Aide Memoire: Ghana Education Mission
Ghana Secondary Education Improvement Project (P145741-Cr. 5452)
Proposed SEIP Additional Financing (P163628)
March 27-April 4, 2017
A. INTRODUCTION AND ACKNOWLEDGEMENTS
1. A World Bank technical support mission for the Ghana Secondary Education Improvement
Project (SEIP) was undertaken from March 27 to April 4, 2017. The mission team took the
opportunity to engage with Government of Ghana (GoG) on the proposed Additional Financing
(AF) of US$50 million for the SEIP. The SEIP mission reviewed the achievement to date of
project results under components 1 and 2 and discussed year 3 disbursement linked indicators
(under Component 1); engaged with the implementation team on proposed senior high school
(SHS) policies and implications for SEIP; and developed a comprehensive terms of reference for
the upcoming Mid-Term Review and discussed additional analysis required. The mission team
also participated in the two-day Ghana Education Evidence Summit and stakeholder workshop
on “Engaging the Private Sector in Delivering Basic Education in Ghana;” held on March 28 and
29. The objectives of the mission were outlined in the mission announcement letter dated March
13, 2017. The Aide Memoire summarizes the context, key findings and agreements reached
during the mission.
2. The team appreciates the collaboration of the GoG and the cordial environment in which
discussions were held, notably the leadership provided by the Minister for Education, Hon. Dr.
Matthew Opoku Prempeh, Hon. Dr. Yaw Osei Adu Twum, Deputy Minister for Education, and
Mr. Enoch H. Cobbinah, Chief Director, Ministry of Education. The team would also like to
thank Mr. Jacob Kor, Director General, Ghana Education Service (GES); Mrs. Cynthia
Bosomtwe Sam, Acting Deputy Director General, GES and Mr. Chris Koramoah, Financial
Controller, GES. The team appreciates the coordination by Mr. Hayford Riley Wilson, Project
Coordinator SEIP. A list of persons met is attached as Annex 1.
3. Mission members included the following staff from the World Bank: Deborah Newitter
Mikesell, Sr. Education Specialist; Eunice Yaa Brimfah Ackwerh, Sr. Education Specialist;
Mariam Nusrat Adil, Operations Analyst; Thomas K.S. Anang, Senior Procurement Specialist;
Oni Lusk-Stover, Sr. Education Specialist; Michael Gboyega Ilesanmi, Social Safeguards
Specialist; Franklin Kuma Kwasi Gavu, Environmental Specialist; Kennedy Fosu,
Communications Officer; and Kathleen Beegle, HD Program Leader. Stephen Tettevie, Team
Assistant, and Janet Adebo, Program Assistant provided mission support from Accra and
Washington DC respectively. Jean-Christophe Maur, Senior Economist, IFC joined the team
during the Evidence Summit on March 23-24.
B. CONTEXT
4. Ghana Secondary Education Improvement Project (SEIP): The Secondary Education
Improvement Project was approved by the World Bank Board on May 20, 2014 for an amount of
US$156 million (IDA), signed on July 30, 2014, declared effective on October 3, 2014, and
launched on November 4, 2014. The project was restructured on August 30, 2016 to ensure
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
2
reallocation among disbursement categories and revise the percentage of expenditures to be
financed for all categories up to 100% financing. The Project Development Objective is to
increase access to senior secondary education in underserved districts and improve quality in
low-performing SHS in Ghana.
5. This is a five-year IPF closing on November 30, 2019. It uses a results based financing
approach under the first component which aims to increase access with equity and quality in
SHSs. Component One comprises Pillar 1 and 2 as follows: The first results area (Pillar 1) aims
to expand senior secondary places through the construction of 23 new SHS in underserved
districts; rehabilitate and expand 50 existing low performing SHSs and support attainment of
disadvantaged students (e.g., through scholarships to 10,400 students from low income families,
especially girls). The second results area (Pillar 2) focuses on improving the quality of education
in 125 selected low-performing SHS through: (i) strengthened school management and
accountability; (ii) improved mathematics and science teaching and learning; (iii) expanded
information, communication technology and internet connectivity in schools; and (iv) the
implementation of school performance partnership plans. Component Two uses a traditional
investment approach to finance technical assistance, management, research and monitoring and
evaluation for effective project implementation.
6. Disbursements: The year zero disbursement linked indicators were achieved and verified
on February 20, 2015. The year one disbursement linked indicators were achieved and verified
on February 25, 2016. The year two disbursement linked indicators are expected to be verified
on April 15, 2017. Disbursement to date is US$80.34 million (58% disbursed). The next
disbursement would be an advance against Year 3 DLRs based on meeting five (5) out of six (6)
DLRs in year 2.
7. Evidence Summit and Private education workshop: The mission participated in the first
Ghana Education Evidence Summit “Towards Quality Education in Ghana: Using Evidence to
Achieve Better Learning Outcomes” sponsored by the Ministry of Education and Innovations for
Poverty Action (IPA). The SEIP helped support the workshop through its research agenda sub-
component which brought international and national researchers together to present and discuss
rigorous research on the education sector in Ghana. The second day of the summit provided a
forum to plan the future research agenda and identify key research gaps that would need to be
addressed over the short and medium term. In addition, the summit included a forum on the
private education market in Ghana and guidelines on how to encourage more public-private
partnerships in supporting all Ghanaian pupils. It was agreed that the Summit would be
conducted annually to help influence education policies. The SEIP research agenda funding
could support selected research topics throughout the implementation of the project.
8. Request for Additional Financing: The GoG has requested additional financing of US$50
million and a proposed extension of the SEIP closing date to November 30, 2021. A formal letter
from the Ministry of Finance was submitted to the World Bank after the mission on April 7,
2017. To ensure expedited preparation before the end of the WB FY, a concept memo has been
drafted during the mission and circulated for further processing in the Bank. To facilitate
delivery of the AF before July 1, 2017, the Bank and GoG will need to work quickly to define
3
and appraise the SEIP AF project activities. The mission recommended weekly audio/video
conferences to expedite preparation. The proposed AF is summarized in the aide memoire below.
C. KEY FINDINGS and AGREEMENTS REACHED
9. Implementation Progress (IP) is on track, albeit four months delayed due to the national
elections and transition arrangement in December 2016 and January 2017. The GoG reported in
mid-March that it has met the disbursement-linked results for year 2. The disbursement-linked
results for year 2 include the following achievements: (a) 80% construction works completed
(achieved and verified); (b) increase in enrolment in low performing schools by 1,000 seats
(achieved); (c) at least 4,000 SHS students receiving scholarships in project schools (achieved);
(d) Publication of updated school performance data for FY15/16 online and in brochure (partially
achieved); (e) SPPPs for 80 schools signed (achieved); and (f) ICT-based instruction rolled out in
about 50% of targeted schools (achieved).
10. Disbursement Linked Results verification: The independent verification has already
confirmed the achievement of the construction of new works (January, 2017 report). The
remaining results are now being verified by the independent verification agency after some delay
in school enrolment for first year students and the slower pace required for effective installation
and testing of i-boxes. The school mapping publication as a digest (in addition to an online
version) has also been delayed because of some missing school-level data and the longer than
anticipated procurement process to print hard copies of the digest. Although the online version is
available, the procurement for the printing of the digests will take several additional weeks to
complete. The independent verifiers were requested to take an additional 10% sample in order to
collect more data on progress in SEIP schools in anticipation of reporting at the Mid-term
Review.
11. Overall progress: The mission noted the slow-down in implementation progress to date,
and the partial achievement to date of activities to meet the year 2 disbursement linked results
given the time for national elections and transition period to conclude. Some Contractors had not
been paid for five months (since October 2016). In particular the mission raised concerns about
the lack of progress on construction of new schools --only 8 out of 23 are practically complete,
and for some additional 6 sites, only the E-Block is complete although the school has been
operationalized. This means that for some sites, school is ongoing while certain sections are
partitioned off for construction. The situation is not conducive for learning and there is the
additional risk that some incomplete schools will remain unutilized into the next academic year.
For facilities improvement, only 45 out of the 50 rehabilitated/expanded schools have been
completed and are in use, although only 40 have been formally handed over. Even with limited
progress on infrastructure activities, other interventions have contributed to progress against the
results indicators and the team was commended for exceeding disbursement linked result targets
for new seats utilized, School Performance Partnership Plan (SPPP) implementation and number
of scholarships offered.
12. About 100 Senior High Schools have submitted their SPPPs and 80 have been reviewed,
approved, signed and initial funds disbursed. As such, the related DLR has been met and this
helps pave the way for other DLRs by supporting school- level interventions to improve quality
4
of SHS teaching and learning. Training has already been rolled out to over 1,700 science and
mathematics teachers, surpassing the end of project target. Evaluation of the training reveals a
continued lack of qualified teachers and high teacher absenteeism. Additional staffing audits,
leadership training and resource materials are being provided to address these challenges. A
consulting firm is providing technical assistance to strengthen the in-service training modules for
teachers.
13. Electronic content has been developed for the i-campus teaching and learning portal with
200 modules in core subjects for SHS1 completed to date. Year 2 content development is
completed and work has begun on year 3 content. The i-boxes deliver pre-prepared video
lessons, student exercises and content assessment to SHS students and teachers. The i-boxes
have been rolled out to the initial 70 schools following on the heels of i-box utilization
training. However, the independent verification indicates that the technology is not being
adequately used by students and teachers in many schools that still lack the infrastructure
(computer labs) to access the content. The current policy prohibiting cell phones and/or tablets
further prevents students from accessing the i-campus on their personal devices. An impact
evaluation is being conducted to test the i-box concept, and the remaining schools will receive
the i-box in September, 2017.
14. An updated implementation progress report was submitted to the mission team. This will be
updated over the coming week. Constructive meetings were held with various members of the
technical implementation teams and relevant divisions and units in the MOE and GES and
provided feedback on all received activity reports. The team also helped to review the overall
implementation and procurement plans and steps towards achieving year 3 results. The project
is rated Satisfactory for both the Project Development Objective (PDO) and for
Implementation Progress (IP). With respect to PDO, the mission noted that there has been an
increase in access to senior secondary education in beneficiary districts, but it is too early to
measure an improvement in the quality of the low-performing SHS in Ghana, although the data
demonstrate an increase in examination results against last year (WASCCE performance).
5
Ghana Secondary Education Improvement Project Year 2 DLR
Verification (P145741- CR.54520)
STATUS OF DLI ACHIEVEMENT DLI DLR Requirement
s/Comments
Verification
source/docu
ments
Verification Protocol Status
DLI 2:
Increase in
new seats for
SHS
students in
underserved
school
districts
DLR 2.3: About 80% of
all
construction
works
completed
(aggregated)
Works
completion
guidelines- as
of February
2017 85.7%
complete as
per CWT
report
Independent
Verification
Firm report
Independent
Verification Firm to
visit sites and verify
against monthly
construction
supervision reports
COMPLETED and
Verified by
Independent
Verification Firm
(KE&T) and reviewed
by the World Bank.
80% verified
DLI 3: Increase in
number of
seats utilized
in existing
low-
performing
schools
DLR 3.3:
About 1,000
seats utilized
(cumulative)
Improvement
in total
enrolment in
125 schools
from 2014/15
EMIS data.
2016/17 data
comes from
school survey.
Independent
Verification
Firm report
Enrolment data
collected through
school reporting and in
future through school
mapping. Independent
Verifier will visit 10%
sample of schools to
confirm enrolment
records as compared to
submissions by school
heads.
COMPLETED and to
be verified by
Independent
Verification Firm (DAB
Consult) and reviewed
by World Bank in
April.
(5,889 seats)
DLI 4: Increased
enrolment in
SHS in
targeted
districts and
schools for
students
from low-
income
families,
especially
girls
DLR 4.3: At
least 4,000
SHS students
receiving
scholarship in
selected
schools
Total number
scholarships in
both first and
second year are
5,398 which
exceeds the
target for this
DLR. 61% of
beneficiaries
are girls.
Independent
Verification
Firm Report
Independent
Verification firm will
visit schools to validate
receipt of funds and
will check that
selection criteria has
been adhered to.
COMPLETED and to
be verified by
Independent
Verification Firm (DAB
Consult) and reviewed
by the World Bank.
(5,398)
DLI 5: Annual
Publication
of School
Performance
Report
DLR 5.2:
Publication of
updated
school
performance
data for
FY2016
online and in
brochure
All schools
(including
private)
mapped and
information
uploaded onto
school
mapping
portal and
World Bank School mapping
functional and digest is
being compiled and
printed. Additional
information is still
being collected from
schools which did not
provide data--
monitoring visits
To be verified by the
World Bank once digest
is printed- expected by
May 1, 2017. See
www.ghanaschoolsinfo.o
rg
6
printed digest. ongoing.
DLI 6: School
Performance
Partnerships
in 125
Beneficiary
Schools
DLR 6.3: 80
selected
schools
signing
performance
partnerships
out of the 125
selected
schools
80 plans have
been signed,
and
additionally
funds have
been allocated
for the
schools (first
tranche).
Independent
Verification
Firm
Independent
Verification firm
would sample schools
to confirm plans are
available and initial
funds have been
received.
COMPLETED and to
be verified by the
Independent
verification Firm (DAB
Consult).
DLI 7: Improved
learning
outcomes in
125 selected
SHS (quality
package)
DLR 7.3: ICT
based
instruction
rolled out in
about 50% of
selected SHS
70 i-boxes
have been
rolled out to
70 schools.
Teachers in
these schools
have already
received
training.
Independent
Verification
Firm
Independent
Verification Firm to
validate through school
visits, interviews with
teachers trained.
COMPLETED and to
be verified by
Independent
Verification Firm (DAB
Consult).
15. Meeting the fourth round (Year 3) of Disbursement Linked Results: Component 1
disburses according to the achievement of agreed disbursement linked indicators with
benchmarks for each year pre-determined as disbursement linked results. Year 1 indicators were
fully achieved in February 2016 and an advance of SDR18.2 million (US$25.34 million) was
disbursed in two tranches – March and September towards meeting the Year 2 results (following
the restructuring in August 2016). The mission reviewed the verification protocol and
assumptions for meeting the next set of indicators for Year 3. See table below for status of Year
2 DLRs. The advance on Year 3 DLRs would only be available once 5 out of the 6 DLRs are met
(See Annex 3 for DLR verification for YEAR 3)
Proposed Additional Financing (US$50 million)
16. The AF would scale up activities under the disbursement linked results areas related to
increasing both access and quality in selected low-performing schools in targeted districts. See
proposed allocation by result area below.
7
Financing of Disbursement linked Indicators/Components
Original Funding and Proposed AF (US$ 50 million)
Components and Results
Amount of
Financing
Allocated per
DLI/
component
Type of
Modification
(PAD)
Proposed
AF cost Total Cost
1. Support to increase access with equity
and quality in SHS 140.1
Pillar 1: Increase Access with Equity
DLI 1 Targeting of school expansion in
underserved school districts 5.54 - - 5.54
DLI 2 Increase in new seats for SHS students in
underserved school districts 23.2 - - 23.2
DLI 3 Increase in number of seats utilized in
existing low-performing schools 23.2 Scale up 10 33.2
DLI 4
Increased enrolment in SHS in targeted
districts and schools for students from
low-income families, especially girls
23.2 Scale Up 9 32.2
Pillar 2: Improve quality of education
DLI 5 Annual Publication of School
Performance Report 18.56 Continue 9 27.56
DLI 6 School Performance Partnerships in 125
beneficiary schools (now 225) 23.2 Scale up 10 33.2
DLI 7 Improved learning outcomes in 125
selected SHS (quality package- now 225) 23.2 Scale up 9 32.2
2 Management, Research, M&E 15.9
Program management/operational
costs/communications/verification/technic
al assistance/training/research
15.9 Scale Up 3 18.9
TOTAL 156 50 206
17. The AF is not expected to alter the design of the SEIP but instead provide opportunities for
expansion and strengthening of key efforts, particularly those related to improving access to and
quality of low performing secondary schools.
8
18. Selection of additional schools: The proposed AF would not change the PDO indicators
except to revise the targets based on the increase in beneficiary schools within the selected
districts. Under the SEIP, districts were ranked based on the following criteria: (i) demand for
senior secondary school places (defined by the ratio of JHS3 pupils in year x to SHS1 pupils in
year x+1 for the same district); (ii) district poverty index; and (iii) size of school population.
Criteria have various weights in the ranking and reflect both the capacity as well as demand for
schooling. The bottom 100 districts were selected based on the above criteria ranking all the 216
districts in Ghana. Up to 125 SHSs based on WASSCE and facilities assessment were selected.
The AF would now aim to cover all schools in the selected 100 districts (up to 221 SHSs) as well
as the 23 newly constructed schools. The expansion therefore retains the transparent and poverty-
targeted criteria and avoids significant recalculation of the baseline indicator data, annual and
cumulative targets. As such, support will be provided as follows:
Component 1: Support to Increase Access with Equity and Quality in Senior High Schools
(Current allocation: $140.1 million; Total allocation with proposed AF: US$187.1 million)
19. Pillar 1: Increase Access with Equity in senior secondary education in underserved
districts (Current allocation: US$125.1 million; revised allocation with proposed AF:US$144.1
million): The DLIs associated with this pillar (DLIs 2-4) aim to reward significant increases in
the number of new seats utilized in the newly constructed schools as well as the existing low-
performing schools. In addition, the increase in enrollment was to be further targeted to include
more students from low-income families, especially girls. The activities expected to contribute to
the achievement of these results (construction of additional seats, improvements to existing
schools and scholarships (now bursaries) to students from low-income families would be
continued for the current targeted schools under the AF.
Additional schools: In an effort to extend the impact of greater access to SHS, the
additional financing would support additional schools in the targeted 100 districts
(approximately 100 schools, plus 23 newly constructed schools under the SEIP). New
scholarships (bursaries) for needy students to cover private costs would be rolled out for
existing and new targeted schools. Facilities improvements based on a comprehensive
needs assessment would be targeted to the 75 original SEIP schools that did not receive
upgrading. With the proposed extension of the SEIP by another two years, the
implementation of minor works/rehabilitation would be completed in time to absorb the
increased enrollment expected/forecasted. The selection of additional schools to benefit
under the SEIP would use the original comprehensive targeting criteria that was used to
identify the underserved districts and low-performing schools under the Parent project. The
AF, coupled with an extension of the period for implementation, would allow for: (i) the
expansion of seats utilized in existing low-performing schools (75 schools beginning in the
September 2017 school term) from an original target of 10,000 to 15,000; and (ii) an
increase in the number of students receiving scholarships (from the original target of
10,000 to 20,000). Given the experience with the first round of upgrading to 50 SHS, the
AF could support a more demand driven approach to meeting infrastructure needs well
aligned with the SPPPs to ensure strategic alignment with school priorities.
9
20. Pillar 2: Improve quality in low-performing SHS (Current allocation: US$15 million;
revised allocation with proposed AF: US$43 million): The DLIs associated with this pillar (DLIs
5-7) aim to reward school level improvements in the quality of the teaching and learning offered
in the low-performing SHS. Contributing to the overall outcome of improved completion scores
on the standardized WASSCE for math and science in particular, the ongoing GoG program
supports an interactive school mapping portal, grants to SHSs through the SPPPs, leadership
training, intensive science and math training and resources for teachers, and the roll out of an
innovative mechanism for ICT based instruction through the Ghana patented i-campus/i-box
(Adedo1). All of these activities contribute to a “quality package” for the SEIP schools and have
just recently been rolled out. Initial feedback is positive on the mapping, ICT activities and first
year and a half of leadership, math and science teacher training. The SPPPs provide a mutual
accountability mechanism for incentivizing SHS quality improvement activities as enrollments
increase through the expansion of infrastructure and scholarships.
Quality interventions: Under the AF, these quality packages would therefore be extended
to approximately 123 additional schools. The AF would also reward the increased number
of teachers benefitting from math and science training, with potential customized materials
and lesson plans created through either the MS4SSA (World Bank regional initiative on
math and science for Sub-Saharan Africa) program; (science and math training provided by
the African Institute for Mathematical Sciences-AIMS) or other follow-up teacher
strengthening activities, and the expansion of the i-box technology, training, content
development and internet connectivity for the additional 123 schools.
Component 2: Management, Research and Monitoring and Evaluation (Current allocation:
US$15.9 million; Total allocation with proposed AF: US$18.9 million)
21. Under the AF, a proposed US$3 million will be provided to project management and
supervision, specifically to cover costs related to technical assistance for MOE, GES and
other key implementing agencies. In addition, the funding will continue to sponsor key
trainings. The funding would support web-based school monitoring through the innovative
school mapping portal and the subsequent enhancements being made to use this tool to better
monitor program activities. Independent verification firms would be supported to annually
verify the disbursement linked results. The research and diagnostic activities to support
analysis on SHS policy and strategy will be particularly critical to scale up now that GoG has
announced the implementation of free SHS expected to commence in September 2017. The
necessary data analysis and implementation assessments could be supported to help guide
such a transformative agenda, especially in light of the structural nature of the education
system (boarding vs. day schools), fiscal constraints (limited non-salary education
expenditures), and quality challenges (low learning outcomes at completion of basic
education). The AF could also support more systematic procurement and financial
management capacity at school level in order to strengthen the implementation of the SPPPs
and facilities upgrade. Operational costs of the SEIP associated with the scale-up and/or
continuation of activities through the extended AF closing date would also be supported.
1 Adedo in Ewe means knowledge that is meant to be shared.
10
22. Economic Analysis for AF: The economic analysis will evaluate the economic impact of
the project so far and provide an evidence-based rationale for scale-up of key interventions under
the AF. The team will require additional support from GoG to confirm the figures in the
economic analysis and ensure consistencies across the data by April 19, 2017. In particular, the
team would require verified information on the following:
Number of public and private SHS in Ghana as at March, 2017
Number of teachers trained for SPPP (with dates of training), number of unique schools
benefitting from SPPP trainings
Average (total and annual) unit cost of scholarships disbursed to date
Total expenditure on school mapping (by categories across component 1 and 2)
Total expenditure on iBox (by categories across component 1 and 2, including SPPP)
Estimated maintenance and replacement costs for iBox (annual per school)
Subsidy estimates per student (day/boarding) per TERM and YEAR prior to free SHS
Scholarship estimates per student (day/boarding) per TERM and YEAR for free SHS
Teacher and Administrative salary cost estimate projections per YEAR for free SHS
Proposed Timetable for Additional Financing for
delivering FY17
Date
Concept Memorandum review/approval March 31, 2017
Decision Meeting April 29, 2017
Appraisal May 5, 2017
Negotiations May 19, 2017
Board June 27, 2017
Signing August 1, 2017
Effectiveness September 8, 2017
23. Upcoming Mid-Term Review: The Mid-Term Review (MTR) was postponed and is now
planned for September 2017. The mission agreed that the postponement would allow for
additional analysis on project outcomes and impacts. The MTR will also coincide with the
planned SPPP/leadership peer review workshop to bring participating schools together to discuss
the project results, challenges and lessons, and to consider potential revisions to strengthen
project outcomes and impact in the sector. With the potential for additional financing being
effective by the MTR, the MTR would offer a good forum to launch the additional financing,
address the implementation plans for the additional activities and expansion of new project
schools. It was agreed that the following reports/analysis will contribute to the MTR:
Road Map for MTR (timeline for analyses, logistics and stakeholder engagement)
WAEC ranking of schools, with explanations of the ranking criteria
11
CSSPS analysis and triangulation of student choice, vacancy declared, placement and
enrolment in SEIP schools including dates of first year student registration
Analysis of SHSs contributing to university, polytechnic and tertiary enrollment
School mapping analysis; update on SHSs (mostly private) which have not provided
data for digest
Independent Fiduciary Review (Bank can share sample TOR)
Independent Procurement Review (Bank can share sample TOR)
Technical review of construction and facilities upgrade- ongoing
Safeguards Review
Revised implementation plan with addition of new project schools in targeted districts
for AF
Revised procurement plans for AF
Cost-benefit analysis of project interventions- including unit cost analysis of free SHS
policy (including projected salary and non-salary costs)
Qualitative survey on math and science and leadership trainings
Whatsapp leadership, SPPP, i-box platform survey
Analysis of SPPPs through most recent monitoring report
Analysis of Monitoring Reports—both quantitative and qualitv
Decisions on MS4SSA adoption and roll out under the additional financing
Analysis of possible AIMS math and science training
Cost comparisons on school operational costs
24. Procurement: A review of the updated procurement plan for Component 2 (which was
cleared in January 2017) was undertaken by the mission and overall performance was assessed.
With the plans for additional financing, the mission recommended a value for money
procurement audit of both components 1 and 2. A sample TOR will be shared with the team by
April 20, 2017. Assessing procurement to date, the mission noted that in total, 29 procurement
activities were planned to be executed. 17 contracts have successfully been executed
representing (58.62%), 5 contracts are on-going representing (17.24%), one contract was at pre-
contract stage, representing (3.4%) and 6 are yet to be initiated, representing (20.74%). Total
amount of procurement US$2,594,142.42 out of which an amount of US$2,275,296.42 is
committed representing about 76%. This is a significant achievement as procurement left to be
executed is less than 24%. The Bank reviewed its Prior/Method Thresholds which was applied in
preparing the procurement plan for 2017. Due to the increase in the thresholds, most of the
procurement would be undertaken by the procurement team of SEIP. Procurement records for the
contracts reviewed were complete, chronologically filled, secured and kept with the procurement
officer. The overall procurement risk rating is maintained as Substantial and the Procurement
Performance rating is Moderately Satisfactory.
25. In addition, according to the World Bank’s procurement policy, the new Additional
Financing is subject to the new procurement framework, however the GoG has requested to seek
a waiver and apply the Procurement and Consultant Guidelines applicable to the original
project/original financing to the Additional Financing. This waiver will be requested pursuant to
paragraph 3, Section VI of Bank Directive “Procurement in IPF and Other Operational Procurement
Matters” and Section III – Scope, I. Procurement During IPF Preparation - C. Additional Financing of
the Bank Procedure “Procurement in IPF and Other Operational Procurement Matters.” The task team
12
supports GoGs request for an exemption from applying the new procurement framework because
the Additional Financing involves minimal new procurement and application of the new
procurement framework offers little advantage in this particular regard.
26. Safeguards update: The short technical mission did not include a comprehensive
safeguards review. The Safeguards Performance Chart was shared with the team and indicates
where contractors are not performing well. Therefore, the mission agreed that the Safeguards
consultant working in the MOE provide an update by April 19, 2017 on how outstanding issues
from the last mission’s reporting (October, 2016) have been addressed. A-RAP additions have
been documented and shared with the Bank Social Safeguards Specialist for review on February
17, 2017. The RAPs will need to be re-disclosed. With the preparation for additional financing,
the Environmental and Social Management Framework (ESMF) would need to be updated to
reflect the additional beneficiary schools and re-disclosed.
27. Monitoring and Evaluation: The mission requested that the monitoring reports be shared
from visits in October 2016 and more recently in March 2017. The mission reminded the team
that it had been agreed during the previous mission that the monitoring teams would use
standardized templates for the collection of information and evaluating activities which would be
uploaded on tablets/laptops for more timely data collection, collation and analysis. The Results
Framework was updated in March 2017 (See Annex 6) and still requires calculations on direct
project beneficiaries (using EMIS data and monitoring reports). Some typos were discovered in
the reporting of the completion rate data (target) and corrected in the latest version of the
framework. In addition, the team was advised to continue sensitizing schools on the calculation
of completion which is really a survival rate. Reaching mutual understanding on defining
repeaters would help ensure more accurate reporting on this key indicator. The mission
recommended that special registers be given to each SEIP school to more easily capture the
data. With regard to the PDO indicator on educational attainment, it was agreed that the team
would indicate the dates of the next household survey and census to determine whether the SEIP
would need to conduct a separate survey to report on key indicators. With an extension of the
closing date proposed for the SEIP, the end line survey would need to be confirmed given the
current plans for the next Ghana Living Standards Survey 8 planned for 2021 and the national
census planned for 2020. The team will further discuss with the Ghana Statistical Service (GSS)
to determine survey options.
28. Communications: The communications team has scaled up the outreach and public
relations activities and will continue to roll out campaigns through SMS, TV and newspaper fora.
The communications plan for 2017 was shared with the mission. The coordination with the
CSSPS has helped to make information on SEIP available to recently placed students. Going
forward, the team will need to expand sensitization to all new schools added under the
Additional Financing. The communication activities could also include some short videos of
interviews of beneficiaries at SEIP schools. The mission encouraged the communications team to
include in the work plan activities for strengthening internal communication between MOE and
GES, better supervision of district Public Relations Officers and Girls Education Officers. The
mission recommended a quarterly newsletter to update policy makers and other stakeholders
about SEIP activities and results.
13
D. DISCLOSURE
29. The World Bank and GoG confirm their understanding and agreement to publicly disclose
this Aide-Mémoire. The disclosure of this Aide Memoire was agreed with project
counterparts led by Dr. Yaw Osei Adu Twum, Deputy Minister for Education, Ministry of
Education at the wrap-up meeting held on April 3, 2017 at the Ministry of Education.
E. PENDING ACTIONS/NEXT STEPS
Description of ACTION Date Due STATUS and Responsible
Party
SEIP
Letter from MOF requesting Additional Financing April 7, 2017 DONE
Independent Verification of Quality DLRs April 15, 2017 DONE
Technical Review of civil works contracted April 19, 2017 MOE, CWT
Safeguards report documenting all RAP issues April 19, 2017 MOE
Procurement Review MTR- TOR April 20, 2017 GES, MOE, WB
Fiduciary Review-MTR- TOR April 20, 2017 GES, MOE, WB
SPPPs Assessment (performance review) June 1, 2017 GES
Letter from DG to Regional Directors on Head
teacher selection and transfers
April 4, 2017 DONE
Data for Economic Analysis April 19, 2017 GES/MOE
School Mapping (Adedo) Digest printed May 15, 2017 GES, MOE
MTR analyses completed August 15, 2017 GES, MOE
Appraisal of Additional Financing May 2017 WB, MOE, GES
Technical Review of civil works completed June 2017 MOE, CWT
MS4SSA workshop application submitted April 19, 2017 MOE, GES
MS4SSA workshop May 15-26, 2017 MOE, GES, WB
14
Annex 1: List of People Met
Ministry of Finance
Lawrence Nyanor Snr Economist, WBU 0243438322 [email protected]
Ministry of Education Dr Matthew Opoku-Prempeh Hon. Minister 0302662772 [email protected]
Dr Yaw Osei Adutwum Dep. Minister 0206335932 [email protected]
Enoch Cobbinah Chief Director 0202030286 [email protected]
H. R. Wilson SEIP Co-ordinator 0208111627 [email protected]
Mawuli Sebgefia Head, ICU 0244695607 [email protected]
Cynthia Lawson-Heyman SEIP Administrator 0203628202 cynthialheyman@gmail,com
Wilhelmina Asamoah Director F&A 0578289188 [email protected]
Isaac Biney Director, PBME 0244484518 [email protected]
Paul K Mensah CWT, QS 0206933776 [email protected]
Kofi Howard CWT, Engineer 0244376789 [email protected]
Philip T Okletey CWT, Architect 0208528948 [email protected]
Aruna Nelson Procurement 0244068823 [email protected]
Matilda Tettey PRO 0244595298 [email protected]
Rahinatu Dari Prin Accountant 0244635096 [email protected]
Emelia B. O. Derkyi Director, Finance 0208167941 [email protected]
Dan Osman Mwin Head, PR 0244732876 [email protected]
Mirabel Bentil PBME 0260900031 [email protected]
Caesar W. Sowah ICT, Programmer 0543525962 [email protected]
Agbemabiese G. Alex SEIP Secretariat 0207407499 [email protected]
Noah Asante SEIP Secretariat 0244502865 [email protected]
Monica D. Tandoh Snr Planning Officer 0244478235 [email protected]
Caitlin Willams ODI Fellow 0557389023 [email protected]
Ernest Wesley-Otoo D. P Co-ordinator 0244101822 [email protected]
Divine Ayidzoe Director SRIM 0244466125 [email protected]
Ernest Owusu-Ansah Head, M&E 0246617273 [email protected]
Bernard Ayensu M&E 0267730142 [email protected]
Daniel Adonu Head, Audit 0208002307 [email protected]
Van-Excel Acheampong (Proc. Unit) Service Person 0274277267 [email protected]
Franklin Bediako PRO 0277551225 [email protected]
Samuel Adjei Snr. System Analyst 0277470144 [email protected]
Lawrence Fianu FPMU, Engineer 0244834109 [email protected] Mary Hammond National Service Personnel 0244236815 [email protected] Shirley Acquah National Service Personel 0243732432 [email protected]
Ghana Education Service Jacob A.M. Kor Director-General 0244798521 [email protected]
Cynthia Bosomtwe-Sam TL Research 0209834524 [email protected]
Felicia Boakye- Yiadom Dir. / Ag Exe Sec NACCA 0244682111 [email protected]
Naa-Dei Thompson Chief Accountant 0244696501 [email protected]
Dr. Chris Koramoah Ag FC 0204343020 [email protected]
Dr. Dorothy Glover SEIP Coordinator (Q&U) 0207366900 [email protected]
Kwasi A. Anokye CSSPS 0202510037 [email protected]
Rev Jonathan Bettey Pro Head 0208236592 [email protected]
Kwame A. A. Agyapong GPEG Project Coordinator 0244519507 [email protected]
15
David A. Banamini PR Unit 0243246124 [email protected]
Augustus Agyemfra SED 0244709335 [email protected]
Richmond Atta-Williams ICT 0264530270 [email protected]
Akandi A. Bismark Chief Int. Auditor 0208188744 [email protected]
Bernard Ntim Head, Budget 0202621724 [email protected]
Elizabeth Dufie Account Officer 0247926191 [email protected]
Andrews K. Quaning Head, SMT 0244132853 [email protected]
Adams Zuwii Procurement Officer 0248454999 [email protected]
Obeng Ennin ICT 0246957152 [email protected]
Michael Inkoom Director 0277129427 [email protected]
Beatrice Zalia Ali Director-GES Procurement 0208110079 [email protected]
Dr. Evelyn Oduro NTC, Ag. Exe. Sec 0244686241 [email protected]
Agencies Joshua Mallet Director 0244438643 [email protected]
Samuel Ofori-Arko Head F&A 0267375166 [email protected]
Robert Obenyah Field Co-ordinator 0201061195 [email protected]
Consultants Aaron Asant-Addai Envilogica Consult 0244368671 [email protected]
Kwaku Osafo-Affum Struc Engineer 0244638830 [email protected]
Alex L. Ababio Twum Boafo & Part., Q. S 0246454061 [email protected]
Boateng Twum-Barima Twum Boafo & Part., Assist. Q. S 0244886706 [email protected]
Dr. Albert Awuah UDC, Director 0208164805 [email protected]
David Gyampoh CONPRO Ltd, Q. S 0501368447 [email protected]
Philip Antwi PDC, Project Engineer 0243811633 [email protected]
Eric Quao UDC, Project Engineer 0247656725 [email protected]
16
Annex 2: Implementation Status Detailed Update
Component 1: Pillar 1 Access with Equity
1. Civil works- new construction: With regard to meeting the disbursement linked indicators
for increasing access to SHS in beneficiary districts, the GoG aims to construct 23 new schools
through 46 contract lots. Construction began in July 2015 with completion scheduled for October
15, 2016. Overall percentage of work completed as of end of February 2017 is 85.7%. The three
vocational blocks and two technical blocks have not yet been awarded and it was agreed that
these should be awarded without delay to ensure that the benefits to the students are realized as
soon as possible.
CONSTUCTION- EXPENDITURE TO DATE
NO. OF
CONTRA
CTS
TOTAL BUDGET PROJECTED
FINAL COST
(GHS)
TOTAL
PAYMENTS
BALANCE
(GHS)
%
Paid
%
complete
Facility
Upgrade 50
25,273,195 25,023,068 20,892,750 4,130,317 83.49 97.92
New
Works 46
313,464,724 303,339,955 186,486,248 116,853,707 61.48 85.70
Total 96 338,737,920 328,363,023 207,378,999 120,984,024
2. While the target for the DLR of reaching 80% has been met, the category of poorly
performing contractors are still dragging down the progress for completion of several of the new
schools. The mission noted that eight schools have been completed (both lots A and B) and about
thirteen E-blocks have been completed. Current monthly average progress has been 1.4% or less
since November. The summary of performance groupings is indicated below.
GROUP PROGRESS % RANGE PERFORMANCE BASED ON %
ACHIEVED
NO. OF CONTRACTS
A Completed and Handed Over 100 VERY GOOD 11
B Practical Completion 100 - 98 GOOD 9
C Between 90% and 98% complete 98 - 90 SATISFACTORY 6
D Between 75% and 90% 90 - 75 POOR 11
E Below 75% complete <75 VERY POOR 7
TERMINATED 2
TOTAL 46
Source: CWT summary Feb 2017
3. The E-blocks and all ancillary facilities should be functional to ensure that students already
enrolled (3,111) have full educational opportunities to complete their first year of SHS. The
17
mission learned that none of the science labs have been operationalized as the contract for the
science equipment and installation while awarded in September, has not yet produced any
results. In addition, some of the schools also do not have functioning ICT labs as equipment has
not yet been delivered and/or installed. The construction contracts would need to be extended
given the current status as of April 2017. It was agreed that as with usual contract management
practice, the price indices on the contracts would be frozen for contracts extended beyond the
original contract completion date.
a. For lots where construction may extend past April 2017:
i. Monthly progress targets would be fixed and monitored.
ii. The contract would be terminated if the targets are not met for several consecutive
months.
b. The worst performing contracts of the two lots (both at one school) have been
terminated. It has been estimated that it would take about thirteen months to complete
the procurement (four months) and construction (nine months).
4. Cost escalation: The mission discussed concerns about the projected increase in total
construction cost and the significant variance in costs between sites as it is not clear why the
projected costs vary when plans, Bills of Quantities (BoQs) and super structures are the same
(the exception is the foundations which vary because of site differences in slopes). While the
mission has noted that the cost overruns have been reported lower than 26% it is not clear if this
includes the contingency amounts. Therefore it will be critical to initiate the technical review
immediately. The savings on the cost enhancement while welcomed, should not divert the focus
of the CWT. Besides the reduction in indices they must consider: the variation in quantities for
same buildings for the above plinth level are not justified and need to be reviewed by an
independent person. Until this is settled, the final bills of the contractors cannot be cleared; the
manner in which the contractors have claimed higher index by delaying submission of their bills
or even delays in progress is unfortunate. Contractors should be entitled to the fluctuations as per
their work plans ONLY.
a. The revised projected final cost of the New Construction civil works is now estimated
at GHS 303,339,955.17.
b. This exceeds the original total Contract Sums of GHS 268,592,293.86 by GHS
34,747,661.31 representing an increase of 12.94% of the total Contract Value
c. Even though the building designs are the same, the costs varied widely between sites
for substructure, super structure and external development - between (-)5% to 56% for
sub-structure at sites with basements and relatively flat ground levels; between (-)2% to
19% for superstructure; and between (-)7% to 39% for external works. The CWT
agreed that there might be some errors in calculations.
d. There was an error in the principle used to calculate the fluctuations in some payment
certificates, which were reviewed at random.
e. The on-going work between the MOE (CWT) and the Consultants to arrive at the full
details of the projected cost increase has been slow and needs urgent and expeditious
actions. The mission team strongly recommends that the details in variations are
finalized quickly so that the contracts can be closed where works would be completed
soon.
18
5. In the forthcoming payment certificates of contractors, the amounts for variations would be
withheld and the fluctuations would be calculated as per the last official cost index declared by
GSS. The payments made to date on account of the variations and fluctuations calculated on
provisional indices would be adjusted and released only after the variations are finalized and
official indices are declared by GSS.
6. The technical review would verify the differences in quantities for the same items at
various sites, quantities of additional items executed at sites, calculations of fluctuations etc.
7. The MOE requested the Ghana Statistical Service (GSS) to review its indices used for
calculating fluctuations from April 2016 onwards and determined that the indices were in fact
overestimated. This inquiry has resulted in over US$2 million in reduced fluctuation
demonstrating the need for careful review of all variances and price fluctuations.
8. Other issues and agreements on civil works:
a. The mission team recommended that the GoG should consider terminating the contracts
of poor performing Supervision Consultants.
b. District Assemblies are required to provide access road, electricity and water supply to
the schools sites. The current status is: electricity is available at 20 new construction
sites. The transformer designs have been changed at three sites where the supply
voltage is 33KvA compared to 11KvA planned originally; water connection has been
provided to three sites and bore-holes are to be used to supply water in the remaining
20 sites. Depending on the water quality test reports, water treatment plants will be
installed after consulting the Community Water and Sanitation Agency for advice on
the treatment and siting of additional boreholes if need be; access is possible through
roads to 20 sites, minor road works are required for one site, and major road works are
needed for two sites. It was agreed that the CWT would work with supervision
consultants and District Assemblies (for provision of potable water and access roads) to
prepare time lines for provision of the above facilities. In case delays are expected in
providing the water treatment plants at sites where the students would join from this
academic year, the District Assemblies would ensure that alternate arrangements are
made for potable water.
19
DISTRICT ASSEMBLIES OBLIGATIONS – NEW CONSTRUCTION
S/No. Lot No. Site Contractor
%
PROGRESS
PER LOT
FOR JAN.
2017
%
PROGRESS
FOR E-
BLOCK
ONLY
%
COMPLETION
/HANDING
OVER
STUDENT
ADMISSION
ACCESS AND UTILITY SERVICES
ACCESS
ROAD
WATER
CONNECTION
ELECTRICITY
CONNECTION
1
AS02A Adugyama Nickseth 100 100.00 Handed over
Dec. 22, 2016
Students
admitted in
Oct. 2016
Access is
satisfactory
Borehole water
suitable for
consumption
Electricity
available on site AS02B Adugyama Nickseth 100 -
2
AS01A Agric
Nzema Barry's Limited 99 100.00
Sectional
Handing Over
Students
admitted in
Nov. 2016
Access is
satisfactory
GWCL Water
connected to
site.
Awaiting
installation of
meters. AS01B Agric
Nzema Barry's Limited 99 -
3
GA01A Katamanso Krane
Construction Ltd 100 100.00
Sectional
Handing Over
Students
admitted in
Nov. 2016
Access is
satisfactory
Borehole water
requires
treatment.
Electricity
available on site GA01B Katamanso Tonyan 100 -
4
GA02A Fafraha Antartic Contract
Works 100 100.00
Handed Over
Nov. 11, 2016
Students
admitted in
Oct. 2016
Access is
satisfactory
GWCL Water
connected to
site.
Electricity
available on site GA02B Fafraha
Antartic Contract
Works 100 -
5 GA03A Kwabenya
Construction
Logistics 100 100.00
Handed Over
Nov. 11, 2016
Students
admitted in
Oct. 2016
Access is
satisfactory
GWCL Water
connected to
site.
Electricity
available on site GA03B Kwabenya G.R Construction 100 -
6
BA01A New
Longoro China Railways 100 100.00
Handed Over
Dec. 30, 2016
Students
admitted in
Nov. 2016
Access is
satisfactory
Borehole water
suitable for
consumption
Electricity
available on site
BA01B New
Longoro China Railways 100 -
7 UW01A Loggu Lubie 99 100.00
Handed Over
Feb. 15, 2017
Students
admitted in
Jan. 2017
Access is
satisfactory
Borehole water
suitable for
consumption
Electricity
available on site UW01B Loggu Lubie 98.79 -
20
S/No. Lot No. Site Contractor
%
PROGRESS
PER LOT
FOR JAN.
2017
%
PROGRESS
FOR E-
BLOCK
ONLY
%
COMPLETION
/HANDING
OVER
STUDENT
ADMISSIO
N
ACCESS AND UTILITY SERVICES
ACCESS
ROAD
WATER
CONNECTION
ELECTRICITY
CONNECTION
8
AS03A Asuoso Akalifa 100.00 100.00 Handed Over
Dec. 21, 2016 Ready for
admission Access
satisfactory
Borehole water
suitable for
consumption
Electricity
available on site AS03B Asuoso Ivag Const. Ltd. 73.94 -
9
UE02A Zulugu Top Construction 98.72 100.00 Handed Over
Feb. 17, 2017
Students
admitted in
Jan. 2017
Access
satisfactory
Borehole water
suitable for
consumption
Electricity
available on site UE02B Zulugu Top Construction 99.00 -
10 VR01A Adaklu
Aduadi
/Tsrefe
Sarbah 93.75 95.00 93.19
Major
roadworks
required
Borehole water
requires treatment Electricity
available on site VR01B Macoby 99.38 -
11
VR02A Yawbram Defiat Dev. Co. 97.74 98.00
92.29 Students
admitted in
Dec. 2016
Access
satisfactory
Borehole water
requires treatment Electricity
available on site VR02B Yawbram Budox Const. Co. 93.07 -
12 NR02A Daboya Top Construction 96.75 100.00 Sectional Handing
Over (E-Block)
Students
admitted in
Dec. 2016
Access
satisfactory
Borehole water
suitable for
consumption
Electricity
available on site NR02B Daboya Top Construction 96.32 -
13
ER01A Anum
Apapam
Integrated Properties
Limited 94.42 98.00
Sectional Handing
Over Students
admitted in
Nov. 2016
Access
satisfactory
Borehole water
requires treatment
Electricity not
yet connected to
site ER01B
Anum
Apapam
Integrated Properties
Limited 97.05 -
14
CE01A Ofaakor
Kasoa Barry's Ltd. 77.50 98.60
Sectional Handing
Over Students
admitted in
Dec. 2016
Access
satisfactory
Borehole water
requires treatment Electricity
available CE01B
Ofaakor
Kasoa Aquila Int. Ltd 78.02 -
15
ER02A Maame
Krobo
Perfect Business
Const. Ltd. 82.09 95.00
Sectional Handing
Over Students
admitted in
Jan. 2017
Access
satisfactory
Borehole water
suitable for
consumption
Electricity
available on site ER02B
Maame
Krobo Big Foot 74.00 -
21
S/NO LOT NO. SITE CONTRACTOR
%PROGRESS
PER LOT FOR
JAN. 2017
% PROGRESS
FOR E-BLOCK
ONLY
%
COMPLETIO
N /HANDING
OVER
STUDE
NT
ADMIS
SION
ACCESS AND UTILITY SERVICES
ACCESS
ROAD
WATER
CONNECTION
ELECTRICITY
CONNECTION
16
WR03A Nsawora
Edumafua KKF Classic Co 73.30 91.00
NO
T Y
ET
ST
AR
TE
D
Access
satisfactory
Borehole water
suitable for
consumption
Electricity available
on site WR03B
Nsawora
Edumafua Zotime Ent. Ltd 98.08 - Handed Over
17 BA03A Bassa
Excellent Builders
Co. 80.66 87.00
79.10 Access
satisfactory
Borehole water
requires treatment
Electricity available
on site BA03B Bassa Is-Joy Ltd 74.78 -
18
UE01A Tambilgu Araco 61.94 70.00
62.51 Access
satisfactory
Borehole water
suitable for
consumption
Electricity available
through 33kv
transformer UE01B Tambilgu Myturn Ltd. 66.29 -
19
NR03A Mpaha Beobiya Ltd. 59.49 78.00
62.96 Access
satisfactory
Borehole yet to be
drilled
Electricity available
through 33kv
transformer NR03B Mpaha U-Comm Ltd. 77.91 -
20
WR01A Manso Amenfi David Walter 58.70 72.00
60.56
Major
roadworks
required
Borehole water
requires treatment
Electricity not
available WR01B Manso Amenfi Justmoh Ltd. 76.66 -
21 NR01A Sang Kundim Ltd. 62.42 79.00
63.21 Access
satisfactory
Awaiting borehole
test results
Electricity available
through 33kv
transformer NR01B Sang Koddeg Ltd. 75.95 -
22
BA02A New Kokrompe Rinacand 78.1 86.30
76.50 Access
satisfactory
Borehole water
suitable for
consumption
Electricity not
available BA02B New Kokrompe Alexiboam 76.16
23 WR02A Adabokrom Jowak 35.13 - Terminated Termin
ated
Access
satisfactory
Borehole drilled but
water yet to be tested
Electricity nearby but
not connected WR02B Adabokrom Jowak 42.33 - Terminated
Service available but not adequate
Service not available
22
9. Civil Works-Facilities upgrade: Additional civil works are being implemented through
rehabilitation of 50 SHSs to help meet the DLR for Component 1. The Component 1 DLR is
related to increased seats in existing under performing schools. Forty-five out of 50 SHSs have
their rehabilitation completed and forty have been formally handed over. All forty-five SHS’s are
being used by the schools. One contract has been terminated (Lot UW03). Works carried out to
date under the contract has been assessed by the Supervising Consultants and the CWT and bid
documents prepared for the re-award of the contract. The re-award of the contract has been
stalled due to the transition process. CWT undertook site inspections to 41 Facility Upgrade sites
in January and February 2017 to carry out in most cases, final inspection of works handed over
and in their defects liability period, and in some cases to prepare snag lists prior to handing over
of the facilities to the beneficiaries.
10. The Total Contract Value of the 50 SEIP Facility Upgrade Works is GH₵22,223,550.67.
The total variations on the Facility Upgrading Works is GHS 874,149.56. The Variations are due
to ground conditions and differences between Contract Bills of Quantities and re-measured
quantities. There were some changes in the scope of the Rehabilitation Works. The Fluctuations
on the Facility Upgrade is estimated at GHS 2,572,655.75. This brings the Total Variations and
Fluctuations to GHS 3,446,805.31. The Revised Projected Total Cost of the Facility Upgrade
including Variations and Fluctuations is estimated at GHS 25,023,068.10.
11. This exceeds the Original Total Contract Sum of GHS 22,223,550.68 by GHS
2,799,517.42 representing 12.60% increase of the original Contract Value as indicated above.
MONTH
FACILITY UPGRADES WORKS
EXPECTED OVERALL
TARGET (%)
% ACTUAL OVERALL
PROGRESS
% MONTHLY
PROGRESS
FEBRUARY 2016 68.0 72.6 5.6
MARCH 2016 76.0 82.7 10.1
APRIL 2016 84.0 86.3 3.6
MAY 2016 92.0 88.6 2.3
JUNE 2016 100.0 92.5 3.9
JULY 2016 100.0 94.84 2.34
AUGUST 2016 100.0 96.38 1.54
SEPT. 2016 100.0 97.58 1.20
OCTOBER 2016 100.0 97.82 0.24
NOVEMBER 2016 100.0 97.84 0.02
DECEMBER 2016 100.00 97.84 0.00
JANUARY 2017 100.00 97.84 0.00
FEBRUARY 2017 100.00 97.84 0.00
23
12. There is also the need to follow up on maintenance arrangements- It was agreed that
supervision consultants would share the finalized maintenance manuals that are currently being
discussed and reviewed with the schools.
13. Looking at additional financing interventions, the team urged caution about the plans for
increased expansion/construction in existing schools as a means to increasing enrolment in these
schools. Looking at the data to date, in the schools where such interventions were rolled out (50
schools) the increase was only 24% and this was mainly accounted for by large increases to
about 3 schools with growth over 100%. Even with significant outreach to raise awareness about
the rehabilitated/new senior high schools and to admit qualified students from the JHSs in the
relevant communities, the expansion remains modest.
Enrollment increases in SEIP low-performing schools
Average enrolment growth 2013/14 to 2016/17
Total 18.9%
In the 75 15.1%
In the 50 24.6%
Number of schools with growth in 3 years of project 32
last 2 years of project 34
Growth in % girls enrolled 2013/14 - 2016/17
Number of schools 87
Average growth per school 3%
Maximum growth 23%
14. Additional Financing and Contracting: The mission agreed that consultancies for civil
works, rehabilitation, works supervision and independent verification would all be re-advertised
as contracts draw to a close.
15. Scholarships have contributed to increasing enrolment in low-performing schools, having
been rolled out to 5,398 students across 108 of the 125 SEIP schools. At least 61% of
scholarship beneficiaries are girls. This figure includes the students from the 2014/2015
academic year currently in SHS2 and students from the 2015/16 academic year in SHS1. The
selection of beneficiaries for 2016/17 academic year is underway. The total number of
scholarship beneficiaries is 5,398 (2014/15: 2,074 beneficiaries; and 2015/16: 3,324
beneficiaries). The highest proportion of scholarships are in the Ashanti region (19 percent) and
the lowest proportion of beneficiaries is in the Upper East region (2 percent).
16. The challenges of high attrition of head teachers, undue delay in submitting reports, delay
in collecting cheques for disbursement and subsequent delay in paying student remittances
remain. The SEIP accounts are still not active for all schools (Accountant Generals Department
is required to provide clearance before school accounts can be opened). This means that head
teachers have to come to all the way to headquarters in Accra to pick up checks for scholarships.
Beneficiary schools are still struggling to provide termly returns on the scholarship program
making it difficult to track performance and attendance. Cheques for the first year are usually
disbursed in the third term. In view of the commitments made under the new free SHS policy,
the SEIP scholarships would be reduced to approximately US$150 per student per year to cover
24
remaining private costs to SHS for low-income students (including school bags, school sandals,
transportation etc.). The mission recommended that the GES internal audit unit support a
scholarship audit and in 2017, the Component 2 budget should provide for more regular routine
audits at the regional level. In addition, the mission recommended that schools provide their
account numbers so that funds can be transferred through Banks rather than physical collection
of cheques.
17. School Performance Partnership Plans (SPPPs). The status on SPPPs remains as
determined during the December, 2016 mission. The SPPPs for 80 schools have been vetted and
signed with funds disbursed against the schools’ plans for goods and services activities. Prior to
releasing funds, the schools must have outlined acceptable plans to facilitate the procurement
process. A verification protocol for assessing school performance on the SPPPs preparation and
implementation by scoring and ranking schools was agreed during the last mission to be shared
with the Independent Verifier. The team looks forward to receiving this verification guidelines
for input. The data scoring and ranking SHSs on the basis of SPPP implementation will be
shared with the GES for management administrative decision making. The impact of low
capacity of school heads and administration to implement SPPPs is critical. The presentation on
Component 2 budget and expenditure, indicated SPPPs to be among the lowest expenditures in
2016. Only 6.41 percent out of the total SPPP budget of GHC272,000 (US$64,700) was spent
on eligible activities in 2016. The necessary training for school heads and administration was
not undertaken and this has the potential for slowing down the school implementation of SPPPs.
The team strongly recommends that the planned SPPP training for 2017 should be fully
implemented to ensure that low implementing schools are supported.
18. In addition the high turnover of head teachers has also impacted implementation as new
teachers have not had SPPP training. A training is being planned in April 2017 which would
include procurement capacity building to expedite production of the procurement plans and
subsequent release of remaining SPPP funding. It was agreed that quarterly presentations of
Component 1 expenditures (including SPPP and other quality expenditures) would be initiated to
better monitor progress against the activity. In addition, the mission agreed to conduct an
analysis of the monitoring reports for the MTR to better understand expenditures under the
SPPPs. The team was advised to code activities without being too prescriptive for ease of
monitoring and data analysis. The DG has also agreed to send a letter to all Regional Directors
to limit the transfer of head teachers in SEIP schools and to ensure that high capacity heads are
assigned to SEIP and AF schools. Schools will also work on their 2017 annual plans during the
training in addition to procurement plan updates.
Pillar 2: Improve Quality in low-performing Senior high Schools
19. School mapping: A local name has been selected for the school mapping portal “e-Adido’
meaning “knowledge is meant to be shared”. The new name will be included in the soon to be
published Digest (expected May 2017). The digest has been delayed because data was missing
from some schools (mostly private SHSs). In addition, new procurement awards had been frozen
during the election and transition period (the Procurement Authority Board is yet to be set up).
The digest is also going to be made available on the Ministry’s website. It was agreed that some
verification would be conducted to verify that the digests have been distributed to all JHS (e.g.,
25
phone calls to JHS heads). The digest is missing the WAEC rankings as these were not received
in time. The mission team recommended that SHS which had not provided the data should be
listed and tagged with “data not available”. It was also recommended that regional listing
should be in alphabetical order and the enrollment should be cross-tabulated by programs and
class (i.e. SHS1, SHS2, SHS3). The mission team also recommended that heads be made to
verify data provided on their schools and a unique identification and coding for each school
should be determined. The second phase of school mapping - to enhance the school mapping
platform and expand its scope to include scholarship information, M&E and academic
performance tracking - has been proceeding well and significant improvements have been made
to the portal to tackle the integration of these databases. One issue that needs to be addressed is
how to route the comments received on social media to the appropriate school heads for their
responses. The ability for the portal to respond quickly to citizen comments/complaints is
critical for its continued relevance, use and real time problem solving. In addition, the portal fills
the information gap for students selecting SHS schools, but only if all schools are reporting in a
timely manner. It was agreed that more sensitization and training would be provided to head
teachers during the upcoming leadership trainings.
20. ICT: The mission is pleased to note that the iboxes have been procured (160) and 70 have
been installed by end of January. The content for SHS1 and SHS2 has been uploaded onto the
machines which includes video lessons, interactives and assessments as well as over 3,000
additional open source resources (e.g., Khan Academy). It was agreed that the list of resources
would be shared with the team for further quality assurance and suggestions on appropriate
materials that can be included. Training has been conducted for four core subject teachers and
one ICT teacher from each of the first 70 schools to receive the iboxes, while the remaining
schools will receive the training and ibox in September 2017. The mission learned that
procurement is still ongoing for installation accessories such as UPS, access points and solar
panels. It was advised to make sure that the equipment is functional at each school. The mission
also advised the team to review the estimated costs for connectivity (US$1,100), solar panels
(US$12,000) and solar panel installation (US$1,200) as the unit costs appeared very high.
Content for the final year of senior high school (SHS3) is being developed in 2017 and would
focus more on subject reviews. The mission recommended that the team consider how to include
more interesting resources to keep students engaged and eager to use the system. The mission
also discussed whether new policies on technology in schools would need to be considered to
allow for increased access to these resources. Suggestions for day students include using their
phones and providing i-boxes to local public libraries. The mission also recommended that the
plans for the ICT studio be put on hold until after the results of the impact evaluation on the
functionality, use and cost effectiveness of the i-box are better determined.
21. e-transform and e-learning projects:
a. The 125 SEIP schools plus 23 new SHSs will participate in the training by KACE.
b. Training for eTransform and eLearning SHS beneficiaries will consider an additional
200 and 240 SHSs respectively using the harmonized unit cost for training agreed among
the MOE, GES, Ministry of Communications (MOC) and KACE.
c. The Curriculum Research Development Division (CRDD) will lead in reviewing the
ICT curriculum bringing in all the relevant stakeholders
26
d. KACE is invited to provide a proposal for the review and may suggest key stakeholders
for the ICT curriculum review
e. The ICT training modules developed under the Global e-Schools Community Initiative
(GESDI) will be shared with KACE and all stakeholders
f. A list of resource persons already trained under other ICT project will be utilized in the
KACE training as relevant
g. A technical committee made up of key stakeholders will be constituted to oversee the
proposed training by KACE
h. Content from CENDLOS will be released to accelerate and inform the KACE training
i. A selection process for subject area specialists for the training will be agreed between
KACE and CRDD.
22. Science and math: An assessment strategy workshop was held in March 2017 in
preparation for rolling out school based assessments using an extensive question bank.
CADENA has been providing technical advice under this activity and would help roll out the
training in July for creating relevant assessments. The mission requested to see the
implementation plan for assessment roll out. The current local arrangements rely on science
coordinators in every district as well as district support teams who do in-service STEM training.
Unfortunately capacity is weak and the district support teams are not functioning. The i-box
teacher portal is still not well understood by all teachers. The plans for the Ghana Olympiad have
been initiated although the strategy was too narrowly focused. The mission advised that the
preparation for the Olympiad focus more on rolling out science and math enrichment activities to
all SEIP schools and giving teachers the resources needed to make the learning fun and
accessible. The focus on selecting representatives to attend the national competition in
September should be secondary. The mission also requested to know who is doing quality
assurance on the syllabus and activities for this Olympiad enrichment. In preparation for the
MTR, it was agreed that science and math teachers would be surveyed (possibly through a
moderated Whats app intervention) to gage their progress under the SEIP, use of i-box if
applicable and sentiments on trainings. A delegation is planning to attend the upcoming
MS4SSA workshop in Worcester, MA to investigate the potential for adopting the methodology
as a pilot under the SEIP. The list of proposed attendees and the filled in application form to
attend the workshop would be completed by the team by April 19, 2017.
23. Leadership: The two day training held in October/November 2016 continued to sensitize
head teachers to the standards and expectations delineated in the leadership manual. The manual
is still not finalized. The mission recommended that the manual be finalized as soon as possible
and distributed to schools. In addition, there should be some workshop launched by May for all
new head teachers given the high turnover rate. A refresher training is being planned for
August/September and could provide a platform for MTR stakeholder engagement and the
launch of the additional financing. The mission discussed the possible creation of a school
leadership index (SLI) to better monitor and assess progress. The mission learned that the
feedback from monitoring is that there have been some improvements in leadership in the SEIP
schools. However, many of the Heads are still not communicating regularly about the project and
reporting on various activities. The mission encouraged the team to sensitize the Heads about
how they will be assessed throughout the project period.
27
24. Research: A consultant has been contracted to oversee the research agenda (CERED at
University of Cape Coast). There were some delays in preparing the inception report because the
research leader became the Vice Chancellor of UCC. Therefore the team has a new leader (Dr.
Francis Medahe) and the report has been shared. The areas for research focus include
scholarships, science and math and teacher training performance. In addition, the team would
look at teacher deployment and school level systems. The mission recommended that the
research agenda also focus on key areas relevant to implementing the government’s new free
SHS policy and produce short data analyses (as described for the MTR preparation) over the
next several months. The Research fellow is now on board and working across the research
agenda at the Ministry and to help build capacity while managing the research database.
Statistical training is being rolled out to interested staff in different departments of education
agencies. The Research database is being developed, but has not yet been populated. Different
categories of entries (academic research/papers, manuals, project info, etc.) are being considered
and criteria for vetting submissions has been determined. A national service person is also to be
appointed/posted to the Ministry to support the research team. The student perceptions study is
ongoing (team is completing field work in April). A mapping of NGOs, CSOs and DPs operating
in Ghana is also being considered. IPA and MOE/GES hosted a research evidence summit March
28-29, 2017. In addition, the mission also agreed to explore study tour options for the team to
visit Shanghai, Korea and possibly Vietnam in October/November 2017.
25. Impact evaluations are underway to test the impact of the ibox package and to assess the
extent to which follow-up science and math teacher training has an impact on student learning.
The principal investigator and field coordinator were hired in May and have completed the
baseline study. The report would be shared by April 8, 2017. It was agreed that the impact
evaluation consider conducting a midline survey in September before the roll out of the
additional i-boxes to better capture impact of i-box activities given the considerable interest to
scale this high cost activity. The baseline and midline surveys would include lesson observations,
assessment of facilities, surveying teachers and students. The mission discussed how to define
the follow-up teacher training intervention that would need to be rolled out by the end of the
calendar year. It was agreed that the team could explore piloting the Math and Science for Sub-
Saharan Africa intervention as the follow-up science and math teacher support. Alternative
options include electronic mentoring messages to teachers. The mission agreed that further
clarification is needed to define the follow-up teacher training and the observation tool that
would be used to measure impact. A proposed road map of the design is attached as Annex 4.
Financial Management: Overview of Project Expenditures
Component 1 Summary of activity expenditures
BUDGET LINES BUDGET(GHS
)
ACTUAL EXPENDITURE(GHS) CUMMULATI
VE TOTAL
BALANCE
SCHOLARSHIP 53,040,000.00
5,185,847.63
11,345,885.62
16,531,733.25
36,508,266.75
SPPP'S 51,000,000.00
-
5,817,752.05
5,817,752.05
45,182,247.95
ICT IN EDUCATION 19,349,380.00
1,856,673.20
4,866,602.10
588,000.00
7,311,275.30
12,038,104.70
NEW CONSTRUCTION 310,464,724.27
95,412,318.01
91,073,930.55
186,486,248.56
123,978,475.71
28
BUDGET LINES BUDGET(GHS
)
ACTUAL EXPENDITURE(GHS) CUMMULATI
VE TOTAL
BALANCE
FACILITY UPGRADE 25,273,195.90
9,395,871.07
11,496,879.42
20,892,750.49
4,380,445.41
REFURBISHMENT FOR e LEARNING PROJECT
220,905.00
-
- -
220,905.00
SUPERVISION CONSULTANCY -NEW CONTRUCTION
12,549,750.00
3,924,887.84
5,900,257.90
9,825,145.74
2,724,604.26
SUPERVISION CONSULTANCY -FACILITY UPPGRADE
4,210,442.25
562,610.57
1,874,552.34
2,437,162.91
1,773,279.34
CONSULTANCY-CIVIL WORKS TEAM
1,104,000.00
135,700.00
494,650.00
86,550.00
716,900.00
387,100.00
CONSULTANCTY VOC-TECH BLOCK
-
- -
-
CONSULTANCY-PROC. /M&E SPECIALIST
649,992.00
-
404,350.09
37,306.67
441,656.76
208,335.24
CONSULTANCY-EXT. WORKS & OTHER DOCUMENTATION
951,750.00
951,750.00
- 951,750.00
-
CONSULTANCY-NEW WORKS DESIGN REVIEW CONTROL
37,189.00
37,189.00
- 37,189.00
-
CONSULTANCY-FACILITY UPGRADE DESIGN REVIEW CONTROL
30,000.00
30,000.00
- 30,000.00
-
CONSULTANCY- SAFEGUARDS
178,900.00
178,150.00
- 178,150.00
750.00
CONSULTANCY- SAFEGUARDS IMPLEMENTATION MONIRORING
251,635.00
44,631.32
114,436.00
159,067.32
92,567.68
CONSULTANCY- VOCATIONAL & TECHNICAL BLOCK DOCUMENTATION
254,000.00
206,712.77
- 206,712.77
47,287.23
FURNITURE NEW SCH. (23 SHS)
11,425,788.00
-
3,864,960.00
1,510,464.60
5,375,424.60
6,050,363.40
FURNITURE-OFFICE EQUIPMENT NEW SCH. (23 SHS)
1,380,000.00
-
- 136,200.15
136,200.15
1,243,799.85
FURNITURE UPGRADED SCH. (50)
2,214,300.00
-
- 186,909.30
186,909.30
2,027,390.70
FURNITURE UPGRADED SCH. NEW 22 CLASSROOMS
490,000.00
-
- -
490,000.00
FURNITURE -LAB EQUIPMENT, HARDWARE & CHEMICALS 23 NEW SCH
30,406,113.19
-
- -
30,406,113.19
FURNITURE -SEIP SECRETARIAT
325,814.66
-
159,625.63
159,625.63
166,189.03
COST OF MONITORING AND SITE MONITORS OF 23 SHS AND 50 UPGRADED SHS
1,000,000.00
495,538.78
294,453.41
84,670.18
874,662.37
125,337.63
29
BUDGET LINES BUDGET(GHS
)
ACTUAL EXPENDITURE(GHS) CUMMULATI
VE TOTAL
BALANCE
CONTINGENCIES 2,000,000.00 831,155.40
153,740.54
12,063.00
996,958.94
1,003,041.06
TOTAL 528,807,879.27
119,249,035.59
119,249,035.59
2,642,163.90 259,762,567.27
269,045,312.00
Component 2 Budget, Expenditure and Overview by Focal Area for Year 2
30
Annex 3: Disbursement Linked Indicators for YEAR 3 RESULTS
Ghana Secondary Education Improvement Project Year 3 DLR
Verification (P145741- CR.54520)
DLI DLR Requirement
s/Comments
Verification
source/docu
ments
Verification Protocol Status
DLI 2:
Increase in
new seats for
SHS
students in
underserved
school
districts
DLR 2.4: About 5,000
new seats
created in
underserved
districts
(US$4.64 m)
Independent
Verification
Firm report
Independent
Verification Firm to
visit sites and verify
against school
enrolment records,
subsidy collection list
and school mapping
reports
To be verified by
Independent
Verification Firm
(KE&T) and reviewed
by the World Bank.
DLI 3: Increase in
number of
seats utilized
in existing
low-
performing
schools
DLR 3.4:
About 3,000
seats utilized
(cumulative)
(US$4.64 m)
Improvement
in total
enrolment in
125 schools
from 2014/15
EMIS data.
2017/18 data
will come
directly from
school survey.
Independent
Verification
Firm report
Enrolment data
collected through
school reporting and
through school
mapping. Independent
Verifier will visit 10%
sample of schools to
confirm enrolment
records as compared to
submissions by school
heads.
To be verified by
Independent
Verification Firm (DAB
Consult) and reviewed
by World Bank.
DLI 4: Increased
enrolment in
SHS in
targeted
districts and
schools for
students
from low-
income
families,
especially
girls
DLR 4.4: At
least 6,000
SHS students
receiving
scholarship in
selected
schools
(US$4.64 m)
Total number
scholarships in
all three years
where at least
6o% of
beneficiaries
are girls. With
introduction of
Free SHS-
scholarships
will be fully
distributed.
(10,000)
(US$ 4.64 m)
Independent
Verification
Firm Report
Independent
Verification firm will
visit schools to validate
receipt of funds and
will check that
selection criteria has
been adhered to.
To be verified by
Independent
Verification Firm (DAB
consult) and reviewed
by the World Bank.
DLI 5: Annual
Publication
of School
Performance
Report
DLR 5.3:
Publication of
updated
school
performance
data for
FY2016/2017
online and in
All schools
(including
private)
mapped and
information
uploaded onto
school
mapping
World Bank
and random
spot checks
to JHS and
district
offices.
School mapping up and
running and digest is
being compiled and
printed. Additional
information is still
being collected from
schools during ongoing
monitoring visits.
To be verified by the
World Bank once digest
is printed See
www.ghanaschoolsinfo.o
rg for online version
31
brochure
(US$4.64 m)
portal and
printed digest.
DLI 6: School
Performance
Partnerships
in 125
Beneficiary
Schools
DLR 6.4: 100 selected
schools
signing
performance
partnerships
out of the 125
selected
schools
(US$4.64 m)
100 plans
have been
signed, and
additionally
funds have
been allocated
for the
schools
Independent
Verification
Firm
Independent
Verification firm
would sample schools
to confirm plans are
available and initial
funds have been
received.
To be verified by the
Independent
verification Firm (DAB
Consult).
DLI 7: Improved
learning
outcomes in
125 selected
SHS (quality
package)
DLR 7.4: ICT
based
instruction
rolled out in
all targeted
SHS
(US$4.64 m)
Teachers in
these schools
received
training.
iBoxes are
functioning
Independent
Verification
Firm
Independent
Verification Firm to
validate through school
visits, interviews with
teachers trained.
To be verified by
Independent
Verification Firm (DAB
Consult)
32
Annex 4: Proposed Design for Impact Evaluation
Final Groups:
A. Phase 1 iBox: These were the first X schools to receive an iBox, they remain unchanged
B. Phase 1 iBox + new intervention: Among the Phase 1 iBox receivers, these are the ones that will be
randomly selected to receive a new intervention (MS4SSA or text messages)
C. Phase 2 iBox: These were the SEIP schools that receive an iBox in Sep 2017
D. Phase 2 iBox + new intervention: Among the Phase 1 iBox receivers, these are the ones that will be
randomly selected to receive a new intervention (MS4SSA or text messages)
E. New intervention: These are among the 25 non – SEIP schools that will become SEIP in September
2017 under AF. Half of these will be randomly selected to receive a new intervention in January
2018.
F. No new intervention: These are among the 25 non – SEIP schools that will become SEIP in
September 2017 under AF but will not receive a new intervention.
June 2018 - endline
January 2018 (new
intervention)
September 2017 (Phase
2: iBox, midline)
January 2017
(Phase 1: iBox,
baseline)
Sampling
Sample of X schools
1. iBox -SEIP 1. iBox - SEIP
(Phase 1 i Box)
A. Phase 1
iBox X schools
B. 1 + new intervention
X schools
2. no iBox SEIP 2. iBox - SEIP
(Phase 2 iBox)
C. Phase 2
iBox X schools
D. 2 + new intervention
X schools
3. no iBox- non SEIP
3. no iBox - SEIP
E. new intervention
X schools
F. no new intervention
X schools
33
Research questions:
Does iBox work: Compare Group 1 and 2 at midline survey
iBox impact through longer duration: compare A and C at endline
Does new intervention work better with Phsase 1 iBox or Phase 2 iBox: compare B and D at
endline
Does new intervention work: Compare
34
Annex 6: SEIP Results Framework (March 2017)
Indicator Unit of
Measure
Baseline
2014
Cumulative Target Values Frequency Data Source/
Methodology
Responsibility
for Data
Collection
2015 2016 2017 2018 2019
Target Actual Target Actual Target Target Target
Indicator One: Increase in
Transition Rates
from JHS3 to SHS1 in targeted districts
Percentage
EMIS 2013/14 39%
39%
EMIS
2014/15
40%
41%
EMIS
2015/16:
43%
43% 46% 47% Annual EMIS MoE, PBME,
SRIMPR; GES
Indicator Two:
Increase in SHS educational
attainment within
the two poorest quintiles in targeted
districts (disaggregated by
gender)
Percentag
e
Total: 8.4%
N/A N/A N/A N/A N/A N/A
Total: 15%
End of
Project
Population and
Housing Census (2010) and end
line survey
measuring the highest level of
education completed by
20-22 year-olds
MoE, PBME,
SRIMPR; GES HQ; GSS
Male: 11.1% Male:
18.9%
Female: 6.1% Female: 11.7%
Indicator Three:
WASSCE
achievement of 6 credits and above
within beneficiary
schools (disaggregated by
gender)
Percentag
e
Total: 10.7% Total:
11.0%
Total:
7.4%
Total:
12.0%
Total:
10.7%
Total:
13.5%
Total:
14.5%
Total:
15.0%
Annual
WAEC/EMIS Annual
WASSCE
league table
MoE (PBME);
WAEC Male: 11.6%
Male: 11.9%
Male: 8.6%
Male: 12.9%
Male: 12.6%
Male: 14.4%
Male: 15.4%
Male: 15.9%
Female: 9.5% Female:
9.8%
Female:
5.8%
Female:
10.8%
Female:
8.1%
Female:
12.3%
Female:
13.3%
Female:
14.3%
Indicator Four:
Direct project
beneficiaries
(students, teachers, institutional
leaders)
(cumulative)
Number
Total: 0 Total:
4241
Total:
134,721
Total:
108992
TBD
June 2017
Total:
178597
Total:
233499
Total:
276970
Annual
MoE,
Independent
Verification end line Survey
Report
MoE, PBME,
SRIMPR; GES HQ
Male: 0%
Male:
2387 (56.3%)
Male:
72,993 (54.2%)
Male:
61778 (56.7%)
Male:
100672 (56.4%)
Male:
130713 (56.0%)
Male:
154763 (55.9%)
Female 0% Female: 1854
(43.7%)
Female: 61,729
(45.8%)
Female: 47214
(43.3%)
Female: 77919
(43.6%)
Female: 102767
(44.0%)
Female: 122187
(44.1%)
Intermediate-level Results Indicators Component 1: Support to Increase Access with Equity and Quality in SHS
35
Indicator Unit of
Measure
Baseline
2014
Cumulative Target Values Frequency Data Source/
Methodology
Responsibility
for Data
Collection
2015 2016 2017 2018 2019
Target Actual Target Actual Target Target Target
Pillar 1: Increase Access with Equity in senior secondary education in underserved districts
Intermediate Result
Indicator One:
Number 0 0 0 0 3,111 5,000 15,000 15,000 Annual
M&E Report
Web based
school monitoring
MoE, PBME,
SRIMPR; GES
New (additional) SHS seats created
and utilized by SHS students in the
targeted schools
(cumulative)
Intermediate Result
Indicator Two:
Number
0
Baseline Enrolment in
2014/15
(EMIS) = 132,229
500
1,259
Enrolment collected
from
schools as of
February
2016 = 133,488
1,000
3,000 5,000 10,000 Annual
M&E Report Web based
school
monitoring
MoE, PBME,
SRIMPR; GES
Increase in seats created and utilized
within low
performing beneficiary SHS
schools
(cumulative)
5,889
Intermediate Result
Indicator Three:
Number 0 2,000 2,143 4,000
6,000 10,000 10,000 Annual
M&E Report Web based
school
monitoring
MoE,
PBME,SRIMPR, GES
Scholarships are
distributed to low income students in
the participating
districts and schools (cumulative)
5,398
Pillar 2: Improve Quality in low-performing senior high schools
Intermediate Result
Indicator One:
Number
Mathematics
Mathematics:
0
Mathemat
ics: 0
Mathemat
ics: 331
Mathemat
ics: 120
Math:
645 (304 in year 2)
Mathemat
ics: 240
Mathemat
ics: 360
Mathemat
ics: 360
Annual
M&E Report
Web based
school monitoring
MoE, PBME,
SRIMPR, GES
Teachers
participating in
training to upgrade or acquire new
skills in
Mathematics or Science
(cumulative)
Number
Science Science: 0
Science:
0
Science:
576
Science:
100
Science: 1,126
(550 in
year 2)
Science:
250
Science:
500
Science:
500
36
Indicator Unit of
Measure
Baseline
2014
Cumulative Target Values Frequency Data Source/
Methodology
Responsibility
for Data
Collection
2015 2016 2017 2018 2019
Target Actual Target Actual Target Target Target
Intermediate Result
Indicator Two:
Percentag
e
Total: 81.7% Total: - Total: Total:
81.7%
Total:
81.6%
Total:
82.7%
Total:
83.7%
Total:
85.71%
Annual School Registry/
EMIS
MoE, PBME,
SRIMPR; GES
Increase in
completion rates in
targeted schools (disaggregated by
gender)
Male: 81.8% Male: - Male: Male: 81.8%
Male: 81.4%
Male: 82.8%
Male: 83.8%
Male: 85.8%
Female:
81.2%
set using
average of
completion rate for
cohort ending
2013/14 and 2015/16.
Female:-
Female:
81.2%
Female:
81.8%
Female:
82.1%
Female:
83.1%
Female:
85.1%
Intermediate Result
Indicator Three:
Number 0 0 0 80
100 125 125 Annual
M&E Report
Web based
school monitoring
MoE, PBME,
SRIMPR, GES
Number of
Performance
Partnerships for Learning with
beneficiary SHSs
established (cumulative)
100
Intermediate Result
Indicator Four:
Number 0 0 0 70
125 125 125 Annual
M&E Report,
Web-based school
monitoring
MoE, PBME,
SRIMPR, GES,
NITA
SHS ICT packages
implemented in
beneficiary schools (cumulative)
70
Component 2: Management, Research and Monitoring and Evaluation
Intermediate Result
Indicator One: Yes/No No Yes Yes Yes Yes Yes Yes Yes Annual
M&E Report,
Web-based
MoE, PBME,
SRIMPR, GES
37
Indicator Unit of
Measure
Baseline
2014
Cumulative Target Values Frequency Data Source/
Methodology
Responsibility
for Data
Collection
2015 2016 2017 2018 2019
Target Actual Target Actual Target Target Target
Monitoring system established and
functioning to
annually track data and publish
information on all
SHS schools in Ghana
school monitoring
Intermediate Result
Indicator Two:
Number 0 0 0 1
2 3 5 Annual
M&E Report
Web based
school monitoring
MoE, PBME,
SRIMPR, GES
Research and
Sector analyses
conducted to inform elaboration of
Secondary
Education Strategy (cumulative)
1