AIR MONITORING PLANDELATTE METALS SUPERFUND SITE
PONCHATOULA, TANGIPAHOA PARISH, LOUISIANAEPA ID NO. LAD052510344
Prepared for
U.S. ENVIRONMENTAL PROTECTION AGENCY1445 Ross Avenue
Dallas, Texas 75201-2733
Prepared by
Tetra Tech EM Inc.One Dallas Center
350 N. St. Paul Street, Suite 2600Dallas, Texas 75201
Work Assignment No. : 111-RA-RA-06DFEPA Region : 6Date Submitted : November 20, 2002Contract No. : 68-W6-0037Prepared by : Tetra Tech EM Inc.Tetra Tech Project Manager : Mr. Tim StartzTelephone No. : 214-740-2064EPA Work Assignment Manager : Mr. Stephen TzhoneTelephone No. : (214) 665-8409
CONTENTS
Section Page
i
ACRONYMS AND ABBREVIATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iv
1.0 INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
2.0 OBJECTIVES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
2.1 METEOROLOGICAL CONDITIONS MONITORING . . . . . . . . . . . . . . . . . . . . . . . . 22.2 INTEGRATED AIR MONITORING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32.3 REAL-TIME AIR MONITORING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
3.0 ACTION LEVELS AND ASSOCIATED RESPONSE ACTIONS . . . . . . . . . . . . . . . . . . . . . . 3
3.1 PARTICULATE MATTER . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33.2 LEAD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 63.3 HYDROGEN SULFIDE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 63.4 SULFUR DIOXIDE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 63.5 OTHER . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
4.0 MONITORING CRITERIA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
5.0 INTEGRATED AIR MONITORING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
5.1 PARTICULATE MATTER . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
5.1.1 Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 85.1.2 Frequency . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 85.1.3 Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 85.1.4 Quality Assurance and Quality Control Requirements . . . . . . . . . . . . . . . . . . . . 9
5.2 LEAD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
5.2.1 Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 95.2.2 Frequency . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 105.2.3 Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 105.2.4 Quality Assurance and Quality Control Requirements . . . . . . . . . . . . . . . . . . . 11
6.0 REAL-TIME AIR MONITORING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
6.1 PARTICULATE MATTER . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
6.1.1 Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 126.1.2 Frequency . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
CONTENTS (Continued)
Section Page
ii
6.1.3 Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 126.1.4 Quality Assurance and Quality Control Requirements . . . . . . . . . . . . . . . . . . . 13
6.2 HYDROGEN SULFIDE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
6.2.1 Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 136.2.2 Frequency . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 136.2.3 Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 146.2.4 Quality Assurance and Quality Control Requirements . . . . . . . . . . . . . . . . . . . 14
6.3 SULFUR DIOXIDE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
6.3.1 Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 156.3.2 Frequency . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 156.3.3 Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 156.3.4 Quality Assurance and Quality Control Requirements . . . . . . . . . . . . . . . . . . . 16
6.4 OTHER SOURCES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
7.0 PREVENTIVE MEASURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
8.0 HEALTH AND SAFETY PLAN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
9.0 ANALYTICAL ANALYSIS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
10.0 AIR SAMPLING AND MONITORING REPORT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
REFERENCES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
Appendix
A AIR MONITORING DATA SHEETS
Attachment
A ANALYTICAL ANALYSIS METHODS
iii
TABLE
Table Page
1 SITE-SPECIFIC AIR MONITORING REQUIREMENTS AND ACTION LEVELS . . . . . . . . 4
iv
ACRONYMS AND ABBREVIATIONS
CM Construction managerCO Carbon monoxideDM Delatte MetalsEPA U.S. Environmental Protection AgencyHASP Health and Safety PlanH2S Hydrogen sulfideLEL Lower explosive limitmg/m3 Milligram per cubic meterml/min Milliliters per minuteNIOSH National Institute for Occupational Safety and HealthOSHA Occupational Safety and Health AdministrationO2 OxygenPM Particulate matterPM-10 Particulate matter less than 10 microns but greater than 1.0ppm Parts per millionQA/QC Quality assurance and quality controlRA Remedial actionRD Remedial designRI Remedial investigationS/S Solidification/stabilizationSHSO Site health and safety officerSTART Superfund Technical Assessment and Response TeamTetra Tech Tetra Tech EM Inc.TPSD Tangipahoa Parish Sheriff’s DepartmentTWA Time-weighted average
1
1.0 INTRODUCTION
This plan describes the air monitoring procedures that will be used during the remedial action (RA) at the
Delatte Metals (DM) site. The purpose of this air monitoring plan is to outline the procedures that will
be used to monitor potential air emissions resulting from activities at the site during the RA. Because of
the complexity of the remedial design (RD), these procedures may be modified during the RA to satisfy
unanticipated or changing conditions.
The RA for contaminated soil and sediment is excavation and treatment using on-facility
solidification/stabilization (S/S). The RA for contaminated ground water is treatment through a
permeable reactive barrier wall . The RA for the Delatte Metals site is to be implemented in accordance
with the U.S. Environmental Protection Agency’s (EPA) 2000 Record of Decision and the RD
specifications. Tetra Tech EM Inc. (Tetra Tech) will provide all necessary personnel, services, materials,
and equipment to provide the required management and analytical support.
Extensive air monitoring will be administered and monitored for all RA activities. Based on previous
information from Superfund Technical Assessment and Response Team (START) removal activit ies
(Ecology & Environment, Inc. [E&E 1996]) and the remedial investigation (RI), (Tetra Tech 2000), the
primary concern for workers on site is exposure to soil contaminated with high levels of lead. Previous
START removal activities indicate that exposure to nearby workers may present a safety hazard.
Additionally, exposure to workers associated with the Tangipahoa Parish Sheriff’s Department (TPSD)
vehicle maintenance operations may also present a safety hazard. The TPSD vehicle maintenance
operations currently occupy the former maintenance building located on the south side of the site.
Perimeter monitoring will be conducted during RA activities to ensure that dust generated during RA
activities does not result in off-site migration of contaminants to nearby residential areas and businesses.
This air monitoring plan will be used in conjunction with the site health and safety plan (HASP)
(Tetra Tech 2001). Unforseen gas emissions from soil excavation areas will also be addressed and
monitored with this air monitoring plan. Although it is difficult to quantify the types of potentially harmful
air emissions from soil disturbance areas, the air monitoring plan will be revised, if necessary, based on RA
activities and the HASP (Tetra Tech 2001). These revisions will be based on recommendations by the site
health and safety officer (SHSO) and must meet EPA approval.
2
A majority of RA activities at DM involve soil disturbance activities such as excavating and handling of
contaminated materials. Dust from these activit ies can be minimized using preventive measures, as listed
in Section 7.0. Airborne dust par ticles will be quantified and analyzed to ensure a safe workplace for
workers around these areas. Integra ted air monitoring will be used to monitor the dust levels as well as the
primary contaminant (lead) contained in the dust.
Real-time air monitoring will be conducted around the S/S unit, outside and inside the TPSD vehicle
maintenance operations building, and at other designated perimeter monitoring locations; confirmation
sampling will be conducted around excavated areas and other areas designated by the SHSO. Real-time air
monitoring provides real-time data (data returned by methods such as digital, dial, or calorimetric readings
within a very short time or continuously), which is used to determine if work practices should be changed
or engineering controls can be implemented immediately. The following sections describe the approach and
rationale for conducting air monitoring activities at the DM site.
2.0 OBJECTIVES
The overall objective of the air monitoring effort is to monitor contaminant levels in the ambient air to
determine whether airborne contaminants at the site exceed action level concentrations during RA activities.
Air monitoring will provide data to determine whether work practices must be altered or engineering
controls added to minimize off-site migration of unacceptable levels of airborne contamination.
2.1 METEOROLOGICAL CONDITIONS MONITORING
The objective of monitoring meteorological conditions is to collect sufficient meteorological data to
interpret air sampling data and to document that air was sampled or monitored in accordance with this plan
during the RA. At a minimum, temperature and barometric pressure will be recorded during each day of
on-facility activity. Temperature and barometric pressure will be recorded for use in converting air
volumes to standard temperature and pressure values. A meteorological station will be installed on facility,
and daily meteorological conditions will be recorded and documented.
3
2.2 INTEGRATED AIR MONITORING
The objective of integrated air monitoring is to determine whether the RA activities were conducted in
compliance with action levels established herein. Integrated air monitoring will occur over an 8-hour work
period. Based on analytical results, integrated air monitoring samples that exceed an action level could
result in modifications to the work schedule. In addition, integrated air monitoring will be used in
conjunction with the HASP (Tetra Tech 2001).
2.3 REAL-TIME AIR MONITORING
The objective of real-time air monitoring is to determine, in a timely manner, whether unacceptable levels
of airborne contaminants exist at the site, the adjacent TPSD vehicle maintenance operations building, or
designated perimeter monitoring locations. The preferred method of air monitoring for unacceptable levels
of airborne contamination for an RA of relatively short duration is one that provides real-time data. This
method is preferred because when airborne contamination reaches unacceptable levels at the work site or
perimeter locations, work practices can be changed or engineering controls can be implemented
immediately.
3.0 ACTION LEVELS AND ASSOCIATED RESPONSE ACTIONS
This section presents action levels and associated response actions for air monitoring activities at the DM
site.
3.1 PARTICULATE MATTER
As shown in Table 1, the current Occupational Safety and Health Administration (OSHA) limit for total
particulate matter (PM) is 15 milligrams per cubic meter (mg/m3) for an 8-hour work period (integrated air
monitoring). This will be verified and measured by an analytical lab using pre-weighed filter cassettes and
a Gillian GilAir-5 Sampler, or an approved equal. All equipment operators around soil disturbance areas,
such as excavation or contaminated material handling areas, will be required to participate. Permanent
monitoring sta tions will also be established outside and inside the TPSD vehicle maintenance
4
TABLE 1
SITE-SPECIFIC AIR MONITORING REQUIREMENTS AND ACTION LEVELS
Contamin ant or Ha zard Task Mon itoring Device Action Level Mon itoring Frequ ency Action
Organic vapo rs Ground water or
soil with a very
strong odor
PID Background to 5 ppm Every 30 to 60 minutes Use modified Level D PPE
5 to 100 ppm Every 30 m inutes Use Level C PPE (unless specific chem icals are
identified and evaluated using detector tube)
> 100 ppm NA Stop work and evacuate area; implement vapor
sup pres sion con trols
Hydrogen sulfide Stabilization/
Solidification area
02/CO/LE L/H 2S monitor > 20 ppm 2
Hou rly Stop work, evacuate area, and evaluate source
< 20 ppm 2
Continu e work
Sulfur dioxide Stabilization/
Solidification area
S02 monitor > 5 ppm 2
Hou rly Stop work, evacuate area, and evaluate source
< 5 ppm 2
Continu e work
Lead in dust Soil disturbance
(excavation and
material handling)
Personal air sampling > 0.05 mg/m3 1
8-hour work period Stop work, evacuate area, and evaluate source
0.03 - 0.0 5 mg/m3 1
Continue work with extreme caution
0 - 0.03 m g/m3 1
Continu e work
Oxygen-deficient or
enriched atm osphere
Confirmation
sampling
02/CO/LE L/H2S monitor $19.5 to #23.5% oxygen Hou rly Continu e work
<19.5% or >23.5% oxygen Stop work and evacuate area
Particulate Soil disturbance
(excavation and
material handling)
Personal air sampling >15 m g/m 3 1
8-hour work period Stop work and implement dust suppression
activities
7.0 - 15.0 mg/m3 1
Use Level C PP E and implemen t dust
suppression activities
0 - 7.0 m g/m3 1
Continu e work
Soil disturbance
(excavation and
material handling)
Particulate meter > 0.5 m g/m3 1
Hou rly Stop work and implement dust suppression
activities
0.3 - 0.5 m g/m3 1
Use Level C PP E and/or implement du st
suppression activities
0 -
0.3 m g/m3
1Continu e work
5
TABLE 1 (Continued)
SITE-SPECIFIC AIR MONITORING REQUIREMENTS AND ACTION LEVELS
Notes:
1 OSHA Recommended Exposure Limit (REL) through a time-weighted average (TWA) for up to an 8-hour period 2 OSHA Ceiling REL; value should not be exceeded at any time
CO Carbon monoxideLEL Lower explosive limit mg/m3 Milligram per cubic meterNA Not applicableOSHA Occupat ional Safety and Health Administra tionPEL Permissible exposure limitPID Photoionizat ion detectorPPE Personal protective equipmentppm Part per mi llion
6
operations building and designated perimeter monitoring locations. In addition, real-time air monitoring
will be used to provide immediate results. Generally, most real-time air monitors measure respirable
particulates between 1.0 and 10 micrometers in size (PM-10). The current hourly OSHA limit for
respirable particulate matter (PM-10) is 0.5 mg/m3.
3.2 LEAD
As shown in Table 1, the current OSHA limit for respirable lead dust is 0.05 mg/m3 for an 8-hour work
period (integrated air monitoring). This will be verified and measured by an analytical lab using
pre-weighed filter cassettes and a Gillian GilAir-5 Sampler, or an approved equal. All equipment operators
around soil disturbance areas, such as excavation or contaminated material handling areas, will be required
to participate. Permanent monitoring stations will also be established outside the TPSD vehicle
maintenance operations building and other designated perimeter monitor locations. To decrease cost, both
analyses will be obtained using the same pre-weighed filter cassette and air sampler. A time-weighted
average (TWA) for an 8-hour period of sampling will determine the particulate level, and a subsequent
analysis will be considered to determine lead content.
3.3 HYDROGEN SULFIDE
The current OSHA limit for hydrogen sulfide real-time air monitoring is 20 parts per million (ppm).
During RA activities, the SHSO will administer all real-time measurements.
3.4 SULFUR DIOXIDE
The current OSHA limit for sulfur dioxide real-time air monitoring is 5 ppm. During RA activities, the
SHSO will administer all real-time measurements.
7
3.5 OTHER
The current OSHA limit for other possible air emissions are listed in Table 1. During RA activities, the
SHSO will administer all real-time measurements.
4.0 MONITORING CRITERIA
Air monitoring will occur during active periods of the RA and will include hand-held equipment for both
real-time and integrated air monitoring. The integrated air monitoring equipment will be located on or near
personnel who are near soil disturbance areas, such as excavation or contaminated soil handling areas.
Permanent monitoring stations will also be established outside and inside the TPSD vehicle maintenance
operations building and designated perimeter monitoring locations. Real-time air monitoring will be
administered by the SHSO when requested by RA personnel or when possible air emissions may be
present.
5.0 INTEGRATED AIR MONITORING
As discussed in Section 4.0, ambient air will be monitored for personnel participating in soil disturbance
activities at excavation or contaminated soil handling areas. Permanent monitoring stations will also be
established outside and inside the TPSD vehicle maintenance operations building and designated perimeter
monitoring locations. Any deviation or variations in the sampling frequency or the number of personnel
involved in the air monitoring plan will be dependent upon the analytical results and EPA approval.
Initially, all personnel working around soil disturbance activities will be required to participate.
Background samples, field blanks, and field duplicates will also be implemented initially.
5.1 PARTICULATE MATTER
Airborne dust will be present during RA and soil disturbance activities.
8
5.1.1 Equipment
Total airborne PM concentrations will be collected during an 8-hour work schedule using hand-held air
sampling equipment on or near personnel. Using pre-weighed filter cassettes and a Gillian GilAir-5
Sampler, or an approved equal, air samples above the OSHA action limit for total dust (15 mg/m3) will be
determined. The air sampler will be calibrated once a day to a flow rate of 1,000 milliliters per minute
(ml/min) using a Gillian Gilbrator Calibrator, or equivalent.
5.1.2 Frequency
PM will be monitored continuously during RA activities at the soil disturbance areas, outside and inside the
TPSD vehicle maintenance operations building, and at designated perimeter monitoring locations unless
rain occurs during the 8-hour sampling period. In the case of rain, air monitoring will continue after the
rain has ceased, for the duration of the scheduled 8-hour sampling period or as advised by the construction
manager (CM). In addition, air monitoring will cease when fog or heavy mist is present. Initially, all
personnel around soil disturbance areas and the permanent areas outside the TPSD vehicle maintenance
operations building and designated perimeter monitoring locations will be required to participate in air
monitoring on a daily basis. Any deviation or variat ions in the sampling frequency or the number of
personnel involved in the air monitoring plan will be dependent upon the analytical results and EPA
approval. If the action levels are not exceeded for one month, the sampling frequency may change.
5.1.3 Procedures
Monitoring equipment will be operated in accordance with the manufacturer’s operating instructions. For
each air monitoring event, the following data processing procedures will be completed:
• The SHSO will complete, sign, and date the air monitoring log (Tables A-1 andA-2) immediately following each monitoring event.
• At a minimum, one field duplicate sample must be obtained on a weekly basis.
• At a minimum, one field blank and background sample must be obtained on a daily basis.
9
• Each sampler must be calibrated at least once a day to the flow rate of 1,000 ml/min. Thebattery for each sampler will be recharged overnight to ensure no power failure during the8 hours of air sampling.
• The sampling line, from the sampler to the pre-weighed filter cassettes, will be attached topersonnel by tape or other means.
• PM air monitoring data will be evaluated by the SHSO to determine if action levels wereexceeded.
• If action levels were not exceeded, the SHSO will sign, date, and file the log.
• If action levels were exceeded, the SHSO will inform the CM. The SHSO and CM willdevelop response actions for reducing emissions.
• Proposed response actions will be written on the logs, and the CM and the SHSO will signand date the log.
• After necessary signatures have been obtained, the PM monitoring log will be bound in athree-ring binder in chronological order and consecutively numbered by hand.
5.1.4 Quality Assurance and Quality Control Requirements
PM monitoring equipment will be calibrated in accordance with the manufacturer’s operating instructions.
Field blanks, field duplicates, and background samples will help provide a quality assurance and quality
control (QA/QC) basis for data interpretation.
5.2 LEAD
Airborne dust with high levels of lead may be present during RA and soil disturbance activities.
5.2.1 Equipment
The same equipment used for PM monitoring will be used to collect samples for lead analysis. To decrease
cost, PM and lead analysis will be obtained using the same pre-weighed filter cassette and air sampler. A
TWA for an 8-hour period of sampling will first determine the PM level followed by an analysis for lead.
10
5.2.2 Frequency
Lead will be monitored continuously during RA activities at the soil disturbance areas, outside and inside
the TPSD vehicle maintenance operations building, and at designated perimeter monitoring locations unless
rain occurs during the 8-hour sampling period. In the case of rain, air monitoring will continue after the
rain has ceased for the duration of the scheduled 8-hour sampling period or as advised by the CM. In
addition, air monitoring will cease when fog or heavy mist is present. Initia lly, all personnel around soil
disturbance areas and the permanent areas outside and inside the TPSD vehicle maintenance building and
designated perimeter monitoring locations will be required to participate in air monitoring on a daily basis.
Any deviation or variations in the sampling frequency or the number of personnel involved in the air
monitoring plan will be dependent upon the analytical results and EPA approval. If the action levels are
not exceeded for one month, the sampling frequency may change.
5.2.3 Procedures
Monitoring equipment will be operated in accordance with the manufacturer’s operating instructions. For
each air monitoring event, the following data processing procedures will be completed:
• The SHSO will complete, sign, and date the air monitoring log (Tables A-1 andA-2) immediately following each monitoring event.
• At a minimum, one field duplicate sample must be obtained on a weekly basis.
• At a minimum, one field blank and background sample must be obtained on a daily basis.
• Each sampler must be calibrated at least once a day to the flow rate of 1,000 ml/min. Thebattery for each sampler will be recharged overnight to ensure no power failure during the8 hours of air sampling.
• The sampling line, from the sampler to the pre-weighed filter cassettes, will be attached topersonnel by tape or other means.
• Lead air monitoring data will be evaluated by the SHSO to determine if action levels wereexceeded.
• If action levels were not exceeded, the SHSO will sign, date, and file the log.
11
• If action levels were exceeded (0.05 mg/m3), the SHSO will inform the CM. The SHSOand CM will develop response actions for reducing emissions.
• Proposed response actions will be written on the logs, and the CM and the SHSO will signand date the log.
• After necessary signatures have been obtained, the PM monitoring log will be bound in athree-ring binder in chronological order and consecutively numbered by hand.
5.2.4 Quality Assurance and Quality Control Requirements
Lead monitoring equipment will be calibrated in accordance with the manufacturer’s operating instructions.
Field blanks, field duplicates, and background samples will help provide a QA/QC basis for data
interpretation.
6.0 REAL-TIME AIR MONITORING
The SHSO will conduct real-time air monitoring during active RA activities. Areas monitored will include
the S/S area, areas where ground water or sediment is encountered, and outside the TPSD vehicle
maintenance operations building and designated perimeter monitoring location. The SHSO will also
conduct real-time air monitoring during the RA activities in other areas of concern when requested by RA
personnel or when air emissions may be present.
6.1 PARTICULATE MATTER
This section presents real-time air monitoring requirements for quantifying the levels of airborne particulate
particles in ambient air near site personnel or at locations designated by the SHSO. Based on previous data
obtained from the RI (Tetra Tech 2000), high levels of airborne particulate particles may be present
(1) during the S/S process, and (2) in or around soil disturbance areas.
12
6.1.1 Equipment
A MIE pdr DataRAM™ monitor , or an approved equal, will be used to measure PM. Generally, real-time
air monitoring equipment measures respirable dust concentrations in the 1.0 to 10 micrometer size range
(PM-10). The OSHA permissible exposure level for respirable dust is 0.5 mg/m3.
6.1.2 Frequency
The SHSO will administer particulate readings once an hour during the S/S operation or soil disturbance
activities, unless rain is encountered during that period.
6.1.3 Procedures
Monitoring equipment will be operated in accordance with the manufacturer’s operating instructions. For
each air monitoring event, the following data processing procedures will be completed:
• Air monitoring personnel will complete, sign, and date the air monitoring log(Table A-6) immediately following each monitoring event.
• At a minimum, the air monitor will be calibrated once a day or before use with itscalibration gas.
• At a minimum, one duplicate instantaneous reading per week will be taken with aseparate monitor to compare instantaneous data from both meters . Theinstantaneous readings from both meters will be recorded on the log.
• The battery for the air monitor will be recharged to ensure no power failure.
• The SHSO will evaluate particulate air monitoring data to determine if actionlevels were exceeded (0.5 mg/m3).
• If action levels were not exceeded, the SHSO will sign, date, and file the log.
• If action levels were exceeded, the SHSO will inform the CM. The SHSO andCM will develop response actions for reducing emissions.
• Proposed response actions will be written on the logs, and the CM and the SHSOwill sign and date the log.
13
• After necessary signatures have been obtained, the PM monitoring log will bebound in a three-ring binder in chronological order and consecutively numbered byhand.
6.1.4 Quality Assurance and Quality Control Requirements
PM-10 monitoring equipment will be calibrated in accordance with the manufacturer’s operating
instructions. At least weekly, instantaneous PM-10 readings from the monitor will be verified with
instantaneous readings from a second air monitor. Both instantaneous meter readings will be recorded,
along with the check date on the air monitoring log, to document that the QA/QC check was performed and
to provide a QA/QC basis for data interpretation.
6.2 HYDROGEN SULFIDE
This section presents real-time air monitoring requirements for quantifying the levels of hydrogen sulfide in
ambient air near site personnel or at locations designated by the SHSO. Based on previous data obtained
from the RI (Tetra Tech 2000), hydrogen sulfide air emissions may be present during the S/S process.
6.2.1 Equipment
A Biosystems PHD Ultra O2/LEL/CO/H2S monitor, or an approved equal, will be used to measure all of
the following: (1) oxygen (O2); (2) carbon monoxide (CO); (3) lower explosive limit (LEL); and
(4) hydrogen sulfide (H2S).
6.2.2 Frequency
H2S readings will be administered by the SHSO once an hour during the S/S operation.
14
6.2.3 Procedures
Monitoring equipment will be operated in accordance with the manufacturer’s operating instructions. For
each air monitoring event, the following data processing procedures will be completed:
• Air monitoring personnel will complete, sign, and date the air monitoring log(Table A-5) immediately following each monitoring event.
• At a minimum, the air monitor will be calibrated once a day or before use with itscalibration gas.
• At a minimum, one duplicate instantaneous reading per week will be taken with aseparate monitor to compare instantaneous data from both meters . Theinstantaneous readings from both meters will be recorded on the log.
• The battery for the air monitor will be recharged to ensure no power failure.
• The SHSO will evaluate H2S air monitoring data to determine if action levels wereexceeded.
• If action levels were not exceeded, the SHSO will sign, date, and file the log.
• If action levels were exceeded, the SHSO will inform the CM. The SHSO andCM will develop response actions for reducing emissions.
• Proposed response actions will be written on the logs, and the CM and the SHSOwill sign and date the log.
• After necessary signatures have been obtained, the PM monitoring log will bebound in a three-ring binder in chronological order and consecutively numbered byhand.
6.2.4 Quality Assurance and Quality Control Requirements
H2S monitoring equipment will be calibrated in accordance with the manufacturer’s operating instructions.
At least weekly, instantaneous PM readings from the monitor will be verified with instantaneous readings
from a second air monitor. Both instantaneous meter readings will be recorded, along with the check date
on the air monitoring log, to document that the QA/QC check was performed and to provide a QA/QC
basis for data interpretation.
15
6.3 SULFUR DIOXIDE
This section presents real-time air monitoring requirements for quantifying the levels of sulfur dioxide in
ambient air near site personnel or at locations designated by the SHSO. Based on previous data obtained
from the RI (Tetra Tech 2000), sulfur dioxide air emissions may be present during the S/S process.
6.3.1 Equipment
An ISC SO261 Sulfur Dioxide Monitor, or an approved equal, will be used to measure sulfur dioxide.
6.3.2 Frequency
The SHSO will administer sulfur dioxide readings once an hour during the S/S process.
6.3.3 Procedures
Monitoring equipment will be operated in accordance with the manufacturer’s operating instructions. For
each air monitoring event, the following data processing procedures will be completed:
• Air monitoring personnel will complete, sign, and date the air monitoring log(Table A-3) immediately following each monitoring event.
• At a minimum, the air monitor will be calibrated once a day or before use with itscalibration gas.
• At a minimum, one duplicate instantaneous reading per week will be taken with aseparate monitor to compare instantaneous data from both meters . Theinstantaneous readings from both meters will be recorded on the log.
• The battery for the air monitor will be recharged to ensure no power failure.
• The SHSO will evaluate sulfur dioxide air monitoring data to determine if actionlevels were exceeded.
• If action levels were not exceeded, the SHSO will sign, date, and file the log.
• If action levels were exceeded, the SHSO will inform the CM. The SHSO andCM will develop response actions for reducing emissions.
16
• Proposed response actions will be written on the logs, and the CM and the SHSOwill sign and date the log.
• After necessary signatures have been obtained, the PM monitoring log will bebound in a three-ring binder in chronological order and consecutively numbered byhand.
6.3.4 Quality Assurance and Quality Control Requirements
Sulfur dioxide monitoring equipment will be calibrated in accordance with the manufacturer’s operating
instructions. At least weekly, instantaneous PM readings from the monitor will be verified with
instantaneous readings from a second air monitor. Both instantaneous meter readings will be recorded,
along with the check date on the air monitoring log, to document that the QA/QC check was performed and
to provide a QA/QC basis for data interpretation.
6.4 OTHER SOURCES
Although it is hard to identify and quantify air emissions from excavation areas, there are monitoring
devices that will detect different types of air emissions. The monitor used to measure hydrogen sulfide will
also be used to measure areas where CO might be present. During confirmation sampling, an O2 or LEL
reading will also be collected by the same monitoring device. Daily calibration with calibration gasses
should be administered by the SHSO to provide a QA/QC basis for data interpretation.
7.0 PREVENTIVE MEASURES
Preventive measures to control airborne dust emissions include frequent watering of on- and off-facility
roads. In addition, dust masks and respirators should be used by all personnel on dry, windy days when
there are soil disturbances around areas with high levels of contamination.
17
8.0 HEALTH AND SAFETY PLAN
The air monitoring plan will be used in conjunction with the HASP (Tetra Tech 2001). Results from both
the integrated and real-time air monitoring will determine the level of protection for personnel working in
soil disturbance areas. In addition, the frequency and continuation of biological monitoring for lead will be
dependent upon analytical results.
9.0 ANALYTICAL ANALYSIS
Ambient air will be sampled and analyzed in accordance with National Institute for Occupational Safety
and Health (NIOSH) method number 0500, Particulates Not Otherwise Regulated, Total and NIOSH
method number 7300, Elements by ICP to determine total dust and lead emissions, respectively
(Attachment A).
10.0 AIR SAMPLING AND MONITORING REPORT
Daily Air Monitoring/Sampling Summary Form 0401 will be completed on each day of air sampling or
monitoring. Form 0401 will be attached to individual monitoring data sheets as part of a daily air
monitoring report. Daily air monitoring reports will be bound and consecutively numbered in chronological
order to form a comprehensive air monitoring report. Following completion of the RA, the comprehensive
air monitoring report will serve as the record of the air monitoring and sampling activities conducted during
the RA. In addition, daily meteorological conditions will also be included in the report.
18
REFERENCES
Ecology & Environment, Inc. 1996. “Removal Support Report, Ponchatoula Battery, Ponchatoula,Tangipahoa Parish, Louisiana.” January.
National Institute of Occupational Safety and Health. 1997. Manual of Analytical Methods, FourthEdition.
Tetra Tech EM Inc. 2000. “Remedial Investigation Report, Delatte Metals, Ponchatoula, TangipahoaParish, Louisiana.” January.
Tetra Tech EM Inc. 2001. “Health & Safety Plan, Delat te Metals, Ponchatoula, Tangipahoa Parish,Louisiana.” December.
TABLE A-1
DELATTE METALSTETRA TECH EM INC
PERSONNEL PUMP FIELD DATA SHEET
A-1-1
DateTime
(on/off)
Pre-TestCalibration Flow (l/min)
Pre-TestCalibration
Average Flow (l/min)
Post-TestCalibration
Flow(l/min)
Post-TestCalibration
AverageFlow
(l/min)
AverageCalibration
Flow(l/min)
TotalTestTime
(mins)
TotalSample Volume (liters)
PumpSerial
NumberFilter
NumberSample ID
NumberEmployee
Wearing Sampler
Calibrated by:_________________________
Chain of Custody #:_____________________
Date sent to Lab:________________________
Valid Pre-Test and Post-Test leak check: ____ yes ____ no All samples were sent to Pace Analytical Laboratory (504-469-0333) in St. Rose, LA for analysis
A-2-1
TABLE A-2
SUMMARY OF ANALYTICAL TESTING OF PERSONNEL AIR SAMPLINGFOR PM and TOTAL LEAD
DELATTE METALS
Sample Identifi cation PM (mg/m3)OSHA 8-HourTWA for PM Total Lead (mg/m3)
OSHA 8-HourTWA for
LeadPersonnel Wearing
Sampler Activity
Date:
15.0 mg/m3 0.05 mg/m3
Date:
15.0 mg/m30.05 mg/m3
A-3-1
TABLE A-3
DELATTE METALSTETRA TECH EM INC
SULFUR DIOXIDE DATA SHEET
Date Time Actual Reading Action Limit Administered by Activity
5 ppm
5 ppm
5 ppm
5 ppm
5 ppm
5 ppm
5 ppm
5 ppm
5 ppm
5 ppm
5 ppm
5 ppm
5 ppm
5 ppm
5 ppm
5 ppm
5 ppm
A-4-1
TABLE A-4
DELATTE METALSTETRA TECH EM INC
OXYGEN/LEL MONITORING DATA SHEET
Date Time Actual Reading Action Limit Administered by Activity
< 19.5 % or >23.5% O2
< 19.5 % or >23.5% O2
< 19.5 % or >23.5% O2
< 19.5 % or >23.5% O2
< 19.5 % or >23.5% O2
< 19.5 % or >23.5% O2
< 19.5 % or >23.5% O2
< 19.5 % or >23.5% O2
< 19.5 % or >23.5% O2
< 19.5 % or >23.5% O2
< 19.5 % or >23.5% O2
< 19.5 % or >23.5% O2
< 19.5 % or >23.5% O2
< 19.5 % or >23.5% O2
< 19.5 % or >23.5% O2
< 19.5 % or >23.5% O2
< 19.5 % or >23.5% O2
< 19.5 % or >23.5% O2
A-5-1
TABLE A-5
DELATTE METALSTETRA TECH EM INC
HYDROGEN SULFIDE MONITORING DATA SHEET
Date Time Actual Reading Action Limit Administered by Activity
20 ppm
20 ppm
20 ppm
20 ppm
20 ppm
20 ppm
20 ppm
20 ppm
20 ppm
20 ppm
20 ppm
20 ppm
20 ppm
20 ppm
20 ppm
20 ppm
A-6-1
TABLE A-6
DELATTE METALSTETRA TECH EM INC
HOURLY PARTICULATE MONITORING DATA SHEET
Date Time Actual Reading Action Limit Administered by Activity
0.5 ppm
0.5 ppm
0.5 ppm
0.5 ppm
0.5 ppm
0.5 ppm
0.5 ppm
0.5 ppm
0.5 ppm
0.5 ppm
0.5 ppm
0.5 ppm
0.5 ppm
0.5 ppm
0.5 ppm
0.5 ppm
0.5 ppm
A-7-1
TABLE A-7
DELATTE METALSTETRA TECH EM INC
PID DATA SHEET
Date Time Actual Reading Action Limit Administered by Activity
5 ppm
5 ppm
5 ppm
5 ppm
5 ppm
5 ppm
5 ppm
5 ppm
5 ppm
5 ppm
5 ppm
5 ppm
5 ppm
5 ppm
5 ppm
5 ppm