We are a Steel fabrication based Company. Over the past ten years, A.K. Engineering Works, has worked hard to build its infrastructure
and system to handle a significant amount of business. Additionally company has configured a high technological equipment and has
experienced staffs and workers, who are well equipped to handle various kind of Steel Structure Projects.
Our clients trust us because…….
Steel Fabrication is our Core business and we offer the industry's most comprehensive and flexible service delivery model—on a large
scale—in today's business scenario.
In-depth knowledge of Steel Fabrication: Our technicians have insight knowledge of products, tools and methologies to provided better
solution to the client in order to complete project on time with quality work.
We work with a strong sense of transparency with all our employees and clients. To maintain transparency of operations with our clients
we regularly provide updates through Daily project report, detailed invoice annexure and copies of challans for statutory payments.
At A K ENGINEERING, We are the Second Generation in Fabrication & Erection process, we have Quality Management team who is
capable to sort out the puzzle of Fabrication management, apart from the management, our biggest asset is our team: We have
periodically upgraded our core team of welders, fitters, designers and operators, and its all come from the long way journey of Steel
Fabrication & Erection
At A K ENGINEERING, Quality has been consider the major part of any Steel Project. Our Team, Monitor quality Control from 2D model on
a paper to actual work done at project site. To achieve a Quality Assurance we have consider following Procedure.
A. As an Fabrication and Erection company, A.K. Engineering Works, is totally committed to the safety of its
employees and labours , as well as to prevent loss of human life, to protect against injury and to prevent
damage / destruction to project, property, equipment and materials at its work sites.
B. To achieve this we has established and implemented an effective Safety and Fire Prevention Program to
create a safe working environment at site. Within the frame work of this Safety and Fire Prevention Program,
we are committed strategy of creating Safety Awareness at all level of work.
i. All individual working in our firm are above 18 years of age & well aware of the risk of working at
the construction site.
ii. The firm provides identity cards to all workers for each project
iii. The firm provides Uniform, safety shoes, safety glasses for welding purpose, safety belts, hand gloves,
and we ensure they are used at the site
iv. The firm also provides fire extinguishers at the Work site
v. All the equipment’s like rectifier welding machines, gas cutting machines, portable cranes are well
maintained and checked before providing at the site
vi. All safety precautions measures are taken if the worker is working on high rise towers
vii. The hierarchy of controls for working at height, working at ground level, using scaffolds, platforms
and ladders and safety netting.
Nos. Year Client Project Scope of Work Cost
A Current Projects
1 2012-2013 LODHA GROUP LODHA LXURIA Fabrication of M S Railing 55 lacs
2 2012-2013 KALPATARU LTD SYNERGY II - SANTACRUZ FABRICATION of M S BEAM 102 lacs
3 2012-2013 RAHEJA UNIVERSAL RAHEJA EXCELSIOR ROOFING WORK 30 Lacs
4 2009-2012 KAPSTONE CONSTRUCTION RUSTOMJEE URBANIA - THANE FABRICATION & ACP WORK 320 lacs
5 2011-12 RNA CORP RNA GRANDEUR FABRICATION Work 10 lacs
6 2010 – 2012 Bombay Dyeing ICC Tower – Dadar FABRICATION WORK 35 lacs
7 2010-2012 MARTHON REALTY MARATHON – FUTURE X FABRICATION Work 54 lacs
B Projects Completed
1 2010 – 2011 AVIGHNA INDIA LTD ONE AVIGHNA FABRICATION WORK 10 Lacs
2 2009-2011 RAHEJA UNIVERSAL RAHEJA ATLANTIS FABRICATION Work 148 Lacs
3 2010-2011 RAHEJA UNIVERSAL RAHEJA POLIS – AMBIVALI Civil Work of Compound Wall 166 lacs
4 2006-2010 RAHEJA UNIVERSAL RAHEJA EXOTICA FABRICATION Work 196 lacs
5 2009-2010 KANAKIA GROUP KANAKIA – METRO FABRICATION Work 30 lacs
6 2009-2010 KANAKIA GROUP KANAKIA – BOOMERANG FABRICATION Work 19 lacs
7 2009-2010 KANAKIA GROUP KANAKIA – Marriot FABRICATION Work 22 lacs
8 2009-2010 RAHEJA UNIVERSAL RAHEJA LEGEND FABRICATION Work 90 lacs
9 2008-2009 RAHEJA UNIVERSAL RAHEJA EXOTICA FABRICATION Work 40 lacs
10 2008-2009 RAHEJA UNIVERSAL RAHEJA WILLOWS FABRICATION Work 48 Lacs
11 2008-2009 RAHEJA UNIVERSAL RAHEJA TITANIUM FABRICATION Work 62 lacs
12 2008-2009 RAHEJA UNIVERSAL RAHEJA – TIPCO FABRICATION Work 58 lacs
Work Done 6th Floor – Fabricated Steel Beam
Work Detail Providing, Fabrication and Fixing M S Structural Member with ACP Sheet
Work Detail Providing, Fabrication and Fixing M S Structural Member with ACP Sheet
Work Done 30th Floor Pergola Work
Cost of Project 285 Lacs
Client Name RAHEJA UNIVERSAL LTD.
Project Name RAHEJA ATLANTIS, Worli
Work Done Staging at 17th Floor for erection of H Frame
Approximate Weight 95.50 M.Tons
Project Name Raheja Atlantis, Worli
Detail of Work Fabricated and Erected of M.S. Structure for A.C.P. Sheet fitting.
Project Name Raheja Atlantis, Worli
Detail of Work By using ISA, ISMC, Base Plate & HILTI Anchor Fastener
Project Name Raheja Atlantis, Worli
Detail of Work By using ISA, ISMC, Base Plate & HILTI Anchor Fastener
Project Name Raheja Atlantis, Worli
Detail of Work By using ISA, ISMC, Base Plate & HILTI Anchor Fastener
Project Name Raheja Atlantis, Worli
Detail of Work Steel Structure for Crown on Terrace about 430 Ft above the ground level
Detail of Work Steel Structure for Crown on Terrace about 430 Ft above the ground level.
Project Name Raheja Atlantis, Worli
Detail of Work Steel Structure for Crown on Terrace about 430 Ft above the ground level
Client Name RAHEJA UNIVERSAL LTD.
Project Name RAHEJA LEGEND, Worli
Project Name Raheja – Legend - Worli
Detail of Work Fabricated and Erected Triplex Flat Staircase about 20 M.Tos.
Project Name Raheja – Legend - Worli
Detail of Work Fabricated and Erected Service Platform in hollow floor , Mezzanine Floor.
Project Name Raheja – Legend - Worli
Detail of Work Fabricated and Erected Service Platform in hollow floor , Mezzanine Floor.
Project Name KANAKIA – METRO - BORIVALI
Detail of Work Fabricated and Erected M.S. Structure for A.C.P. Sheet fitting @ Terrace
Project Name KANAKIA – METRO - BORIVALI
Detail of Work Fabricated and Erected M.S. Structure for A.C.P. @ Terrace
Scope of Work Lifting & shifting of material Manually, Fabrication and erection at position safely.
Material Used M.S. hollow Pipe 300x150x6mm, Base Plate 20mm & HILTI Anchor Fastener.
Work Detail Fabrication and Fixing Column Jacketing with Anchor Fastener
Project Name Raheja – Acropolis - Govandi
Detail of Work
Fabricated and Erected Circular Dome Structure
Project Name Raheja – Acropolis - Govandi
Detail of Work Fabricated and Erected Circular Dome Structure
Project Name Raheja – Acropolis - Govandi
Detail of Work Fabricated and Erected Ornamental Gate and Grill.
Land line : 022 26525609
Mobile : 91 9867684550
Email : [email protected]
Web : www.akengg.com
Office Add :
104, Miranda House, Kole Kalyan,
Opp Christina Apt,
Kalina – Kurla - Road,
Santa Cruz West,
Mumbai - 400029