2020 $4 $1 $5
TOTAL COST: $4 $1 $5
Route CR-2120 ProjectDescription
RESURFACING AND TRAFFIC STRIPE ON CR-2120 (ALABAMA RIVER PARKWAY) FROM JACKSON FERRY ROAD TO THE MONTGOMERY CITY LIMITS
Type of Work RESURFACING
Project Length in Miles 1.890 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067623 STPMN 5118 () CONSTRUCTION
RESURFACING
2020 $446 $111 $557
TOTAL COST: $446 $111 $557
12/2/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
2 of 28
HIGHWAY PROJECTS - MONTGOMERY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-234 ProjectDescription
RESURFACE AND WIDEN RYAN ROAD (CR-234) FROM VAUGHN ROAD TO CHANTILLY PARKWAY
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 0.820 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064673 STPMN 5115 () PRELIMINARY ENGINEERING
WIDENING AND RESURFACING (RDWY)
2020 $286 $71 $357
100064674 STPMN 5115 () RIGHT OF WAY
WIDENING AND RESURFACING (RDWY)
2021 $170 $42 $212
100064675 STPMN 5115 () CONSTRUCTION
WIDENING AND RESURFACING (RDWY)
2022 $2,400 $600 $3,000
TOTAL COST: $2,855 $714 $3,569
Route CR-236 ProjectDescription
RESURFACE, CURB AND GUTTER, INLET CONVERSION, TRAFFIC STRIPING AND SIDEWALKS ON FEDERAL DRIVE FROM ATLANTA HIGHWAY TO CSX RAILROAD CROSSING.
Type of Work RESURFACING
Project Length in Miles 2.130 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059831 STPMN 5116 () CONSTRUCTION
RESURFACING
2020 $2,400 $600 $3,000
TOTAL COST: $2,400 $600 $3,000
12/2/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
3 of 28
HIGHWAY PROJECTS - MONTGOMERY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-24 ProjectDescription
RESURFACE CR-24 (CLOVERFIELD/FEDERAL ROAD) FROM THE LOWNDES COUNTY LINE TO SR-3 (US-31) - MCP 51-82-17
Type of Work RESURFACING
Project Length in Miles 2.960 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067616 STPAA 5117 (252) CONSTRUCTION
RESURFACING
2019 $572 $143 $715
TOTAL COST: $572 $143 $715
Route CR-33 ProjectDescription
BRIDGE REPLACEMENT ON CR-33 (NARROW LANE ROAD) AT HANNON SLOUGH (BIN # 003250 AND # 003249)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060092 STPMN 7702 (601) RIGHT OF WAY
BRIDGE REPLACEMENT
2020 $60 $15 $75
100060091 STPMN 7702 (601) UTILITIES
BRIDGE REPLACEMENT
2020 $160 $40 $200
100055807 STPMN 7702 () CONSTRUCTION
BRIDGE REPLACEMENT
2020 $1,600 $400 $2,000
TOTAL COST: $1,820 $455 $2,275
12/2/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
4 of 28
HIGHWAY PROJECTS - MONTGOMERY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-39 ProjectDescription
BRIDGE REPLACEMENT ON CR-39 (WOODLEY ROAD)ATWHITES SLOUGH AND TRIBUTARY (BIN # 003047 AND 003048)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060096 STPAA 7701 (602) RIGHT OF WAY
BRIDGE REPLACEMENT
2019 $60 $15 $75
100060095 STPMN 7701 (602) UTILITIES
BRIDGE REPLACEMENT
2020 $160 $40 $200
100055809 STPMN 7701 (602) CONSTRUCTION
BRIDGE REPLACEMENT
2021 $2,340 $585 $2,925
TOTAL COST: $2,560 $640 $3,200
12/2/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
5 of 28
HIGHWAY PROJECTS - MONTGOMERY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-42 ProjectDescription
RESURFACE AND TRAFFIC STRIPE HYUNDAI BOULEVARD (CR-42) FROM SR-3 (US-31) TO SR-9 (US-331) TO INCLUDE AN AT-GRADE RAILROAD CROSSING WITH CSX TRANSPORTATION
Type of Work RESURFACING
Project Length in Miles 2.700 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064378 STPMN 5118 (251) CONSTRUCTION
RESURFACING
2019 $1,279 $320 $1,599
TOTAL COST: $1,279 $320 $1,599
Route CR-42 ProjectDescription
RESURFACING AND TRAFFIC STRIPE ON HYUNDAI BOULEVARD (CR-42) FROM SR-3 (US-31) TO SR-9 (US-331)
Type of Work RESURFACING
Project Length in Miles 2.737 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064377 STPMN 5118 () PRELIMINARY ENGINEERING
RESURFACING
2019 $4 $1 $5
TOTAL COST: $4 $1 $5
12/2/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
6 of 28
HIGHWAY PROJECTS - MONTGOMERY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-43 ProjectDescription
WIDEN, RESURFACE AND ADD TURN LANES CR-43(BELL RD) FROM NORTH END I-85 BRIDGE TO SR-8 (US-80, ATLANTA HWY), TURN LANESATBELL GABLES, BELL ROAD MANOR, BELL ROAD COURT, OLIVER DRIVE AND HENLEY WAY
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 1.400 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100044515 STPMN 7707 () CONSTRUCTION
WIDENING AND RESURFACING (RDWY)
2020 $888 $222 $1,110
TOTAL COST: $888 $222 $1,110
Route CR-54 ProjectDescription
RESURFACING ON CR-54 (HUNTER LOOP ROAD) FROM OLD SELMA ROAD TO SR-3 (US-31)
Type of Work RESURFACING
Project Length in Miles 3.700 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067638 STPMN 5118 () PRELIMINARY ENGINEERING
RESURFACING
2019 $64 $16 $80
100067639 STPMN 5118 () CONSTRUCTION
RESURFACING
2022 $2,800 $700 $3,500
TOTAL COST: $2,864 $716 $3,580
12/2/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
7 of 28
HIGHWAY PROJECTS - MONTGOMERY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-74 ProjectDescription
RESURFACING AND TRAFFIC STRIPE ON ANDERSON ROAD/LOWER WETUMPKA ROAD (CR-74) FROM ALABAMA RIVER PARKWAY TO SR-9 (US-231) - MCP 51-83-17
Type of Work RESURFACING
Project Length in Miles 5.230 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064380 STPAA 5117 (253) CONSTRUCTION
RESURFACING
2019 $1,006 $252 $1,258
TOTAL COST: $1,006 $252 $1,258
Route CR-NA ProjectDescription
WIDEN AND RESURFACE ATLANTA HIGHWAY FROM MOUNTAINVIEW DRIVE TO SR-9 (US-231:EAST BLVD)
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 0.400 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100040822 STPMN 7771 () CONSTRUCTION
WIDENING AND RESURFACING (RDWY)
2020 $692 $173 $865
TOTAL COST: $692 $173 $865
12/2/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
8 of 28
HIGHWAY PROJECTS - MONTGOMERY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
WIDEN AND RESURFACE PERRY HILL ROAD FROM HARRISON ROAD TO CR-235 (ATLANTA HIGHWAY)
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 1.710 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100044273 STPMN 7724 () RIGHT OF WAY
WIDENING AND RESURFACING (RDWY)
2019 $1,052 $263 $1,315
100044272 STPMN 7724 () UTILITIES
WIDENING AND RESURFACING (RDWY)
2020 $1,642 $411 $2,053
100007740 STPMN 7724 () CONSTRUCTION
WIDENING AND RESURFACING (RDWY)
2020 $4,737 $1,184 $5,921
TOTAL COST: $7,431 $1,858 $9,289
Route CR-NA ProjectDescription
INTERSECTION IMPROVEMENTS AT PERRY HILL ROAD AND ATLANTA HIGHWAY
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064161 STPMN 5115 () RIGHT OF WAY
INTERSECTION IMPROVEMENTS
2019 $800 $200 $1,000
100064162 STPMN 5115 () CONSTRUCTION
INTERSECTION IMPROVEMENTS
2020 $5,600 $1,400 $7,000
TOTAL COST: $6,400 $1,600 $8,000
12/2/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
9 of 28
HIGHWAY PROJECTS - MONTGOMERY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
WIDEN AND RESURFACE ANN STREET FROM HIGHLAND AVENUE TO BREWTON STREET (PHASE2)
Type of Work GRADE, DRAIN, BASE AND PAVE
Project Length in Miles 0.450 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100053061 STPAA 7733 (602) RIGHT OF WAY
GRADE, DRAIN, BASE AND PAVE
2019 $973 $243 $1,217
100045392 STPMN 7733 () CONSTRUCTION
WIDENING AND RESURFACING (RDWY)
2020 $1,474 $368 $1,842
100053059 STPAA 7733 (601) CONSTRUCTION
GRADE, DRAIN, BASE AND PAVE
2021 $1,898 $474 $2,372
TOTAL COST: $4,345 $1,086 $5,431
Route CR-NA ProjectDescription
RESURFACE AND SIDEWALK BEAUTIFICATION SOUTH COURT STREET FROM CR-233 (FAIRVIEW AVENUE) TO SR-6 (US-331,SOUTH BOULEVARD)
Type of Work RESURFACING
Project Length in Miles 1.720 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100054277 STPAA 7729 (600) CONSTRUCTION
RESURFACING
2019 $3,200 $800 $4,000
TOTAL COST: $3,200 $800 $4,000
12/2/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
10 of 28
HIGHWAY PROJECTS - MONTGOMERY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
RESURFACE ADAMS AVE FROM CR-232 (DECATUR STREET) TO SOUTH COURT STREET, AND WASHINGTON AVE FROM CR-232 (DECATUR STREET) TO SOUTH COURTATLEE STREET
Type of Work RESURFACING
Project Length in Miles 0.700 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100054280 STPMN CN10 () CONSTRUCTION
RESURFACING
2020 $1,316 $329 $1,645
TOTAL COST: $1,316 $329 $1,645
Route CR-NA ProjectDescription
RESURFACE SOUTH PERRY STREET FROM CR-233 (FAIRVIEW AVENUE) TO ARBA STREET
Type of Work RESURFACING
Project Length in Miles 1.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100054282 STPMN 7716 () CONSTRUCTION
RESURFACING
2020 $1,125 $281 $1,406
TOTAL COST: $1,125 $281 $1,406
12/2/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
11 of 28
HIGHWAY PROJECTS - MONTGOMERY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
DRAINAGE, WIDENING, RESURFACING, SIGNALS AND LANDSCAPING FAIRVIEW AVENUE (CR-233) FROM I-65 TO SOUTH COURT STREET
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 0.810 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100054285 STPMN 7730 (600) CONSTRUCTION
WIDENING AND RESURFACING (RDWY)
2020 $3,360 $840 $4,200
TOTAL COST: $3,360 $840 $4,200
Route CR-NA ProjectDescription
BRIDGE PAINTING ON AIRBASE BOULEVARD (BIN#011513, #011514), MAXWELL AFB ENTRANCE (#006013), UPPER WETUMPKA ROAD (#008715 AND 008716), MADISON AVENUE (#011480)
Type of Work BRIDGE PAINTING
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060098 STPMN 5113 () CONSTRUCTION
BRIDGE PAINTING
2020 $200 $50 $250
TOTAL COST: $200 $50 $250
12/2/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
12 of 28
HIGHWAY PROJECTS - MONTGOMERY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
WIDEN AND RESURFACE ZELDA ROAD FROM ANN STREET TO CARTER HILL ROAD
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 1.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100040817 STPMN 5116 () CONSTRUCTION
WIDENING AND RESURFACING (RDWY)
2020 $1,248 $312 $1,560
TOTAL COST: $1,248 $312 $1,560
Route CR-NA ProjectDescription
WIDEN AND RESURFACE ZELDA ROAD FROM ANN STREET TO CARTER HILL ROAD
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 1.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064606 STPAA 5116 (250) RIGHT OF WAY
WIDENING AND RESURFACING (RDWY)
2019 $200 $50 $250
100064607 STPMN 5116 (250) UTILITIES
WIDENING AND RESURFACING (RDWY)
2020 $40 $10 $50
TOTAL COST: $240 $60 $300
12/2/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
13 of 28
HIGHWAY PROJECTS - MONTGOMERY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
RESURFACE, CURB AND GUTTER, INLET CONVERSION, STRIPING, SIDEWALKS AND CONVERSION FROM 4 LANE TO 3 LANE WITH PEDESTRIAN FACILITIES ON FAIRVIEW FROM SOUTH COURT STREET TO NARROW LANE ROAD
Type of Work RESURFACING
Project Length in Miles 1.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059726 STPMN 5115 (251) UTILITIES
RESURFACING
2020 $80 $20 $100
100063695 STPMN 5115 () CONSTRUCTION
RESURFACING
2020 $3,200 $800 $4,000
TOTAL COST: $3,280 $820 $4,100
Route CR-NA ProjectDescription
RESURFACE AND OPERATIONAL IMPROVEMENTS ON PERRY STREET FROM NOBLE AVE. TO HIGH ST.
Type of Work RESURFACING
Project Length in Miles 0.600 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063696 STPMN 5115 () PRELIMINARY ENGINEERING
RESURFACING
2020 $87 $22 $108
100063697 STPMN 5115 () CONSTRUCTION
RESURFACING
2021 $997 $249 $1,247
TOTAL COST: $1,084 $271 $1,355
12/2/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
14 of 28
HIGHWAY PROJECTS - MONTGOMERY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
RESURFACE AND OPERATIONAL IMPROVEMENTS ON PERRY STREET FROM JEFFERSON ST. TO POLLARD ST.
Type of Work RESURFACING
Project Length in Miles 0.200 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063698 STPMN 5115 () PRELIMINARY ENGINEERING
RESURFACING
2020 $35 $9 $43
100063699 STPMN 5115 () CONSTRUCTION
RESURFACING
2022 $398 $99 $497
TOTAL COST: $433 $108 $541
Route CR-NA ProjectDescription
RESURFACE, OPERATIONAL IMPROVEMENTS, HANDICAP RAMPS AND SIDEWALKS ON FEDERAL DRIVE FROM SOUTH OF THE RR TO ATLANTA HWY.
Type of Work RESURFACING
Project Length in Miles 2.100 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063731 STPMN 5115 () PRELIMINARY ENGINEERING
RESURFACING
2020 $342 $86 $428
100063732 STPMN 5115 () CONSTRUCTION
RESURFACING
2021 $3,939 $985 $4,923
TOTAL COST: $4,281 $1,070 $5,351
12/2/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
15 of 28
HIGHWAY PROJECTS - MONTGOMERY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
RESURFACE AND OPERATIONAL IMPROVEMENTS ON DAILRAIDA ROAD FROM ATLANTA HWY TO GUNTER AFB
Type of Work RESURFACING
Project Length in Miles 1.400 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064163 STPMN 5115 () PRELIMINARY ENGINEERING
RESURFACING
2020 $232 $58 $290
100064164 STPMN 5115 () CONSTRUCTION
RESURFACING
2022 $2,085 $521 $2,606
TOTAL COST: $2,316 $579 $2,896
Route CR-NA ProjectDescription
RESURFACE AND OPERATIONAL IMPROVEMENTS ON LOWER WETUMPKA ROAD FROM TOLVERT STREET TO THE BYPASS
Type of Work RESURFACING
Project Length in Miles 1.700 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064165 STPMN 5115 () PRELIMINARY ENGINEERING
RESURFACING
2020 $257 $64 $321
100064166 STPMN 5115 () CONSTRUCTION
RESURFACING
2021 $2,314 $579 $2,893
TOTAL COST: $2,571 $643 $3,214
12/2/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
16 of 28
HIGHWAY PROJECTS - MONTGOMERY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
BRIDGE REPLACEMENT ON DAY STREET BRIDGE BIN # 016848
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064167 STPMN 5115 () PRELIMINARY ENGINEERING
BRIDGE REPLACEMENT
2020 $824 $206 $1,030
100064168 STPMN 5115 () CONSTRUCTION
BRIDGE REPLACEMENT
2021 $7,416 $1,854 $9,270
TOTAL COST: $8,240 $2,060 $10,300
Route CR-NA ProjectDescription
WIDEN MARLER ROAD TO 3-LANE FROM SR-8 (US-80) TO OKFUSKI TRAIL
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 2.500 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064169 STPMN 5115 () PRELIMINARY ENGINEERING
WIDENING AND RESURFACING (RDWY)
2020 $800 $200 $1,000
100064170 STPMN 5115 () RIGHT OF WAY
WIDENING AND RESURFACING (RDWY)
2021 $1,600 $400 $2,000
100064171 STPMN 5115 () CONSTRUCTION
WIDENING AND RESURFACING (RDWY)
2022 $13,040 $3,260 $16,300
TOTAL COST: $15,440 $3,860 $19,300
12/2/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
17 of 28
HIGHWAY PROJECTS - MONTGOMERY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
CONVERT SOUTH COURT STREET FROM FAIRVIEW AVENUE TO ARBA STREET FROM ONE-WAY TO TWO-WAY
Type of Work RESURFACING
Project Length in Miles 1.064 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064180 STPMN 5115 () PRELIMINARY ENGINEERING
RESURFACING
2020 $8 $2 $10
100064156 STPMN 5115 () CONSTRUCTION
RESURFACING
2020 $1,680 $420 $2,100
TOTAL COST: $1,688 $422 $2,110
Route CR-NA ProjectDescription
RESURFACE AND OPERATIONAL IMPROVEMENTS ON RAY THORINGTON ROAD FROM PARK CROSSING TO PIKE ROAD
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066880 STPMN 5117 () PRELIMINARY ENGINEERING
RESURFACING
2019 $200 $50 $250
100066881 STPMN 5117 () CONSTRUCTION
RESURFACING
2022 $2,800 $700 $3,500
TOTAL COST: $3,000 $750 $3,750
12/2/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
18 of 28
HIGHWAY PROJECTS - MONTGOMERY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
RESURFACE AND OPERATIONAL IMPROVEMENTS ON MCGEHEE ROAD FROM WOODLEY ROAD TO SOUTHERN BLVD
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066882 STPMN 5117 () PRELIMINARY ENGINEERING
RESURFACING
2019 $160 $40 $200
100066883 STPMN 5117 () CONSTRUCTION
RESURFACING
2022 $3,376 $844 $4,220
TOTAL COST: $3,536 $884 $4,420
Route CR-NA ProjectDescription
RESURFACE AND OPERATIONAL IMPROVEMENTS ON VIRGINIA LOOP ROAD FROM SR-6 (US-231) TO WOODLEY ROAD
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066884 STPMN 5117 () PRELIMINARY ENGINEERING
RESURFACING
2019 $200 $50 $250
100066885 STPMN 5117 () CONSTRUCTION
RESURFACING
2022 $976 $244 $1,220
TOTAL COST: $1,176 $294 $1,470
12/2/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
19 of 28
HIGHWAY PROJECTS - MONTGOMERY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
RESURFACE AND OPERATIONAL IMPROVEMENTS ON ATLANTA HIGHWAY FROM ANN STREET TO PERRY HILL ROAD
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066886 STPMN 5117 () PRELIMINARY ENGINEERING
RESURFACING
2019 $200 $50 $250
100066887 STPMN 5117 () CONSTRUCTION
RESURFACING
2022 $4,000 $1,000 $5,000
TOTAL COST: $4,200 $1,050 $5,250
Route CR-NA ProjectDescription
INTERSECTION IMPROVEMENTS AT VAUGHN ROAD AND RYAN ROAD
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067611 STPAA 5117 () RIGHT OF WAY
INTERSECTION IMPROVEMENTS
2019 $32 $8 $40
100067613 STPAA 5117 () UTILITIES
INTERSECTION IMPROVEMENTS
2020 $80 $20 $100
100067614 STPMN 5117 () CONSTRUCTION
INTERSECTION IMPROVEMENTS
2020 $400 $100 $500
TOTAL COST: $512 $128 $640
12/2/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
20 of 28
HIGHWAY PROJECTS - MONTGOMERY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
RESURFACING ON MCINNIS ROAD FROM WOODLEY ROAD TO NARROW LANE ROAD
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067636 STPMN 5117 () PRELIMINARY ENGINEERING
RESURFACING
2019 $80 $20 $100
100067637 STPMN 5117 () CONSTRUCTION
RESURFACING
2022 $2,400 $600 $3,000
TOTAL COST: $2,480 $620 $3,100
12/2/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
21 of 28
HIGHWAY PROJECTS - MONTGOMERY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route I -65 ProjectDescription
RESURFACE I-65 FROM CATOMA CREEK TO NORTH OF FAIRVIEW AVENUE
Type of Work PREVENTATIVE MAINTENANCE LEVEL 1
Project Length in Miles 3.420 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066453 IM I065 (494) CONSTRUCTION
PREVENTATIVE MAINTENANCE LEVEL 1
2019 $2,685 $298 $2,984
TOTAL COST: $2,685 $298 $2,984
Route I -65 ProjectDescription
RESURFACE I-65 FROM NORTH OF FAIRVIEW AVENUE TO THE ALABAMA RIVER BRIDGE
Type of Work PREVENTATIVE MAINTENANCE LEVEL 1
Project Length in Miles 2.030 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066459 IM I065 () CONSTRUCTION
PREVENTATIVE MAINTENANCE LEVEL 1
2020 $2,061 $229 $2,290
TOTAL COST: $2,061 $229 $2,290
Route I -85 ProjectDescription
SIGN REHABILITATION ALONG I-85 FROM I-65 THROUGH MONTGOMERY AND MACON COUNTY TO LEE COUNTY LINE
Type of Work SIGN REHABILITATION
Project Length in Miles 47.460 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100054302 IM I085 (333) CONSTRUCTION
SIGN REHABILITATION
2019 $2,510 $279 $2,789
TOTAL COST: $2,510 $279 $2,789
12/2/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
22 of 28
HIGHWAY PROJECTS - MONTGOMERY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route I -85 ProjectDescription
BRIDGE REPLACEMENT ON I-85 NB AND SB OVER LINE CREEK (INCLUDING TWO RELIEF BRIDGES) BIN # 7554, 7555, 7556, 7557, 7566, 7567
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.480 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059252 IM I085 () PRELIMINARY ENGINEERING
BRIDGE REPLACEMENT
2019 $2,430 $270 $2,700
100059253 IM I085 () CONSTRUCTION
BRIDGE REPLACEMENT
2022 $3,555 $395 $3,950
TOTAL COST: $5,985 $665 $6,650
Route I -85 ProjectDescription
PAVEMENT REHAB AND SLAB REPAIRS ON I-85 FROM I-65 TO JUST NORTH OF THE HALL STREET OVERPASS
Type of Work PREVENTATIVE MAINTENANCE LEVEL 1
Project Length in Miles 1.842 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100062472 IM I085 (357) CONSTRUCTION
PREVENTATIVE MAINTENANCE LEVEL 1
2019 $2,536 $282 $2,818
TOTAL COST: $2,536 $282 $2,818
12/2/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
23 of 28
HIGHWAY PROJECTS - MONTGOMERY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
RETROFITTING OF HANDICAP RAMPS ON VARIOUS STREETS IN THE CITY OF MONTGOMERY DOWNTOWN CENTRAL BUSINESS DISTRICT
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060100 STPMN 5113 () CONSTRUCTION
SIDEWALK 2020 $400 $100 $500
TOTAL COST: $400 $100 $500
Route NA- ProjectDescription
STREET LIGHT CONVERSION TO LED IN CENTRAL BUSINESS DISTRICT (CITY OF MONTGOMERY)
Type of Work LIGHTING
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063693 STPMN 5115 () CONSTRUCTION
LIGHTING 2019 $1,653 $413 $2,066
TOTAL COST: $1,653 $413 $2,066
Route NA- ProjectDescription
DAY STREET/MAXWELL AIR FORCE BASE FEASIBILITY STUDY
Type of Work CORRIDOR STUDY
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063733 STPMN 5115 () SPECIAL
CORRIDOR STUDY
2020 $240 $60 $300
TOTAL COST: $240 $60 $300
12/2/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
24 of 28
HIGHWAY PROJECTS - MONTGOMERY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-110 ProjectDescription
ADDITIONAL LANES ON SR-110 FROM CHANTILLY PKWY TO CR-294 (BRIDLEBROOK BLVD)
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 1.030 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100043877 STPAA 0110 (501) UTILITIES
ADDITIONAL ROADWAY LANES
2019 $687 $172 $859
100050187 STPAA 0110 (501) CONSTRUCTION
ADDITIONAL ROADWAY LANES
2021 $2,917 $729 $3,647
TOTAL COST: $3,604 $901 $4,505
Route SR-110 ProjectDescription
ADDITIONAL LANES ON SR-110 FROM CR-294 (BRIDLEBROOK BLVD) TO THE OUTER LOOP
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 1.450 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067733 STPAA 0110 (502) UTILITIES
ADDITIONAL ROADWAY LANES
2019 $687 $172 $859
TOTAL COST: $687 $172 $859
12/2/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
25 of 28
HIGHWAY PROJECTS - MONTGOMERY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-271 ProjectDescription
INTERSECTION IMPROVEMENTS ON SR-271 (EXIT 9) ONTO I-85 SOUTHBOUND
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067646 STPAA 0271 () CONSTRUCTION
INTERSECTION IMPROVEMENTS
2019 $2,040 $510 $2,550
TOTAL COST: $2,040 $510 $2,550
Route SR-6 ProjectDescription
BRIDGE REPLACEMENT ON SR-6 (US-231) AT JENKINS CREEK BIN #000735 STR #6-51-17.5
Type of Work BRIDGES AND APPROACHES
Project Length in Miles 0.010 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100038170 BR 0006 (563) UTILITIES
BRIDGES AND APPROACHES
2019 $242 $61 $303
100004312 BR 0006 () CONSTRUCTION
BRIDGES AND APPROACHES
2020 $3,981 $995 $4,976
TOTAL COST: $4,223 $1,056 $5,279
12/2/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
26 of 28
HIGHWAY PROJECTS - MONTGOMERY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-8 ProjectDescription
WIDEN AND RESURFACE SR-8 (US-80) FROM THE WAUGH INTERSECTION TO THE MARLER ROAD INTERSECTION
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064153 STPMN 5115 () PRELIMINARY ENGINEERING
WIDENING AND RESURFACING (RDWY)
2020 $203 $51 $254
100064154 STPMN 5115 () RIGHT OF WAY
WIDENING AND RESURFACING (RDWY)
2020 $160 $40 $200
100064155 STPMN 5115 () CONSTRUCTION
WIDENING AND RESURFACING (RDWY)
2021 $1,669 $417 $2,086
TOTAL COST: $2,032 $508 $2,540
Route SR-8 ProjectDescription
TRAFFIC STUDY ON SR-8 (US-80) FROM WAUGH TO MARLER ROAD
Type of Work CORRIDOR STUDY
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064157 STPMN 5115 () SPECIAL
CORRIDOR STUDY
2020 $96 $24 $120
TOTAL COST: $96 $24 $120
12/2/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
27 of 28
HIGHWAY PROJECTS - MONTGOMERY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-9 ProjectDescription
EXTEND SEVICE ROAD ALONG SR-9 (NOTHERN BLVD) NORTH BOUND FROM HACKEL DRIVE TO PLANTATION WAY AND SOUTHBOUND FROM LAGOON PARK DRIVE TO THE EXISTING SERVICE ROAD
Type of Work GRADE, DRAIN, BASE AND PAVE
Project Length in Miles 0.760 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063744 NH 0009 (533) PRELIMINARY ENGINEERING
GRADE, DRAIN, BASE AND PAVE
2023 $69 $17 $87
TOTAL COST: $69 $17 $87
12/2/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
28 of 28
HIGHWAY PROJECTS - MONTGOMERY
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019