Monitoring andReporting Plans
aka “PAEP” (Project Assessment and Evaluation Plan)
Acronyms
PAEP = Project Assessment and Evaluation PlanPMPP = Project Monitoring and Performance PlanSAP = Sampling and Analysis PlanQAPP = Quality Assurance Project Plan
Steps in a Project
Request for
Proposals
(RFP)
Grant Propo
sal
Grant Awar
dCONTRAC
T or GRANT
AGREEME
PLANNING
Project Assessment and Evaluation Plan (PAEP, a.k.a
PMPP, PMAP)
Environmental Monitoring Plan
Quality Assurance
Project Plan
(QAPP)
Construction Design
Permits
Outreach Plan
PRE-implementation Effectiveness Monitoring or
Surveys
IMPLEMENTATION
POST-implementation Effectiveness Monitoring or
Surveys
REPORTING
Construction,Restoration,
Re-vegetation, Public education campaign, etc.
Scope of Work
Schedule
Budget
Conceptual Scope of Work
PAEP
Monitoring Plan
QAPP
PLANNING
REPORTINGINTRO
TEXT
PAEP - March 2004 MemoCalifornia Regional Water Quality Control Board
San Francisco Bay Region
1515 Clay Street, Suite 1400, Oakland, California 94612 (510) 622-2300 Fax (510) 622-2460
http://www.swrcb.ca.gov/rwqcb2
Preserving, enhancing, and restoring the San Francisco Bay Area’s waters for over 50 years
Recycled Paper
Terry Tamminen Secretary for
Environmental Protection
Arnold Schwarzenegger Governor
TO: Proposition 13 Grant Recipient Project Directors and Regional Water Quality Control Board Contract Managers
FROM: Carrie Austin, San Francisco Bay Regional Water Quality Control Board On Behalf of the Statewide Grants Work Group
DATE: FINAL – Revised March 2004 – version 1.3
SUBJECT: MONITORING AND REPORTING ON PROJECTS FUNDED BY THE COSTA-MACHADO WATER ACT OF 2000 (PROPOSITION 13)
NOTE: This document will not be revised again. SWRCB DFA staff is preparing comprehensive instructions (contact: Steven Rodriguez, 916/324-9944 or [email protected] )
TABLE OF CONTENTS I. INTRODUCTION 1
A. Purpose 1 B. Regulatory Requirements 1 C. Project Variability 1 D. Contents and audience 1
II. PROJECT ASSESSMENT AND EVALUATION PLAN CONTENTS 2 A. Background and Beneficial Uses 2 B. Problem 2
1. Nonpoint Sources of Pollution 2 2. Baseline Water Quality 2
C. Proposed Solution 3 D. Effectiveness Evaluation 4 E. Watershed Program Requirements 4 F. Outline of Draft and Final Project Report 4
ATTACHMENTS A. Regulatory Requirements – Proposition 13 B. Monitoring Requirements – Request for Proposal 1. Prop 13 Phase 1 – Grants Awarded May 2001 2. Prop 13 Phase 2 – Grants Awarded November 2002 3. Prop 13 Phase 3 – Grants Awarded 2004
Memo TOC Section II(NPS Project)
Project Background & BUs
Problem– NPSources of Pollution– Baseline Water Quality
Proposed Solution (the Project)Effectiveness EvaluationOutline of Draft and Final Project Report
Memo Attachment A
ATTACHMENT AMONITORING AND REPORTING
REQUIREMENTS COSTA-MACHADO WATER ACT OF
2000 (Proposition 13)
Memo Attachment B
ATTACHMENT B.1REQUEST FOR PROPOSALS –MONITORING REQUIREMENTS
PROP 13 PHASE 1 – GRANTS AWARDED MAY 2001
Memo Attachment C
ATTACHMENT CEXAMPLE PLAN
PAEP
Monitoring Plan
QAPP
PLANNING
REPORTINGINTRO
TEXT
Reporting –Coastal & Nonpoint Source
Final report includes:effectiveness of BMPs or NPS MMs in preventing or reducing nonpoint source pollutionFor which we need quality data
The End