Transcript of AIR OPERATOR CERTIFICATION. THE AIR OPERATOR CERTIFICATE - ICAO ANNEX 6, 4.2.1.1 An operator shall...
AIR OPERATOR CERTIFICATION
AIR OPERATOR CERTIFICATION
• THE AIR OPERATOR CERTIFICATE - ICAO ANNEX 6,
• 4.2.1.1 An operator shall not engage in commercial air transport operations unless in possession of a valid air operator certificate or equivalent document issued by the State of the Operator.
THE AIR OPERATOR CERTIFICATE
• 4.2.1.2 The air operator certificate…. shall authorize the operator to conduct commercial air transport operations in accordance with such conditions and limitations as may be specified.
THE AIR OPERATOR CERTIFICATE
• 4.2.1.3 The issue of an AOC …….by the State of the Operator shall be dependent upon the operator demonstrating an adequate organization, method of control and supervision of flight operations, training programme and maintenance arrangements consistent with the nature and extent of the operations specified.
THE AIR OPERATOR CERTIFICATE -
• The AOC shall contain at least the following:– a) operator's identification (name, location);– b) date of issue and period of validity;– c) description of the types of operations
authorized;– d) the type(s) of aircraft authorized for use;
and– e)authorized areas of operation or routes.
THE AIR OPERATOR CERTIFICATE
• THE CERTIFICATION PROCESS.The certification process is divided into steps:– Pre-application– Formal application– Preliminary financial, economic, and legal
assessment of the application– Preliminary technical assessment– Operational inspections– Decision on application and award of AOC and
ops specs
AOC - PRE-APPLICATION PHASE
• This phase includes preliminary contact, prior to formal application.
• CAA to make the potential operator aware of the regulatory requirements
• Show exact steps in the certification process
• Applicant is given understanding of the form, content, and documents required for the formal application.
AOC - FORMAL APPLICATION
CONTENT:
– A. The name and address of the applicant and the main base of the proposed operations;
– B. A description of the applicant's business organization;
– C. Information on management organization and key staff members, including their title, name, background, qualifications and experience;
AOC - FORMAL APPLICATION
• Detailed information on the operations (AW) under the following headings :– type of aircraft, equipment, instruments, equipment and
flight documents to be used;– State of Registry of the aircraft, (copy of lease);– arrangements personnel training and qualification;– installations and equipment available; – nature of operations ‑ passenger/cargo, VFR or IFR,
etc.;– arrangements for maintenance and inspection of aircraft
and associated equipment;
AOC - FORMAL APPLICATION• MAINTENANCE DOCUMENTATION
– General Maintenance Manual (GMM) (This manual may be combined with the GOM for certain operators.)
– Maintenance Program/Manuals– Weight and Balance Procedures– Maintenance Training Program/Manual– Minimum Equipment List (MEL/CDL– Maintenance Reliability Program– Continuous Analysis and Surveillance
AOC - FORMAL APPLICATION• COMPLIANCE
DOCUMENT
• detailed description of how the applicant intends to show compliance with each provision of the applicable code of air navigation regulations;
AOC - FORMAL APPLICATION
• Financial data; and
• Desired date for
operation to commence.
AOC - PRELIMINARY ASSESSMENT
• GENERAL.– Very Important
– Must try to establish competence at the initial stage,
– Less likely to have serious problems later on.
– Essential to reveal any critical deficiencies in the applicant's proposals
– Will enable the operator to prepare alternative proposals
AOC - PRELIMINARY ASSESSMENT.
• GENERAL – If deficiencies are found applicant should be
given a reasonable opportunity to rectify– otherwise the application should be rejected.– This preliminary assessment consists of two
phases:• Financial, economic and legal assessment• Technical Assessment/Document review
AOC - PRELIMINARY ASSESSMENT
• CHECK APPLICANT HAS:– sufficient financial resources;– a route structure for the proposed
operation;– an intended level of service that meets a
need or demand and is in the public interest;
– proposed an operation that is in accord with bi-lateral agreements; (Cont.)
AOC - PRELIMINARY ASSESSMENT
• CHECK APPLICANT HAS:– presented traffic studies indicating that
the proposed operation should be economically successful; and
– management structure and suitable personnel, equipment, facilities, manuals, buildings, service agreements, etc., or will be able to obtain them.
AOC - PRELIMINARY ASSESSMENT
LEASING
Unless suitable arrangements
are made by the State of Registry and the State of the Operator, complex legal problems as well as safety problems, particularly in respect of the continuing airworthiness and operations supervision, may result.
AOC - PRELIMINARY TECHNICAL ASSESSMENT• DOCUMENT REVIEW (AW)• Review the following:
– Aircraft Flight Manual(s)– Minimum Equipment Lists CDL– Weight and Balance Manual– Maintenance Manual(GMM)– *Continuous Airworthiness Maintenance Program/Manuals– Maintenance Training Program/Manual– Maintenance Reliability Program– Continuous Analysis and Surveillance System
AOC - PRELIMINARY TECHNICAL ASSESSMENT• GENERAL
• The company manuals must be sufficiently detailed to provide a comprehensive account of practically every aspect of the operator's organization, policies, and procedures. The primary focus of the preliminary technical assessment will be upon the information provided by the prospective operator in these manuals.
PRELIMINARY TECHNICAL ASSESSMENT• GENERAL CONSIDERATIONS
• Can the aircraft be properly maintained, inspected and supported with the available maintenance and spare parts resources?
• Are the aircraft suitably instrumented and equipped for the proposed operation?
AIRWORTHINESS INSPECTIONS• GENERAL.
– AW inspections are normally conducted in the following sequence:a. Organizational Structure Evaluationb. Maintenance managementc. Records Inspectiond. Line Station Facility Inspectione. Main Base Facility Inspectionf. Training program Inspectiong. Emergency Evacuation
Demonstrationh. General Maintenance manual
Reviewi. Proving Flights including Line
Stations
AIRWORTHINESS INSPECTIONS• ORGANIZATIONAL STRUCTURE AND
MANAGEMENT EVALUATION– Must be further evaluated to ensure proper
control – Verify that written policies are fully understood
and implemented .– clear lines of authority and specific duties and
responsibilities of individuals are established. – Must be clearly outlined in the applicant's
manuals,
AIRWORTHINESS INSPECTIONS• MAINTENANCE MANAGEMENT
• Personnel responsible for inspection and maintenance must be qualified.
• Key personnel still required even if all maintenance is contracted out.
• The positions that are required include the following:– The Director of Maintenance, – The Chief Inspector
AIRWORTHINESS INSPECTIONS• Consolidated Positions.
– An airworthiness Manager may hold more than one position however he must meet the qualification requirements for both positions.
• Chief Engineer always required • Chief Inspector may not always required,• Part time staff may be acceptable• Deviations to the rule may be authorised.
AIRWORTHINESS INSPECTIONS
• RECORDS INSPECTIONS.• ensure a suitable system exists
for creating, preserving and retrieving required records, and the records as required by the national regulations, are being kept for the specified periods..
AIRWORTHINES INSPECTIONS• LINE STATION FACILITY
INSPECTIONS.
• Every airport should be inspected prior to first revenue flight or during any proving flights.
AIRWORTHINESS INSPECTIONS• MAIN BASE FACILITY INSPECTION
• Evaluate – Housing and Facilities– Technical documents – Equipment, tools, and test equipment,
• Review Personnel list. Ensure that:– The maintenance organization/applicant has
sufficient number of supervisory/licenced and inspection personnel.
AIRWORTHINESS ORGANISATION• TRAINING PROGRAMME
INSPECTION.
• Ensure the operator has a structured training and recurrent training program for all maintenance staff.
• Maintenance/inspection training programs are the most efficient manner to inform personnel of the requirements of the operator/applicant's program.
PROVING FLIGHTS.
• As a final demonstration that he has the proper organization, facilities,
equipment, and training to successfully carry out revenue flights, the applicant will be required to perform a series of proving flights in accordance with the national requirement.
ISSUANCE OF THE AOC & OPERATIONS SPECIFICATIONS
• GENERAL
The preceding process will have provided specific information related to:– the scope of the applicant's proposed
operation;– the adequacy of the organization and
resources;and– reveal any deficiencies.
ISSUANCE OF THE AOC• DETERMINATION ON THE
APPLICATION.• Following the completion of the assessment
and inspection programme, the Inspector will recommend to the Director that the applicant is either:
• properly equipped and capable in all respects of conducting the proposed operation, or
• is not, or is not yet capable of conducting the proposed operation
ISSUANCE OF THE AOC.
The AOC will contain or make reference to the following information:
• operator's identification (name, location);• date of issue and period of validity;• description of the types of operations
authorized;• the type(s) of aircraft authorized for use;
and
ISSUANCE OF OPERATIONS SPECIFICATIONS.
• Operations specifications and limitations applicable to an AOC will be issued in conjunction with the issue of the AOC certificate and form part of the certificate.
ISSUANCE OF OPERATIONS SPECIFICATIONS• For purposes of standardization , operations
specifications may be divided into separate parts as follows:
• Part A ‑ General Provisions• Part B ‑ En-route authorizations and limitations• Part C ‑ Aerodrome authorizations and
limitations• Part D ‑ Maintenance• Part E ‑ Mass and balance• Part F ‑ Interchange of equipment operations• Part G ‑ Aircraft leasing operations
OPERATIONS SPECIFICATIONS
TABLE OF CONTENTSPART D - AIRCRAFT MAINTENANCE• D71. Additional Maintenance requirements• D72. Aircraft maintenance - general requirements.• D73. Approved aircraft inspection program- GA• D74. Reliability program authorization: entire
aircraft• D75. Reliability program authorization:airframe,
powerplant, systems or selected items...• D76. Short term escalation authorization.• D77. Maintenance contractual arrangement authorization:
for entire aircraft.
OPERATIONS SPECIFICATIONSCONTINUED• D78. Maintenance contractual arrangement
authorization: for specific maintenance• D79. Reliability program contractual arrangement
authorization • D80. Leased aircraft maintenance program
authorizations: • D81. Parts pool agreement authorization• D82. Prorated time authorization.• D83. Parts borrowing authorization• D84. Special flight permit with continuous
authorization to conduct ferry flights
OPERATIONS SPECIFICATIONS
• D85. Aircraft listing• D86. Maintenance program authorization for
two engine airplanes used in extended range operation.
• D87. Maintenance program authorization for leased foreign aircraft operated by (local) air carriers
• D88. Maintenance time limitations• D90- D94 reserved:• D95. Minimum equipment list authorization.
OPERATIONS SPECIFICATIONS
• APPENDIX A – Maintenance Time Limitations section (For operators with a partial reliability program or no reliability program)
• PART E• E96. WEIGHT AND BALANCE CONTROL
PROCEDURES
TYPICAL OPS SPECIFICATIOND74. RELIABILITY PROGRAM AUTHORIZATION: ENTIRE AIRCRAFT((Date)).
The certificate holder is authorized to use the provisions of its maintenance reliabilityprogram for the aircraft identified in the following table.
AIRCRAFTMAKE/MODEL/SERIES
DOCUMENT NAMEAND NUMBER
DOCUMENTDATE
BOEING 737-200
BOEING 737-300
AVOR AIRLINESRELIABILITY AV-13A
AVOR AIRLINESRELIABILITY AV-13A
07/10/87
07/10/87
a. The program description and the standards for determining maintenance intervals andprocesses are contained in the certificate holder's document in the table above.b. The time limitation for the overhaul, inspections, and checks of the aircraft and relatedsystems including appliances and components controlled by the program shall becontained in the certificate holder's computer program (Identify).c. If the program document is canceled, the maintenance program shall be completelyreevaluated by the (NATIONAL AUTHORITY). Maintenance and overhaul time limitsshall then be reestablished by the operator and approved by the (NATIONALAUTHORITY).