PT. Brown & Root Indonesia
Doc. No. 65-EVT-MC-1477 Rev. 5A
Project TLNG Author’s Org. KJP
KJP Doc. No. G-215A-005 Date 10 Nov. 05
KJP Job Code J-3400-20-0000 Sheet 1 of 64
1. GENERAL...................................................................................................................................2 2. VENDOR NAMES AND ACCEPTABILITY ..........................................................................2 3. SUMMARY OF EVALUATIONS ............................................................................................2
3.1 Technical......................................................................................................................................2 3.2 Delivery Schedule........................................................................................................................3 3.3 Experiences..................................................................................................................................3
4. DEVIATIONS AND CLARIFICATIONS................................................................................3 4.1 General Deviations......................................................................................................................3 4.2 MIGAS Inspection Requirements and Instructions ................................................................3 4.3 Sub-vendor List...........................................................................................................................3
Attachment-1: Bid Analysis Report Attachment-2.1: Deviation and Clarification List from Atlas Copco Attachment-2.2: Deviation and Clarification List from Airpack Attachment-2.3: Deviation and Clarification List from Delair Attachment-3.1: Experience List of Atlas Copco Attachment-3.2: Experience List of Airpack Attachment-3.3: Experience List of Delair Attachment-4.1: Sub-vendor List of Atlas Copco Attachment-4.2: Sub-vendor List of Airpack Attachment-4.3: Sub-vendor List of Delair
X Core Non-core Lifecycle Code B
For Information For Review X For Approval Released As-Built
Rev. Date Page Description Prep’d Chk’d App’d BP App’d
5A 10 Nov 05 All First Issue for Approval A. Corral A. Almirez S. Kato
3.8 MTPA TRAIN CAPACITY Technical Evaluation Report for Air Dryer Packages
Table of Contents
BPMIGAS
TANGGUH LNG
BP Berau Ltd.
Inquiry Requisition No.: R-215A-005
_____
| |
| |
_____INDRA
11-NOV-2005
Doc. No. 65-EVT-MC-1477 KJP Doc. No. G-215A-005 Rev. 5A Sheet No. 2 of 64
Technical Evaluation Report for Air Dryer Packages
BP Berau Ltd. Tangguh LNG Project
1. GENERAL
This report covers the Technical Bid Evaluation for Air Dryer Packages; 065-V-1001A/B for the Tangguh LNG Project.
2. VENDOR NAMES AND ACCEPTABILITY
Vendor Name Country Technical Acceptability
A ATLAS COPCO INDONESIA Acceptable; Recommendable
B AIRPACK NETHERLAND Acceptable
C DELAIR NETHERLAND Not Acceptable
3. SUMMARY OF EVALUATIONS
Atlas Copco
- Atlas Copco proposed to supply their standard Air Dryer Package with acceptable deviations. For details of deviations, please refer to Attachment 2.1.
- Atlas Copco’s proposed Air Dryer Package is a proven standard and proprietary design of their principal company in Belgium.
- Atlas Copco has many successful experiences of supplying Air Dryer Packages in Indonesia.
- Atlas Copco, as a local subsidiary company of Atlas Copco-Belgium, will be able to provide the expedient and quick technical service when need arises during normal operation and downtime.
Airpack
- Airpack proposed to supply their standard Air Dryer Package with acceptable deviations and some pending clarifications. For details of deviations, please refer to Attachment 2.2.
- Airpack’s proposed Air Dryer Package is a proven standard and proprietary design from its own company in Netherlands.
- Airpack has no experience in supplying Air Dryer Package in Indonesia.
- Airpack has no local subsidiary in Indonesia.
Delair
- Delair proposed to supply their standard Air Dryer Package with acceptable deviations except for unacceptable deviations to Quality Control. For details of deviations, please refer to Attachment 2.3
- Delair proposed Air Dryer Package is a proven standard and proprietary design from its own company in Netherlands.
- Delair has no experience in supplying Air Dryer Package for the last 5 years in Indonesia.
- Delair has no local subsidiary in Indonesia.
3.1 Technical
Technical Bid Evaluation of Vendor’s proposal is tabulated in Attachment-1.
_____
| |
| |
_____INDRA
11-NOV-2005
Doc. No. 65-EVT-MC-1477 KJP Doc. No. G-215A-005 Rev. 5A Sheet No. 3 of 64
Technical Evaluation Report for Air Dryer Packages
BP Berau Ltd. Tangguh LNG Project
3.2 Delivery Schedule
Atlas Copco
Atlas Copco’s proposed delivery schedule is 5 months after issuance of the Purchase Order. This proposed schedule is appropriate for the project execution of the Tangguh LNG Project.
Airpack
Airpack’s proposed delivery schedule is 5 months after receipt of the Purchase Order. This proposed schedule is also acceptable to meet the project schedule for the Tangguh LNG Project.
Delair
Delair’s proposed delivery schedule is 8 months after issuance of the Purchase Order. This proposed schedule is not appropriate for the project execution of the Tangguh LNG Project.
3.3 Experiences
Please refer to Attachments 3.1 - 3.3 for vendor’s list of experience.
The three (3) vendors have various experiences on the supply of Air Dryer Package worldwide.
Atlas Copco has many successful experience of supplying Air Dryer Package in Indonesia.
4. DEVIATIONS AND CLARIFICATIONS
For details of the deviation and clarifications of the three (3) vendors, please refer to Attachment 2.1-2.3.
4.1 General Deviations
Each vendor had proposed several deviations from applicable documents except for the performance and process requirements of Air Dryer Package specified in the Equipment Data Sheet.
4.2 MIGAS Inspection Requirements and Instructions
Atlas Copco and Airpack will comply with MIGAS Inspection, Requirements and Instruction.
Delair will not comply on the MIGAS Inspection Requirements and Inspection. This is unacceptable.
4.3 Sub-vendor List
Basically, the three (3) vendors proposed to utilize their standard component sub-vendors particularly for valves and instrumentation, with proven performance according to their experiences.
Each bidder has proposed different sub-vendors for each component of the Air Dryer Packages.
For details of the sub-vendor list, please refer to Attachment 4.1-4.3
_____
| |
| |
_____INDRA
11-NOV-2005
Doc. No. 65-EVT-MC-1477 KJP Doc. No. G-215A-005 Rev. 5A Sheet No. 4 of 64
Technical Evaluation Report for Air Dryer Packages
BP Berau Ltd. Tangguh LNG Project
Attachment 1:
Bid Analysis Report
_____
| |
| |
_____INDRA
11-NOV-2005
DATE: 09 Nov 05 Rev 01DEPARTMENT: PACKAGE
LEGENDS: EVALUATED: A. CORRALo : complied/ acceptable CHECKED: A. ALMIREZx : deviated/ unacceptable APPROVED: S. KATO? : needs further clarificationVTP : Vendor to ProvideJ : JGC's Judgement
DELAIR, Netherlands J AIRPACK, Netherlands J
ATLAS COPCO COMPRESSOR INTL.
(C/O P.T. ATLAS COPCO INDONESIA)
J
1. GENERAL 1.1 Experience --- good good good1.2 Quality assurance ISO 9001 or Equivalent ISO 9001 - 2000 ISO 9001 - 2000 ISO 9001: 20001.3 Deviation list to be submitted submitted submitted submitted1.4 Sub-vendor list to be submitted submitted submitted submitted1.5 Overall Dimension (L x W x H) m By vendor 6.1 x 2.5 x 3.8 o 3.0 x 2.5 x 3.0 o 1.283 x 2.250 x 2.687 o1.6 Overall weight kg By vendor 6000 o 4500 o 2000 o
2. DELIVERY
2.1 Delivery Schedule VTP 8 months (*) x 5 months o 17 weeks (approx. 5 months) o (*) To be improved.
2.2 Port of Delivery VTP Antwerp (Belgium) or Rotterdam o Antwerp o Belgium o
3. REQUISTION REQUIREMENTS
3.1 Applicable Documents as per para. 6 complied w/ deviations complied w/ deviations complied w/ deviations
3.2 Scope of Vendor's Supply3.2.1 Equipment
Air Dryer Package 065-V-1001 A/B 2 sets complied o complied o complied o Adsorber Vessels 2 /unit complied o complied o complied o Pre-filters 2 /unit complied o complied o complied o After-filters 2 /unit complied o complied o complied o
3.2.2 Accessories List
(a) Structural / steelworkSkid structures VTP complied o complied o complied o
Baseplates with checker plate decking VTP not complied (*) x complied o complied o (*) Refer to item 1.1 of Attachment 2.3.
(b) Pressure vesselsStainless steel nameplates with brackets VTP complied o complied o complied oAll vessel internals/ externals and supports VTP complied o complied o complied oEquipment and vessel support structures VTP complied o complied o complied o
(c) PipingVTP complied o complied o complied o
(d) Instrumentation & controlVTP complied o complied o complied o
PLC based control system VTP complied o complied o complied o
NO SPEC. REQUIREMENTSDESCRIPTION
VENDOR'S DATA
REMARKS
All necessary piping materials within this package
All necessary instrument/ equipment w/in this package
BID ANALYSIS REPORT
PROJECT: Tangguh LNGJGC JOB NO.: 0-3400-20
ITEM: Air Dryer Package 065-V-1001A/BREQ. NO.: R-215A-005CLIENT: BP Berau Ltd
_____
| |
| |
_____INDRA
11-NOV-2005
DATE: 09 Nov 05 Rev 01DEPARTMENT: PACKAGE
LEGENDS: EVALUATED: A. CORRALo : complied/ acceptable CHECKED: A. ALMIREZx : deviated/ unacceptable APPROVED: S. KATO? : needs further clarificationVTP : Vendor to ProvideJ : JGC's Judgement
DELAIR, Netherlands J AIRPACK, Netherlands J
ATLAS COPCO COMPRESSOR INTL.
(C/O P.T. ATLAS COPCO INDONESIA)
JNO SPEC. REQUIREMENTSDESCRIPTION
VENDOR'S DATA
REMARKS
BID ANALYSIS REPORT
PROJECT: Tangguh LNGJGC JOB NO.: 0-3400-20
ITEM: Air Dryer Package 065-V-1001A/BREQ. NO.: R-215A-005CLIENT: BP Berau Ltd
Local Control Panel VTP complied o complied o complied oInstruments/ equipments for dew point analysis VTP complied o complied o complied o
(e) GeneralEarthing lugs or boss VTP complied o complied o complied o
VTP complied o complied o complied o
VTP complied o complied o complied o
VTP complied o complied o complied o
3.3 Special ToolsVTP not required o not required o not required o
Price for special tools To be included in lump sum price not required o not required o not required o
3.4 Spare Parts Construction and Commissioning Spares VTP complied o complied o complied o 2 years Operation Spares VTP complied o complied o complied o
3.5 Vendor's Drawing and Document Requirements as per S-900-1420-001 "Instruction for Vendor Documentation" complied o complied o complied o
3.6 Field Services VTP complied o complied o complied o
3.7 Quality Control as per S-900-1520-017 "Quality Control Requirements for Vendors (Offshore)" Vendor's standard x Vendor's standard x Vendor's standard x
Refer to item 1.1 of Attachment 2.1; item 5.0 of Attachment 2.2; item 10.0 of Attachment 2.3.
as per S-900-1520-008 "MIGAS Inspection Requirements and Instructions" not complied (*) x complied o complied o (*) Refer to item 6.1 of
Attachment 2.3.
3.8 Painting Protection as per S-900-13A0-001 "Specification for Painting" Vendor's standard x Vendor's standard x Vendor's standard x
Refer to item 3.4 of Attachment 2.1; item 3.0 of Attachment 2.2; item 7.3 of Attachment 2.3.
All required reinforcements of skid for shipping to job site
List of Special Tools (as per Attachment 4 of R-215A-005)
Supply of all materials required for transportation and field erection ( i.e lifting lugs, eye bolts, lifting beam, etc.)
Test/ inspection materials such as function test equipment, testing counter flange, testing ring etc.
_____
| |
| |
_____INDRA
11-NOV-2005
DATE: 09 Nov 05 Rev 01DEPARTMENT: PACKAGE
LEGENDS: EVALUATED: A. CORRALo : complied/ acceptable CHECKED: A. ALMIREZx : deviated/ unacceptable APPROVED: S. KATO? : needs further clarificationVTP : Vendor to ProvideJ : JGC's Judgement
DELAIR, Netherlands J AIRPACK, Netherlands J
ATLAS COPCO COMPRESSOR INTL.
(C/O P.T. ATLAS COPCO INDONESIA)
JNO SPEC. REQUIREMENTSDESCRIPTION
VENDOR'S DATA
REMARKS
BID ANALYSIS REPORT
PROJECT: Tangguh LNGJGC JOB NO.: 0-3400-20
ITEM: Air Dryer Package 065-V-1001A/BREQ. NO.: R-215A-005CLIENT: BP Berau Ltd
3.9 Shipping and Packing Requirements as per S-900-1450-003 "Project Shipping and Packing Instructions" complied o complied o complied o
3.10 Special Technical Requirements as per Attachment 2 of R-215A-005 complied o complied o complied o
compliance with Spare Parts and Interchangeability Records (SPIRs) "S-900-
1410-005"complied o complied o complied o
4.0 DESIGN BASIS as per EQUIPMENT DATA SHEET (S-065-135A-001)
4.1 GeneralType of Air Dryer Heatless, Pressure Swing complied o complied o complied oNo. of Units to be Installed 2 sets complied o complied o complied oNo. of Units to be Operated Normally 1 set complied o complied o complied o
4.2 System Configuration (Quantity for One Unit)Pre-filter 2 sets complied o complied o complied oAdsorber (Twin Vessels) 1 pair complied o complied o complied oAfter-filter 2 sets complied o complied o complied o
4.3 Location Outdoor complied o complied o complied o
4.4 Area Classification Non Hazardous Area complied o complied o complied o
4.5 Design Codes & Standards Pressure Vessel ASME Sec. VIII Div. 1 complied o complied o complied o Code Stamp Requirement Required complied o complied o complied o
Piping International Code (ASME, JIS, DIN, etc.) ASME o ASME o ASME o
4.6 Performance4.6.1 Product Dry Air
Capacity (per each unit) Nm3/h 2560 complied o complied o complied oDew point deg C -40 complied o complied o complied o at pressure kg/cm2G Atmospheric Pressure complied o complied o complied o
4.6.2 Feed Air
_____
| |
| |
_____INDRA
11-NOV-2005
DATE: 09 Nov 05 Rev 01DEPARTMENT: PACKAGE
LEGENDS: EVALUATED: A. CORRALo : complied/ acceptable CHECKED: A. ALMIREZx : deviated/ unacceptable APPROVED: S. KATO? : needs further clarificationVTP : Vendor to ProvideJ : JGC's Judgement
DELAIR, Netherlands J AIRPACK, Netherlands J
ATLAS COPCO COMPRESSOR INTL.
(C/O P.T. ATLAS COPCO INDONESIA)
JNO SPEC. REQUIREMENTSDESCRIPTION
VENDOR'S DATA
REMARKS
BID ANALYSIS REPORT
PROJECT: Tangguh LNGJGC JOB NO.: 0-3400-20
ITEM: Air Dryer Package 065-V-1001A/BREQ. NO.: R-215A-005CLIENT: BP Berau Ltd
Capacity (per each unit) Nm3/h By Vendor 3026 o 2865 o 3780 (*) o (*) Nominal capacity.
Pressure (max) kg/cm2G 9.4 complied o complied o complied oPressure (min) kg/cm2G 8.5 complied o complied o complied oTemperature deg C 50 complied o complied o complied oHumidity % Saturated at Inlet Pressure 100 o 100 o 100 oOil Content % Nil Nil o Nil o Nil o
4.7 Allowable Pressure Drop (Total) kg/cm2 0.8 < 0.8 o complied o 0.071 o
4.8 Drying Cycle
Cycle NEMA-20 complied o 10 min (*) x 10 min (*) x(*) Refer to item 2.1 & 1.1 of Attachments 2.1 & 2.2, respectively.
Drying min 10 complied o 5 x 5 xRegeneration min 10 complied o 5 x 5 x
5.0 MECHANICAL DESIGN REQUIREMENTS as per EQUIPMENT DATA SHEET (S-065-135A-001)
5.1 Design Conditions of UnitDesign Pressure kg/cm2G 10.8 complied o complied o complied oDesign Temperature deg C 65 complied o complied o complied oCorrosion Allowance of C.S Parts mm 2.5 complied o complied o complied o
5.2 Operation ModeFull Automatic Continuous Operation Required complied o complied o complied oInitiation of Regeneration By Fixed Timer complied o complied o complied o
5.2 Design Requirement5.2.1 Pre-filter
Pressure Drop - Clean kg/cm2 By Vendor 0.2 o 0.65 o 0.05 o - Max kg/cm2 By Vendor 0.3 o 1 o 0.12 o
Element - Type By Vendor Cartridge o Cartridge o Cartridge o
- Specification By Vendor 1 micron o 1 micron o 1 micron o
5.2.2 AdsorberDessicant - Type Activated Alumina or Equal Activated Alumina o Molecular sieve o Activated Alumina o
- Quantity per Vessel kg By Vendor 1340 o under clarification (*) ? 1410 o (*) Refer to item 1.2 of Attachment 2.2.
- Expected Life year By Vendor 3 to 5 o 2 o 5 o_____
| |
| |
_____INDRA
11-NOV-2005
DATE: 09 Nov 05 Rev 01DEPARTMENT: PACKAGE
LEGENDS: EVALUATED: A. CORRALo : complied/ acceptable CHECKED: A. ALMIREZx : deviated/ unacceptable APPROVED: S. KATO? : needs further clarificationVTP : Vendor to ProvideJ : JGC's Judgement
DELAIR, Netherlands J AIRPACK, Netherlands J
ATLAS COPCO COMPRESSOR INTL.
(C/O P.T. ATLAS COPCO INDONESIA)
JNO SPEC. REQUIREMENTSDESCRIPTION
VENDOR'S DATA
REMARKS
BID ANALYSIS REPORT
PROJECT: Tangguh LNGJGC JOB NO.: 0-3400-20
ITEM: Air Dryer Package 065-V-1001A/BREQ. NO.: R-215A-005CLIENT: BP Berau Ltd
5.2.3 After-filterPressure Drop - Clean kg/cm2 By Vendor 0.15 o 0.65 o 0.05 o - Max kg/cm2 By Vendor 0.25 o 1 o 0.12 oElement - Type By Vendor Cartridge o Cartridge o Cartridge o - Specification 3 micron 1 micron o complied o 0.01 micron o
5.2.4 SilencerOverall Noise Level at 1 meter from Skid Edge Maximum Allowable Noise Level dB (A) 89 85 o 85 o complied o
5.3 Mechanical Design5.3.1 Pre-filter
Corrosion Allowance mm 2.5 complied o complied o complied oMaterial Shell/ Head By Vendor ASTM A-516 Gr.60 or 65 o Aluminum o carbon steel o Internal By Vendor ASTM A-516 Gr.60 or 65 o Aluminum o carbon steel o
5.3.2 Adsorber Corrosion Allowance mm 2.5 complied o complied o complied oMaterial Shell/ Head By Vendor ASTM A-516 Gr. 60 or 65 o Aluminum o carbon steel o Internal By Vendor ASTM A-516 Gr. 60 or 65 o Aluminum o carbon steel o
5.3.3 After-filter Corrosion Allowance mm 2.5 complied o complied o complied oMaterial Shell/ Head By Vendor ASTM A-516 Gr. 60 or 65 o Aluminum o carbon steel o Internal By Vendor ASTM A-516 Gr. 60 or 65 o Aluminum o carbon steel o
5.4 Instrumentation5.4.1 Controller
Type PLC complied o complied o complied o Location in the Local Control Panel complied o complied o complied o
Manufacture of PLC as per Approved Vendor List SIEMENS o SIEMENS o PRIMA (*) x (*) Refer to item 1.2 of Attachment 2.1.
5.4.2 Local Control Panel No. Required (per unit) 1 complied o complied o complied o Type Self-standing or Wall mounted Wall mounted o Wall mounted o Mounted on frame o Degree of Protection IP 54 or Better (Non-hazardous) IP 55 o IP 55 o IP 54 o Panel Sunshade Requirement Required complied o complied o complied o
_____
| |
| |
_____INDRA
11-NOV-2005
DATE: 09 Nov 05 Rev 01DEPARTMENT: PACKAGE
LEGENDS: EVALUATED: A. CORRALo : complied/ acceptable CHECKED: A. ALMIREZx : deviated/ unacceptable APPROVED: S. KATO? : needs further clarificationVTP : Vendor to ProvideJ : JGC's Judgement
DELAIR, Netherlands J AIRPACK, Netherlands J
ATLAS COPCO COMPRESSOR INTL.
(C/O P.T. ATLAS COPCO INDONESIA)
JNO SPEC. REQUIREMENTSDESCRIPTION
VENDOR'S DATA
REMARKS
BID ANALYSIS REPORT
PROJECT: Tangguh LNGJGC JOB NO.: 0-3400-20
ITEM: Air Dryer Package 065-V-1001A/BREQ. NO.: R-215A-005CLIENT: BP Berau Ltd
Air Ventilation or Vortex Cooler Required, when necessary With Vortex Cooler o not required(*) o not required(*) o(*) Components in local control panel are suitable for outdoor condition.
5.4.3 Dew Point Analyzer No. Required 1 set (common to 2 units) complied o complied o complied o
5.5 Piping
Material By Vendor Carbon steel o Carbon steel o Carbon steel o
Flanges By Vendor Carbon steel o Carbon steel o Carbon steel o
Process connections 6" ASME Class 150 RF complied o complied o complied o Corrosion Allowance mm 1.3 complied o complied o complied o
6.0 ADDITIONAL REQUIREMENTS as per SPECIFICATION FOR INSTRUMENT AIR DRYER (S-065-135A-101)
6.1 Operational Requirement one year continuous operation, minimum complied o complied o complied o
6.2 Design Requirements6.2.1 Dryer Vessels
Grids & screen (for desiccant) VTP sieve tubes o grids & screen o grids & screen oDesiccant fill and removal nozzles VTP complied o complied o complied oInitial fill of desiccants VTP complied o complied o complied oPressure Gauges VTP complied o complied o complied o
6.2.2 Pre-filters and After-filtersBypass and isolation valves VTP complied o complied o complied oAutomatic drain trap (for pre-filters) VTP complied o complied o complied o
6.2.3 Switching Valve
Type non lubricated and two way or fully proven three-way type butterfly valves o under clarification ? complied o
Position Limit Switch VTP complied o under clarification ? complied o
6.3 Control System and Instrumentation6.3.1 Moisture Analyzer____
_
| |
| |
_____INDRA
11-NOV-2005
DATE: 09 Nov 05 Rev 01DEPARTMENT: PACKAGE
LEGENDS: EVALUATED: A. CORRALo : complied/ acceptable CHECKED: A. ALMIREZx : deviated/ unacceptable APPROVED: S. KATO? : needs further clarificationVTP : Vendor to ProvideJ : JGC's Judgement
DELAIR, Netherlands J AIRPACK, Netherlands J
ATLAS COPCO COMPRESSOR INTL.
(C/O P.T. ATLAS COPCO INDONESIA)
JNO SPEC. REQUIREMENTSDESCRIPTION
VENDOR'S DATA
REMARKS
BID ANALYSIS REPORT
PROJECT: Tangguh LNGJGC JOB NO.: 0-3400-20
ITEM: Air Dryer Package 065-V-1001A/BREQ. NO.: R-215A-005CLIENT: BP Berau Ltd
Cable between analyzer and probe VTP complied o complied o complied oSpare probe (warehouse spare) 1 complied o complied o complied o
6.3.2 Local Control PanelLamps and Indicators VTP complied o complied o complied oPair of volt-free contacts for common trouble alarm VTP complied o complied o complied oPush button switches for start and stop VTP complied o complied o complied oPower On-Off switch VTP complied o complied o complied o
_____
| |
| |
_____INDRA
11-NOV-2005
Doc. No. 65-EVT-MC-1477 KJP Doc. No. G-215A-005 Rev. 5A Sheet No. 12 of 64
Technical Evaluation Report for Air Dryer Packages
BP Berau Ltd. Tangguh LNG Project
Attachment 2.1:
Deviation and Clarification List From
ATLAS COPCO
_____
| |
| |
_____INDRA
11-NOV-2005
Attachment - 2.1 Deviations and Clarifications List of Atlas Copco
Instrument Air Dryer Packages Tangguh LNG Project Requisition No. R-215A-005 Equipment Number: 065-V-1001A/B Mark: D – Deviation (Exception), C - Clarification Vendor Name: Atlas Copco
Item No.
Specification Specification Requirement Mark Deviation / Clarification Purchaser’s Disposition
1.0 R-215A-005 Requisition for Air Dryer Package
1.1 Para. 6 Applicable Documents D Atlas Copco will use its standard and
proprietary design for Air Dryer
Package.
Acceptable.
Atlas Copco
equipment is
suited for the
purpose and
meets the
required
performance.
1.2 Attachment-7 Approved Manufacturer List D Atlas Copco will be using it’s own
qualified and experienced
sub-suppliers for all components
including instrumentation to be used in
Model CD1050 Air Dryer Package.
Acceptable.
Atlas Copco
sub-suppliers
provide
components
_____
| |
| |
_____INDRA
11-NOV-2005
Item No.
Specification Specification Requirement Mark Deviation / Clarification Purchaser’s Disposition
For the proposed sub-vendors of Atlas
Copco, please refer to Attachment 4.1
including
instruments of
high-grade
industrial
standards, tested
from their proven
experiences.
2.0 S-065-135A-001 Equipment Data Sheet for Air Dryer Package
2.1 Item 2.4 Drying cycle shall be 10 minutes
drying and 10 minutes
regeneration.
D Atlas Copco will be using its standard
tested design, which is 5 minutes drying
and 5 minutes regeneration. The
performance of Atlas Copco’s Air
Dryer Package is designed based on
this drying cycle time.
Acceptable.
Basically, Atlas
Copco has met
the process
requirements i.e.
product dry air
capacity and
dew point
temperature.
3.0 S-065-135A-101 Specification for Instrument Air Dryer 3.1 Para 4.7 A weep hole shall be provided at
the lowest point of the silencer to
remove rain and /or dust.
D Weep hole is not applicable in the
standard proven design of Atlas
Copco’s silencer.
Acceptable.
Atlas Copco’s
silencer with drain
_____
| |
| |
_____INDRA
11-NOV-2005
Item No.
Specification Specification Requirement Mark Deviation / Clarification Purchaser’s Disposition
hole is located at
the bottom of the
Air Dryer
Package wherein
rain and dust can
be removed.
3.2 Para 5.1.3 Time Cycle shall be NEMA 20
minutes (10 minutes drying, 10
minutes regeneration).
D Atlas Copco will be using its standard
tested design, which is 5 minutes drying
and 5 minutes regeneration. The
performance of Atlas Copco’s Air
Dryer Package is designed based on
this drying cycle time.
Acceptable.
Basically, Atlas
Copco has met
the process
requirements i.e.
product dry air
capacity and
dew point
temperature.
3.3 Para 5.3.2 Sufficient lamps and indicators
shall be provided on the local
panel to indicate operation
modes such as drying,
depressurizing, purging and
pressurizing for each vessel.
C Atlas Copco have standard indicator
for the modes of operation in the local
control panel.
Acceptable
_____
| |
| |
_____INDRA
11-NOV-2005
Item No.
Specification Specification Requirement Mark Deviation / Clarification Purchaser’s Disposition
3.4 Para 5.4.2 Painting
D Atlas Copco will use a special painting
and corrosion protection.
Three layer painting:
- Ground layer of Zinga;
DFT=100µ
- Intermediate coating of
2-comp. EPOXY; DFT=60µ
- Final coating of 2-comp. PU;
DFT 40µ
Acceptable. This
is Atlas Copco’s
standard painting
suitable for the
given outdoor
and operating
condition.
_____
| |
| |
_____INDRA
11-NOV-2005
Doc. No. 65-EVT-MC-1477 KJP Doc. No. G-215A-005 Rev. 5A Sheet No. 17 of 64
Technical Evaluation Report for Air Dryer Packages
BP Berau Ltd. Tangguh LNG Project
Attachment 2.2:
Deviation and Clarification List From
AIRPACK
_____
| |
| |
_____INDRA
11-NOV-2005
ATTACHMENT 2.2 Deviations and Clarifications List of Airpack
Instrument Air Dryer Package Tangguh LNG Project Requisition No. R-215A-005 Equipment Number: 065-V-1001A/B Mark: D – Deviation (Exception), C - Clarification Vendor Name: AIRPACK
Item No.
Specification Specification Requirement Mark Deviation/ Clarification and
Remarks Purchaser’s Disposition
1.0 S-065-135A-001 Equipment Data Sheet for Air Dryer Package 065-V-1001A/B
1.1 Item 2.4 Drying cycle:
a. Drying: 10 minutes
b. Regeneration: 10
minutes
D Airpack proposed to apply their
standard Drying cycles, which are:
a. Cycle time: 10 minutes
b. Drying time: 5 minutes
c. Regenerating time: 4 minutes
d. Pressurizing time: 1 minute
Acceptable.
Basically, Airpack
has met the
process
requirements i.e.
product dry air
capacity and
dew point
temperature.
1.2 Item 4.2.2 Vendor to provide the quantity
per vessel of the desiccant in the
adsorber.
C Airpack to provide data after purchase
order is issued.
For further
clarification.
2.0 S-065-135A-101 Specification for Instrument Air Dryer
2.1 Para. 4.5 All piping shall meet international
industry codes and standards,
D Interconnecting DIN flanges shall be
applied within the skid, however, tie-in
Acceptable
_____
| |
| |
_____INDRA
11-NOV-2005
such as ASME and JIS. All piping
at tie in points shall be flanged
(ASME Class 150) and brought to
the edge of skid base.
points at battery limits will be as per ANSI
B16.5
2.2 Para. 5.1.3 The timed cycle shall be NEMA 20
minutes (i.e. 10 minutes drying
and 10 minutes regeneration),
unless otherwise specified.
D See above item 1.1
See above item
1.1
2.3 Para. 5.5 All electrical equipment or
electronic instrumentation shall
conform to industry codes and
standards, such as IEC, NEMA
and JIS.
C Electrical equipment will be according
to AIRPACK’s standard based on IEC.
Acceptable.
3.0 “S-900-13A0-001:
Specification for
Painting”
(Attachment 1 item
2.3)
Final color for the Air Dryer
Package shall be light gray (RAL
7047).
D Air Dryer Package will be painted
according to AIRPACK’s standard, i.e.
two (2) layers of a two pack, high solids
modified epoxy coating and one (1)
layer of a two pack high solid, aliphatic
polyurethane topcoat. The complete
unit will be painted in one final color
(RAL 6021). Dry film thickness will be
approximately 200µm.
Acceptable. This
is Airpack
standard
painting suitable
for the given
outdoor and
operating
condition.
4.0 “S-900-1420-001:
Instruction for Vendor
Para. 5.8 Electronic Requirements
a. 3D CAD – PDS
C AIRPACK use the following programs:
a. Microsoft Office 2003
b. Auto CAD 2000
Acceptable
_____
| |
| |
_____INDRA
11-NOV-2005
Documentation” b. 2D CAD – Microstation
c. 2D CAD – AutoCAD
d. Spread sheets –
Microsoft Excel
e. Word Processing –
Microsoft Word
c. Auto CAD 2002
d. Auto CAD 2004
e. Auto CAD 2005
f. Inventor 9 professional
5.0 “S-900-1520-017:
Quality Control
Requirements for
Vendors (Offshore)”
Requirements on testing and
inspection of Air Dryer Package.
D Testing and inspection will be done in
accordance with Airpack’s standard
Quality Test and Inspection Plan.
Acceptable.
Airpack provide
equipment and
devices of high
grade that are
tested from their
proven
experiences.
_____
| |
| |
_____INDRA
11-NOV-2005
Doc. No. 65-EVT-MC-1477 KJP Doc. No. G-215A-005 Rev. 5A Sheet No. 21 of 64
Technical Evaluation Report for Air Dryer Packages
BP Berau Ltd. Tangguh LNG Project
Attachment 2.3:
Deviation and Clarification List Of
DELAIR
_____
| |
| |
_____INDRA
11-NOV-2005
Attachment - 2.3 Deviations and Clarifications List of DELAIR
Instrument Air Dryer Packages Tangguh LNG Project Requisition No. R-215A-005 Equipment Number: 065-V-1001A/B Mark: D – Deviation (Exception), C - Clarification Vendor Name: DELAIR
Item No.
Specification Specification Requirement Mark Deviation / Clarification Purchaser’s Disposition
1.0 R-215A-005 Requisition for Air Dryer Package
1.1 Attachment 1
Item 2.6
Vendor shall provide skid
structures/ base plates with
checker plate decking.
D Checkered plate decking is not
required for the skid of Air Dryer
Package.
Acceptable. All
valves,
instruments, etc.
are accessible at
grade level
during operation
and
maintenance.
1.2 Attachment-7 Approved Manufacturer List D Delair shall supply equipment and
instruments from the sub-suppliers as per
AML. However, Delair proposed
additional suppliers for the following:
• Check valves: Pan Korea
Acceptable.
Delair have
extensive
experience from
the proposed
_____
| |
| |
_____INDRA
11-NOV-2005
Item No.
Specification Specification Requirement Mark Deviation / Clarification Purchaser’s Disposition
• Fittings/flanges/piping: Van
Leeuwen
Materials from these sub-suppliers shall
be qualified and certified as per
specifications.
For the complete sub-vendor list of
Delair, please refer to Attachment 4.3.
sub-vendors in
their previous
projects.
2.0 S-065-135A-101 Specification for Instrument Air Dryer 2.1 Para. 5.4.2 Terminal block and lug for
external cables to be of
Harmonica type.
D Delair proposed to use standard Phoenix
terminals, as this is part of our standard
practice.
Acceptable. This
is Delair’s
standard and
proven design.
3.0 S-099-135A-102 General Specification for Package Equipment
3.1 Para. 2.3.1.5 Wafer style valves, other than in
water service, are not
acceptable.
D Delair quoted wafer style butterfly
valves.
Acceptable.
4.0 S-099-1370-001 Specification for General Instrumentation
4.1 Para. 4.9 Specification of “Control Valves”
99-SPE-CS-1729 (S-099-1370-006)
shall be referred for the detail
D On/off valves to be used shall be
butterfly type. Ball valves, as per
Delair’s experience, are not
Acceptable. This
is Delair standard
proven design.
_____
| |
| |
_____INDRA
11-NOV-2005
Item No.
Specification Specification Requirement Mark Deviation / Clarification Purchaser’s Disposition
design wherein ball type valves
shall be considered for on/off
services.
recommendable as switching valves for
this package unit because it is not
protected by filters. The desiccant
particles are extremely hard and can
penetrate between the ball and seat
and damage it. Therefore, Delair
proposed to use butterfly valves in
desiccant dryers as this problem never
arises with this type of valves.
5.0 S-099-1370-006
“Specification for
Control Valves”
All requirements for control
valves.
C This specification has not been
considered. Delair only have on-off
valves and manual valves.
Acceptable
6.0 S-900-1351-001 Specification for Pressure Vessels
6.1 Para. 4.3 Vessel shall be subject to
Inspection and registration by
MIGAS. The third party inspector
shall be MIGAS approved.
D Delair cannot comply with the MIGAS
inspection requirement as vendor is not
familiar with this.
Not Acceptable
7.0 S-900-13A0-001 Specification for Painting
7.1 Para. 10.1 A pre-start meeting shall be held
at least one week prior to
D Pre-start meeting not considered. Not acceptable.
_____
| |
| |
_____INDRA
11-NOV-2005
Item No.
Specification Specification Requirement Mark Deviation / Clarification Purchaser’s Disposition
commencement of the work to
discuss work plans, quality and
HSE aspects.
7.2 Para. 11.0 Material samples and test panels
to be provided by Subcontractor
will be specified by KJP and BP, if
required where necessary.
D Material samples and test panels will not
be provided by Delair. However,
Painting material specification and data
sheets will be provided.
Acceptable
7.3 Appendix 1 Painting requirements for carbon
steel and low alloy steel.
C Delair considered only one paint system
for all pressure vessels, piping and
structural steel according to para. 2.3
i.e. L1 SS. All equipment and piping will
receive one and the same color of light
gray RAL 7047. Minimum total DFT is
150µm.
Local control panel will not be painted
additionally. Panel is painted according
to manufacturer standard.
Acceptable. This
is Delair’s
standard painting
suitable for the
given outdoor
and operating
condition.
8.0 S-900-13A0-003
“Specification for
All requirements on rust
prevention.
D Delair proposed standard rust
prevention procedure as applied to
Acceptable.
Delair standard
_____
| |
| |
_____INDRA
11-NOV-2005
Item No.
Specification Specification Requirement Mark Deviation / Clarification Purchaser’s Disposition
Rust Prevention” other air dryer packages delivered to
KJP. Delair ensures that the
equipment, piping, etc., shall satisfy their
guarantees and ensures smooth
operation of the package unit without
interference from loose rust on the
equipment.
proven design.
9.0 S-900-1360-002
“Specification for
Piping Material Class”
Requirements on the Piping
Material Class for Air Dryer
Package, which is 1CG1U.
D Delair proposed to provide piping
materials as per their own standard.
Acceptable. This
is Delair’s
standard and
proven design for
piping.
10.0 S-900-1520-017
“Quality Control
Requirements for
Vendors (Offshore)”
Requirements on testing and
inspection of Air Dryer Package.
D Testing and inspection will be done in
accordance with Delair’s standard
Quality Test and Inspection Plan.
Acceptable.
Delair provide
equipment and
devices of high
grade that were
tested from their
proven
experiences.
_____
| |
| |
_____INDRA
11-NOV-2005
Doc. No. 65-EVT-MC-1477 KJP Doc. No. G-215A-005 Rev. 5A Sheet No. 27 of 64
Technical Evaluation Report for Air Dryer Packages
BP Berau Ltd. Tangguh LNG Project
Attachment 3.1:
Experience List Of
ATLAS COPCO
_____
| |
| |
_____INDRA
11-NOV-2005
_____
| |
| |
_____INDRA
11-NOV-2005
_____
| |
| |
_____INDRA
11-NOV-2005
Doc. No. 65-EVT-MC-1477 KJP Doc. No. G-215A-005 Rev. 5A Sheet No. 30 of 64
Technical Evaluation Report for Air Dryer Packages
BP Berau Ltd. Tangguh LNG Project
Attachment 3.2:
Experience List Of
AIRPACK
_____
| |
| |
_____INDRA
11-NOV-2005
_____
| |
| |
_____INDRA
11-NOV-2005
_____
| |
| |
_____INDRA
11-NOV-2005
_____
| |
| |
_____INDRA
11-NOV-2005
_____
| |
| |
_____INDRA
11-NOV-2005
_____
| |
| |
_____INDRA
11-NOV-2005
_____
| |
| |
_____INDRA
11-NOV-2005
_____
| |
| |
_____INDRA
11-NOV-2005
_____
| |
| |
_____INDRA
11-NOV-2005
_____
| |
| |
_____INDRA
11-NOV-2005
_____
| |
| |
_____INDRA
11-NOV-2005
_____
| |
| |
_____INDRA
11-NOV-2005
_____
| |
| |
_____INDRA
11-NOV-2005
_____
| |
| |
_____INDRA
11-NOV-2005
_____
| |
| |
_____INDRA
11-NOV-2005
_____
| |
| |
_____INDRA
11-NOV-2005
Doc. No. 65-EVT-MC-1477 KJP Doc. No. G-215A-005 Rev. 5A Sheet No. 46 of 64
Technical Evaluation Report for Air Dryer Packages
BP Berau Ltd. Tangguh LNG Project
Attachment 3.3:
Experience List Of
DELAIR
_____
| |
| |
_____INDRA
11-NOV-2005
_____
| |
| |
_____INDRA
11-NOV-2005
_____
| |
| |
_____INDRA
11-NOV-2005
_____
| |
| |
_____INDRA
11-NOV-2005
_____
| |
| |
_____INDRA
11-NOV-2005
_____
| |
| |
_____INDRA
11-NOV-2005
_____
| |
| |
_____INDRA
11-NOV-2005
Doc. No. 65-EVT-MC-1477 KJP Doc. No. G-215A-005 Rev. 5A Sheet No. 53 of 64
Technical Evaluation Report for Air Dryer Packages
BP Berau Ltd. Tangguh LNG Project
Attachment 4.1:
Sub-vendor List Of
ATLAS COPCO
_____
| |
| |
_____INDRA
11-NOV-2005
_____
| |
| |
_____INDRA
11-NOV-2005
_____
| |
| |
_____INDRA
11-NOV-2005
Doc. No. 65-EVT-MC-1477 KJP Doc. No. G-215A-005 Rev. 5A Sheet No. 56 of 64
Technical Evaluation Report for Air Dryer Packages
BP Berau Ltd. Tangguh LNG Project
Attachment 4.2:
Sub-vendor List Of
AIRPACK
_____
| |
| |
_____INDRA
11-NOV-2005
ATTACHMENT 4.2
AIRPACK SUB-SUPPLIERS Our main suppliers of material are mentioned underneath. • Plate, pipe material and Konings Staal, Dylan Staal, HOB,
flanges etc. Staalunie, Sloestaal, Combori, Montan Staal
• Tubing, couplings etc. Swagelok, Hylock, A-lok, Parker,
Hydrasun • Electrodes Philips, Smitweld • Compressors Airpack, other makes on request • Electric motors Schorch, A.E.G., Rotor, ABB, Weg, Loher, Siemens, Electromotoren Fabriek Nijmegen • Nitrogen membranes Airliquide, Parker Aquilo, UBE • Coolingwater pumps Lowara, Travaini, Distrimex • Air/water coolers TT-Coil, TES, NRG-HECO, Hyros • Switchbox components (non-Ex) Telemecanique, Moeller, ABB, Siemens, Phoenix, Bauser, Carlo Gavazzi, Omega • Switchbox components (Ex) Bartec, Moeller, Telemecanique, ABB, Siemens, Phoenix, Omega Carlo Gavazzi, Pepperl & Fuchs • Junction boxes, panels Bartec, Rittal, Häwa, Eldon, Fondisonzo, Bartec, ATX • Cable, LV/HV Batt cable, Noskab, Rexel, Kenwill • Cable glands CMP, RCN, Hawke • Cable tray Van Geel, Ebo, BST
_____
| |
| |
_____INDRA
11-NOV-2005
• Gauges Wika, Ashcroft, Airpack,
Alaxa Products • Switches Beta, Trafag, United Electric, FFE,
Krohne, Magnetrol, Endress & Hauser, Delta Controls, Ashcroft
• Transmitters Emerson, Foxboro, Honeywell, ABB, General Eastern, Crowcon, Binder, ABB, Rosemount • Solenoid valves ASCO, Lucifer, Bürkert, Herion, Buschjost • Pressure reducers Mankeberg, RHPS • Check valves Hoerbiger, Ondastop, Hylock • Heaters Heatex, Sesco, Sarell, Rittal • Oilfilters Fram, Purolator, Boll & Kirch, Mann • Oilcoolers Oeltechnik, Bugge • Dryer inlet valve Airpack Nederland B.V. • Safety valves Crosby, Dresser, Consolidated, Econ, Tyco • Traps and drains Sarco, SMC, Float Type • Air intake filters Donaldson, Solberg • Filters Donaldson Ultrafilter, BEKO,
Parker-Hannifin, Domnick Hunter, Classic Filter
• Timers Telemecanique, Crouzet, Omron • Diesel engines Lister-Petter, Cummins, Perkins, Deutz, Caterpillar • Accumulators Greer, Fawcett, Flexcon, Saft-Nife • V-belts, pulleys Fenner, Vector, Imthorn • Vibration dampers Erics, Econosto, Dunlop, Trelleborg
_____
| |
| |
_____INDRA
11-NOV-2005
Doc. No. 65-EVT-MC-1477 KJP Doc. No. G-215A-005 Rev. 5A Sheet No. 59 of 64
Technical Evaluation Report for Air Dryer Packages
BP Berau Ltd. Tangguh LNG Project
Attachment 4.3:
Sub-vendor List Of
DELAIR
_____
| |
| |
_____INDRA
11-NOV-2005
_____
| |
| |
_____INDRA
11-NOV-2005
_____
| |
| |
_____INDRA
11-NOV-2005
_____
| |
| |
_____INDRA
11-NOV-2005
_____
| |
| |
_____INDRA
11-NOV-2005
_____
| |
| |
_____INDRA
11-NOV-2005