![Page 1: Air Force Center for Engineering and the Environment · 2013-05-11 · performance and reduce time to site closure Virtual roundtable for all-party consensus. Sustainable . Remediation](https://reader034.fdocuments.in/reader034/viewer/2022050208/5f5b3a40e8523353ee5ae2fb/html5/thumbnails/1.jpg)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Air Force Center for Engineering and the Environment
1
Dr. Sam BrockAFCEE/TDV13 May 2010
Low-Energy Technologies and Uncertainty Analysis
Federal Remediation Technologies Roundtable
May 13, 2010
![Page 2: Air Force Center for Engineering and the Environment · 2013-05-11 · performance and reduce time to site closure Virtual roundtable for all-party consensus. Sustainable . Remediation](https://reader034.fdocuments.in/reader034/viewer/2022050208/5f5b3a40e8523353ee5ae2fb/html5/thumbnails/2.jpg)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Overview
Understanding Risk and Uncertainty
Environmental Restoration Program – Optimization (ERP-O)
ERP-O Performance data/ Lessons Learned
Emerging Issues
Remediation Performance Risk Management Guidance
2
![Page 3: Air Force Center for Engineering and the Environment · 2013-05-11 · performance and reduce time to site closure Virtual roundtable for all-party consensus. Sustainable . Remediation](https://reader034.fdocuments.in/reader034/viewer/2022050208/5f5b3a40e8523353ee5ae2fb/html5/thumbnails/3.jpg)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Air Force Risk-Based Approach
Decisions Risk-Based to Maximum Extent
Follow National and DOD Guidance
Risk Assessment to be
Reasonable
Relevant and
Representative
Multiple Lines of Evidence - ITRC 2007
Risk Triangle
Source, Pathway, Receptor
EPA Government Performance and Results Act (GPRA) Environmental Restoration Goals
Human Exposure Pathways under control
No Off-Site groundwater Migration
Restoration of contaminated media to the extent Practicable
3
Receptor
Representative
Pathway
RelevantReasonable
Source
3
![Page 4: Air Force Center for Engineering and the Environment · 2013-05-11 · performance and reduce time to site closure Virtual roundtable for all-party consensus. Sustainable . Remediation](https://reader034.fdocuments.in/reader034/viewer/2022050208/5f5b3a40e8523353ee5ae2fb/html5/thumbnails/4.jpg)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Understanding Risk
Coupling a toxicology MODEL with an exposure MODEL to predict probability of an adverse health outcome
Benzene-exposed rats develop leukemia extrapolate to human subpopulations calculate concentration in water that may cause effects
Develop site specific exposure equations for various scenarios
Essentially, all models are wrong, some are useful.
George Box, 1987
4
![Page 5: Air Force Center for Engineering and the Environment · 2013-05-11 · performance and reduce time to site closure Virtual roundtable for all-party consensus. Sustainable . Remediation](https://reader034.fdocuments.in/reader034/viewer/2022050208/5f5b3a40e8523353ee5ae2fb/html5/thumbnails/5.jpg)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
What is Uncertainty?
Risk = Likelihood X Consequences
The components of risk are
Likelihood of occurrence
Consequences of occurrence
Uncertainty
Uncertainty = Lack of Knowledge- Outcome different from Expected - Model used / Parameters used- Better Data can reduce uncertainty
Variability = real identifiable differences between individual cases- A single action/approach is not optimal in every case- Better Data cannot reduce variability
5
![Page 6: Air Force Center for Engineering and the Environment · 2013-05-11 · performance and reduce time to site closure Virtual roundtable for all-party consensus. Sustainable . Remediation](https://reader034.fdocuments.in/reader034/viewer/2022050208/5f5b3a40e8523353ee5ae2fb/html5/thumbnails/6.jpg)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Identifying Uncertainty
Intended Consequence
Human exposure pathways under control
No off-site groundwater migration
Restoration of contaminated media to the extent practicable
Unintended Consequence
In-situ performance risks
Remediation is too slow
Community impacts/accidents
Ecological impacts
Legal issues
6
![Page 7: Air Force Center for Engineering and the Environment · 2013-05-11 · performance and reduce time to site closure Virtual roundtable for all-party consensus. Sustainable . Remediation](https://reader034.fdocuments.in/reader034/viewer/2022050208/5f5b3a40e8523353ee5ae2fb/html5/thumbnails/7.jpg)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Performance Risk Management
A course of action that addresses all risks related to the remediation process
Risks associated with site investigation, remedy selection, implementation and close out
Holistic, life cycle basis
Consider Likelihood of Attaining Goals
Overstated likelihood of success
Incorrect Parameters (Cost vs. Certainty)
Omitting consequence of action
Objective
Maximize the certainties in the cleanup process to protect human health and the environment
7
![Page 8: Air Force Center for Engineering and the Environment · 2013-05-11 · performance and reduce time to site closure Virtual roundtable for all-party consensus. Sustainable . Remediation](https://reader034.fdocuments.in/reader034/viewer/2022050208/5f5b3a40e8523353ee5ae2fb/html5/thumbnails/8.jpg)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Environmental Restoration Program Optimization
Environmental Restoration Program Optimization encompasses three environmental program processes
Investigation Process Optimization (IPO)
Remedial Process Optimization (RPO)
Post Closure Care
Environmental Restoration Program Optimization (ERP-O)A comprehensive and systematic review of an installation’s cleanup activitiesRemediate natural infrastructure resources to sustain current and planned mission use
Promote/incorporate sustainability principles
Ensure remedy effectiveness, first; then optimize remedy efficiency
8
![Page 9: Air Force Center for Engineering and the Environment · 2013-05-11 · performance and reduce time to site closure Virtual roundtable for all-party consensus. Sustainable . Remediation](https://reader034.fdocuments.in/reader034/viewer/2022050208/5f5b3a40e8523353ee5ae2fb/html5/thumbnails/9.jpg)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Process Optimization
Evaluating Remedial Study Programs with the Goal of Improving Overall:
Investigation Effectiveness (through Triad or RSC)
Time and Cost to Achieve RIP Milestone
Development/Update of a CSM for Decision Makers
An Iterative/Systematic Planning Approach for: Evaluating Existing/Proposed Remediation Processes with the Goal of Improving Overall:
Remediation Effectiveness
Reduction in Cleanup Time and Costs
Timely Feedback to Decision Makers
Efficiency
Final Decommissioning Activities Leading to Site Closure with the Goal of Improving Overall:
Well Decommissioning
System Decommissioning
RCRA permit Closure
Removal from NPL
9
![Page 10: Air Force Center for Engineering and the Environment · 2013-05-11 · performance and reduce time to site closure Virtual roundtable for all-party consensus. Sustainable . Remediation](https://reader034.fdocuments.in/reader034/viewer/2022050208/5f5b3a40e8523353ee5ae2fb/html5/thumbnails/10.jpg)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Estimating Uncertainty
Judgment & Checklists
Performance Measures
Decision Support
Matrices
Probability distributions
Probabilistic Risk Analysis
10 10
![Page 11: Air Force Center for Engineering and the Environment · 2013-05-11 · performance and reduce time to site closure Virtual roundtable for all-party consensus. Sustainable . Remediation](https://reader034.fdocuments.in/reader034/viewer/2022050208/5f5b3a40e8523353ee5ae2fb/html5/thumbnails/11.jpg)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Performance Measures -Develop a Hierarchy of Objectives
11
![Page 12: Air Force Center for Engineering and the Environment · 2013-05-11 · performance and reduce time to site closure Virtual roundtable for all-party consensus. Sustainable . Remediation](https://reader034.fdocuments.in/reader034/viewer/2022050208/5f5b3a40e8523353ee5ae2fb/html5/thumbnails/12.jpg)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Other
Wall/Barrier
Monitored NaturalAttenuation (MNA)
EnhancedBioremediation
LNAPL Recovery
Soil Vapor Extraction (SVE)
Pump and Treat
11 yrs
30 yrs
11 yrs
30 yrs
27 yrs
13 yrs
15 yrs
$8.39 M
$1.45M
$2.8 M
$1.51M
$2.60M
$2.04M
$1.01M
AF Environmental Restoration Program
12
Energy IntensiveInventory – 38%
LCC - 73%
Low Energy / PassiveInventory – 48%
LCC – 24%
Other
*Based on FY08 EDITT System Inventory as of 15 March 2010
Average Lifetime Operation
Average Lifetime O&M Costs
$1.25B
Average Life-Cycle Costs
by Technology
12
![Page 13: Air Force Center for Engineering and the Environment · 2013-05-11 · performance and reduce time to site closure Virtual roundtable for all-party consensus. Sustainable . Remediation](https://reader034.fdocuments.in/reader034/viewer/2022050208/5f5b3a40e8523353ee5ae2fb/html5/thumbnails/13.jpg)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
ERP-O ToolsSupport ToolsUncertainty ToolSustainability ToolPerformance TrackingRecommendation TrackingLTMOEDITT
InputInput
Design
Materials & Consumables
Output: Sustainability
Metrics
13
![Page 14: Air Force Center for Engineering and the Environment · 2013-05-11 · performance and reduce time to site closure Virtual roundtable for all-party consensus. Sustainable . Remediation](https://reader034.fdocuments.in/reader034/viewer/2022050208/5f5b3a40e8523353ee5ae2fb/html5/thumbnails/14.jpg)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
What the Sustainable Remediation Tool (SRT) does:
Estimates sustainability metrics for 8 specific technologies
Sustainability metrics estimated:
Carbon dioxide emissions to atmosphere
Total energy consumed
Change in resource service
Safety / Accident risk
Technology cost
NOx
SOx
PM10
Used in future planning and optimization of existing systems
Provides lifetime sustainability assessment
Works in concert with Performance Tracking Tool (PTT) to evaluate performance and reduce time to site closure
Virtual roundtable for all-party consensus
Sustainable Remediation Tool
Optimization tool … helps drive and influence GSR technology selection
15 sustainability assessments over past 8 months
2010 release – Interface with RACER and additional features, metrics, and technology modules
14
![Page 15: Air Force Center for Engineering and the Environment · 2013-05-11 · performance and reduce time to site closure Virtual roundtable for all-party consensus. Sustainable . Remediation](https://reader034.fdocuments.in/reader034/viewer/2022050208/5f5b3a40e8523353ee5ae2fb/html5/thumbnails/15.jpg)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
SRT Example -Risk to Workers
By operating the groundwater treatment system:
Risk to workers ~ 1 X10-3
Risk to community ~ 1 X10-4
Risk to HH & Eco from ground water ~ 1 X10-6
Is active remediation really justified?
Alternative to remediation
15
![Page 16: Air Force Center for Engineering and the Environment · 2013-05-11 · performance and reduce time to site closure Virtual roundtable for all-party consensus. Sustainable . Remediation](https://reader034.fdocuments.in/reader034/viewer/2022050208/5f5b3a40e8523353ee5ae2fb/html5/thumbnails/16.jpg)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Resources Protected
Evaluation of resources being protected
Technology vs. Energy Use
Is active remediation really justified?
Alternative to remediation
Groundwater restoration atCalifornia installation
Consuming 1.5M KWH/yr
Removing < 50 grams of TCE/yr
Producing 750 tons of CO2
$3.6M/lb TCE removed
16
![Page 17: Air Force Center for Engineering and the Environment · 2013-05-11 · performance and reduce time to site closure Virtual roundtable for all-party consensus. Sustainable . Remediation](https://reader034.fdocuments.in/reader034/viewer/2022050208/5f5b3a40e8523353ee5ae2fb/html5/thumbnails/17.jpg)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Lessons Learned Performance Tracking Tool
![Page 18: Air Force Center for Engineering and the Environment · 2013-05-11 · performance and reduce time to site closure Virtual roundtable for all-party consensus. Sustainable . Remediation](https://reader034.fdocuments.in/reader034/viewer/2022050208/5f5b3a40e8523353ee5ae2fb/html5/thumbnails/18.jpg)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Remedial Project Risk Management
Risk Planning
18
![Page 19: Air Force Center for Engineering and the Environment · 2013-05-11 · performance and reduce time to site closure Virtual roundtable for all-party consensus. Sustainable . Remediation](https://reader034.fdocuments.in/reader034/viewer/2022050208/5f5b3a40e8523353ee5ae2fb/html5/thumbnails/19.jpg)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Definitions
Emerging Contaminants: Chemicals & materials that have pathways to enter the environment and present potential unacceptable human health or environmental risks
they do not have regulatory peer-reviewed human health standards
the regulatory standards are evolving due to new science, detection capabilities, or pathways
Emerging Issues: Items such as exposure pathways, sampling strategies, policy, or quality assurance that potentially impact cleanup schedules, increases cost, alters the technical approach, or necessitates developing new partnerships
e.g., vapor intrusion, reinvestigation, emerging technologies, and sustainability
…and either
…or
19
![Page 20: Air Force Center for Engineering and the Environment · 2013-05-11 · performance and reduce time to site closure Virtual roundtable for all-party consensus. Sustainable . Remediation](https://reader034.fdocuments.in/reader034/viewer/2022050208/5f5b3a40e8523353ee5ae2fb/html5/thumbnails/20.jpg)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Emerging Issues Tool
Detailed parameter input, such as weightings for each Factor Rating Entities input Score and Certainty for the Technical Analysis
Result of analysis; the PDF curve and confidence of Response Levels are displayed for the Technical Analysis
20
![Page 21: Air Force Center for Engineering and the Environment · 2013-05-11 · performance and reduce time to site closure Virtual roundtable for all-party consensus. Sustainable . Remediation](https://reader034.fdocuments.in/reader034/viewer/2022050208/5f5b3a40e8523353ee5ae2fb/html5/thumbnails/21.jpg)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Emerging Issues Tool (cont)
Stats for Technical, Political, and Regulatory Analysis displayed separately…
Result of combining the Technical Analysis, Political Analysis, and the Regulatory Analysis shown as a PDF curve and confidence of Response Levels.
21
![Page 22: Air Force Center for Engineering and the Environment · 2013-05-11 · performance and reduce time to site closure Virtual roundtable for all-party consensus. Sustainable . Remediation](https://reader034.fdocuments.in/reader034/viewer/2022050208/5f5b3a40e8523353ee5ae2fb/html5/thumbnails/22.jpg)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Preliminary Assessment
(PA)
Site Inspection
(SI)
Remedial Investigation
(RI)
Feasibility Study (FS)
Remedial Design
(RD)Remedial Action
Construction (RA-C)Long Term
Monitoring (LTM)Site Closure (SC)
SITES IN PROGRESS
PRE-DECISION DECISION POST-DECISION SITE
CLOSURE
ROD/DD
RA-O
NEW SITES
DISCOVERY
Restoration Performance Risk Management
22
![Page 23: Air Force Center for Engineering and the Environment · 2013-05-11 · performance and reduce time to site closure Virtual roundtable for all-party consensus. Sustainable . Remediation](https://reader034.fdocuments.in/reader034/viewer/2022050208/5f5b3a40e8523353ee5ae2fb/html5/thumbnails/23.jpg)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Conclusions
1. Address Site Life Cycle / Start Early2. Analyze performance & generate
performance data3. Develop performance measures to leverage
experience and lessons learned4. Improve estimates until:
• Risk is below decision criteria• More knowledge doesn't change estimated risk• Stakes (consequences) are low
(not high enough to warrant further work)
23
![Page 24: Air Force Center for Engineering and the Environment · 2013-05-11 · performance and reduce time to site closure Virtual roundtable for all-party consensus. Sustainable . Remediation](https://reader034.fdocuments.in/reader034/viewer/2022050208/5f5b3a40e8523353ee5ae2fb/html5/thumbnails/24.jpg)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Dr. Sam Brock AFCEE/TDVEmail: [email protected]
Brooks City-Base, San Antonio TX 78235- 5112
(210) 536-7936; DSN 240-7936
Contact Information
Contact Information:
Dr. Sam Brock AFCEE/TDVEmail: [email protected]
Brooks City-Base, San Antonio TX 78235-5112(210) 395-8429; DSN 969-8429