A.Kovalenko 2 nd Lab Directors Meeting, Protvino, January 15/16, 2008 FAIR: JINR EoI.

7
A.Kovalenko 2 nd Lab Directors Meeting, Protvino, January 15/16, 2008 FAIR: FAIR: JINR EoI JINR EoI

Transcript of A.Kovalenko 2 nd Lab Directors Meeting, Protvino, January 15/16, 2008 FAIR: JINR EoI.

Page 1: A.Kovalenko 2 nd Lab Directors Meeting, Protvino, January 15/16, 2008 FAIR: JINR EoI.

A.Kovalenko

2nd Lab Directors Meeting, Protvino, January 15/16, 2008

FAIR: FAIR: JINR EoIJINR EoI

Page 2: A.Kovalenko 2 nd Lab Directors Meeting, Protvino, January 15/16, 2008 FAIR: JINR EoI.

A.Kovalenko

From our SUMMARY at the 1st meeting:

• JINR/GSI COLLABORATIVE R&D COVERED SET OF THE PROBLEMS CONNECTED WITH THE SIS100 FAST-CYCLED SYNCHROTRON;

•We consider, for example, the SIS100 MAGNETS AND

OTHER LATTICE ELEMENTS (TS-2, TS-6,…) as possible contribution OF RUSSIAN INDUSTRY AND LABORATORIES, nevertheless, it should be COLLABORATIVE AGREEMENTS AT GOVERNMENTAL LEVEL

Lab Directors Meeting, Darmstadt, October 1/2, 20072nd Lab Directors Meeting, Protvino, January 15/16, 2008

Page 3: A.Kovalenko 2 nd Lab Directors Meeting, Protvino, January 15/16, 2008 FAIR: JINR EoI.

•JINR NUCLOTRON is considered as the SIS100 prototype system

ring circumference -250 m

Page 4: A.Kovalenko 2 nd Lab Directors Meeting, Protvino, January 15/16, 2008 FAIR: JINR EoI.

Indeed, the SIS100 collaborative R&D are carried out by JINR/GSI team since 2000.The list of considered problems is the following:

- MODEL DIPOLES & QUADRUPOLES; - FULL LENGTH PROTOTYPES; - STEERERS AND MULTIPOLES; - LATTICE STRUCTURE; - BEAM EXTRACTION and TRANSFER; - CLOSE ORBIT CORRECTION; - U(29+) COLLIMATION; - OTHER ELEMENTS (BPM, CATCHERS); - CRYOSTAT MODULES; - COOLING SYSTEM;

A.Kovalenko Lab Directors Meeting, Darmstadt, October 1/2, 20072nd Lab Directors Meeting, Protvino, January 15/16, 2008

Page 5: A.Kovalenko 2 nd Lab Directors Meeting, Protvino, January 15/16, 2008 FAIR: JINR EoI.
Page 6: A.Kovalenko 2 nd Lab Directors Meeting, Protvino, January 15/16, 2008 FAIR: JINR EoI.

A.Kovalenko 2nd Lab Directors Meeting, Protvino, January 15/16, 2008

•SIS100 WP’s proposed to JINR by the FAIR

Page 7: A.Kovalenko 2 nd Lab Directors Meeting, Protvino, January 15/16, 2008 FAIR: JINR EoI.

A.Kovalenko Lab Directors Meeting, Darmstadt, October 1/2, 20072nd Lab Directors Meeting, Protvino, January 15/16, 2008