![Page 1: Airport Solar Project St. Thomas](https://reader033.fdocuments.in/reader033/viewer/2022051816/546f23bfaf79595d298b59dc/html5/thumbnails/1.jpg)
A sea of panelsThe Cyril E. King Airport Installation is the largest in the Virgin Islands.
![Page 2: Airport Solar Project St. Thomas](https://reader033.fdocuments.in/reader033/viewer/2022051816/546f23bfaf79595d298b59dc/html5/thumbnails/2.jpg)
Lotta powerThe 450 Kw system will generate enough power to take 15 percent off the airport’s utility bill, saving about $35,000 a month
![Page 3: Airport Solar Project St. Thomas](https://reader033.fdocuments.in/reader033/viewer/2022051816/546f23bfaf79595d298b59dc/html5/thumbnails/3.jpg)
Pretty longThe system is 1,600 feet long and 21 feet wide. Each array is 10 feet and six inches wide.
![Page 4: Airport Solar Project St. Thomas](https://reader033.fdocuments.in/reader033/viewer/2022051816/546f23bfaf79595d298b59dc/html5/thumbnails/4.jpg)
Preparing the ground
![Page 5: Airport Solar Project St. Thomas](https://reader033.fdocuments.in/reader033/viewer/2022051816/546f23bfaf79595d298b59dc/html5/thumbnails/5.jpg)
Erosion control methods were implemented
![Page 6: Airport Solar Project St. Thomas](https://reader033.fdocuments.in/reader033/viewer/2022051816/546f23bfaf79595d298b59dc/html5/thumbnails/6.jpg)
Ready to go into the ground
![Page 7: Airport Solar Project St. Thomas](https://reader033.fdocuments.in/reader033/viewer/2022051816/546f23bfaf79595d298b59dc/html5/thumbnails/7.jpg)
Help was needed in the rocky spots
![Page 8: Airport Solar Project St. Thomas](https://reader033.fdocuments.in/reader033/viewer/2022051816/546f23bfaf79595d298b59dc/html5/thumbnails/8.jpg)
Supports were driven deeply into the groundSystem is rated to withstand 150 mile per hour wind
![Page 9: Airport Solar Project St. Thomas](https://reader033.fdocuments.in/reader033/viewer/2022051816/546f23bfaf79595d298b59dc/html5/thumbnails/9.jpg)
First nightTo interfere as little as possible with air traffic some work was done at night.
![Page 10: Airport Solar Project St. Thomas](https://reader033.fdocuments.in/reader033/viewer/2022051816/546f23bfaf79595d298b59dc/html5/thumbnails/10.jpg)
FramingThe framing was together but had to be spread out
![Page 11: Airport Solar Project St. Thomas](https://reader033.fdocuments.in/reader033/viewer/2022051816/546f23bfaf79595d298b59dc/html5/thumbnails/11.jpg)
Flex racks
![Page 12: Airport Solar Project St. Thomas](https://reader033.fdocuments.in/reader033/viewer/2022051816/546f23bfaf79595d298b59dc/html5/thumbnails/12.jpg)
Unfolding the frames
![Page 13: Airport Solar Project St. Thomas](https://reader033.fdocuments.in/reader033/viewer/2022051816/546f23bfaf79595d298b59dc/html5/thumbnails/13.jpg)
The frames before the panels were placed on top
![Page 14: Airport Solar Project St. Thomas](https://reader033.fdocuments.in/reader033/viewer/2022051816/546f23bfaf79595d298b59dc/html5/thumbnails/14.jpg)
Underneath the frames, combiner box
![Page 15: Airport Solar Project St. Thomas](https://reader033.fdocuments.in/reader033/viewer/2022051816/546f23bfaf79595d298b59dc/html5/thumbnails/15.jpg)
Constructing transformers and inverter pad
![Page 16: Airport Solar Project St. Thomas](https://reader033.fdocuments.in/reader033/viewer/2022051816/546f23bfaf79595d298b59dc/html5/thumbnails/16.jpg)
Not a small jobSome heavy equipment was called in
![Page 17: Airport Solar Project St. Thomas](https://reader033.fdocuments.in/reader033/viewer/2022051816/546f23bfaf79595d298b59dc/html5/thumbnails/17.jpg)
Titled toward the sun
![Page 18: Airport Solar Project St. Thomas](https://reader033.fdocuments.in/reader033/viewer/2022051816/546f23bfaf79595d298b59dc/html5/thumbnails/18.jpg)
Transformer installed
![Page 19: Airport Solar Project St. Thomas](https://reader033.fdocuments.in/reader033/viewer/2022051816/546f23bfaf79595d298b59dc/html5/thumbnails/19.jpg)
Installing fuses in combiner boxes
![Page 20: Airport Solar Project St. Thomas](https://reader033.fdocuments.in/reader033/viewer/2022051816/546f23bfaf79595d298b59dc/html5/thumbnails/20.jpg)
Closing up after the fuses are in
![Page 21: Airport Solar Project St. Thomas](https://reader033.fdocuments.in/reader033/viewer/2022051816/546f23bfaf79595d298b59dc/html5/thumbnails/21.jpg)
Commissioning inverters
![Page 22: Airport Solar Project St. Thomas](https://reader033.fdocuments.in/reader033/viewer/2022051816/546f23bfaf79595d298b59dc/html5/thumbnails/22.jpg)
Completing the wiring for the transformer
![Page 23: Airport Solar Project St. Thomas](https://reader033.fdocuments.in/reader033/viewer/2022051816/546f23bfaf79595d298b59dc/html5/thumbnails/23.jpg)
Long as a runway itselfThose are solar street lights on the left. Solar is definitely making an impact in the Virgin Islands