Heavy Civil Infrastructure
Aide Memoire
3 KM, 2 Lane Bridge Across River Brahmaputra, Assam
HEAVY CIVIL INFRASTRUCTURE IC
31.05.2014 Page 1
2-Lane Existing
Bridge 2-Lane Proposed Bridge 80M
d/s to the Existing Bridge
1.0 Synopsis:
4 Laning of NH-37A from KM. 0.00 (Kaliabor) to KM.17.300 (Dolabari) in Tezpur including construction of
new bridge across river Brahmaputra is issued on EPC basis by the Ministry of Road Transport and
Highways (MORT&H). This would connect Nagaon and Sonitpur districts in Central Assam with an aim to
create 4-lane connectivity to Itanagar, Arunachal Pradesh
The proposed bridge alignment is 80 m downstream parallel to the existing bridge at Tezpur.
The project is on EPC mode and the client estimate is Rs 670 Cr with bid due date Aug 21, 2014
2.0 Location:
1. Project is 150 KM from Guwahati – By Road. Also, connected by Railway and Airway
2. Established Army base at Tezpur
3. PT&D – Project Site, operating next to bridge location (Mr. Majumdar – Cluster Head – 80170008101)
& Mr. Prolay – Project Manager – 08876582102)
4. 215 KM from Subhanshri Project Site
3.0 About Client:
The Project is proposed to be executed by
the National Highway wing of Assam PWD
headed by Chief Engineer.
4.0 Funding Arrangement:
"Special Accelerated Road Development Programme in North East (SARDP-NE)". Phase – A. Govt. Sanction available
5.0 Owner / Senior Management:
Mr. Sunil Kumar Verma, Chief Engineer – MoRT&H
+91-11-23739074, [email protected]
6.0 Regulator: MoRT&H
7.0 Scope of Works:
1. 2 lane Bridge = 3.01 KM (1 X
67m + 24 X 120m + 1X 67m)
2. Approaches = 14 KM
2-Lane Existing Bridge
Heavy Civil Infrastructure
Aide Memoire
3 KM, 2 Lane Bridge Across River Brahmaputra, Assam
HEAVY CIVIL INFRASTRUCTURE IC
31.05.2014 Page 2
Current Status
• L&T pre-qualified for Projects taken up by MoRT&H
• Site visit scheduled on 2nd
week of June.
Time Lines
• RFP Submission Date – Aug 21, 14
• Prebid Meeting – July 7,14
8.0 Project Status
SL No
Item Yes (����)
No (����)
Remarks
1 Project Concept / Clear Scope � 3.01 KM Main bridge along with 14 KM
approach roads (including minor bridges)
2 BOOT �
3 EPC �
4 Feasibility Report / PPR � Available
5 Detailed Feasibility Report / Detailed Project Report
�
6 Govt. Sanction � Center Approved
7 Environmental Clearance (MoEF) � Not required as per Govt. Mandate
8 Project funding Tied up � Assam PWD
9.0 Due diligence on client
SL No
Item Yes (����)
No (����)
Remarks
1 Project definition � Scope clarity with Client
2 Net worth of client � Available
3 Funding Source � Assam PWD
4 Any litigation with contractor � Nil
5 Clarification / delays in payment
� -
6 Final bill settlement NA
10.0 Due diligence on Project
SL No
Item Yes (����)
No (����)
Remarks
1 Relevant Sector � Special bridge (Span ~120m & Perennial river)
2 Sizeable Volume � Value > 500 Cr
3 Client Relation ship �
4 Any other reasons �
Heavy Civil Infrastructure
Aide Memoire
3 KM, 2 Lane Bridge Across River Brahmaputra, Assam
HEAVY CIVIL INFRASTRUCTURE IC
31.05.2014 Page 3