Systems AIA Survey Preparation and Experiences Jürgen HENRICHSMEYER

Transcript of AIA Survey - American Society of Mechanical Engineers

Page 1: AIA Survey - American Society of Mechanical Engineers

Systems

AIA Survey –Preparation and Experiences

Jürgen HENRICHSMEYER

Page 2: AIA Survey - American Society of Mechanical Engineers

Systems

AIA Survey – Preparation and Experiences

Structure:

I. History of TÜV Nord Systems in the ASME Business

II. TÜV Nord Systems Accreditation

III. Application / Scope

IV. Development of the ASME Business

V. Initial Position: Administration

VI. Optimization of the System and Survey Preparation

VII. The Survey

VII.1 – Course of Action

VII.2 – Experiences

VII.3 – Results

VIII. Conclusion

Page 3: AIA Survey - American Society of Mechanical Engineers

Systems

AIA Survey – Preparation and Experiences

I. History of TÜV Nord Systems

1984 FM/TÜV

1997 FM/TÜV/BV

2003 One/TÜV/BV

2012 TÜV NORD Systems

Page 4: AIA Survey - American Society of Mechanical Engineers

Systems

AIA Survey – Preparation and Experiences

II. TÜV Nord Systems Accreditation

2012

ASME NB-360 NB-369(for repairs and alterations)

Initial;

Section I, IV, V, X

2013

2014

2015

Added:

Section III, Div. 1 & 3;

Section XII

Implementation in the

real business

initial initial

Implementation in the

real business

Implementation in the

real business

renewal renewal renewal

Page 5: AIA Survey - American Society of Mechanical Engineers

Systems

AIA Survey – Preparation and Experiences

III. Application / Scope

Scope: ASME NB-360 NB-369

√ √ ?Question: It is necessary to be accredited according to NB-369 for repairs

and alterations?

• June 2014: Answer National Board:

„No. The respective Inspector just needs an AR or IS Endorsement.“

• May 2015: Question by NB:

„Should the AIA audit in June 2015 include both, the audit for ASME and NB-369?“

Yes, but only if NB is required for repairs and alterations

official statement requested Answer: „Yes, NB-369 is required.“

Page 6: AIA Survey - American Society of Mechanical Engineers

Systems

AIA Survey – Preparation and Experiences

IV. Development:

Significant growth of personnel and shops

2012:

- 1 AI and 1 AIS (in India)

2013:

- added: 1 ANI and 1 ANIS

2015:

- more than 50 Inspectors/Supervisors

- more than 200 Shops

Page 7: AIA Survey - American Society of Mechanical Engineers

Systems

No. of Countries

serviced worldwide by

TÜV NORD SYSTEMS:

25

AIA Survey – Preparation and Experiences

Area Coverage and Shops

Page 8: AIA Survey - American Society of Mechanical Engineers

Systems

AIA Survey – Preparation and Experiences

V. Initial Position: Administration

• 1 control tool: Shop list

Containing information related to: Shops

Inspectors/Supervisors

Audits

• Data Base

Transparency had to be

improved!!!!

Page 9: AIA Survey - American Society of Mechanical Engineers

Systems

AIA Survey – Preparation and Experiences

VI. Optimization of the System and Survey Preparation

- Continuous Process since January 2014

- Processes and Structure had to be questioned and optimized:

new tools to be introduced

(Shoplist, Inspectors Supervisor List, Audit Schedules)

Improvement of AI Homepage

(QA Manual Distribution, procedures, forms, news,…)

Revision and Improvement of QAM and Procedures

(QAM Revision 4 issued)

about 1000 h preparation work

Page 10: AIA Survey - American Society of Mechanical Engineers

Systems

AIA Survey – Preparation and Experiences

Page 11: AIA Survey - American Society of Mechanical Engineers

Systems

AIA Survey – Preparation and Experiences

Page 12: AIA Survey - American Society of Mechanical Engineers

Systems

Date: June 15th – 17th, 2015

Location: TÜV Nord, Essen

Participants:

ASME/NB Team: 3 Persons including one Trainee

TÜV Nord Systems COO

Internal Auditor

Head of CC ASME

Responsible ANIS

Responsible AIS

4 Team Assistants

AIA Survey – Preparation and Experiences

VII. The Survey

Page 13: AIA Survey - American Society of Mechanical Engineers

Systems

Day 1: Review of QA Manual and Procedures by the ASME / NB Team

Day 2+3: Opening Meeting and Implementation

Team 1: Team Leader, Internal Auditor, Responsible AIS

- Review and Revision of the QAM and Procedures

Team 2: Team Member, Trainee, Head of CC ASME, responsible ANIS, Team

Assistant

- review of Implementation containing:

10 personnel files (qualification, designation, etc.)

all ANIS and Lead Auditor Files

10 Shop Files (monitoring, ISA, notification ASME/NB,…)

Data Base and new Forms (4.1/4.2)

internal audit program

Training evidence (Quiz / internal training / NB-Training)

check of Inspector‘s Diary (3 examples)

check of personnel files related to terminated AI

AIA Survey – Preparation and Experiences

VII.1. Course of Action

Page 14: AIA Survey - American Society of Mechanical Engineers

Systems

AIA Survey – Preparation and Experiences

VII.2. Experiences during the AIA Survey

professional Audit Team

well structured Audit Plan

audited the complete QA-System

open atmosphere

helpful discussions with the Survey Team

fair feedback

Page 15: AIA Survey - American Society of Mechanical Engineers

Systems

QAM:

- just one significant change

Head of CC ASME is responsible for Designation of Inspectors and

Supervisors

Direct line from Head of CC ASME to COO

QAM Revision 5 issued during the Survey and

accepted by ASME and approved by NB

Implementation:

- no deficiencies!

VII.3. Results

AIA Survey – Preparation and Experiences

Page 16: AIA Survey - American Society of Mechanical Engineers

Systems

The Audit Team

Page 17: AIA Survey - American Society of Mechanical Engineers

Systems

AIA Survey – Preparation and Experiences

Page 18: AIA Survey - American Society of Mechanical Engineers

Systems

AIA Survey – Preparation and Experiences

VIII. Conclusion

Transparency of the System

will lead to Efficiency

of the Business!

Stay close to the Business!

Page 19: AIA Survey - American Society of Mechanical Engineers

Systems

Thank you very much for the

attention!