AHN SAINT VINCENT HOSPITAL · ed103 ground floor plan - hvac power demolition e001 symbols,...

33
I. PROJECT LOCATION SAINT VINCENT HOSPITAL 232 WEST 25TH STREET ERIE PA 16544 II. DESCRIPTION & USER GROUP CLASSIFICATION OF BUILDING A. NATURE OF PROJECT: INTERIOR RENOVATION B. USE GROUP: I-2-HOSPITAL C. CONSTRUCTION CLASS TYPE: IA NON-COMBUSTIBLE D. COST: $TBD E. BUILDING DIMENSIONS: EXISTING F. ARCH. SCOPE OF WORK: 3,610 SF G. FIRE PROTECTION: EXISTING FULLY SPRINKLERED H. PRINCIPLE HEATING FUEL: EXISTING I. SEWAGE DISPOSAL: EXISTING J. WATER SUPPLY: EXISTING K. TYPE OF MECHANICAL: EXISTING COMMONWEALTH OF PENNSYLVANIA: IN ALL CASES, IF THERE IS A DISCREPANCY BETWEEN CODE REQUIREMENTS, BETWEEN ANY REFERENCED CODES, THE MORE STRINGENT CODE ALWAYS APPLIES. - PENNSYLVANIA UNIFORM CONSTRUCTION CODE (UCC) - IBC-2009 INTERNATIONAL BUILDING CODE, EXCLUDING CHAPTER 11 - IBC 2012 INTERNATIONAL BUILDING CODE, CHAPTER 11 AND APPENDIX E, ONLY - U.S. DEPARTMENT OF JUSTICE'S 2010 ADA STANDARDS FOR ACCESSIBLE DESIGN - IPC-2009 INTERNATIONAL PLUMBING CODE - IMC-2009 INTERNATIONAL MECHANICAL CODE - IFC-2009 INTERNATIONAL FIRE CODE - NFPA 70-2008 INTERNATIONAL ELECTRICAL CODE - IFGC-2009 INTERNATIONAL FUEL GAS CODE - ASHRAE 90.1-2007 OR IECC-2009 INTERNATIONAL ENERGY CONSERVATION CODE - ASME A17.1 -2000 & A17.1A-2002 ELEVATORS & OTHER LIFTING DEVICES - AUTHORITY HAVING JURISDICTION - CITY OF ERIE DOH: - 2014 GUIDELINES FOR DESIGN & CONSTRUCTION OF HEALTHCARE FACILITIES - NFPA 101 LIFE SAFETY CODE - 2000 EDITION - H-14-1010 -CONSTRUCTION TYPE: TYPE II (000) FSES BUILDING DATA / CODE SUMMARY Code Reference Occupancy / Use Group: Construction Type: Fire Resistance Required by City of Erie: IBC2009 I-2 IA Required by: Pennsylvania Departmeny of Health: NFPA 101 HEALTHCARE II (000)FSES Columns 2Hr. Beams 2Hr. Smoke Compartment None Columns 2Hr. Beams 2Hr. Smoke Compartment 1Hr FIRE PROTECTION SYSTEM: Automatic Sprinkler System Through Out Automatic Sprinkler System Through Out Other Code References: Accessibility Code: Plumbing Code: Fire Protection Code: Mechanical Code: Electrical Code: ANSI IPC IFC IMC IEC 2000 NFPA 101 1999 NFPA 13 NFPA 72 NFPA 90A 2014 GUIDELINES MECHANICAL HD101 GROUND FLOOR PLAN - DEMOLITION H001 HVAC SCHEDULES, NOTES, SYMBOLS, AND ABBREVIATIONS H101 GROUND FLOOR PLAN - NEW WORK PLUMBING PD100 GROUND FLOOR PLAN - PLUMBING DEMOLITION P001 SYMBOLS, ABBREVIATIONS, NOTES AND SCHEDULES P101 GROUND FLOOR PLAN - WATER PIPING P102 GROUND FLOOR PLAN - DRAINAGE AND VENT PIPING P103 GROUND FLOOR PLAN - MEDICAL GAS PIPING P200 PLUMBING DETAILS AND SCHEDULES FIRE PROTECTION FP100 GROUND FLOOR PLAN - FIRE PROTECTION DEMOLITION FP001 SYMBOLS, NOTES & ABBREVIATIONS - FIRE PROTECTION FP201 GROUND FLOOR PLAN - FIRE PROTECTION ELECTRICAL ED101 GROUND FLOOR PLAN - LIGHTING DEMOLITION ED102 GROUND FLOOR PLAN - POWER DEMOLITION ED103 GROUND FLOOR PLAN - HVAC POWER DEMOLITION E001 SYMBOLS, ABBREVIATIONS, NOTES AND SCHEDULES E101 GROUND FLOOR PLAN - LIGHTING E102 GROUND FLOOR PLAN - POWER E103 GROUND FLOOR PLAN - HVAC POWER EMBOSS ARCHITECTS PRINTED SEAL VOLUME OF 2729 Prospect Avenue Cleveland, OH 44115 216.621.7900 2631 West 8th Street Erie, PA 16505 814.838.7525 BOSTWICKDESIGN.com P Bostwick Design Partnership Bostwick Design Partnership VICINITY MAP CODE SUMMARY P INDEX OF DRAWINGS AHN SAINT VINCENT HOSPITAL CHEMO INFUSION CENTER EXPANSION AT HARDNER BDP NO. 15119 AHN SAINT VINCENT HOSPITAL GROUND FLOOR CHEMO INFUSION CENTER EXPANSION AT HARDNER 232 W 25 ST. ERIE, PA 16544 PLAN REVIEW SUBMISSION FEBRUARY 2016 CJL Engineering Mechanical / Plumbing / Electrical Engineer GENERAL G300 GROUND FLOOR CODE DATA PLAN G500 GROUND FLOOR PHASING PLAN ARCHITECTURAL SITE AS101 ARCHITECTURAL SITE PLAN ARCHITECTURAL DEMOLITION AD101 GROUND FLOOR DEMOLITION PLAN ARCHITECTURAL A001 GENERAL NOTES & LEGEND A002 TYPICAL DETAILS A010 SCHEDULES AND SCHEDULE TYPES A101 GROUND FLOOR PLAN A102 ENLARGED PLANS A201 ENLARGED REFLECTED CEILING PLANS A701 INTERIOR ELEVATIONS A801 MILLWORK DETAILS A901 GROUND FLOOR FINISH PLAN A1101 GROUND FLOOR FURNITURE PLAN PROJECT NORTH 232 Horner Street Johnstown, PA 15902 (814)536-1651 Phone (814)536-5732 Fax TRUE NORTH PROJECT SITE

Transcript of AHN SAINT VINCENT HOSPITAL · ed103 ground floor plan - hvac power demolition e001 symbols,...

Page 1: AHN SAINT VINCENT HOSPITAL · ed103 ground floor plan - hvac power demolition e001 symbols, abbreviations, notes and schedules e101 ground floor plan - lighting e102 ground floor

I. PROJECT LOCATION SAINT VINCENT HOSPITAL232 WEST 25TH STREETERIE PA 16544

II. DESCRIPTION & USER GROUP CLASSIFICATION OF BUILDINGA. NATURE OF PROJECT: INTERIOR RENOVATIONB. USE GROUP: I-2-HOSPITALC. CONSTRUCTION CLASS TYPE: IA NON-COMBUSTIBLED. COST: $TBDE. BUILDING DIMENSIONS: EXISTINGF. ARCH. SCOPE OF WORK: 3,610 SFG. FIRE PROTECTION: EXISTING FULLY SPRINKLEREDH. PRINCIPLE HEATING FUEL: EXISTINGI. SEWAGE DISPOSAL: EXISTINGJ. WATER SUPPLY: EXISTINGK. TYPE OF MECHANICAL: EXISTING

COMMONWEALTH OF PENNSYLVANIA:IN ALL CASES, IF THERE IS A DISCREPANCY BETWEEN CODE REQUIREMENTS, BETWEEN ANYREFERENCED CODES, THE MORE STRINGENT CODE ALWAYS APPLIES.

- PENNSYLVANIA UNIFORM CONSTRUCTION CODE (UCC)- IBC-2009 INTERNATIONAL BUILDING CODE, EXCLUDING CHAPTER 11

- IBC 2012 INTERNATIONAL BUILDING CODE, CHAPTER 11 AND APPENDIX E, ONLY- U.S. DEPARTMENT OF JUSTICE'S 2010 ADA STANDARDS FOR ACCESSIBLE DESIGN- IPC-2009 INTERNATIONAL PLUMBING CODE- IMC-2009 INTERNATIONAL MECHANICAL CODE- IFC-2009 INTERNATIONAL FIRE CODE- NFPA 70-2008 INTERNATIONAL ELECTRICAL CODE- IFGC-2009 INTERNATIONAL FUEL GAS CODE- ASHRAE 90.1-2007 OR IECC-2009 INTERNATIONAL ENERGY CONSERVATION CODE- ASME A17.1 -2000 & A17.1A-2002 ELEVATORS & OTHER LIFTING DEVICES- AUTHORITY HAVING JURISDICTION - CITY OF ERIE

DOH:- 2014 GUIDELINES FOR DESIGN & CONSTRUCTION OF HEALTHCARE FACILITIES- NFPA 101 LIFE SAFETY CODE - 2000 EDITION- H-14-1010

-CONSTRUCTION TYPE: TYPE II (000) FSES

BUILDING DATA / CODE SUMMARY

Code Reference

Occupancy / UseGroup:

Construction Type:

Fire Resistance

Required by City ofErie:

IBC2009

I-2

IA

Required by:Pennsylvania

Departmeny ofHealth:

NFPA 101

HEALTHCARE

II (000)FSES

Columns 2Hr.Beams 2Hr.SmokeCompartment None

Columns 2Hr.Beams 2Hr.SmokeCompartment 1Hr

FIRE PROTECTIONSYSTEM:

Automatic SprinklerSystem Through Out

Automatic SprinklerSystem Through Out

Other Code References:Accessibility Code:Plumbing Code:Fire Protection Code:Mechanical Code:Electrical Code:

ANSIIPCIFCIMCIEC

2000 NFPA 1011999 NFPA 13

NFPA 72NFPA 90A

2014 GUIDELINES

MECHANICAL

HD101 GROUND FLOOR PLAN - DEMOLITIONH001 HVAC SCHEDULES, NOTES, SYMBOLS, AND ABBREVIATIONSH101 GROUND FLOOR PLAN - NEW WORK

PLUMBING

PD100 GROUND FLOOR PLAN - PLUMBING DEMOLITIONP001 SYMBOLS, ABBREVIATIONS, NOTES AND SCHEDULESP101 GROUND FLOOR PLAN - WATER PIPINGP102 GROUND FLOOR PLAN - DRAINAGE AND VENT PIPINGP103 GROUND FLOOR PLAN - MEDICAL GAS PIPINGP200 PLUMBING DETAILS AND SCHEDULES

FIRE PROTECTION

FP100 GROUND FLOOR PLAN - FIRE PROTECTION DEMOLITIONFP001 SYMBOLS, NOTES & ABBREVIATIONS - FIRE PROTECTIONFP201 GROUND FLOOR PLAN - FIRE PROTECTION

ELECTRICAL

ED101 GROUND FLOOR PLAN - LIGHTING DEMOLITIONED102 GROUND FLOOR PLAN - POWER DEMOLITIONED103 GROUND FLOOR PLAN - HVAC POWER DEMOLITIONE001 SYMBOLS, ABBREVIATIONS, NOTES AND SCHEDULESE101 GROUND FLOOR PLAN - LIGHTINGE102 GROUND FLOOR PLAN - POWERE103 GROUND FLOOR PLAN - HVAC POWER

EMBOSS ARCHITECTS PRINTED SEALVOLUME OF

2729 Prospect Avenue Cleveland, OH 44115 216.621.79002631 West 8th Street Erie, PA 16505 814.838.7525

BOSTWICKDESIGN.com

P

BostwickDesign

Partnership

Bos

twic

kD

e sig

nPa

r tne r

ship

VICINITY MAP CODE SUMMARY

P

INDEX OF DRAWINGS

AHN

SAI

NT

VIN

CEN

T H

OSP

ITAL

C

HEM

O IN

FUSI

ON

CEN

TER

EXP

ANSI

ON

AT

HAR

DN

ERBD

P N

O.

1511

9

AHN SAINT VINCENT HOSPITAL

GROUND FLOOR

CHEMO INFUSION CENTER EXPANSION AT HARDNER232 W 25 ST. ERIE, PA 16544

PLAN REVIEW SUBMISSIONFEBRUARY 2016

CJL EngineeringMechanical / Plumbing / Electrical Engineer

GENERALG300 GROUND FLOOR CODE DATA PLANG500 GROUND FLOOR PHASING PLAN

ARCHITECTURAL SITEAS101 ARCHITECTURAL SITE PLAN

ARCHITECTURAL DEMOLITIONAD101 GROUND FLOOR DEMOLITION PLAN

ARCHITECTURALA001 GENERAL NOTES & LEGENDA002 TYPICAL DETAILSA010 SCHEDULES AND SCHEDULE TYPESA101 GROUND FLOOR PLANA102 ENLARGED PLANSA201 ENLARGED REFLECTED CEILING PLANSA701 INTERIOR ELEVATIONSA801 MILLWORK DETAILSA901 GROUND FLOOR FINISH PLANA1101 GROUND FLOOR FURNITURE PLAN

PROJECTNORTH

232 Horner StreetJohnstown, PA 15902(814)536-1651 Phone

(814)536-5732 Fax

TRUENORTH

PROJECT SITE

Page 2: AHN SAINT VINCENT HOSPITAL · ed103 ground floor plan - hvac power demolition e001 symbols, abbreviations, notes and schedules e101 ground floor plan - lighting e102 ground floor

REF.N.I.C.

REF

.N

.I.C

.

EXIST.STAIR.

EXIST.STAIR.

EXIST.ELEV.

EXIST.ELEV.

EXIST.ELEV.

EXISTINGELEVATOR

LOBBY

MEN'S T.R.G41

FUTURE OFFICEG35LOCKERS

G40

CORRIDORG38

BREAK ROOMG39

EXAMG37

CO

RRID

OR

G34

OPEN OFFICEG36

VENDINGG32

MAIL ROOMG33

EXISTSTAIRG-SA

INTAKEG26

ROOM 15G25

ROOM 14G24

ROOM 13G23

ROOM 12G22

ROOM 11G21

ROOM 10G20

ROOM 9G19

ROOM 8G18

ROOM 7G17

ROOM 6G16

ROOM 5G15

ROOM 4G14

ROOM 3G13

PRIVATEROOM 2

G11

PRIVATEROOM 1

G09

EXIST.PATIENT

T.R.G12

EXIST.STAFFT.R.G08 BREAK

ROOMG07

CORRIDORG04

STORAGEG05WAITING

G01NURSE

STATION/RECEPTION

G31

EXIST.NURSE

G30

CORRIDORG02 CLOSET

G03

PATIENTT.R.G10

EXIST.SOILEDHOLDG28

EXIST.CLEANSUPPLY

G29

EXIST.PATIENT

T.R.G27

81 S.F. 81 S.F. 81 S.F. 81 S.F. 81 S.F. 81 S.F. 81 S.F. 81 S.F. 81 S.F. 81 S.F. 81 S.F. 81 S.F. 100 S.F. 129 S.F.132 S.F.

DN

DN

WOMEN'ST.R.G43

LOCKERSG42

PHASE IA

PHASE IB

PHASE III

PHASE IVA

PHASE IVB PHASE II

SHEET NO.

SEAL

ISSUED/ REVISED FOR DATE

2729 Prospect Avenue Cleveland, OH 44115 216.621.79002631 West 8th Street Erie, PA 16505 814.838.7525

BOSTWICKDESIGN.com

P

BostwickDesign

Partnership

GENERAL NOTES

SHEET NOTES

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

A

B

C

D

E

F

G

J

K

L

M

N

H

P

P

C:\U

sers

\hur

stn\

Doc

umen

ts\1

5119

-SVH

Che

mo

Infu

sion

Cen

ter a

t Har

dner

_Cen

tral_

hurs

tn.rv

t2/

23/2

016

8:53

:54

AM

GROUND FLOORPHASING PLAN

G500

AHN SAINTVINCENT

HOSPITALCHEMO INFUSION

CENTER EXPANSIONAT HARDNER

BDP NO. 15119

1/8" = 1'-0"A1 GROUND FLOOR PHASING PLAN

PLAN REVIEW SUBMISSION FEB. 2016

Page 3: AHN SAINT VINCENT HOSPITAL · ed103 ground floor plan - hvac power demolition e001 symbols, abbreviations, notes and schedules e101 ground floor plan - lighting e102 ground floor

W a l l

W a l l

W a l l W a l l

GROUND FLOORAREA OF WORK

GROUND FLOORAREA OF WORK

W 25TH STREET

SASS

AFRA

S ST

REET

MYR

TLE

STRE

ET

W 24TH STREET

W 23RD STREET

ONE

WAY

MYR

TLE

STRE

ET

AMBULANCEENTRANCE

COMPONENT #08

MRIBUILDING

COMPONENT #08

EXISTING HARDNERBUILDING

COMPONENT #08

REHAB BUILDINGCOMPONENT #03

NORTH BUILDINGCOMPONENT #01

SOUTHEAST BUILDINGCOMPONENT #02

NADCOBUILDING

NO D.O.H. DESIGNATION

SERVICEBUILDING

NO D.O.H. DESIGNATION

COURT INFILL BUILDINGCOMPONENT #06

BOILERHOUSE

NO D.O.H. DESIGNATION

EDUCATIONBUILDING

NO D.O.H. DESIGNATION

NORTH WING

SOUTH BUILDINGCOMPONENT #05

WEST 24TH STREET (VACATED)

WALK

WALK

PARKINGDECK

AmbulatoryCenter

GuestHouse

PARKINGRAMP

EXISTINGHighpointTowers

W 23RD STREET

W. 25TH STREET

1. NOT USED.2. NOT USED.

SHEET NO.

SEAL

ISSUED/ REVISED FOR DATE

2729 Prospect Avenue Cleveland, OH 44115 216.621.79002631 West 8th Street Erie, PA 16505 814.838.7525

BOSTWICKDESIGN.com

P

BostwickDesign

Partnership

GENERAL NOTES

SHEET NOTES

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

A

B

C

D

E

F

G

J

K

L

M

N

H

P

P

C:\U

sers

\hur

stn\

Doc

umen

ts\1

5119

-SVH

Che

mo

Infu

sion

Cen

ter a

t Har

dner

_Cen

tral_

hurs

tn.rv

t2/

23/2

016

8:53

:51

AM

ARCHITECTURAL SITEPLAN

AS101

AHN SAINTVINCENT

HOSPITALCHEMO INFUSION

CENTER EXPANSIONAT HARDNER

BDP NO. 15119

1" = 30'-0"A1 SITE PLAN

PLAN REVIEW SUBMISSION FEB. 2016

Page 4: AHN SAINT VINCENT HOSPITAL · ed103 ground floor plan - hvac power demolition e001 symbols, abbreviations, notes and schedules e101 ground floor plan - lighting e102 ground floor

REMOVE EXISTING PARTITION ANDASSOCIATED CONSTRUCTION.PREPARE FOR NEW CONSTRUCTION

REMOVE EXISTING DOOR, FRAME, & HARDWARE.PREPARE FOR NEW CONSTRUCTION

REMOVE EXISTING PLUMING FIXTURES.CAP ALL UTILITIES AS REQUIRED.PREPARE FOR NEW CONSTRUCTION.

REMOVE EXISTING CEILING CONSTRUCTIONINCLUDING MECHANICAL & ELECTRICAL FIXTURES.PREPARE FOR NEW CONSTRUCTION.

REMOVE EXISTING FLOOR FINISH & BASE.PREPARE FOR NEW FINISHES.

REMOVE EXISTING LOCKERS & RETAIN FOR REUSE

REMOVE EXISTING CASEWORK & ASSOCIATED PLUMING/ELECTRICAL FIXTURES. SEE PLUMBING & ELECTRICAL.CAP ALL UTILITIES.

REMOVE EXISTING WALLCOVERING, PATCH WALLSAND PREPARE FOR NEW FINISH.

REMOVE & RE-USE EXISTING DOOR, FRAME & HARDWARE.SEE FLOOR PLAN FOR NEW LOCATIONS.

1

2

3

4

5

6

7

8

9

4 5 4 5

1 2

21 1

7

11

11

12 2 2

4 5 4 5 4 5

4 5

4

4'-4

"2'

-0"

3'-4

"

1

9

2

9

2

1 1 1

4 5

4

5

6'-6

"

3'-1

0 3/

4"6'

-6"

RELOCATE EXISTINGVENDING

REMOVE & RELOCATEEXISTING MAILBOXES

1

7

2

1

2

4 5 1

2

4 5

1

1

1

2

2

11

1 1

2

2

2 2

2

1

1

6

3

4

734

4

1

7

2

3

3

1

REMOVE & RETAIN ALLCASEWORK & SINK FOR RELOCATION.CAP ALL UTILITIES AS REQUIRED

RETAIN FORRE-USE

4'-1

0 1/

8"6'

-6" 10

'-11

3/8"

5'-5

1/4

"

7'-9 1/4"

RETAIN FORRE-USE

ROOM 12.2-3.1.12.2.8(1)

EXCEPTIONCONDITIONELIMINATED

5'-10 1/8"

1

NOTE: ALL MATERIALS & FIXTURES FROM DEMOLITION SHOULD BEREVIEWED FOR RE-USE. STORE MATERIALS & FIXTURES ON SITE ASAPPROPRIATE. ITEMS SUCH AS DOORS & HARDWARE, ACOUSTICALCEILING TILE, CASEWORK, LIGHTING FIXTURES, PLUMBING FIXTURES,ETC. SHOULD ALL BE ASSESSED.

REMOVE EXISTING PLANTER AND WALLS ASREQUIRED SLAVAGE ANY TILE FOR REUSE

1

REMOVE EXISTING WALL BASE, SALVAGE FOR REUSE888

6

5

55

55 5

33

7

44

4

54

5

SHEET NO.

SEAL

ISSUED/ REVISED FOR DATE

2729 Prospect Avenue Cleveland, OH 44115 216.621.79002631 West 8th Street Erie, PA 16505 814.838.7525

BOSTWICKDESIGN.com

P

BostwickDesign

Partnership

GENERAL NOTES

SHEET NOTES

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

A

B

C

D

E

F

G

J

K

L

M

N

H

P

P

C:\U

sers

\hur

stn\

Doc

umen

ts\1

5119

-SVH

Che

mo

Infu

sion

Cen

ter a

t Har

dner

_Cen

tral_

hurs

tn.rv

t2/

23/2

016

8:53

:50

AM

GROUND FLOORDEMOLITION PLAN

AD101

AHN SAINTVINCENT

HOSPITALCHEMO INFUSION

CENTER EXPANSIONAT HARDNER

BDP NO. 15119

1/8" = 1'-0"A1 GROUND FLOOR DEMOLITION PLAN

PLAN REVIEW SUBMISSION FEB. 2016

Page 5: AHN SAINT VINCENT HOSPITAL · ed103 ground floor plan - hvac power demolition e001 symbols, abbreviations, notes and schedules e101 ground floor plan - lighting e102 ground floor

ALUMINUM

STEEL

GLAZING(IN SECTION)

GLAZING (IN ELEVATION)

GYPSUM BOARD,PLASTER OR GROUT

BRICK(COMMON OR FACE)

CONCRETEMASONRY UNIT(CMU)

CAST-IN-PLACE CONCRETE

BATT OR BLANKETINSULATION

COMPRESSIBLESEALANT

RIGID INSULATION

PRECAST CONCRETE

STONE (CUT OR CAST)

WOOD (ROUGHAND BLOCKING)

WOOD (FINISHED)

PLYWOOD

EARTH

POROUS FILL,STONE OR GRAVEL

TERRAZZO

SECTION# 3/4" = 1'-0"

#

A#.##

#

A#.##

#

#

####

DRAWING NUMBER

DRAWING TITLE

DRAWING SCALE

DETAIL NUMBER

SHEET ON WHICHDETAIL APPEARS

SECTION NUMBER

SHEET ON WHICHSECTION APPEARS

A#.##

##

##

####

ELEVATION NUMBER

SHEET ON WHICHELEVATION APPEARS

01 LEVEL

100'-0"

01 LEVEL

100'-0"

LEVEL ELEVATION

LEVEL NAME

LINE NAME

LINE NAME

####

#

45°

45°

DOOR NUMBER

ROOM NAME

ROOM NUMBER

AWINDOW TYPE

A101-A

EQUIPMENT TYPE

NOTE NUMBER

##

100'-0"

SPOT ELEVATION

100'-0"

100

100

SPECIFICATIONSECTION

DESCRIPTION

07 20 00RIGID INSULATION

1. DRAWING IDENTIFICATION

2. DETAIL REFERENCE

3. SECTION REFERENCE

4. ELEVATION REFERENCE

5. NEW COLUMN CENTERLINE, GRID LINE

6. EXISTING COLUMN CENTERLINE, GRID LINE

7. NEW LEVEL LINE

8. EXISTING LEVEL LINE

9. NEW SPOT ELEVATION

10. EXISTING SPOT ELEVATION

11. TEST BORING LOCATION

12. NORTH ARROW

13. NEW DOOR

14. EXISTING DOOR, FRAME OR WALL TO REMAIN

15. EXISTING DOOR, FRAME OR WALL TO BE DEMOLISHED

16. ROOM TAG

17. PARTITION TAG

A1PARTITION TYPE

18. WINDOW TAG

19. EQUIPMENT TAG

20. SHEET NOTE

21. KEYNOTE

22. BREAKLINE

23 CENTERLINE, LEVEL LINE

24. ITEMS ABOVE OR BEYOND, NOT IN CONTRACT (N.I.C.)

25. CONTRACT LIMIT LINE

26. PROPERTY LINE

27. NEW CONTOUR LINE

28. EXISTING CONTOUR LINE

29. CAMERA LOCATION FOR 3D PERSPECTIVES

#/A#.##

DETAIL NUMBER

SHEET ON WHICH DETAIL APPEARS

CAMERA LOCATION ANDDIRECTION FOR VIEW

LEVEL ELEVATION

LEVEL NAME

SPOT ELEVATION

ROOM NAME

INDICATESSMOKE RATING

s

1. IN MANY OF THE INTERIOR SPACES, THE ACTUAL DIMENSION MAY BE LESS IMPORTANT THAN IF TWO ELEMENTS IN THE BUILDING WERE TO BE EQUAL. IN THESE CASES, THE WORD "EQUAL" (OR "EQ") IS USED IN LIEU OF THE ACTUAL DIMENSIONS.

2. WHEN A ROOM CENTERLINE IS INDICATED, ONLY ONE SIDE OF THE ROOM'S ELEMENTS MAY BE DIMENSIONED.

3. COLUMN IDENTIFICATION: DETAILS WILL GOVERN ALL DIMENSIONS AND NO DIMENSIONS WILL BE SHOWN ON SMALL SCALE PLANS.

4. PARTITIONS CENTERED ON COLUMN OR GRID LINES WILL NOT BE DIMENSIONED ON SMALL SCALE PLANS BUT WILL BE DRAWN ACCORDINGLY:

5. PARTITIONS WITH A FINISHED FACE FLUSH WITH A FINISHED FACE OF COLUMN ENCLOSURE WILL NOT BE DIMENSIONED ON SMALL SCALE PLANS BUT WILL BE DRAWN ACCORDINGLY:

6. FINISHED FACE OF PARTITION LOCATED ON GRID LINE WILL NOT BE DIMENSIONED ON SMALL SCALE PLANS BUT WILL BE DRAWN ACCORDINGLY:

7. CURVED WALLS TO BE LOCATED WITH RADIUS INDICATION:

8. SPECIFIC POINT LOCATIONS MAT BE IDENTIFIED BY AN "X-Y" COORDINATE SYSTEM FROM A PLAN'S DIMENSIONAL START POINT:

9. LOCATIONS OF UNFRAMED OPENINGS IN PARTITIONS OR WALLS:

A. WHEN ONE JAMB OCCURS AT A COLUMN OR GRID LINE, NO DIMENSIONS WILL BE SHOWN ON THE SMALL SCALE PLANS. THE OPENING WIDTH WILL BE GOVERNED BY THE CRITERIA OR SCHEDULES.

B. WHEN NEITHER JAMB OCCURS AT A COLUMN OR GRID LINE, OR IS NOT GOVERNED BY THE STANDARD NOTE IN ITEM 9A, ONE JAMB WILL BE DIMENSIONED.

10. DOOR LOCATION:

A. AS DIMENSIONED

B. ONE JAMB FACE LOCATED BY A PARTITION AT RIGHT ANGLE TYPICAL UNLESS INDICATED ON PLAN. TYPICAL DIMENSION TO BE 4" OFF WALL AS SHOWN IN "TYPICAL DETAILS" FOR PARTITIONS AND WALLS.

11. PARTITIONS ARE DIMENSIONED TO FACE OF GYPSUM BOARD OR FACE OF BLOCK UNLESS OTHERWISE NOTED. REFER TO PARTITION TYPES FOR THICKNESS.

12. ALL DIMENSIONS ARE INDICATED IN THE DOCUMENTS. THE DRAWINGS SHOULD NOT BE SCALED FOR DIMENSIONS.

13. PARTITIONS CENTERED ON WINDOW MULLIONS WILL NOT BE DIMENSIONED ON SMALL SCALE PLANS BUT WILL BE DRAWN ACCORDINGLY:

14. FOR OPENINGS IN CONCRETE MASONRY WALLS, THE FOLLOWING DIAGRAM APPLIES:

15. MASONRY DIMENSIONS ARE NOMINAL DIMENSIONS FROM FACE OF ONE UNIT TO FACE OF THE NEXT UNIT AND WILL BE DRAWN ACCORDINGLY:

16. ALIGNMENT: ALIGN THE NEW FINISH SURFACE OF PARTITIONS FLUSH TO EXISTING WALLS WHERE INDICATED ACCORDINGLY:

B

4

B

B

4

COLUMN CENTERLINE

PARTITION

COLUMN CENTERLINE

PARTITION

COLUMN CENTERLINE

PARTITION

R 1

4'-0

"

8"

DIMENSION

DIM

ENS

ION

ALIGNX

-Y

X

- YDIMENSIONALSTART POINTX=0; Y=0

A MINUS OR NEGATIVE SYMBOL(-) DENOTES A LOCATION WESTOR SOUTH OF THE DIMENSIONALSTART POINT.

SHEET NO.

SEAL

ISSUED/ REVISED FOR DATE

2729 Prospect Avenue Cleveland, OH 44115 216.621.79002631 West 8th Street Erie, PA 16505 814.838.7525

BOSTWICKDESIGN.com

P

BostwickDesign

Partnership

GENERAL NOTES

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

A

B

C

D

E

F

G

J

K

L

M

N

H

P

P

C:\U

sers

\hur

stn\

Doc

umen

ts\1

5119

-SVH

Che

mo

Infu

sion

Cen

ter a

t Har

dner

_Cen

tral_

hurs

tn.rv

t2/

23/2

016

8:53

:22

AM

GENERAL NOTES &LEGEND

A001

AHN SAINTVINCENT

HOSPITALCHEMO INFUSION

CENTER EXPANSIONAT HARDNER

BDP NO. 15119

MATERIAL LEGEND

DIMENSIONING AND BUILDING LAYOUT

SYMBOLS AND REFERENCESSECTION CUT UNLESS NOTED OTHERWISE

1. THE WORK IS BASED ON A COMPLETE SET OF CONTRACT DOCUMENTS. CONTRACTORS ARE RESPONSIBLE TO COORDINATE INFORMATION CONTAINED IN SITE,ARCHITECTURAL, STRUCTURAL, FIRE SUPPRESSION, PLUMBING, HVAC, ELECTRICAL, TECHNOLOGY, CIVIL, LANDSCAPE DRAWINGS AND REFERENCE DRAWINGS,SPECIFICATIONS AND PROJECT MANUAL.

2. REFER TO OTHER SHEETS, DRAWINGS AND SCHEDULES FOR ADDITIONAL NOTES.3. DRAWINGS ARE DIAGRAMMATIC REPRESENTATIONS OF DESIGN INTENT. DO NOT SCALE DRAWINGS TO DETERMINE DIMENSIONS. SIZES, LOCATIONS AND DETAILING

SHALL BE AS REQUIRED BY THE INTENT OF THE CONTRACT DOCUMENTS. CONTRACTORS ARE RESPONSIBLE TO VERIFY EXISTING CONDITIONS AND COORDINATE ALLWORK WITH ACTUAL FIELD CONDITIONS.

4. REPRESENTATIONS OF EQUIPMENT, FURNISHINGS, ETC. ARE DIAGRAMMATIC. CONTRACTOR SHALL COORDINATE ACTUAL SIZES WITH INTENDED LOCATIONS ANDVERIFY FIT AND CLEARANCES. CONTRACTOR SHALL ADVISE ARCHITECT OF ANY DISCREPANCIES.

5. TYPICAL SECTIONS AND PLAN DETAILS APPLY TO SIMILAR CONDITIONS THAT MAY NOT BE SPECIFICALLY DRAWN.6. FIRST FLOOR GRADE ELEVATION IS DESIGNATED ON ARCHITECTURAL DRAWINGS AS 0'-0". REFER TO SITE DRAWINGS FOR REFERENCE GRADE.7. ABBREVIATION SYSTEM IDENTIFICATION: SEE BELOW FOR ALL ABBREVIATIONS, IDENTIFICATIONS AND DESCRIPTIONS.8. "TAGS" ARE ABBREVIATIONS FOLLOWED BY A DASH AND A NUMBER (TAG-#). TAGS INDICATE A SPECIFIC FINISH, MATERIAL OR PRODUCT IDENTIFIED ON THE "FINISH,

MATERIAL & PRODUCT LEGEND."9. THE KEYNOTING SYSTEM CORRELATES THE DRAWINGS TO THE SPECIFICATIONS. THE KEYNOTE SYSTEM IS NOT INTENDED TO COMPLETELY DEFINE OR DELINEATE

WORK PROCESS OR SCOPE FOR INDIVIDUAL CONTRACTORS / SUBCONTRACTORS.10. KEYNOTES BEGIN WITH A SPECIFICATION SECTION FOLLOWED BY A PERIOD AND A LETTER. THE LETTER IS FOR INTERNAL USE AND IS TO BE DISREGARDED BY THE

CONTRACTOR.11. THIS SHEET INCLUDES TYPICAL REFERENCES, GRAPHICS, ETC. THAT MAY BE (BUT ARE NOT NECESSARILY) FOUND THROUGHOUT THE CONTRACT DOCUMENTS.

ABBREVIATIONS

DRAWING SET / ARCHITECTURAL GENERAL NOTES

A/C air conditioningAB air barrierACF access flooringACM aluminum composite material panel

systemACOUS acoustic(cal)ACT acoustical panel ceiling assembly /

acoustical ceiling tile assemblyAD area drainADH adhesiveADJ adjacentADJ adjustableAESS architecturally exposed structural

steelAFF above finish floorAHU air handling unitAL aluminumALT alternateALUM aluminumANOD anodizedARCH Architect(ural)ATCS acoustical tile ceilingsAUTO automatic

B.O.S. Bottom of SteelB/O bottom ofBLDG buildingBR bumper railBRF brick flooringBSMT basementBUR built up roofing

CAB cabinetCAR sheet carpetCB catch basinCBD chalkboardCC cubicle curtain track systemCG corner guardCJ control jointCL center lineCLG ceilingCMU concrete masonry unitCOL columnCONC concreteCONST constructionCONT continuous or continueCOORD coordinateCPT carpet tileCR crash railCS concrete sealerCSM cast stone masonryCT ceramic tileCTC cementitious coatingsCTW combination towel dispenser, waste

receptacleCUH cabinet unit heaterCWP cement waterproofing, polymer

modified

DCS diaper changing stationDEFS direct-applied exterior finish systemDEMO demolish, demolitionDET detailDF drinking fountainDIA diameterDIAG diagonalDIM dimensionDIV divisionDR doorDS downspoutDWG drawing

E eastEC elastomeric coatingsEF exhaust fanEFG entrance floor grilleEFM entrance floor matEJ expansion jointEJC expansion joint coverEL elevationELEC electric(al)ELEV elevator cabEMBD electronic markerboardEMER emergencyEQ equalEQUIP equipmentERC epoxy resin countertopES exposed structureETR existing to remainEWC electric water coolerEXH exhaustEXIST existingEXP exposedEXT exterior

FA fire alarmFAB fabricFABC fabric ceiling systemFB face brickFD floor drainFEC fire extinguisher cabinetFEX fire extinguisherFFE Furniture, Fixtures and EquipmentFIN finish(ed)FLG flashingFLUOR fluorescentFM framed mirrorFND foundationFRG fire-protection-rated glazingFRP fiberglass reinforced plastic panelFSM formed sheet metal, flashing and trimFSS folding shower seatFT foot or feetFTD facial tissue dispenserFTG footingFVC fire valve cabinet for fire department

hose connection

GALV galvanizedGB grade beamGB grab barGFRC glass-fiber-reinforced concreteGFRP glass-fiber-reinforced plasterGMU glass masonry unit, glass blockGYP BD gypsum board

HB hose bibbHD hand dryer, electricHDWR hardwareHGT HeightHLB horizontal louver blindsHM hollow metalHOR horizontalHP high pointHPC high performance coatingHR handrailHSKG housekeepingHTG heatingHVAC heating, ventilating, and air

conditioningHWH hot water heater

ID inside diameterIG insulating glass unitIMF intumescent mastic fireproofingINCL include(d), (ing)INSUL insulate(d), (ion)INT interiorIP intumescent paint

JAN janitorJS joint sealant

KO knockoutKS knee space

L lengthLAB laboratoryLAV lavatoryLDG leaded glass, for radiation protectionLG laminated glassLH left handLIN linear or linealLKR lockerLLV long leg verticalLNLM linoleum flooringLP low pointLT lightLVR louver(s)

M menMACH machineMAS masonryMAX maximumMB metal baseMBD markerboardMBH mop and broom holderMC medicine cabinetMCF multi-colored finishMECH mechanic(al)MED medicineMFR manufacture(r)MH manholeMIN minimumMISC miscellaneousMO masonry openingMOR mortarMRP metal roof panelsMT metalMTC metal ceiling systemMTD mountedMTL metal lockerMWP metal wall panel

N northNIC not in contractNO numberNOM nominalNRC noise reduction coefficientNTS not to scale

OPH opposite handOPNG openingOPP oppositeOVHD overhead

PC precast architectural concretePCF pounds per cubic footPCS partition mounted child seatPERF perforate(d)PERIM perimeterPL property line or platePLAM plastic laminatePLAS plasterPLBG plumbingPLG plastic glazingPLYWD plywoodPNT paint(ed)PREFAB prefabricate(d)PS purse shelfPSF pounds per square footPSI pounds per square inchPT pointPTD paper towel dispenserPTN partitionPTR paper towel receptaclePVC polyvinyl chloridePVMT pavement

R riserR radiusRA return airRB resilient base (vinyl or rubber)RCP Reflected Ceiling PlanRD roof drainREF referenceREF refrigeratorREQ’D requiredREV revealREV revision(s), revisedREX remove existingRF resinous flooringRH robe hookRH right handRM roomRO rough openingROW right of wayRSA resilient stair accessoriesRSF resilient sheet flooringRTF resilient tile flooringRWS roller window shade

S southSBR support bracket (for countertops)SCD seat cover dispenserSCHED scheduleSCR shower curtain rodSCRF static control resilient flooringSD storm drainSD soap dishSDR soap dispenserSECT sectionSFRM spray-applied fire resistive materialSG security glazingSHT sheetSIM similarSND sanitary napkin disposal receptacleSNV sanitary napkin vendorSPEC specification(s)SQ squareSS stainless steelSSM solid surface materialSSV solid sheet vinylST stoneSTD standardSTF stone flooringSTL steelSTRUC structuralSTT stone tileSWE swimsuit water extractorSWP sheet wall protectionSYM symmetry(ical)SYS system

T treadT&G tongue and grooveT.O.C. top of curbT.O.M. top of masonryT.O.S. top of steelT/O top ofTB towel barTBD tackboardTC toilet compartmentTEL telephoneTERR terrazzo (portland cement or resinous

matrix)TG tempered glassTOIL toilet, or toilet roomTR towel ringTRFC traffic coatingTRK towel rackTS transition stripTTD toilet tissue dispenserTV televisionTYP typical

UCR under cabinet refrigeratorUH unit heaterUNO unless noted otherwiseUS utility shelf

VB vapor barrierVCT vinyl composition tileVERT verticalVIF verify in fieldVLB vertical louver blindsVR vapor retarderVT solid vinyl floor tileW westW womenW/ withW/O withoutWAF wood athletic flooringWC wall coveringWC water closetWD wood (transparent finish)WDC wood ceilingWDF wood flooringWP Work PointWR waste receptacleWWF welded wire fabric

PLAN REVIEW SUBMISSION FEB. 2016

Page 6: AHN SAINT VINCENT HOSPITAL · ed103 ground floor plan - hvac power demolition e001 symbols, abbreviations, notes and schedules e101 ground floor plan - lighting e102 ground floor

TBSCRSCDHDRHDCSSDPSFMSDRPTDSNVSNDTTDCTW

EWC

URINALWALL MTDLAVATORY

ELEVATION BELEVATION A

A

B

ELEVATION BELEVATION A

A

B

TOILET ROOM ACCESSORIES

NOTES

1. UPON A CONFLICT IN HEIGHTSOR LOCATIONS OFACCESSORIES BETWEENARCHITECTURAL DRAWINGSAND OTHERS CONSULT THEARCHITECT BEFORE FINALLOCATION IS DETERMINED.

2. PROVIDE BLOCKING ANDATTACHMENT REINFORCING ATALL WALL MOUNTED DEVICES.

3. THIS SHEET INCLUDES TYPICALSYMBOLS, REFERENCES,GRAPHICS, ETC. THAT MAY BE(BUT NOT NECESSARILY)FOUND IN THE PROJECT.

PLUMBING FIXTURESADA TOILET STALL

MECHANICAL / ELECTRICAL DEVICESSTANDARD TOILET STALL

48" M

AX.

80"

44"

48"

48"

48" T

O L

ATC

H

48" M

AX.

36"

REF

L EC

TIVE

40" T

O

48"

48" M

AX.

48"

30"

20"

48"

6" MAX. 8" MIN.

9" M

IN.

27" M

IN.

42" (

S TAN

DAR

D)

36" (

ADA)

17" MIN.19" MAX.

TOP OFSPOUT

MOP BASIN

SERVICEFAUCET ANDCONTROLS

MBH

US

36"

56"66

"

2'-0

" (S

TAN

DAR

D)

17" E

LON

GA

TED

(AD

A)

34" M

AX.

34"8"

4"

1 1/2" HANDRAIL ORBUMPER GUARD

BUMPERRAIL

HANDRAIL /GUARDRAIL

DOOR FRAMEOR CORNERGUARD

2"

PLAN

48"

18"

ELECTRIC, TELEPHONE ORDATA OUTLET WHERE NO

CASEWORK OCCURS

BASECABINET

WALLCABINET

BAC

KSPL

ASH

8" A

BOVE

48"

LIGHTSWITCH

TO C

ON

TRO

L48

"

MEDICAL GASSHUT OFFVALVES

MEDICAL GASALARM PANEL

AUDIO VISUALFIRE ALARM

80"

48"

FIRE ALARM PULLSTATION, GENERALLYLOCATE UNDER A/V ALARM

TO H

AN

DLE

48" M

AX.

FIRE DEPT. VALVEIN RECESSEDCABINET

FIRE EXTINGUISHERIN RECESSEDCABINET

FIREEXTINGUISHERWALL HUNG

SEAT

19" T

O

36" T

O T

OP

9"GB-42

TTD

TYP. TOILETPARTITION60"

GB-36

TTD

17"

9"

TYP. TOILETPARTITION

SNDTTDTTD

SEE PLAN36" MIN.

60" M

IN.

LINE OFWALL

4" MAX.36"

6" MAX. 36"

12" M

AX.

54" M

IN.

60" M

IN.

60" CLEAR

GB-36

GB-42 33"

TOP OF TABLE

CONT. CLEARBELOW GRAB BAR

FLUSH HANDLE @WIDE PART OF STALL

18"

EQ EQ

TO H

AN

DLE

48" M

AX.

TO H

AN

DLE

48" M

AX.

TO H

AN

DLE

48" M

AX.

TO L

ATC

H48

" MA

X.

8" 8"

SUR

FAC

E

20"

20"

THERMOSTAT

48"

WALL MTD.PHONE JACK

39"

18"

40" GB-18

1-1/

2" M

IN.

CONTROL JOINTS

MASONRY COURSINGPATTERN TYPICAL

BASE MATERIALMAY OCCUR

TOOL JOINTS FLUSH TOHEIGHT OF BASE A.F.F.

4" MIN.

DOOROPENING

NOTE: AT EACH JAMB FOR REINF. CONC. BLOCK LINTELS OR WHERESTEEL LINTELS OCCUR. CONTROL JOINTS SHALL EXTEND UP VERTICALLYFLUSH WITH DOOR FRAME (STEEL LINTELS SHALL BE CONT.)

SCHEDULED BASE

HOLLOW METALFRAME.

DOOROPENING

METAL STUDSCOPED TO FIT

UNDERSIDE OFSTRUCTURE

CONTINUOUS STUDTRACK

METAL STUDS TYPICAL

CONTINUOUS CHANNELREINFORCING (FLAT STRAPPING

3" W. x20 GA. BOTH SIDES WHEREINTERRUPTED BY VERTICAL

PIPING, CONDUIT, ETC.)

MIDPOINT ATDOOR OPENING

DOUBLE STUDS AT JAMBOPENING 20 GA. MIN; 18 GA.

AT OPENING OVER 3'-0"

CONTINUOUS STUD TRACK

CHANNEL STUD FRAMING/REINFORCING AS REQUIREDAT WALL MOUNTED DEVICES

GYPSUM BOARDCONTROL JOINT

MAXIMUM SPACING OF CONTROL JOINTS IN GYPSUM BOARD ASSEMBLIES

CONSTRUCTION & MAX. SINGLE MAX. SINGLELOCATION DIMENSION AREA

INTERIOR PARTITION 30 FT --

INTERIOR CEILINGW/O PERIMETER RELIEF 30 FT 900 SF

INTERIOR CEILINGW/ PERIMETER RELIEF 50 FT 2500 SF

EXTERIOR CEILING 30 FT 900 SF

8'-0

" MAX

FLOOR OR ROOF DECK

DEFLECTION TRACK

5/8" TYPE 'X' GYPSUM BOARD;SEE PARTITION TYPE

METAL STUDS; SEE PARTITION TYPE

INSULATION; SEE PARTITION TYPE

Z-CLIP WHERE REQUIRED FORANCHORAGE TO FLUTED DECK

SEALANT

JOIN

T W

IDTH

JOIN

T W

IDTH

JOINT WIDTH: ≤ 1"COMPRESSION: 100%DEFLECTION: ≤ 1"

DEFLECTION CRITERIA

FLOOR

5/8" TYPE 'X' GYPSUM BOARD;SEE PARTITION TYPE

METAL STUDS; SEE PARTITION TYPE

INSULATION; SEE PARTITION TYPE

SCHEDULED BASE

ACOUSTIC SEALANT; FIRE RATEDWHERE REQUIRED BY U.L. DESIGN

FLOOR OR ROOF DECK

FIRESTOPPING SEALANT

FIRE RATED DEFLECTION TRACK

5/8" TYPE 'X' GYPSUM BOARD;SEE PARTITION TYPE

METAL STUDS; SEE PARTITION TYPE

U.L. SYSTEM # HW-D-0060 1, 2 & 3 HOUR FIRERATED PARTITION CONFIGURATION A

MINERAL WOOL BATT INSULATION

INSULATION; SEE PARTITION TYPE

FLOOR OR ROOF DECK BEYOND

JOIN

T W

IDTH

JOIN

T W

IDTH

FLOOR OR ROOF DECK

FIRESTOPPING SEALANT

5/8" TYPE 'X' GYPSUM BOARD;SEE PARTITION TYPE

WALL ELEVATION

JOINT WIDTH: ≤ 1"COMPRESSION: 100%DEFLECTION: ≤ 1"

DEFLECTION CRITERIA

FLOOR OR ROOF DECK

FIRESTOPPING SEALANT

FIRE RATED DEFLECTION TRACK

5/8" TYPE 'X' GYPSUM BOARD;SEE PARTITION TYPE

METAL STUDS; SEE PARTITION TYPE

U.L. SYSTEM # HW-D-0060 1, 2 & 3 HOUR FIRERATED PARTITION CONFIGURATION B

Z-CLIP

INSULATION; SEE PARTITION TYPE

JOIN

T W

IDTH

JOIN

T W

IDTH

JOINT WIDTH: ≤ 1"COMPRESSION: 100%DEFLECTION: ≤ 1"

DEFLECTION CRITERIA

FLOOR OR ROOF DECK

FIRESTOPPING SEALANT

FIRE RATED DEFLECTION TRACK

5/8" TYPE 'X' GYPSUM BOARD;SEE PARTITION TYPE

METAL STUDS; SEE PARTITION TYPE

U.L. SYSTEM # HW-D-0060 1, 2 & 3 HOUR FIRERATED PARTITION CONFIGURATION C

INSULATION; SEE PARTITION TYPE

JOIN

T W

IDTH

JOIN

T W

IDTH

JOINT WIDTH: ≤ 1"COMPRESSION: 100%DEFLECTION: ≤ 1"

DEFLECTION CRITERIA

6"

4"

DOOR FRAME

DOOR LEAF

NOTE: GYPSUM BOARD PARTITION SHOWN;SIMILAR FOR OTHER PARTITION TYPES

JOINT SEALANT(DELETE MORTARIN JOINT)

CMU

20'-0

"M

AX -

UN

O

SASH BLOCK

BACKER RODAND SEALANT

BC

A

WALL MATERIALVARIES

BACKER ROD

SEALANT

NOTE:SEE SPECIFICATIONS FORSEALANT TYPE AND OTHERREQUIREMENTS

JOINT DIMENSIONS (TYP.)

A B C

3/8" 1/8" 1/4"

1/2" 1/8" 3/8"

5/8" 1/8" 3/8"

3/4" 1/8" 3/8"

7/8" 1/8" 3/8"

1" 1/8" 3/8"

WALL MATERIALVARIES

SPECIFIEDSEALANT

LESS THAN 1/4"

SEALANT BEAD; NON-COMPATIBLE WITH

SPECIFIED SEALANT

1/2" MAX.

3"

7/8"3

5/8"

1/2" MAX.

7/8"3

5/8"

1 7/8"

3 1/8"

5/8"

1/2" MAX.

3 5/

8"

5/8"

1 7/8"

3 1/8"

3 5/

8"

ONE/TWO-HOUR RATED ALTERNATE ASSEMBLY

5/8" GYPSUM BOARD(1 LAYER EA. SIDE FOR 1HR. PARTITION2 LAYERS EA. SIDE FOR 2HR. PARTITION)

ZINC CONTROL JOINTJOINT NO. 093 (BOTH SIDES)

METAL STUD

MINERAL WOOL

ZINC CONTROL JOINTJOINT NO. 093 (BOTH SIDES)

METAL STUDS

5/8" GYPSUM BOARD

ZINC CONTROL JOINTJOINT NO. 093 (BOTH SIDES)

METAL STUDS

5/8" GYPSUM BOARD

JOINT COMPOUNDAND TAPE

METAL STUDS

CONTROL JOINT

TWO-HOUR RATED PARTITIONWHI-651-0318.1

ONE-HOUR RATED PARTITIONFACTORY MUTUAL #W1B - 1 HR.WHI-647-3024

NON RATED PARTITION

FLOOR OR ROOF DECK

FIRESTOPPING SEALANT (SPRAY APPLIED)

DEFLECTION TRACK

5/8" TYPE 'X' GYPSUM BOARD;SEE PARTITION TYPE

METAL STUDS; SEE PARTITION TYPE

U.L. SYSTEM # HW-D-00431, 2, 3 & 4 HOUR FIRE RATED PARTITION

MINERAL WOOL BATT INSULATION

INSULATION; SEE PARTITION TYPE

FLOOR OR ROOF DECK BEYOND

1/2"

MIN

3/4"

MAX

JOIN

T W

IDTH

1/2" MIN

FLOOR OR ROOF DECK

FIRESTOPPING SEALANT

5/8" TYPE 'X' GYPSUM BOARD;SEE PARTITION TYPE

WALL ELEVATION1/2"

OVE

RLA

P M

IN.

1 HR & 2 HR JOINT WIDTH: ≤ 1-1/2" COMPRESSION: 50% DEFLECTION: ≤ 3/4"

JOINT WIDTH: ≤ 2-1/2" COMPRESSION: 40% DEFLECTION: ≤ 1"

3 HR & 4 HR JOINT WIDTH: ≤ 1" COMPRESSION: 50% DEFLECTION: ≤ 1/2"

DEFLECTION CRITERIA

FIRESTOPPING SEALANT

DEFLECTION TRACK

5/8" TYPE 'X' GYPSUM BOARD;SEE PARTITION TYPE

METAL STUDS; SEE PARTITION TYPE

INSULATION; SEE PARTITION TYPE

FLOOR OR ROOF DECK BEYOND

1/2"

1/2"

MIN

3/4"

MAX

FLOOR OR ROOF DECK

FLOOR OR ROOF DECK

FIRESTOPPING SEALANT

5/8" TYPE 'X' GYPSUM BOARD;SEE PARTITION TYPE

WALL ELEVATION

U.L. SYSTEM # HW-D-01031 & 2 HOUR FIRE RATED PARTITION

JOINT WIDTH: ≤ 3/4"COMPRESSION: 25%DEFLECTION: ≤ 3/16"

JOIN

T W

IDTH

1/2" MIN.

JOIN

T W

IDTH

DEFLECTION CRITERIA

FLOOR OR ROOF DECK

FIRESTOPPING SEALANT

DEFLECTION TRACK

5/8" TYPE 'X' GYPSUM BOARD;SEE PARTITION TYPE

METAL STUDS; SEE PARTITION TYPE

Z-CLIP

INSULATION; SEE PARTITION TYPE

1/2"

MIN

3/4"

MAX

U.L. SYSTEM # HW-D-01031 & 2 HOUR FIRE RATED PARTITION

JOIN

T W

IDTH

1/2" MIN.

1/2"

JOINT WIDTH: ≤ 3/4"COMPRESSION: 25%DEFLECTION: ≤ 3/16"

DEFLECTION CRITERIA

FLOOR OR ROOF DECK

FIRESTOPPING SEALANT

DEFLECTION TRACK

5/8" TYPE 'X' GYPSUM BOARD;SEE PARTITION TYPE

METAL STUDS; SEE PARTITION TYPE

U.L. SYSTEM # HW-D-01031 & 2 HOUR FIRE RATED PARTITION

INSULATION; SEE PARTITION TYPE

1/2"

MIN

3/4"

MAX

JOIN

T W

IDTH 1/

2"

1/2" MIN.

JOINT WIDTH: ≤ 3/4"COMPRESSION: 25%DEFLECTION: ≤ 3/16"

DEFLECTION CRITERIA

FLOOR OR ROOF DECK

DEFLECTION TRACK

5/8" TYPE 'X' GYPSUM BOARD;SEE PARTITION TYPE

METAL STUDS; SEE PARTITION TYPE

INSULATION; SEE PARTITION TYPE

Z-CLIP WHERE REQUIRED FORANCHORAGE TO FLUTED DECK

SEALANT

1/2"

MIN

3/4"

MAX

1/2"

JOIN

T W

IDTH

JOINT WIDTH: ≤ 3/4"COMPRESSION: 25%DEFLECTION: ≤ 3/16"

DEFLECTION CRITERIA

SHEET NO.

SEAL

ISSUED/ REVISED FOR DATE

2729 Prospect Avenue Cleveland, OH 44115 216.621.79002631 West 8th Street Erie, PA 16505 814.838.7525

BOSTWICKDESIGN.com

P

BostwickDesign

Partnership

GENERAL NOTES

SHEET NOTES

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

A

B

C

D

E

F

G

J

K

L

M

N

H

P

P

C:\U

sers

\hur

stn\

Doc

umen

ts\1

5119

-SVH

Che

mo

Infu

sion

Cen

ter a

t Har

dner

_Cen

tral_

hurs

tn.rv

t2/

23/2

016

8:53

:26

AM

TYPICAL DETAILS

A002

AHN SAINTVINCENT

HOSPITALCHEMO INFUSION

CENTER EXPANSIONAT HARDNER

BDP NO. 15119

TYPICAL MOUNTING HEIGHTSUNLESS NOTED OTHERWISE

PARTITION AND WALL DETAILSUNLESS NOTED OTHERWISE

1/4" = 1'-0"5 DOOR OPENING MASONRY CJ. ELEV. 1/4" = 1'-0"4 TYPICAL DETAIL AT GYPSUM BOARD INTERIOR PARTITION

3" = 1'-0"9 NON RATED FRAMING ANCHORAGE

3" = 1'-0"1 RATED & NON RATED FRAMING ANCHORAGE

3" = 1'-0"6 RATED FRAMING ANCHORAGE - PERPENDICULAR TO FLUTED DECK 3" = 1'-0"7 RATED FRAMING ANCHORAGE - PARALLEL TO FLUTED DECK

3" = 1'-0"8 RATED FRAMING ANCHORAGE - FLAT DECK

1 1/2" = 1'-0"2 TYP. FRAME LOCATION

1 1/2" = 1'-0"10 TYPICAL INTERIOR MASONRY CTRL. JT.

12" = 1'-0"3 TYPICAL SEALANT DETAIL

3" = 1'-0"11 TYPICAL GYPSUM BOARD CONTROL JOINTS

(FOR DEFLECTION CRITERIAS ≤ 1")

3" = 1'-0"16 RATED FRAMING ANCHORAGE - PERPENDICULAR TO FLUTED DECK - ALTERNATIVE

3" = 1'-0"12 RATED FRAMING ANCHORAGE - PERPENDICULAR TO FLUTED DECK 3" = 1'-0"13 RATED FRAMING ANCHORAGE - PARALLEL TO FLUTED DECK

3" = 1'-0"14 RATED FRAMING ANCHORAGE - FLAT DECK 3" = 1'-0"15 RATED FRAMING ANCHORAGE

(FOR DEFLECTION CRITERIAS ≤ 1") (FOR DEFLECTION CRITERIAS ≤ 1") (FOR DEFLECTION CRITERIAS ≤ 1")

(FOR DEFLECTION CRITERIAS ≤ 3/16") (FOR DEFLECTION CRITERIAS ≤ 3/16") (FOR DEFLECTION CRITERIAS ≤ 3/16") (FOR DEFLECTION CRITERIAS ≤ 3/16")

(FOR DEFLECTION CRITERIAS ≤ 1")

PLAN REVIEW SUBMISSION FEB. 2016

Page 7: AHN SAINT VINCENT HOSPITAL · ed103 ground floor plan - hvac power demolition e001 symbols, abbreviations, notes and schedules e101 ground floor plan - lighting e102 ground floor

1. 2" RADIUS ALL OUTSIDE COUNTERTOP CORNERS.2. SEE A901 FOR CLARIFICATION ON FINISH LOCATIONS.3. USE PROPER FLOORING TRANSITIONS WHERE REQUIRED.

MATERIALS

HM HOLLOW METALGALV HM GALVANIZED HOLLOW METALWD WOODALUM ALUMINUM

FINISHES

PNT PAINTFF FACTORY FINISHED

HINGES

CONT CONTINUOUSFMB FULL MORTISE BUTTPIV PIVOTSSH SPRING HINGES

LOCKS / LATCHES

BL BORED LOCKSETML MORTISE LOCKSETEMAG ELECTROMAGNETIC LOCKSEMECH ELECTROMECHANICAL LOCKSESTR ELECTRIC STRIKEPP PUSH / PULLS

DOOR BOLTS

SB SURFACE BOLTSMFB MANUAL FLUSH BOLTS

EXIT DEVICES

EXD EXIT DEVICE

CLOSER

CHO CLOSER WITH HOLD OPENSSUR SURFACE CLOSERCON CONCEALED CLOSER

STOPS / HOLDERS

FLST FLOOR STOPWLST WALL STOPOVH ST/H OVERHEAD STOP WITH HOLDEREDH ELECTROMAGNETIC

DOOR HOLDER

GASKETING

PWSPERIMETER WEATHER STRIPPINGSRG SOUND RATED GASKETINGADB AUTOMATIC DOOR BOTTOMDSWP DOOR SWEEP

PROTECTION

ARM ARMOR PLATEKICKKICK PLATEMOP MOP PLATE

THRESHOLD

THR THRESHOLD

VARIESSEE SCHED.

VAR

IES

SEE

SC

HED

.

F

VARIESSEE SCHED.

VAR

IES

SEE

SC

HED

.

N

8" 8"

3'-6

"2'

-6"

TG-#

FLUSH NARROW LITE

L

VARIESSEE SCHED.

VAR

IES

SEE

SC

HED

.LOUVERS

LOUVERED

VARIESSEE SCHED.

VAR

IES

SEE

SC

HED

.

FP

FLUSH PAIR

2"

VARIESSEE SCHED. 2"

2"V

ARIE

SS

EE S

CH

ED.

1

3'-6"

4'-0

"

SSM-2

3

PARTITION;SEE PLANFOR TYPE

1 1/

2"

D8A010

TYP.

D12A010

TYP.

2"

VARIESSEE SCHED. 2"

4"V

ARIE

SS

EE S

CH

ED.

2

SOUND BATTINSULATION

1'-4" O.C. MAX.

PLAN

NONBEARING CONSTRUCTION

4 7/

8"

09 29 00.B5/8" GYPSUM BOARD

09 22 16.G3 5/8" STUDS

09 29 00.B5/8" GYPSUM BOARD

ONE (1) HOUR FIRE-RATED-ASSEMBLY, UL DESIGN # U465NONBEARING CONSTRUCTION

SOUND BATTINSULATION

1'-4" O.C. MAX.

PLAN

4 7/

8"

09 29 00.B5/8" GYPSUM BOARD

09 22 16.G3 5/8" STUDS

09 29 00.B5/8" GYPSUM BOARD

SOUND BATTINSULATION

1'-4" O.C. MAX.

PLAN

NONBEARING CONSTRUCTION

09 22 16.G3 5/8" STUDS

09 29 00.B5/8" GYPSUM BOARD

4 1/

4"

PLAN

NONBEARING CONSTRUCTION

SUBSTRATEMAY OCCUR

09 29 00.B5/8" GYPSUM BOARD

09 22 16.F2 1/2" STUDS

06 10 00.DSHIM AS REQ'D

1'-4" O.C. MAX.

3 1/

8"

1/2" 1/2"

1/2"

VARIES; SEEPARTITION TYPE

VAR

IES;

SEE

FRAM

E EL

EV.

FRAME RETURNS ATALL GWB PARTITIONS

1/2"

VARIES; SEEPARTITION TYPE

DOOR; SEE SCHED. FORTYPE

FRAME RETURNS AT ALLGWB PARTITIONS

2" VARIES 2"

5/8"

VAR

IES;

SEE

FRAM

E EL

EV.

08 80 23SLIDING GLASS PANELS

08 80 23UPPER TRACK ASSEMBLYFOR SLIDING GLASSWINDOW SYSTEM

09 29 00CORNER BEAD

06 10 53WOOD BLOCKING

06 10 531/4" SHIM

1"

09 29 00L BEAD

06 40 23SSM-2

VARIES;SEE PARTITION TYPE

09 29 00GYP. BRD.

08 80 23LOWER TRACK ASSEMBLYFOR SLIDING GLASSWINDOW SYSTEM

06 10 53WOOD BLOCKING

06 10 531/4" SHIM

2" 5 1/8"

09 22 16METAL STUD

09 29 00GYP. BRD.

VAR

IES;

SEE

PAR

TITI

ON

TYP

E

09 29 00CORNER BEAD

## ## ##GLAZING

08 80 23TRACK ASSEMBLY BELOWFOR SLIDING GLASSWINDOW SYSTEM 09 67 13 POLISHED

CONCRETE SEALERFLOORING

09 68 16CARPET

09 65 13 RESILIENTACCESSORIES BY CARPETCONTRACTOR

DOORDOOR FRAMEBEYOND

ALIGN W/CLOSEDDOOR EDGE

09 65 16 LINOLEUMFLOORING

09 68 16 CARPET09 65 13 RESILIENTACCESSORIES BY CARPETCONTRACTOR

DOOR

DOOR FRAMEBEYOND

ALIGN W/ CLOSEDDOOR EDGE

09 65 36 STATICCONTROLRESILIENTFLOORING

DOORDOOR FRAMEBEYOND

09 65 16 LINOLEUMFLOORING

ALIGN W/ CLOSEDDOOR EDGE

09 65 13 RESILIENTACCESSORIES BYLINOLEUM CONTRACTOR

09 65 16 LINOLEUMFLOORING

09 67 13 POLISHEDCONCRETESEALER FLOORING

09 65 13 RESILIENTACCESSORIES BYLINOLEUM CONTRACTOR

DOOR

DOOR FRAMEBEYOND

ALIGN W/ CLOSEDDOOR EDGE

PLANSECTION

CEILING MAY OCCUR;REFER TO REFLECTED

CEILING PLANS FORTYPE AND LAYOUT

SCHED. BASE

04 20 00.BCONCRETE MASONRY UNIT

04 20 00.BCONCRETE MASONRY UNIT

TOP OF SLAB 8" N

OM

INAL

7 5/

8"

1'-4"

SEE STRUCTURAL DRAWINGS FOR BRACING DETAIL;PAINT EXPOSED BRACING TO MATCH WALL

UNDERSIDE OFSTRUCTURE

COMPRESSIBLE FILLER

TWO (2) HOUR FIRE-RATED-ASSEMBLY, UL DESIGN # U906NONBEARING CONSTRUCTION

SOUND BATTINSULATION

1'-4" O.C. MAX.

PLAN

NONBEARING CONSTRUCTION

7 1/

4"

09 29 00.B5/8" GYPSUM BOARD

09 22 16.H6" STUDS

09 29 00.B5/8" GYPSUM BOARD

HARDWARE SET: 01

QTY3 EA1 EA1 EA1 EA1 SET

DESCRIPTIONHW HINGEPRIVACY SETKICK PLATEWALL STOPSEALS

CATALOG NUMBER5BB1HW 5 X 4.5ML2020 NSM8400 10" X 1 1/2" LDW B4EWS406CCV5050B

FINISH652626630630BRN

MFRIVEC-RIVEIVENGP

HARDWARE SET: 02

QTY3 EA1 EA1 EA1 EA1 EA1 EA3 EA

DESCRIPTIONHINGECLASSROOM LOCKPERMANENT CORESURFACE CLOSERKICK PLATEWALL STOPSILENCER

CATALOG NUMBER5BB1 4.5 X 4.5ML2055 NSM CT78000-74040XP RW/PA8400 10" X 1 1/2" LDW B4EWS406CCVSR64

FINISH652626626689630630GRY

MFRIVEC-RC-RLCNIVEIVEIVE

HARDWARE SET: 03

QTY3 EA1 EA1 EA1 EA1 EA3 EA

DESCRIPTIONHINGEPASSAGE SETOH STOPTOP JAMB MTG PLATEKICK PLATESILENCER

CATALOG NUMBER5BB1 4.5 X 4.5ML2010 NSM100S4040 18TJ8400 10" X 1 1/2" LDW B4ESR64

FINISH652626630689630GRY

MFRIVEC-RGLYLCNIVEIVE

HARDWARE SET: 04

QTY3 EA1 EA1 EA1 EA1 EA1 EA3 EA

DESCRIPTIONHINGESTOREROOM LOCKPERMANENT CORESURFACE CLOSERKICK PLATEWALL STOPSILENCER

CATALOG NUMBER5BB1 4.5 X 4.5ML2057 NSM CT78000-74040XP RW/PA8400 10" X 1 1/2" LDW B4EWS406CCVSR64

FINISH652626626689630630GRY

MFRIVEC-RC-RLCNIVEIVEIVE

SHEET NO.

SEAL

ISSUED/ REVISED FOR DATE

2729 Prospect Avenue Cleveland, OH 44115 216.621.79002631 West 8th Street Erie, PA 16505 814.838.7525

BOSTWICKDESIGN.com

P

BostwickDesign

Partnership

GENERAL NOTES

LEGEND

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

A

B

C

D

E

F

G

J

K

L

M

N

H

P

P

C:\U

sers

\hur

stn\

Doc

umen

ts\1

5119

-SVH

Che

mo

Infu

sion

Cen

ter a

t Har

dner

_Cen

tral_

hurs

tn.rv

t2/

23/2

016

8:53

:29

AM

SCHEDULES ANDSCHEDULE TYPES

A010

AHN SAINTVINCENT

HOSPITALCHEMO INFUSION

CENTER EXPANSIONAT HARDNER

BDP NO. 15119

FINISH SCHEDULEROOM

FLOOR BASEWALL FINISH CEILING

REMARKS# NAME NORTH EAST SOUTH WEST FINISH HEIGHTG01 WAITING VCT-1 RB-1 PNT-1 PNT-1 PNT-1 PNT-2 ACT-1 8'-8"G02 CORRIDOR ETR, VCT-1,2 RB-1 PNT-1,2 PNT-1 PNT-1 PNT-1 ACT-1 8'-8"G03 CLOSET VCT-1 RB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 8'-8"G04 CORRIDOR VCT-1,2 RB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 8'-8"G05 STORAGE ETR, VCT-1 RB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 8'-8"G06 SHELVING VCT-1 RB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 8'-8"G07 BREAK ROOM VCT-1 RB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 8'-8"G08 EXIST.STAFF T.R. ETR ETR PNT-1 PNT-1 PNT-1 PNT-1 ETR 8'-8"G09 PRIVATE ROOM 1 SV-1 RB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 8'-8"G10 PATIENT T.R. CT-3 CT-3 CT-2, PNT-1 CT-2, PNT-1 CT-2, PNT-1 CT-2, PNT-1 ACT-1 8'-8"G11 PRIVATE ROOM 2 SV-1 RB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 8'-8"G12 EXIST. PATIENT T.R. ETR ETR ETR ETR ETR ETR ETR 8'-8"G13 ROOM 3 SV-1 RB-1 - PNT-1, SWP-1 PNT-2, SWP-2 PNT-1, SWP-1 ACT-1 8'-8"G14 ROOM 4 SV-1 RB-1 - PNT-1, SWP-1 PNT-2, SWP-2 PNT-1, SWP-1 ACT-1 8'-8"G15 ROOM 5 SV-1 RB-1 - PNT-1, SWP-1 PNT-2, SWP-2 PNT-1, SWP-1 ACT-1 8'-8"G16 ROOM 6 ETR ETR - ETR ETR ETR ETR 8'-8"G17 ROOM 7 ETR ETR - ETR ETR ETR ETR 8'-8"G18 ROOM 8 ETR ETR - ETR ETR ETR ETR 8'-8"G19 ROOM 9 ETR ETR - ETR ETR ETR ETR 8'-8"G20 ROOM 10 ETR ETR - ETR ETR ETR ETR 8'-8"G21 ROOM 11 ETR ETR - ETR ETR ETR ETR 8'-8"G22 ROOM 12 ETR ETR - ETR ETR ETR ETR 8'-8"G23 ROOM 13 ETR ETR - ETR ETR ETR ACT-1 8'-8"G24 ROOM 14 SV-1 RB-1 - PNT-1, SWP-1 PNT-2, SWP-2 PNT-1, SWP-1 ACT-1 8'-8"G25 ROOM 15 SV-1 RB-1 - PNT-1, SWP-1 PNT-2, SWP-2 PNT-1, SWP-1 ACT-1 8'-8"G26 INTAKE SV-1 RB-1 - PNT-1, SWP-1 PNT-2, SWP-2 PNT-1, SWP-1 ETR 8'-8"G27 EXIST. PATIENT T.R. ETR ETR ETR ETR ETR ETR ETR 8'-8"G28 EXIST. SOILED HOLD ETR ETR ETR ETR ETR ETR ETR 8'-8"G29 EXIST. CLEAN SUPPLY ETR ETR ETR ETR ETR ETR ETR 8'-8"G30 EXIST. NURSE ETR RB-1 EXIST,PNT-2 EXIST,PNT-2 EXIST,PNT-2 EXIST,PNT-2 ETR 8'-8"G31 NURSE STATION/ RECEPTION VCT-1 RB-1 PNT-2 PNT-2 PNT-2 PNT-2 ETR, ACT-1, PNT-2 8'-8"G32 VENDING ETR ETR PNT-3 PNT-3 PNT-3 MATCH ETR 8'-8"G33 MAIL ROOM ETR CT-3 PNT-3 PNT-3 PNT-3 PNT-3 ACT-1 8'-8"G34 CORRIDOR VCT-1 RB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 8'-8"G35 FUTURE OFFICE NONE NONE - - - - ACT-1 8'-8"G36 OPEN OFFICE VCT-1 RB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 8'-8"G37 EXAM VCT-1 RB-1 PNT-1 PNT-1 PNT-2 PNT-1 ACT-1 8'-8"G38 CORRIDOR VCT-1 RB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 8'-8"G39 BREAK ROOM VCT-1 RB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 8'-8"G40 LOCKERS VCT-1 RB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 8'-8"G41 MEN'S T.R. CT-1 CT-1 CT-2, PNT-1 CT-2, PNT-1 CT-2, PNT-1 CT-2, PNT-1 ACT-1 8'-8"G42 LOCKERS VCT-1 RB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 8'-8"G43 WOMEN'S T.R. CT-1 CT-1 CT-2, PNT-1 CT-2, PNT-1 CT-2, PNT-1 CT-2, PNT-1 ACT-1 8'-8"G44 MAIN LOBBY ETR ETR, MATCH ETR ETR ETR, PNT-3 ETR, PNT-3 ETR, PNT-3 ETR ETRG-SA EXIST STAIR ETR MATCH ETR ETR ETR MATCH ETR ETR ETR 8'-8"

DOOR & FRAMED OPENING SCHEDULE w/Hardware sets

#

OPENING DOOR FRAMEHARDWARE

SET REMARKSWIDTH HEIGHT RATING TYPEMATERIA

L FINISH TYPE MATERIAL FINISHG01-1 4'-0" 7'-0" "C" LABEL F WD MFR 1 HM PNT1,4 2 POWER ASSISTG01-2 4'-0" 7'-0" F WD MFR 1 HM PNT-1,2 2 POWER ASSISTG02-1 4'-0" 7'-0" "C" LABEL F WD MFR 1 HM PNT-1,4 2 POWER ASSISTG03-1 5'-0" 7'-0" FP WD MFR 1 HM PNT-1 4G04-1 3'-0" 7'-0" "C" LABEL F WD MFR 1 HM PNT-1 4G06-1 4'-0" 7'-0" FP WD MFR 1 HM PNT-1 4G06-2 4'-0" 7'-0" FP WD MFR 1 HM PNT-1 4G06-3 2'-0" 7'-0" F WD MFR 1 HM PNT-1 4G07-1 3'-0" 7'-0" "C" LABEL F WD MFR 1 HM PNT-1 3G09-1 4'-0" 7'-0" F WD MFR 1 HM PNT-1 3G10-1 3'-6" 7'-0" F WD MFR 1 HM PNT-1 1 DOUBLE-ACTING HINGE/HARDWAREG11-1 4'-0" 7'-0" F WD MFR 1 HM PNT-1 3G33-1 3'-0" 7'-0" EXIST. EXIST. EXIST. EXIST. EXIST. PNT-4 EXISTING RE-USE EXIST. DOOR & FRAME FROM DEMOG35-1 3'-0" 7'-0" F WD MFR 1 HM PNT-1 2G37-1 3'-0" 7'-0" F WD MFR 1 HM PNT-1 3G40-1 3'-0" 7'-0" F WD MFR 1 HM PNT-4 1G41-1 3'-0" 7'-0" F WD MFR 1 HM PNT-4 1G42-1 3'-0" 7'-0" F WD MFR 1 HM PNT-4 1G43-1 3'-0" 7'-0" F WD MFR 1 HM PNT-4 1G-SA-1 3'-0" 7'-0" "C" LABEL EXIST. EXIST. EXIST. EXIST. EXIST. PNT EXISTING PANIC RE-USE EXIST. DOOR & FRAME FROM DEMO

1/4" = 1'-0"A11 DOOR TYPES 1/4" = 1'-0"A15 FRAME TYPES

1 1/2" = 1'-0"A1 PARTITION TYPE 1A

1 1/2" = 1'-0"C1 PARTITION TYPE 1B

1 1/2" = 1'-0"A5 PARTITION TYPE 3A

1 1/2" = 1'-0"C5 PARTITION TYPE 3B

3" = 1'-0"A8 FRAME DETAIL

3" = 1'-0"B8 FRAME DETAIL

3" = 1'-0"D8 FRAME DETAIL 3" = 1'-0"D12 FRAME DETAIL

12" = 1'-0"D15 CONCRETE TO CARPET

12" = 1'-0"E15 LINOLEUM FLOORING TO CARPET

12" = 1'-0"F15 LINOLUEM FLOORING TO RESILIENT FLOORING

12" = 1'-0"G15 LINOLEUM TO CONCRETE

1 1/2" = 1'-0"E1 PARTITION TYPE 7G 1 1/2" = 1'-0"1 PARTITION TYPE 1E

ACT-1 09 51 13 ACOUSTICAL PANEL CEILINGSDESCRIPTION: STANDARD CEILING TILETILE MANUFACTURER: ARMSTRONGTILE PRODUCT:CORTEGA 770, STANDARD PRELUDETILE SIZE: 2'X2'X3/4"TILE COLOR: WHITEGRID: 15/16 DX/DXLGRID COLOR: WHITE

CC-1 10 21 23 CUBICLE CURTAIN TRACKS & CURTAINS TRACK COLOR: WHITE CURTAIN MANUFACTURER: ARC COM

CURTAIN PRODUCT: SEA-PEARL-XCURTAIN COLOR: #2 CORALMESH COLOR: MATCH EXISTING

CG-1 10 26 00 WALL & DOOR PROTECTIONDESCRIPTION: CORNER GUARDMANUFACTURER: CONSTRUCTION SPECIALTIESPRODUCT: SSM-25N-FNHEIGHT: HALF HEIGHTMATERIAL: HIGH IMPACT VINYL, 0.085" THICKMOUNTING: SURFACECOLOR: 920 ALMOND

CT-1 09 30 00 TILINGMANUFACTURER: DALTILEPRODUCT: KEYSTONESCOLOR: D202 UPTOWN TAUPE SPECKLESIZE: 2"X2"GROUT COLOR: MAPEI, 09 GRAY

JOINT WIDTH: 1/8"INSTALLATION: MONOLITHICNOTE: BASE, MB-5A

CT-2 09 30 00 TILINGMANUFACTURER: DALTILEPRODUCT: SEMI-GLOSSCOLOR: X735 MATTE ALMONDSIZE: 6"X6"GROUT COLOR: MAPEI, 14 BISCUIT

JOINT WIDTH: 1/8"NOTE: WALL CAP, A-3602

CT-3 09 30 00 TILINGMANUFACTURER: DALTILEPRODUCT:COLOR:SIZE: 12"X12"GROUT COLOR:

JOINT WIDTH: 1/8"INSTALLATION: MONOLITHICNOTE: BASE, 6"X6"

FEC-1 10 44 13 FIRE PROTECTION CABINETSMOUNTING: RECESSEDCOLOR: TBD

FEX-1 10 44 16 FIRE EXTINGUISHERSTYPE: 51b.ABC

FM-1 10 28 00 TOILET, BATH, & LAUNDRY ACCESSORIESMANUFACTURER: BOBRICKPRODUCT: B-290SIZE: 24"X42"

GB-18 10 28 00 TOILET, BATH, & LAUNDRY ACCESSORIESDESCRIPTION: GRAB BARMANUFACTURER: BOBRICKPRODUCT: B-6806 STAINLESS STEEL GRAB BARFINISH: SATIN

GB-36 10 28 00 TOILET, BATH, & LAUNDRY ACCESSORIESDESCRIPTION: GRAB BARMANUFACTURER: BOBRICKPRODUCT: B-6806 STAINLESS STEEL GRAB BARFINISH: SATIN

GB-42 10 28 00 TOILET, BATH, & LAUNDRY ACCESSORIESDESCRIPTION: GRAB BARMANUFACTURER: BOBRICKPRODUCT: B-6806 STAINLESS STEEL GRAB BARFINISH: SATIN

HLB-1 12 21 13 HORIZONTAL LOUVER BLINDS MANUFACTURER: MATCH EXISTINGPRODUCT: MATCH EXISTINGCOLOR: MATCH EXISTING

PLAM-1 06 40 23 INTERIOR ARCHITECTURAL WOODWORKMANUFACTURER: FORMICACOLOR: 3696-58 SHOJI SCREEN

PLAM-2 06 40 23 INTERIOR ARCHITECTURAL WOODWORKMANUFACTURER: FORMICACOLOR: 837-58 GRAPHITE

PLAM-3 06 40 23 INTERIOR ARCHITECTURAL WOODWORKMANUFACTURER: FORMICACOLOR: 7008-43 ACAJOU MAHOGANY

PNT-1 09 91 23 PAINTINGCOLOR TO MATCH: BENJAMIN MOORE,952 CAYMAN ISLAND

PNT-2 09 91 23 PAINTINGCOLOR TO MATCH: SHERWIN WILLIAMS,SW7702 SPICED CIDER

PNT-3 09 91 23 PAINTINGCOLOR TO MATCH: SHERWIN WILLIAMS,SW6099 SAND DOLLAR

PNT-4 09 91 23 PAINTINGCOLOR TO MATCH: SHERWIN WILLIAMS,

PTD-1 10 28 00 TOILET, BATH, & LAUNDRY ACCESSORIESDESCRIPTION: PAPER TOWEL DISPENSERSUPPLIED BY OWNER

RB-1 09 65 13 RESILIENT BASE & ACCESSORIESMANUFACTURER: JOHNSONITEPRODUCT: TRADITIONAL COVE BASEHEIGHT: 6"COLOR: 63 BURNT UMBER

RH-1 10 28 00 TOILET, BATH, & LAUNDRY ACCESSORIESDESCRIPTION: ROBE HOOKMANUFACTURER: BOBRICKPRODUCT: B-6717 SATIN

FINISH LEGEND

SDR-1 0 28 00 TOILET, BATH, & LAUNDRY ACCESSORIESDESCRIPTION: SOAP DISPENSERSUPPLIED BY OWNER

SND-1 10 28 00 TOILET, BATH, & LAUNDRY ACCESSORIESDESCRIPTION: SANITARY NAPKIN DISPOSALMANUFACTURER: BOBRICKMOUNTING: RECESSEDPRODUCT: B-353 SANITARY NAPKIN DISPOSAL

SSM-1 06 40 23 SOLID SURFACE MATERIALMANUFACTURER: WIILSONARTCOLOR:1530TM BEIGE TEMPEST

SSM-2 06 40 23 SOLID SURFACE MATERIALMANUFACTURER: CORIANCOLOR:SANDSTONE

SV-1 RESILIENT SHEET FLOORINGMANUFACTURER: FORBOPRODUCT: ETERNAL MARBLECOLOR: 64092 LEATHER

SWP-1 10 26 00 WALL AND DOOR PROTECTIONDESCRIPTION: SHEET WALL PROTECTIONMANUFACTURER: CONSTRUCTION SPECIALTIESPRODUCT: ACROVYN 4000COLOR: 920 ALMONDTEXTURE: SUEDE

SWP-2 10 26 00 WALL AND DOOR PROTECTIONDESCRIPTION: SHEET WALL PROTECTIONMANUFACTURER: CONSTRUCTION SPECIALTIESPRODUCT: ACROVYN 4000COLOR: 193 GINGERSPICETEXTURE: SUEDE

TTD-1 10 28 00 TOILET, BATH, & LAUNDRY ACCESSORIESDESCRIPTION: TOILET TISSUE DISPENSERMANUFACTURER: BOBRICKMOUNTING: RECESSEDPRODUCT: B-4388 TOILET TISSUE DISPENSER

VCT-1 RESILIENT TILE FLOORINGMANUFACTURER: ARMSTRONGPRODUCT: STANDARD EXCELONTEXTURE: IMPERIALCOLOR: 51858 SANDRIFT WHITE

VCT-2 RESILIENT TILE FLOORINGMANUFACTURER: ARMSTRONGPRODUCT: STANDARD EXCELONTEXTURE: IMPERIALCOLOR: 51869 HUMUS

EXIST. EXIST.

EXIST. EXIST.

PLAN REVIEW SUBMISSION FEB. 2016

Page 8: AHN SAINT VINCENT HOSPITAL · ed103 ground floor plan - hvac power demolition e001 symbols, abbreviations, notes and schedules e101 ground floor plan - lighting e102 ground floor

REF.N.I.C.

REF

.N

.I.C

.

1. NOT USED.2. NOT USED.

EXIST.STAIR.

EXIST.STAIR.

EXIST.ELEV.

EXIST.ELEV.

EXIST.ELEV.

EXISTINGELEVATOR

LOBBY

EXISTINGPATIENT

T.R.

EXISTINGPATIENT

T.R.

WAITINGG01

CORRIDORG02

CORRIDORG04

STORAGEG05

SHELVINGG06

BREAKROOM

G07

EXIST.STAFFT.R.G08

PRIVATEROOM 1

G09

PATIENTT.R.G10

PRIVATEROOM 2

G11

EXIST.PATIENT

T.R.G12

CLOSETG03

ROOM 3G13

ROOM 4G14

ROOM 5G15

ROOM 6G16

ROOM 7G17

ROOM 8G18

ROOM 9G19

ROOM 10G20

ROOM 11G21

ROOM 12G22

ROOM 13G23

ROOM 14G24

ROOM 15G25

INTAKEG26

EXIST.PATIENT

T.R.G27

EXIST.SOILEDHOLDG28

EXIST.CLEANSUPPLY

G29 EXIST.NURSE

G30

NURSESTATION/

RECEPTIONG31

VENDINGG32

MAIL ROOMG33

FUTUREOFFICE

G35

OPENOFFICE

G36EXAMG37

BREAKROOM

G39

CORRIDORG38

LOCKERSG40

MEN'S T.R.G41

CO

RRID

OR

G34

G41

-1G

40-1

G35-1

G37-1

G33-1

G02

-1 G-SA-1

G01

-1

G01

-2

G04

-1

G03-1

G10

-1

G09

-1

G11

-1

G06-1 G06-3G06-2

G07-1EXISTSTAIRG-SA

HAND WASHINGSINK

HAND WASHING SINK

EXIST. HANDWASHING SINK

A102A1

A102K11

CHARTINGSTATION

CHARTINGSTATION

CHARTINGSTATION

312 S.F.

WOMEN'ST.R.G43

LOCKERSG42

MAINLOBBY

G44

SHEET NO.

SEAL

ISSUED/ REVISED FOR DATE

2729 Prospect Avenue Cleveland, OH 44115 216.621.79002631 West 8th Street Erie, PA 16505 814.838.7525

BOSTWICKDESIGN.com

P

BostwickDesign

Partnership

GENERAL NOTES

SHEET NOTES

LEGEND

EQUIPMENT LEGEND

KEY PLAN

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

A

B

C

D

E

F

G

J

K

L

M

N

H

P

P

C:\U

sers

\hur

stn\

Doc

umen

ts\1

5119

-SVH

Che

mo

Infu

sion

Cen

ter a

t Har

dner

_Cen

tral_

hurs

tn.rv

t2/

23/2

016

8:53

:32

AM

GROUND FLOOR PLAN

A101

AHN SAINTVINCENT

HOSPITALCHEMO INFUSION

CENTER EXPANSIONAT HARDNER

BDP NO. 15119

1/8" = 1'-0"A1 GROUND FLOOR PLAN OVERALL

PLAN REVIEW SUBMISSION FEB. 2016

Page 9: AHN SAINT VINCENT HOSPITAL · ed103 ground floor plan - hvac power demolition e001 symbols, abbreviations, notes and schedules e101 ground floor plan - lighting e102 ground floor

REF.N.I.C.

REF

.N

.I.C

.

EXIST.ELEV.

EXIST.ELEV. EXIST.

ELEV.

EXISTINGELEVATOR

LOBBY

EXISTINGPATIENT

T.R.

EXISTINGPATIENT

T.R.

RELOCATEDHAND WASHING SINK

RELOCATEDHAND WASHINGSINK

EXIST. HANDWASHING SINK

EXIST. HANDWASHING SINK

HAND WASHINGSINK

WAITINGG01

CORRIDORG02

CORRIDORG04

STORAGEG05

SHELVINGG06

BREAKROOM

G07

EXIST.STAFFT.R.G08

PRIVATEROOM 1

G09

PATIENTT.R.G10

PRIVATEROOM 2

G11

EXIST.PATIENT

T.R.G12

CLOSETG03

ROOM 3G13

ROOM 4G14

ROOM 5G15

ROOM 6G16

ROOM 7G17

ROOM 8G18

ROOM 9G19

ROOM 10G20

ROOM 11G21

ROOM 12G22

ROOM 13G23

ROOM 14G24

ROOM 15G25

INTAKEG26

EXIST.PATIENT

T.R.G27

EXIST.SOILEDHOLDG28

EXIST.CLEANSUPPLY

G29

EXIST.NURSE

G30NURSE

STATION/RECEPTION

G31

VENDINGG32

MAIL ROOMG33

EXISTSTAIRG-SA

CH

(2)

G33-1

G02

-1

G-SA-1

G01

-1

G01

-2

G04

-1

G11

-1

G09

-1

G10

-1

G07-1

G06-1 G06-2 G06-3

G03-1

GB1

8GB42

GB3

6

TPD

-1

SD-1

PTD-1M

CHARTINGSTATION

CHARTINGSTATION(2)

EXISTEWC

CHARTING STATION

CG CG

CG

1A

3A

1B

1A

1A

3A

1A

3B

1A

1A

1A

1B

1A

1A

1A

1A

1A

1A

1A

1A

1A1A

1A

1A

1A

1A

1A

1A

5'-10 3/4" 3 5/8" 7'-0 5/8"

3 5/

8"6'

-2 3

/8"

10'-0

1/2

"

3 5/

8"

4'-0

3/4

"

3 5/8" 13'-3 5/8"

3 5/8"7'-0 1/2"

3 5/8"9'-2 5/8"

3 5/8"11'-10 7/8"

3 5/8"

12'-6 7/8"

8'-6

1/4

"3

5/8"

5'-1

5/8

"

3 5/

8"

7'-9

1/8

"

3 5/

8"

11'-0

"

3 5/8"

12'-7 1/2"3 5/8"

2'-8 3/8"

3 5/8"

12'-0 5/8"

2'-0

5/8

"

3 5/

8"4'-2

5/8

"

3 5/

8"

8'-6

1/4

"

1'-2

"

3 5/

8"7'

-9 5

/8"

3 5/

8"11

'-0"

2'-7 3/4" 3 5/8" 10'-6 7/8"

6'-9

3/4

"

3 5/

8"

1'-4

7/8

"

3 5/

8"

5'-1

1/8

"

3 5/8"10'-10 5/8"

3 5/

8"

5'-9

3/8

"

3 5/8"2'-1"

RELOCATEDVENDING

RELOCATEDMAIL BOXES

HSD-1

1'-1

3/4

"

3 5/

8"

7G

1'-4" 3'-4"ALIGN @ BOTH SIDES

6'-7

"

3'-1 3/8" 9'-0 5/8"

3'-0" 2'-0"

3'-4"

5'-0

"3'

-4 1

/4"

RELOCATED CASEWORK& SINK 3'-4"

ALIGN ALIGN12" MIN.

12" MIN.

ALIGN

A70111

SIM

11

SIM

A70111

SIM

11

SIM

A70111

SIM

11

SIM

A7011

SIM

2 SIM

3

SIM

4 SIM

A010A15

SIM

A701 13A701

14

A701 15

16

17A701 18

A701

19

A70120

1E

HAND WASHINGSINK

A70111

SIM

11

SIM

A70111

SIM

11

SIM6'-6

"

A010A15

SIM

LINE OF SOFFITABOVE

PYXISN.I.C.

6'-8

"

6'-6

"

1BALIGN

PRIVACYCURTAINS

(TYP.)PRIVACY CURTAINS (TYP.)

9 5/

8" 3'-6

"1'

-2"

3'-6

"4'

-0 7

/8"

12SIM12SIM12SIM 12SIM

12SIM

EXISTING HAND-WASH SINK

3 5/

8"

ALIGN

CG-1

CG-1CG-1CG-1CG-1

CG-1

CG-1CG-1

CG-1CG-1

CG-1

CG-1

CG-1

CG-1

CG-1CG-1

CG-1

CG-1

CG-1

CG-1

CG-1

CG-1

CG-1CG-1CG-1CG-1CG-1CG-1

CG-1

CG-1CG-1

4'-6"

2'-6

"

G4A801

TYP.

G4A801

TYP.

2'-6

"

RELOCATEDDOOR

RELOCATED DOOR

PAINT DOOR FRAMES TO MATCHWALL COLOR ON OUTSIDE

HLB-1HLB-1 HLB-1 HLB-1

HLB-1

HLB-1

HLB-1

HLB-1

MEN'S T.R.G41

LOCKERSG40

FUTUREOFFICE

G35 CORRIDORG34

OPENOFFICE

G36

EXAMG37

BREAKROOM

G39

CORRIDORG38

G41

-1G

40-1

G37-1

G35-1

GB1

8TP

D-1 GB42

GB3

6

SD-1

M

PTD-1

CH

(2)

1A

1A

1A

1A

3A

1A

1A

1A

3A13'-5 1/2"

3 5/8"

9'-4 5/8"

3 5/8"

WOMEN'ST.R.G43

LOCKERSG42

G43

-1G

42-1

GB42

TPD

-1G

B18

GB3

6

SD-1

M

PTD-1

2'-10" 2'-2 3/4"

3B

6'-6 5/8"

3 5/8"

6'-7 1/4"

3 5/8"

15'-8 5/8"

3 5/8"5'-0" MIN. FIN.

5'-0 5/8"

1A

3A

1A

1A1A

12'-1

1/2

"

3 5/

8"

5'-2

1/4

"

3 5/

8"

6'-2

"3

5/8"

7'-1

0 1/

4"

3 5/

8"

9 1/

4"

2'-0" 7'-4" 2'-0"

5'-0

"2'

-0"

6"

2'-2 3/4"

3B

A701 6A70110

A701

8

97

A701 1

4

3

2

A701 5

A7011

SIM

4 SIM

3

SIM

2 SIM

A7015

SIM

20'-1

0 5/

8"

2'-8" 4'-0" 6'-9 1/2"

ALIGN

ALIGN

EXISTING LOCKERSRELOCATED

EXISTING COATHOOKS RELOCATED

EXISTING COATHOOKS RELOCATED

CG-1

CG-1

CG-1

CG-1 CG-1

CG-1

FEC-1FEX-1

FEC-1FEX-1

HLB-1 HLB-1HLB-1 HLB-1

SHEET NO.

SEAL

ISSUED/ REVISED FOR DATE

2729 Prospect Avenue Cleveland, OH 44115 216.621.79002631 West 8th Street Erie, PA 16505 814.838.7525

BOSTWICKDESIGN.com

P

BostwickDesign

Partnership

GENERAL NOTES

SHEET NOTES

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

A

B

C

D

E

F

G

J

K

L

M

N

H

P

P

C:\U

sers

\hur

stn\

Doc

umen

ts\1

5119

-SVH

Che

mo

Infu

sion

Cen

ter a

t Har

dner

_Cen

tral_

hurs

tn.rv

t2/

23/2

016

8:53

:35

AM

ENLARGED PLANS

A102

AHN SAINTVINCENT

HOSPITALCHEMO INFUSION

CENTER EXPANSIONAT HARDNER

BDP NO. 15119

1/4" = 1'-0"A1 ENLARGED CHEMO INFUSION PLAN

1/4" = 1'-0"K11 ENLARGED PLAN

PLAN REVIEW SUBMISSION FEB. 2016

Page 10: AHN SAINT VINCENT HOSPITAL · ed103 ground floor plan - hvac power demolition e001 symbols, abbreviations, notes and schedules e101 ground floor plan - lighting e102 ground floor

1. ALL CEILING MOUNTED DEVICES TO BECENTERED IN CEILING TILE UNLESS NOTEDOTHERWISE.

LIGHT FIXTURES TYPICAL;REFER TO ELECTRICALDRAWINGS

MECHANICAL DIFFUSERS; REFERTO MECHANICAL DRAWINGS

WALL SCONCE; REFER TOELECTRICAL DRAWINGS

ACOUSTIC CEILING TILETYPICAL 2x2 LAY IN CEILING TILES

GYPSUM BOARD CEILING

SPEAKER, REFER TOTECHNOLOGY DRAWINGS

EXIT SIGNS; REFER TOELECTRICAL DRAWINGS

ACOUSTIC CEILING TILETYPICAL 2x4 LAY IN CEILING TILES

SPRINKLER HEAD; REFER TOFIRE PROTECTION DRAWINGS

CT-1 CT-1 CURTAIN TRACK; SEE FINISHLEGEND

WAITINGG01

CORRIDORG02

CORRIDORG04

STORAGEG05

SHELVINGG06

BREAKROOM

G07

EXIST.STAFFT.R.G08

PRIVATEROOM 1

G09

PATIENTT.R.G10

PRIVATEROOM 2

G11

EXIST.PATIENT

T.R.G12

CLOSETG03

ROOM 3G13

ROOM 4G14

ROOM 5G15

ROOM 6G16

ROOM 7G17

ROOM 8G18

ROOM 9G19

ROOM 10G20

ROOM 11G21

ROOM 12G22

ROOM 13G23

ROOM 14G24

ROOM 15G25

INTAKEG26

EXIST.PATIENT

T.R.G27

EXIST.SOILEDHOLDG28

EXIST.CLEANSUPPLY

G29 EXIST.NURSE

G30 NURSESTATION/

RECEPTIONG31

VENDINGG32

MAIL ROOMG33

EXISTSTAIRG-SA

EXIST. ELEV.EXIST. ELEV.EXIST. ELEV.

EXISTINGPATIENT T.R.

VISITOR

EXISTINGPATIENT T.R.

VISITOR

EXISTINGELEVATOR

LOBBY

EXISTINGJANITOR CLOSET/ENVIRONMENTAL

SERVICES

2' x 2' ACT System8'-8"

2' x 2' ACT System8'-8"

2' x 2' ACT System8'-8"

2' x 2' ACT System8'-8"

2' x 2' ACT System8'-8"

2' x 2' ACT System8'-8"

2' x 2' ACT System8'-8"

2' x 2' ACT System8'-8"

2' x 2' ACT System8'-8"

2' x 2' ACT System8'-8"

2' x 2' ACT System8'-8"2' x 2' ACT System

8'-8"

2' x 2' ACT System8'-8"

2' x 2' ACT System8'-8"

2' x 2' ACT System8'-8"

2' x 2' ACT System8'-8"

M4A201

K1A201

M1A201

TYP.

K1A201

TYP.

GWB on Mtl. Stud8'-2"

PRIVACY CURTAIN TRACK

EXISTING NEW

SOFFIT WALL, PNT-2

, PNT-2

PAINT SOFFIT, PNT-2

M1A201

TYP.

FUTUREOFFICE

G35CORRIDOR

G34

OPENOFFICE

G36

EXAMG37

BREAKROOM

G39

CORRIDORG38

LOCKERSG40

MEN'S T.R.G41

WOMEN'ST.R.G43

LOCKERSG42

2' x 2' ACT System8'-8"

2' x 2' ACT System8'-8"2' x 2' ACT System

8'-8"

2' x 2' ACT System8'-8"

2' x 2' ACT System8'-8"

2' x 2' ACT System8'-8"

2' x 2' ACT System8'-8"

2' x 2' ACT System8'-8"

2' x 2' ACT System8'-8"

2' x 2' ACT System8'-8"

M1A201

TYP.M1

A201

TYP. PAINT SOFFIT, PNT-1PAINT SOFFIT, PNT-1

3 5/8" METAL STUDS @ 16" O.C.EXTENDED TO UNDERSIDE OF

DECK. SCREW AS REQUIRED

ACOUSTICAL CEILING TILE

5/8" PAINTED GYPSUM BOARD

6"8'

-2" A

.F.F 8'-8

" A.F

.F

6"

3 5/8" METAL STUDS @ 16" O.C. MAXEXTENDED TO UNDERSIDE OF DECK.

SCREW AS REQUIRED

ACOUSTICAL CEILING TILE

5/8" PAINTED GYPSUM BOARD

6"6"

8'-2

" A.F

.F.

8'-8

" A.F

.F.

RECESSED DOWN LIGHTSEE ELECTRICAL

EX

ISTI

NG

8'-8

" A.F

.F.

WIRE TIES

SUSPENSION TEE

ACOUSTICAL CEILING TILEWOOD BLOCKING AS REQUIRED

CURTAIN TRACK

PRIVACY CURTAIN

SHEET NO.

SEAL

ISSUED/ REVISED FOR DATE

2729 Prospect Avenue Cleveland, OH 44115 216.621.79002631 West 8th Street Erie, PA 16505 814.838.7525

BOSTWICKDESIGN.com

P

BostwickDesign

Partnership

GENERAL NOTES

SHEET NOTES

LEGEND

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

A

B

C

D

E

F

G

J

K

L

M

N

H

P

P

C:\U

sers

\hur

stn\

Doc

umen

ts\1

5119

-SVH

Che

mo

Infu

sion

Cen

ter a

t Har

dner

_Cen

tral_

hurs

tn.rv

t2/

23/2

016

8:53

:39

AM

ENLARGEDREFLECTED CEILING

PLANS

A201

AHN SAINTVINCENT

HOSPITALCHEMO INFUSION

CENTER EXPANSIONAT HARDNER

BDP NO. 15119

1/4" = 1'-0"A1 ENLARGED CHEMO INFUSION REFLECTED CEILING PLAN

1/4" = 1'-0"K11 ENLARGED REFLECTED CEILING PLAN

1" = 1'-0"M1 TYPICAL BULKHEAD DETAIL 1" = 1'-0"M4 BULKHEAD DETAIL @ NURSE STATION

1" = 1'-0"K1 PRIVACY CURTAIN TRACK DETAIL

PLAN REVIEW SUBMISSION FEB. 2016

Page 11: AHN SAINT VINCENT HOSPITAL · ed103 ground floor plan - hvac power demolition e001 symbols, abbreviations, notes and schedules e101 ground floor plan - lighting e102 ground floor

09 29 00GYPSUM BOARD

09 30 00.ATILING

09 30 00.ATILING

A212-AMIRROR - FRAMED - FULL

A104-APTD - SURFACE AUTOMATIC

A112-ASOAP DISPENSER -SURFACE

3'-0

"

5'-0

"

3'-0

"6"

2'-1

0"

HC PIPE KIT(TYP.)1'-6"

GB1

8

GB36

A114-ATOILET TISSUE DISPENSER- SURFACE

G41-1

09 29 00GYPSUM BOARD

09 30 00.ATILING

09 30 00.ATILING

A212-AMIRROR - FRAMED - FULL

A104-APTD - SURFACE AUTOMATIC

HC PIPE KIT (TYP)

2'-1

0" MIN

.4'

-0" 5'

-4"

CH

CH

09 29 00GYPSUM BOARD

09 30 00.ATILING

09 30 00.ATILING5'

-0"

8'-8

"

09 65 13.ARESILIENT BASE

09 30 00.ATILING

09 30 00.ATILING

3'-4"

5'-0

"

3'-0

"

1'-5

1/2

"

8"

GB18

GB42

TPD-1

09 29 00GYPSUM BOARD

10 51 13.AMETAL LOCKERS

A10A801

TYP. A6A801

TYP.

REF.N.I.C.

1'-8

"2'

-0"

2'-2

"TO

P O

F S

INK

MAX

2'-1

0"

8'-8

"09 29 00GYPSUM BOARD

09 65 13.ARESILIENT BASE

12"D. PLAS. LAM.CABINETS W/ADJ SHELVES, PLAM-3

S.S COUNTERTOP W/4" BACKSPLASH, SSM-1

PLAS. LAM.BASE CABINETSW/ ADJ SHELVES, PLAM-3

SD-1PTD-1

W2436 W2436

B36SB36

G15A801

TYP.

09 29 00GYPSUM BOARD

PLAS. LAMCOUNTERTOP W/2" BACKSPLASH

PLAS. LAM.END PANEL

09 65 13.ARESILIENT BASE

PLAS. LAM.PARTITION

2'-6

"

5'-6

"

8'-8

"

2'-6

"

EXISTING WINDOWS

PLAS. LAM.COUNTERTOP W/2" BACKSPLASH, PLAM-2SUPPORTBRACKETS @3'-0" MAX. O.C.

PLAS. LAM.PARTITION SCREEN

09 65 13.ARESILIENT BASE

G15A801

TYP. G6A801

TYP.

09 29 00GYPSUM BOARD

09 65 13.ARESILIENT BASE

PLAS. LAM.COUNTERTOP W/2" BACKSPLASH, PLAM-2

SUPPORT BRACKETS@ 3'-0" O.C. MAX.

2'-6

"

06 40 23.U3PLAM-3

2'-6

"2'

-6"

1'-1

0"2'

-10"

M223-ASHARPS DISPOSAL - WALL

MOUNTED

A105-APTD - SURFACE MANUALA112-ASOAP DISPENSER -SURFACE

06 40 23.U1PLAM-1

A326-AWASTE RECEPTACLE -MEDIUM

06 40 23.U1PLAM-1

09 29 00GYPSUM BOARD

PAINTED GYP. BD. SOFFIT

SOLID SURFACECOUNTER TOP &BACKSPLASH, SSM-1

06 40 23.U2PLAM-2

06 40 23.K7aSURFACE MOUNTED

COUNTERTOP SUPPORTBRACKET

6" BASE AS SCHEDULED

SHEET WALL PROTECTIONAS SCHEDULED

PAINTED GYP. BD.

FULL HEIGHT CORNER GUARD

CUBICLE CURTAIN W/ MESH

CUBILE CURTAIN TRACKSEE A201 FOR LOCATION

4'-6

"

A1A801

TYP.

A6A801

TYP.

RELOCATEDEXISTING WALLCABINETS

FILLER PANELSAS REQUIRED

RELOCATEDEXISTING BASECABINETS & COUNTERTOP

09 29 00GYPSUM BOARD

09 65 13.ARESILIENT BASE

RELOCATEDADA SINK BASE

FILLER PANELAS REQUIRED

1'-8

"2'

-0"

2'-2

"TO

P O

F S

INK

MAX

2'-1

0"

8'-8

"

A10A801

TYP. A6A801

TYP.

2'-0

"2'

-2"

TOP

OF

SIN

K M

AX2'

-10"

8'-8

"

09 29 00GYPSUM BOARD

12"D. PLAS. LAM.CABINETS W/ ADJSHELVES

S.S COUNTETOP W/ 4"BACKSPLASH

PLAS. LAM.BASE CABINETSW/ ADJ. SHELF

09 65 13.ARESILIENT BASE

SD-1 PTD-1

W2442 W2442

G10A801

TYP.

2'-6

"2'

-6"

2'-0

"1'

-8"

8'-8

"

3'-6

"

PAINTED GYP. BD.BULKHEAD

PLAS. LAM.TRANSACTION TOP, PLAM-1

PLAS. LAM.COUNTERTOP W/2" BACKSPLASH, PLAM-1

TEMPERED GLASSW/ SLIDING WINDOWS

09 65 13.ARESILIENT BASESUPPORT BRACKETS

@ 3'-0" O.C. MAX.

09 29 00GYPSUM BOARD

W1 W1

G6A801

TYP.

6"1'

-2"

2'-0

"5'

-0"

8'-8

"

W2436 W2436 W2436

09 29 00GYPSUM BOARD

12"D. PLAS LAM.CABINET W/ ADJSHELVES, PLAM-2

PLAS. LAM.TRANSACTION TOP, PLAM-1

PLAS. LAM.COUNTER TOP W/2" BACKSPLASH, PLAM-1

SUPPORT BRACKETS@ 3'-0" O.C. MAX.

09 65 13.ARESILIENT BASE

PLAS. LAM.COUNTERTOP, PLAM-1

PLAS. LAM.END PANEL, PLAM-2

PAINTED GYP. BD.BULKHEAD, PNT-2

09 65 13.ARESILIENT BASE

1'-8

"2'

-0"

5'-0

"

8'-8

"

PLASTIC LAMINATEPEDESTAL, PLAM-2

FILLER PANEL, PLAM-2

OPEN

G15A801

TYP.SIM.

PAINTED GYP.BD.BULKHEAD, PNT-2

PLAS. LAM.COUNTERTOP, PLAM-1

PLAS. LAM. ENDPANEL, PLAM-2

SUPPORT BRACKET@ 3'-0" O.C. MAX.

09 65 13.ARESILIENT BASE

6"8'

-2"

8'-2

"

OPEN

FILLER PANEL, PLAM-2

A15A801

TYP.

6"4'

-8"

3'-6

"

8'-8

"

PAINTED GYP. BD.BULKHEAD

PLAS. LAM.TRANSACTION TOP, PLAM-1

PLAS. LAM.PANEL, PLAM-2

09 65 13.ARESILIENT BASE

09 29 00GYPSUM BOARD

1/2" REVEAL, PLAM-2

2'-0"

PLAS. LAM. CHARTINGSTATION WITH HIDDENBRACKET, PLAM-1

G4A801

TYP.

A15A801

TYP.

6"4'

-8"

3'-6

"

PAINTED GYP. BD.BULKHEAD

PLAS. LAM.TRANSACTION TOP

PLAS. LAM.PANEL, PLAM-2

09 65 13.ARESILIENT BASE

1/2" REVEAL,PLAM-2

2'-0"

PAINTED GYP. BD.

SHEET WALL PROTECTIONAS SCHEDULED

6" BASE

4'-6

"

SHEET NO.

SEAL

ISSUED/ REVISED FOR DATE

2729 Prospect Avenue Cleveland, OH 44115 216.621.79002631 West 8th Street Erie, PA 16505 814.838.7525

BOSTWICKDESIGN.com

P

BostwickDesign

Partnership

GENERAL NOTES

SHEET NOTES

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

A

B

C

D

E

F

G

J

K

L

M

N

H

P

P

C:\U

sers

\hur

stn\

Doc

umen

ts\1

5119

-SVH

Che

mo

Infu

sion

Cen

ter a

t Har

dner

_Cen

tral_

hurs

tn.rv

t2/

23/2

016

8:53

:43

AM

INTERIORELEVATIONS

A701

AHN SAINTVINCENT

HOSPITALCHEMO INFUSION

CENTER EXPANSIONAT HARDNER

BDP NO. 15119

1/4" = 1'-0"1 MEN'S T.R. G41 - 1 1/4" = 1'-0"2 MEN'S T.R. G41 - 2

1/4" = 1'-0"3 MEN'S T.R. G41 - 3 1/4" = 1'-0"4 MEN'S T.R. G41 - 4

1/4" = 1'-0"5 LOCKERS G40 1/4" = 1'-0"6 BREAK ROOM G39

1/4" = 1'-0"7 OPEN OFFICE G36 - 1 1/4" = 1'-0"8 OPEN OFFICE G36 - 2 1/4" = 1'-0"9 OPEN OFFICE G36 - 3

1/4" = 1'-0"10 EXAM ROOM G37 1/4" = 1'-0"11 TYP. INFUSION BAY EAST/WEST WALL

1/4" = 1'-0"13 NOURISHMENT

1/4" = 1'-0"14 BREAK ROOM G07 1/4" = 1'-0"15 NURES STATION G31 - 1 1/4" = 1'-0"16 NURSE STATION G31 - 2

1/4" = 1'-0"17 NURSE STATION G31 - 3 1/4" = 1'-0"18 NURSE STATION G31 - 4

1/4" = 1'-0"19 NURSE STATION G31 - 5 1/4" = 1'-0"20 NURSE STATION G31 - 6

1/4" = 1'-0"12 TYP. INFUSION BAY SOUTH WALL

PLAN REVIEW SUBMISSION FEB. 2016

Page 12: AHN SAINT VINCENT HOSPITAL · ed103 ground floor plan - hvac power demolition e001 symbols, abbreviations, notes and schedules e101 ground floor plan - lighting e102 ground floor

ADA

FOR

WAR

DR

EAC

H L

IMIT

4"

3/4"

2'-1"

SCHEDULED BASE

BACKSPLASH

1 1/

2"3/

8"

SIDESPLASH MAYOCCUR; SEEELEVATIONS

06 40 23.GCOUNTERTOP

09 29 00.B5/8" GYPSUM BOARD

22 00 00.ISINK ; SEEPLUMBING DWG'SFOR SIZE & TYPE

06 10 00.CWOOD BLOCKING

27" M

IN

8" MIN

11" MIN

9" M

IN

17" MIN

6" MAX TO S

INK

OR

CO

UN

TER

ED

GE

34" M

AX

KNEE SPACE

TOE SPACE

UNDERMOUNTAPPLICATION

NOTE: Make sure to coordinate the sinkdepth (especially if it is undermount)with your plumbing engineers to maintainthe ADA clearance below. Drainlocation should be to the rear of the sinkto avoid any conflicts with the knee paneland the drain trap.

ACOUSTICAL CEILING TILE

3/4" MELAMINE CABINET INTERIOR

WOOD BLOCKING AS REQUIRED

3/4" MELAMINE SHELVES (ADJ.)

1/2" MELAMINE BACK MIN.

PLAS. LAM. ON 3/4"PLYWOOD DOOR5mm HOLES @ 1 3/8" O.C. W/METAL SUPPORT DOWELS

WOOD BLOCKING AS REQUIRED

SOLID SURFACE COUNTERTOP& BACKSPLASH

PLAS. LAM ON 3/4" PLYWOODDRAWER FACEWOOD BLOCKING AS REQUIREDBEHIND GYPSUM BOARD

3/4" MELAMINE DRAWER SIDES

1/2" MELAMINE DRAWER BOTTOM

1/2" MELAMINE BACK PANEL

5mm HOLES @ 1 3/8" O.C. W/METAL SUPPORT DOWELSWOOD BLOCKING AS REQUIREDBEHIND GYPSUM BOARD

3/4" MELAMINE CABINET INTERIOR

PLAS. LAM. ON 3/4" PLYWOOD DOOR

3/4" PLYWOOD BASE

6" BASE & FLOOR FINISH - SEE SCHEDULE

6"4

5/8"

2'-1"

1"

1'-8

"2'

-0"

2'-2

3/8

"2'

-9 5

/8"

5"

2"

2'-0"

1'-6"

SEE INTERIOR ELEV.FOR HEIGHT AFF

ACOUSTICAL CEILING TILE

3/4" MELAMINE CABINET INTERIOR

WOOD BLOCKING AS REQUIRED

3/4" MELAMINE SHELVES (ADJ.)

1/2" MELAMINE BACK MIN.

PLAS. LAM. ON 3/4"PLYWOOD DOOR5mm HOLES @ 1 3/8" O.C. W/METAL SUPPORT DOWELS

WOOD BLOCKING AS REQUIRED

SOLID SURFACE COUNTERTOP& BACKSPLASH

PLAS. LAM ON 3/4" PLYWOODDRAWER FACEWOOD BLOCKING AS REQUIREDBEHIND GYPSUM BOARD

1/2" MELAMINE BACK PANEL

WOOD BLOCKING AS REQUIREDBEHIND GYPSUM BOARD

3/4" MELAMINE CABINET INTERIOR

PLAS. LAM. ON 3/4" PLYWOOD DOOR

3/4" PLYWOOD BASE

6" BASE & FLOOR FINISH - SEE SCHEDULE

6"4

5/8"

2'-1"

1"

1'-8

"2'

-0"

2'-2

"M

AX. T

O T

OP

OF

SIN

K2'

-10"

PLAS. LAM. ON 3/4" PLYWOODTRANSACTION TOP, PLAM-1

PLAS. LAM. ON 3/4"PLYWOOD

COUNTERTOP &BACKSPLASH, PLAM-1

2" GROMMET @ 30" O.C.

POWER & DATA RACEWAYSEE ELECTRICAL

2x4 WOOD BLOCKINGAS REQUIRED

5/8" GYPSUM BOARD

SUPPORT BRACKET@ 3'-0" O.C. MAX.

2x4 WOOD BLOCKINGAS REQUIRED

4" H. CONTINUOUS BASE

1 1/

2"

2'-0"

11"

3'-6

"

2'-6

"

2"

3 5/8" METAL STUDS @ 16" O.C. MAXEXTENDED TO UNDERSIDE OF DECK.

SCREW AS REQUIRED

ACOUSTICAL CEILING TILE

5/8" PAINTED GYPSUM BOARD

8'-8

"

6"

PLAS. LAM. ON 1/2" PLYWOODPANEL, PLAM-2

ACOUSTICAL CEILING TILE

3/4" MELAMINE CABINET INTERIOR

WOOD BLOCKING AS REQUIRED

3/4" MELAMINE SHELVES (ADJ.)

1/2" MELAMINE BACK MIN.

PLAS. LAM. ON 3/4"PLYWOOD DOOR5mm HOLES @ 1 3/8" O.C. W/METAL SUPPORT DOWELS

WOOD BLOCKING AS REQUIRED

1'-8

"7'

-0" PLAS. LAM. ON 3/4" PLYWOOD

COUNTER TOP & BACKSPLASH

PLAS. LAM. ON 3/4" PLYWOODDRAWER FACE

3/4" MELAMINE DRAWER SIDES

WOOD BLOCKING AS REQUIRED

WOOD BLOCKING AS REQUIRED

3/4" MELAMINE BACK PANEL

FILE DRAWERS TO ACCOMADTEHANGING FILE HARDWARE

1/2" MELAMINE DRAWER BOTTOM

GUIDE RAILS

4" BASE SEE FINISH SCHEDULE

2'-0

"2'

-6"

1 1/

2"2'

-4 1

/2"

4"

6"1'

-0 1

/8"

5 1/

8"5

1/8"

1/8"

PLAS. LAM. ON 3/4" PLYWOODTRANSACTION TOP

PLAS. LAM. ON 3/4" PLYWOODCOUNTERTOP & BACKSPLASH

2" GROMMET @ 30" O.C.

POWER & DATA RACEWAYSEE ELECTRICAL

2x4 WOOD BLOCKINGAS REQUIRED

5/8" GYPSUM BOARD

SUPPORT BRACKET@ 3'-0" O.C. MAX.

2x4 WOOD BLOCKINGAS REQUIRED

4" H. CONTINUOUS BASE

3 5/8" METAL STUDS @ 16" O.C.EXTENDED TO UNDERSIDE OF

DECK. SCREW AS REQUIRED

ACOUSTICAL CEILING TILE

5/8" PAINTED GYPSUM BOARD

1 1/

2"

2'-6

"

2"

7" VARIES

1'-2"

2"

1'-0 1/8"

2"3/

4"

2" T

YP.

PREDRILLED HOLESFOR ADJUSTABLESHELF SUPPORTS

ADJUSTABLE SHELF

UNDERCABINETFIXTURE MAY OCCUR;REFER TO ELEC. DWG'S

BACKING

SEE REFLECTED CEILINGPLAN FOR HEIGHT AND TYPE

1'-2"

7/8"

09 29 00.B5/8" GYPSUM BOARD

09 51 13.AACOUSTICAL PANEL CEILING

06 10 00.CWOOD BLOCKING

09 29 00.B5/8" GYPSUM BOARD

06 10 00.CWOOD BLOCKING

06 40 23.K1aWIRE PULL

EXISTING WINDOW

EXISTING WALLCONSTRUCTIONAND INSULATION

09 29 00.B5/8" GYPSUM BOARD TO

FLOOR AS REQUIRED

07 92 00.BJOINT SEALANT &

BACKER ROD

06 10 00.CWOOD BLOCKING

AS REQUIRED

ACOUSTICAL CEILINGTILE

3/4" MELAMINE CABINET INTERIOR

WOOD BLOCKING AS REQUIRED

3/4" MELAMINE SHELVES (ADJ.)

1/2" MELAMINE BACK MIN.

PLAS. LAM. ON 3/4"PLYWOOD DOOR5mm HOLES @ 1 3/8" O.C. W/METAL SUPPORT DOWELS

WOOD BLOCKING AS REQUIRED

PLAS. LAM. ON 3/4" PLYWOODCOUNTERTOP & BACKSPLASH

WOOD BLOCKING AS REQUIRED

WOOD BLOCKING AS REQUIRED

2" GROMMET @ 30" O.C.

POWER & DATA RACEWAYSEE ELECTRICAL

SUPPORT BRACKET @ 3'-0" O.C. MAX.

CONTINUOUS BASE AS SCHEDULED

2'-0"

1'-8

"2'

-0"

2'-6

"2'

-6"

7'-0

"

4"

SCHEDULED BASE

BACKSPLASH

09 29 00.B5/8" GYPSUM BOARD

06 40 23.GCOUNTERTOP

1 1/

2"2'

-10

1/2"

06 10 00.J13/4" PLYWOOD

1'-5"

3/4"

FLOATINGCOUNTERTOPSUPPORT

SHEET NO.

SEAL

ISSUED/ REVISED FOR DATE

2729 Prospect Avenue Cleveland, OH 44115 216.621.79002631 West 8th Street Erie, PA 16505 814.838.7525

BOSTWICKDESIGN.com

P

BostwickDesign

Partnership

GENERAL NOTES

SHEET NOTES

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

A

B

C

D

E

F

G

J

K

L

M

N

H

P

P

C:\U

sers

\hur

stn\

Doc

umen

ts\1

5119

-SVH

Che

mo

Infu

sion

Cen

ter a

t Har

dner

_Cen

tral_

hurs

tn.rv

t2/

23/2

016

8:53

:44

AM

MILLWORK DETAILS

A801

AHN SAINTVINCENT

HOSPITALCHEMO INFUSION

CENTER EXPANSIONAT HARDNER

BDP NO. 15119

1 1/2" = 1'-0"A1 BASE CABINET - ADA SINK 1" = 1'-0"A6 CABINET SECTION

1 1/2" = 1'-0"N4 COAT ROD & SHELF

1" = 1'-0"A10 EXAM (SERVICE)SINK COUNTER SECTION 1" = 1'-0"A15 NURSE STATION SECTION

1" = 1'-0"G15 PEDESTAL SECTION 1" = 1'-0"G10 SECTION @ RECEPTIONIST

1 1/2" = 1'-0"G1 WALL CABINET - gypsum board soffit

3/4" = 1'-0"N1 WINDOW GYP BOARD DETAIL

1" = 1'-0"G6 WORKTOP SECTION 1 1/2" = 1'-0"G4 COUNTER - FLOATING BRACKET

PLAN REVIEW SUBMISSION FEB. 2016

Page 13: AHN SAINT VINCENT HOSPITAL · ed103 ground floor plan - hvac power demolition e001 symbols, abbreviations, notes and schedules e101 ground floor plan - lighting e102 ground floor

WAITINGG01

CORRIDORG02

CORRIDORG04

STORAGEG05

SHELVINGG06

BREAKROOM

G07

EXIST.STAFFT.R.G08

PRIVATEROOM 1

G09

PATIENTT.R.G10

PRIVATEROOM 2

G11

EXIST.PATIENT

T.R.G12

CLOSETG03

ROOM 3G13

ROOM 4G14

ROOM 5G15

ROOM 6G16

ROOM 7G17

ROOM 8G18

ROOM 9G19

ROOM 10G20

ROOM 11G21

ROOM 12G22

ROOM 13G23

ROOM 14G24

ROOM 15G25

INTAKEG26

EXIST.PATIENT

T.R.G27

EXIST.SOILEDHOLDG28

EXIST.CLEANSUPPLY

G29EXIST.NURSE

G30

NURSESTATION/

RECEPTIONG31

VENDINGG32

MAIL ROOMG33

FUTUREOFFICE

G35

OPENOFFICE

G36

EXAMG37

BREAKROOM

G39

CORRIDORG38

LOCKERSG40

WOMEN'ST.R.G43

MEN'S T.R.G41

CO

RRID

OR

G34

EXISTSTAIRG-SA

LOCKERSG42

CT-3

VCT-1

SV-1SV-1

SV-1

VCT-1

ETR

ETRVCT-2

VCT-1 ETR ETR

ETR

ETR

ETR

ETR

SV-1SV-1SV-1SV-1

ETRVCT-1

VCT-1

VCT-1ETR

ETRETRETRETRETRETRETRETR

ETR

VCT-1

VCT-1

VCT-1

VCT-1

VCT-1

ETR

VCT-1

VCT-1

VCT-1VCT-1

ETR

PNT-2 PNT-2PNT-2

PNT-2 PNT-2PNT-2 PNT-2

PNT-

2

PNT-

2

PNT-2

PNT-2

CT-1CT-1

MAINLOBBY

G44

REUSE SALVAGED TILE BASE

REUSE SALVAGED TILE BASE

PATCH WALLCOVERING,MATCH EXISTING

EXISTING WALLCOVERINGTO REMAIN TO CORNER

FEC-1FEX-1

FEC-1FEX-1

PNT-2

PNT-

2

PATCH EXISTING TILE, MATCH EXISTING

SHEET NO.

SEAL

ISSUED/ REVISED FOR DATE

2729 Prospect Avenue Cleveland, OH 44115 216.621.79002631 West 8th Street Erie, PA 16505 814.838.7525

BOSTWICKDESIGN.com

P

BostwickDesign

Partnership

GENERAL NOTES

SHEET NOTES

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

A

B

C

D

E

F

G

J

K

L

M

N

H

P

P

C:\U

sers

\hur

stn\

Doc

umen

ts\1

5119

-SVH

Che

mo

Infu

sion

Cen

ter a

t Har

dner

_Cen

tral_

hurs

tn.rv

t2/

23/2

016

8:53

:46

AM

GROUND FLOORFINISH PLAN

A901

AHN SAINTVINCENT

HOSPITALCHEMO INFUSION

CENTER EXPANSIONAT HARDNER

BDP NO. 15119

1/8" = 1'-0"A1 GROUND FLOOR FINISH PLAN

PLAN REVIEW SUBMISSION FEB. 2016

Page 14: AHN SAINT VINCENT HOSPITAL · ed103 ground floor plan - hvac power demolition e001 symbols, abbreviations, notes and schedules e101 ground floor plan - lighting e102 ground floor

REF.N.I.C.

REF

.N

.I.C

.

WAITINGG01

CORRIDORG02

CORRIDORG04

STORAGEG05

SHELVINGG06

BREAKROOM

G07

EXIST.STAFFT.R.G08

PRIVATEROOM 1

G09

PATIENTT.R.G10PRIVATE

ROOM 2G11

EXIST.PATIENT

T.R.G12

CLOSETG03

ROOM 3G13

ROOM 4G14

ROOM 5G15

ROOM 6G16

ROOM 7G17

ROOM 8G18

ROOM 9G19

ROOM 10G20

ROOM 11G21

ROOM 12G22

ROOM 13G23

ROOM 14G24

ROOM 15G25INTAKE

G26

EXIST.PATIENT

T.R.G27

EXIST.SOILEDHOLDG28

EXIST.CLEANSUPPLY

G29EXIST.NURSE

G30

NURSESTATION/

RECEPTIONG31

VENDINGG32

MAIL ROOMG33

FUTUREOFFICE

G35

OPENOFFICE

G36

EXAMG37

BREAKROOM

G39

CORRIDORG38

LOCKERSG40

WOMEN'ST.R.G43

MEN'S T.R.G41

CO

RRID

OR

G34

EXISTSTAIRG-SA

LOCKERSG42

MAINLOBBY

G44

NOTE: ALL FUTNITURE & EQUIPMENT BY OWNER / OTHERSSHOWN FOR REFERENCE ONLY.

SHEET NO.

SEAL

ISSUED/ REVISED FOR DATE

2729 Prospect Avenue Cleveland, OH 44115 216.621.79002631 West 8th Street Erie, PA 16505 814.838.7525

BOSTWICKDESIGN.com

P

BostwickDesign

Partnership

GENERAL NOTES

SHEET NOTES

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

A

B

C

D

E

F

G

J

K

L

M

N

H

P

P

C:\U

sers

\hur

stn\

Doc

umen

ts\1

5119

-SVH

Che

mo

Infu

sion

Cen

ter a

t Har

dner

_Cen

tral_

hurs

tn.rv

t2/

23/2

016

8:53

:49

AM

GROUND FLOORFURNITURE PLAN

A1101

AHN SAINTVINCENT

HOSPITALCHEMO INFUSION

CENTER EXPANSIONAT HARDNER

BDP NO. 15119

1/8" = 1'-0"A1 GROUND FLOOR FURNITURE PLAN

PLAN REVIEW SUBMISSION FEB. 2016

Page 15: AHN SAINT VINCENT HOSPITAL · ed103 ground floor plan - hvac power demolition e001 symbols, abbreviations, notes and schedules e101 ground floor plan - lighting e102 ground floor

REF.N.I.C.

38/1

8

32/1820/12

12/8

10/6

10ø16/1012/6

10/6

10/6

12/6

18/12

12/6

8/6

12/8

12/6

12ø

12/8

10/1

0

8/6

8/6

14/1

0

8ø8ø

12/810/6

48/1

8

8/6

8/68/6

10/6

8/6

10/1

0

14/612/6

22/1

010

/6

22/1

0

20/14

14/8

20/20

20/1

2

10/6

10/6

10/6

14/8

38/1

8

12/8 14/6

48/2

0

42/1

4

42/14

14/1

2 8ø

8ø 8ø

12/1

2

6ø6ø

E1

100

E1

100

S1

100

E3

275

S2

230S2

180

S2

180S2

150

S1

120

E1

100

E1

100 E1

100

S1

100

S3

300

S1

110

S3

330

S3

300

S3

260S3

290S2

220

S2

220S3

270

S4

380

S1

100

S1

100

VVB-G20

VVB-G17

VVB-G23

VVB-G03

VVB-G07

VVB-G09

VVB-G16

E1

100

ELECTRICHEATER

R3

R7

R2

R1

R3

R7

EXISTING 20/20EXHAUST DUCT UPTO EF-3 ON ROOF

EXISTING 20/14EXHAUST DUCTUP FROM BELOW

EXISTINGSUPPLY DUCT

EXISTINGSUPPLY DIFFUSER(TYPICAL)

12ø 10øEXISTINGEXHAUST DUCT

EXISTINGTRANSFER DUCT

EXISTINGRETURN GRILLE(TYPICAL)

EXISTINGTRANSFER DUCT

EXISTINGSUPPLY DUCT

EXISTINGEXHAUST DUCT

EXISTINGSLOTDIFFUSER

8ø EXISTINGFAN POWEREDBOX

MATTHEW R. SOTOSKY

P R O F E S S I O N A L

R E G I S T E R E D

E N G I N E E R

045576-E

CO

M

MO NWEA LT H

OF

PE

N N S Y L V A N I A

SHEET NO.

SEAL

ISSUED/ REVISED FOR DATE

2729 Prospect Avenue Cleveland, OH 44115 216.621.79002631 West 8th Street Erie, PA 16505 814.838.7525

BOSTWICKDESIGN.com

P

BostwickDesign

Partnership

GENERAL NOTES

SHEET NOTES

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

A

B

C

D

E

F

G

J

K

L

M

N

H

P

P

C:\R

evit

Loca

l\15-

0951

-SV

H C

hem

o In

fusi

on C

ente

r at

Har

dner

_ME

P_P

aulS

mia

ch.r

vt2/

22/2

016

11:4

9:23

AM

GROUND FLOOR PLAN- DEMOLITION

HD101

AHN SAINTVINCENT

HOSPITALCHEMO INFUSION

CENTER EXPANSIONAT HARDNER

BDP NO. #####

1/8" = 1'-0"1 GROUND FLOOR DEMOLITION

PLAN REVIEW SUBMISSION FEB 2016

Page 16: AHN SAINT VINCENT HOSPITAL · ed103 ground floor plan - hvac power demolition e001 symbols, abbreviations, notes and schedules e101 ground floor plan - lighting e102 ground floor

T

X

TAG

AIRFLOW

S1

200

X

1. ALL DUCTWORK DIMENSIONS, AS SHOWN ON THE DRAWINGS, AREINTERNAL CLEAR DIMENSIONS AND DUCT SIZE SHALL BE INCREASEDTO COMPENSATE FOR DUCT LINING THICKNESS WHERE SPECIFIED.

2.

3.

4.

5.

6.

7.

8.

9.

10.

13.

14.

15.

16.

1. GENERAL REQUIREMENTS

A. HVAC CONTRACTOR SHALL PROVIDE MECHANICAL EQUIPMENTWITH VOLTAGES AND OTHER ELECTRICAL CHARACTERISTICSAS INDICATED ON THE DRAWINGS AND WITHIN THESPECIFICATIONS.

B.

C.

D.

E.

2. POWER REQUIREMENTS

A.

B.

C.

3. CONTROL REQUIREMENTS

A.

B.

C.

D.

CONNECTION POINT -NEW TO EXISTING

THERMOSTAT

GRILLE, REGISTER ANDDIFFUSER TAG

SUPPLY DUCTTOWARD VIEWER

SUPPLY DUCT AWAYFROM VIEWER

RETURN OR EXHAUST DUCTTOWARD VIEWER

RETURN OR EXHAUST DUCTAWAY FROM VIEWER

SUPPLY DIFFUSER - 4-WAY BLOW

SUPPLY DIFFUSER - 3-WAY BLOW

SUPPLY DIFFUSER - 2-WAY BLOW

SUPPLY DIFFUSER - 1-WAY BLOW

CEILING MOUNTED RETURN OREXHAUST GRILLE / REGISTER

INTERIOR CLEAR DUCTWORKDIMENSIONS; WIDTH/HEIGHT

OUTSIDE AIR DUCTTOWARD VIEWER

OUTSIDE AIR DUCTAWAY FROM VIEWER

FLEXIBLE DUCT

FLEXIBLE CONNECTION

MANUAL VOLUME DAMPER

TRANSITION; SYMMETRIC

MITERED ELBOW WITHTURNING VANES

TEE, BOOT ENTRY BRANCH

TEE, ROUND BRANCH

TEE, CONICAL ROUND BRANCH

CHANGE IN DUCT ELEVATIONDROP INDICATED BY "D"

CHANGE IN DUCT ELEVATIONRISE INDICATED BY "R"

TRANSITION;RECTANGULAR TO ROUND

TRANSITION; ASYMMETRIC

90 DEG RADIUS ELBOW(R/W = 1.5)

SINGLE DUCT AIR TERMINAL UNITWITH REHEAT COIL(CONSTANT OR VARIABLE VOLUME)

LINEAR SLOT DIFFUSER

1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABORREQUIRED TO INSTALL COMPLETE AND OPERABLE MECHANICALSYSTEMS AS INDICATED ON THE DRAWINGS, AS SPECIFIED AND ASREQUIRED BY CODE.

2.

3.

4.

7.

8.

11.

12.

13.

14.

15.

18.

19.

20.

21.

22.

23.

24.

26.

27.

29.

NUMBERED NOTES

REVISION SEQUENCE

AIR FLOW ARROW

DISCONNECTION POINT

24/12

D

R

ELECTRICAL REQUIREMENTS FORMECHANICAL EQUIPMENT

HVAC SYMBOLS SHEET METAL GENERAL NOTESPROJECT GENERAL NOTES

HVAC CONTRACTOR SHALL SUBMIT WIRING DIAGRAMS TO THEARCHITECT/ENGINEER FOR APPROVAL AND PROVIDEAPPROVED DIAGRAMS TO THE ELECTRICAL CONTRACTOR SOTHAT THE ELECTRICAL WORK MAY BE PROPERLYACCOMPLISHED.

HVAC CONTRACTOR SHALL FULLY COOPERATE WITH THEOTHER DIVISIONS AND TRADES ON THE PROJECT, AND THEIRMANUFACTURERS, IN PROMPTLY PROVIDING THE INFORMATIONREQUIRED FOR PROPER COORDINATION OF MOTORPROTECTION, CONTROL EQUIPMENT AND WIRING, AND THEOTHER CHARACTERISTICS OF THE EQUIPMENT.

IT SHALL BE THE RESPONSIBILITY OF THE HEATING ANDELECTRICAL CONTRACTORS TO CHECK FOR ADEQUACY OFSUPPLY WIRING, OVERCURRENT PROTECTION, PROPERVOLTAGE, PHASE ROTATION AND FINAL LOCATION OFEQUIPMENT PROVIDED PRIOR TO THE RUNNING OF ANYCONDUIT OR WIRING. COORDINATE WITH DIVISION 26 TOASSURE PROPER ELECTRICAL SERVICE IS PROVIDED TOEQUIPMENT UNDER DIVISION 23.

EQUIPMENT CONNECTIONS SHALL BE MADE THROUGH CONDUITOR RACEWAYS IN ACCORDANCE WITH DIVISION 26, WITH THEEXCEPTION THAT CONNECTIONS TO MOTORS SHALL BE MADETHROUGH LIQUID TIGHT FLEXIBLE METAL CONDUIT WITHEQUIPMENT GROUNDING CONDUCTOR.

ALL POWER WIRING FOR MECHANICAL EQUIPMENT PROVIDEDUNDER DIVISION 23 SHALL BE FURNISHED AND INSTALLEDUNDER DIVISION 26 TO THE POINT OF FINAL CONNECTION.EXCEPT WHERE SPECIFICALLY INDICATED OTHERWISE, ALLPOWER WIRING TO THE POINT OF FINAL CONNECTION FOREQUIPMENT PROVIDED UNDER DIVISION 23 SHALL BEACCOMPLISHED UNDER DIVISION 26.

FINAL ELECTRICAL POWER CONNECTIONS TO ALL EQUIPMENTSHALL BE FURNISHED AND INSTALLED UNDER DIVISION 26. INGENERAL, THE POINT OF FINAL CONNECTION SHALL BE THETERMINAL HOUSING ON THE EQUIPMENT, OR AN INTERNALJUNCTION BOX ON THE EQUIPMENT OR ITEM. IF NO JUNCTIONBOX IS FURNISHED, A JUNCTION BOX SHALL BE FURNISHED ANDINSTALLED UNDER DIVISION 26. WIRE LEADS OF ADEQUATELENGTH TO ENSURE A PROPER CONNECTION AT THE FINALLOCATION SHALL BE FURNISHED AND INSTALLED UNDERDIVISION 26.

WIRING, OVERCURRENT PROTECTION DEVICES, VOLTAGE,PHASE, ROTATION AND FINAL LOCATION OF ALL EQUIPMENTPROVIDED UNDER DIVISION 23 SHALL BE COORDINATED WITHALL SIMILAR DEVICES AND POWER WIRING FURNISHED ANDINSTALLED UNDER DIVISION 26. COORDINATION SHALL BEACCOMPLISHED PRIOR TO THE RUNNING OF ANY CONDUIT ORWIRING.

ALL CONTROL WIRING (LINE VOLTAGE AND/OR LOW VOLTAGE)FOR MECHANICAL EQUIPMENT PROVIDED UNDER DIVISION 23,SHALL BE FURNISHED AND INSTALLED UNDER DIVISION 23.WIRING FROM THE POWER SOURCE TO ALL CONTROL PANELS,DDC CONTROL PANELS, STARTERS, OPERATOR WORKSTATIONS (PC'S, PRINTERS, MONITORS, AND OTHER WORKSTATION EQUIPMENT) AND OTHER CONTROL EQUIPMENTREQUIRED FOR A COMPLETE AND OPERABLE CONTROL SYSTEMSERVING MECHANICAL EQUIPMENT PROVIDED UNDER DIVISION23 SHALL BE FURNISHED AND INSTALLED UNDER DIVISION 23.

ALL WIRING FROM CONTROL PANELS TO CONTROL DEVICESFOR MECHANICAL EQUIPMENT PROVIDED UNDER DIVISION 23SHALL BE FURNISHED AND INSTALLED UNDER DIVISION 23. ALLCONTROL WIRE AND CONDUIT SHALL COMPLY WITH THENATIONAL ELECTRIC CODE AND DIVISION 26 OF THESPECIFICATIONS. ALL CONTROL WIRING SHALL BE IN CONDUIT.

UNLESS OTHERWISE NOTED, ALL TEMPERATURE CONTROLDEVICES, INSTALLED PILOT DEVICES, AND ALL ASSOCIATEDPILOT CONTROL EQUIPMENT, FOR ALL EQUIPMENT PROVIDEDUNDER DIVISION 23, SHALL BE FURNISHED AND INSTALLEDUNDER DIVISION 23.

ELECTRICAL CONTROL WIRING FOR CONNECTION OFTEMPERATURE CONTROLLERS, PUSH BUTTONS, AND LIKE ITEMSIS SPECIFIED UNDER THE CONTROL SECTION(S) IN DIVISION 23AND INSTALLED BY DIVISION 23.

CONTRACT DOCUMENT DRAWINGS FOR MECHANICAL WORK AREDIAGRAMMATIC AND ARE INTENDED TO CONVEY SCOPE ANDGENERAL ARRANGEMENT ONLY.

INSTALL ALL MECHANICAL EQUIPMENT AND APPURTENANCES INACCORDANCE WITH MANUFACTURERS' RECOMMENDATIONS,CONTRACT DOCUMENTS AND APPLICABLE CODES ANDREGULATIONS.

PROVIDE VIBRATION ISOLATION FOR ALL MECHANICAL EQUIPMENTTO PREVENT TRANSMISSION OF VIBRATION TO BUILDINGSTRUCTURE.

THE LOCATION OF EXISTING EQUIPMENT AND UTILITIES IS SHOWN INAN APPROXIMATE WAY ONLY. THE CONTRACTOR SHALL DETERMINETHE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORECOMMENCING WORK. THE CONTRACTOR SHALL PAY FOR ANDREPAIR ALL DAMAGES CAUSED BY FAILURE TO EXACTLY LOCATE ANDPRESERVE ANY AND ALL UNDERGROUND UTILITIES UNLESSOTHERWISE INDICATED.

COORDINATE CONSTRUCTION OF ALL MECHANICAL WORK WITHARCHITECTURAL, STRUCTURAL, ELECTRICAL WORK, ETC., SHOWNON OTHER CONTRACT DOCUMENT DRAWINGS.

LOCATE ALL TEMPERATURE, PRESSURE, AND FLOW MEASURINGDEVICES IN ACCESSIBLE LOCATIONS WITH THE STRAIGHT SECTIONOF DUCT UP- AND DOWNSTREAM AS RECOMMENDED BY THEMANUFACTURER FOR PROPER ACCURACY.

TESTING, ADJUSTING, AND BALANCING AGENCY SHALL BE A MEMBEROF THE ASSOCIATED AIR BALANCE COUNCIL (AABC) OR THENATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB). TESTING,ADJUSTING, AND BALANCING SHALL BE PERFORMED IN ACCORDANCEWITH THE AABC STANDARDS.

WHERE TWO OR MORE ITEMS OF THE SAME TYPE OF EQUIPMENTARE REQUIRED, THE PRODUCT OF ONE MANUFACTURER SHALL BEUSED.

COORDINATE ALL EQUIPMENT CONNECTIONS WITHMANUFACTURERS' CERTIFIED DRAWINGS. COORDINATE ANDPROVIDE ALL DUCT TRANSITIONS REQUIRED FOR FINAL EQUIPMENTCONNECTIONS TO FURNISHED EQUIPMENT. FIELD VERIFY ANDCOORDINATE ALL DUCT DIMENSIONS BEFORE FABRICATION.

ALL CONTROL WIRE AND CONDUIT SHALL COMPLY WITH THENATIONAL ELECTRIC CODE AND DIVISION 26 OF THE SPECIFICATION.

WHEN MECHANICAL WORK IS SUBCONTRACTED, IT SHALL BE THEMECHANICAL CONTRACTOR'S RESPONSIBILITY TO COORDINATESUBCONTRACTORS AND THE ASSOCIATED CONTRACTS. WHENDISCREPANCIES ARISE PERTAINING TO WHICH CONTRACTORPROVIDED A PARTICULAR ITEM OF THE MECHANICAL CONTRACT ORWHICH CONTRACTOR PROVIDES FINAL CONNECTIONS FOR APARTICULAR ITEM OF THE MECHANICAL CONTRACT, IT SHALL BEBROUGHT TO THE ATTENTION OF THE MECHANICAL CONTRACTOR,WHOSE DECISION SHALL BE FINAL.

THE LOCATIONS OF ALL ITEMS SHOWN ON THE DRAWINGS ORCALLED FOR IN THE SPECIFICATIONS THAT ARE NOT DEFINITELYFIXED BY DIMENSIONS ARE APPROXIMATE ONLY. THE EXACTLOCATIONS NECESSARY TO SECURE THE BEST CONDITIONS ANDRESULTS MUST BE DETERMINED BY THE PROJECT SITE CONDITIONSAND SHALL HAVE THE APPROVAL OF THE ENGINEER BEFORE BEINGINSTALLED. DO NOT SCALE DRAWINGS.

ALL MISCELLANEOUS STEEL REQUIRED TO ENSURE PROPERINSTALLATION AND AS SHOWN IN DETAILS FOR DUCTWORK ANDEQUIPMENT (UNLESS OTHERWISE NOTED) SHALL BE FURNISHEDAND INSTALLED BY THE MECHANICAL CONTRACTOR.

PROVIDE ACCESS PANELS FOR INSTALLATION IN WALLS ANDCEILINGS, WHERE REQUIRED TO SERVICE DAMPERS, VALVES,SMOKE DETECTORS AND OTHER CONCEALED MECHANICALEQUIPMENT. ACCESS PANELS SHALL BE TURNED OVER TO THEGENERAL CONTRACTOR FOR INSTALLATION.

ALL EQUIPMENT, PIPING, DUCTWORK, ETC. SHALL BE SUPPORTED ASDETAILED, SPECIFIED AND REQUIRED TO PROVIDE A VIBRATION-FREEINSTALLATION.

ALL DUCTWORK, PIPING AND EQUIPMENT SUPPORTED FROMSTRUCTURAL STEEL SHALL BE COORDINATED WITH THE GENERALCONTRACTOR. ALL ATTACHMENTS TO STEEL BAR JOISTS, TRUSSES,OR JOISTS GIRDERS SHALL BE AT PANEL POINTS. PROVIDE BEAMCLAMPS MEETING MSS STANDARDS. WELDING TO STRUCTURALMEMBERS SHALL NOT BE PERMITTED. THE USE OF C-CLAMPS SHALLNOT BE PERMITTED.

MECHANICAL EQUIPMENT AND DUCTWORK, SHALL NOT SUPPORTEDFROM A METAL DECK.

LOCATIONS AND SIZES OF FLOOR, WALL AND ROOF OPENINGS SHALLBE COORDINATED WITH ALL OTHER TRADES INVOLVED.

ALL OPENINGS IN FIRE AND/OR SMOKE RATED CONSTRUCTION DUETO DUCTWORK, PIPING, CONDUIT, ETC. SHALL BE FIRE STOPPEDWITH AN APPROVED LISTED AND LABELED FIRE STOPPING MATERIAL.

CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALLEXISTING EQUIPMENT AND UTILITIES BEFORE COMMENCING WORK.

CERTAIN ITEMS SUCH AS RISES AND DROPS IN DUCTWORK, ACCESSDOORS, VOLUME DAMPERS, ETC. ARE INDICATED ON THE CONTRACTDOCUMENT DRAWINGS FOR CLARITY FOR A SPECIFIC LOCATIONREQUIREMENT AND SHALL NOT BE INTERPRETED AS THE EXTENT OFTHE REQUIREMENTS FOR THESE ITEMS.

ALL DUCTWORK SHALL BE COORDINATED WITH ALL TRADESINVOLVED. OFFSETS IN DUCTS, INCLUDING DIVIDED DUCTS ANDTRANSITIONS AROUND OBSTRUCTIONS, SHALL BE PROVIDED AT NOADDITIONAL COST TO THE OWNER.

UNLESS OTHERWISE NOTED, ALL DUCTWORK SHALL BE OVERHEAD,TIGHT TO THE UNDERSIDE OF THE STRUCTURE, WITH SPACE FORINSULATION IF REQUIRED.

PROVIDE ALL 90-DEGREE SQUARE ELBOWS WITH DOUBLE RADIUSTURNING VANES UNLESS OTHERWISE INDICATED. ELBOWS INDISHWASHER, KITCHEN, AND LAUNDRY EXHAUSTS SHALL BE OFUNVANED SMOOTH RADIUS CONSTRUCTION WITH A RADIUS EQUALTO 1-1/2 TIMES THE WIDTH OF THE DUCT. PROVIDE ACCESS DOORSUPSTREAM OF ALL ELBOWS WITH TURNING VANES.

PROVIDE ACCESS DOORS IN DUCTWORK TO PROVIDE ACCESS FORALL SMOKE DETECTORS, FIRE DAMPERS, SMOKE DAMPERS, VOLUMEDAMPERS, HUMIDIFIERS, COILS, AND OTHER ITEMS LOCATED IN THEDUCTWORK THAT REQUIRE SERVICE AND/OR INSPECTION.

PROVIDE ACCESS DOORS IN DUCTWORK FOR THE OPERATION,ADJUSTMENT, AND MAINTENANCE OF ALL VALVES, ANDMECHANICAL EQUIPMENT.

SEE SPECIFICATIONS FOR DUCTWORK GAUGES, BRACING, HANGERS,AND OTHER REQUIREMENTS.

RUNS OF FLEXIBLE DUCT SHALL NOT EXCEED 5 FEET.

LOCATE ALL MECHANICAL EQUIPMENT (SINGLE DUCT, VARIABLEVOLUME, CONSTANT VOLUME ) FOR UNOBSTRUCTED ACCESS TOUNIT ACCESS PANELS, CONTROLS, AND VALVES.

PROVIDE FLEXIBLE CONNECTIONS IN ALL DUCTWORK SYSTEMS(SUPPLY, RETURN, AND EXHAUST) CONNECTED TO OTHEREQUIPMENT THAT REQUIRE VIBRATION ISOLATION. FLEXIBLECONNECTIONS SHALL BE PROVIDED AT THE POINT OF CONNECTIONTO THE EQUIPMENT UNLESS OTHERWISE INDICATED.

ALL DUCTS SHALL BE GROUNDED ACROSS FLEXIBLE CONNECTIONSWITH FLEXIBLE COPPER GROUNDING STRAPS. GROUNDING STRAPSSHALL BE BOLTED OR SOLDERED TO BOTH THE EQUIPMENT AND THEDUCT.

COORDINATE DIFFUSERS, REGISTER AND GRILLE LOCATIONS WITHARCHITECTURAL REFLECTED CEILING PLANS, LIGHTING AND OTHERCEILING ITEMS AND MAKE MINOR DUCT MODIFICATIONS TO SUIT.

UNLESS OTHERWISE SHOWN, LOCATE ALL ROOM THERMOSTATS 42”(CENTERLINE) ABOVE THE FINISHED FLOOR. NOTIFY THEPROFESSIONAL OF ANY ROOMS WHERE THE PRECEDING LOCATIONCANNOT BE MAINTAINED OR WHERE THERE IS A QUESTION ONLOCATION.

AC ALTERNATING CURRENTAFF ABOVE FINISHED FLOORAMP AMPEREANSI AMERICAN NATIONAL STANDARDS INSTITUTEAPD AIR PRESSURE DROPATC AUTOMATIC TEMPERATURE CONTROLATM ATMOSPHEREAUX AUXILIARYAVG AVERAGE

BAS BUILDING AUTOMATION SYSTEM

CKT CIRCUITCLG CEILINGCONTR CONTRACTORCR CONCRETE REDUCERCU FT CUBIC FEET

DEG DEGREEDIA DIAMETERDIFF DIFFUSERDISCH DISCHARGE

EAT ENTERING AIR TEMPERATUREEC ELECTRICAL CONTRACTORELECT ELECTRICENCLOS ENCLOSUREENT ENTERINGEQUIP EQUIPMENTER ECCENTRIC REDUCERERC EXHAUST AIR REGISTER CEILING MOUNTEDERW EXHAUST AIR REGISTER WALL MOUNTEDESP EXTERNAL STATIC PRESSUREEX EXISTINGEXH EXHAUSTEXIST EXISTING

F FAHRENHEITFAT FINAL AIR TEMPERATUREFC FLEXIBLE CONNECTION OR FORWARD CURVEDFT FEETFTG FITTINGFW FEED WATER

GA GAUGEGAL GALLONSGC GENERAL CONTRACTORGI GALVANIZED IRONGLV GLOBE VALVEGPD GALLONS PER DAYGPH GALLONS PER HOURGPM GALLONS PER MINUTEGR GRILLE OR GRAINS

HC HVAC CONTRACTORHZ FREQUENCY (HERTZ)

KW KILOWATTKWH KILOWATT HOUR

LAT LEAVING AIR TEMPERATURELDB LEAVING DRY BULB

MAX MAXIMUMMBH THOUSAND BTU'sMC MECHANICAL CONTRACTOR

OA OUTSIDE AIR

PD PRESSURE DROP

QNTY QUANTITY

RA RETURN AIRRET RETURNRRC RETURN AIR REGISTER CEILING MOUNTEDRRW RETURN AIR REGISTER WALL MOUNTED

SA SUPPLY AIRSDC SUPPLY AIR DIFFUSER CEILING MOUNTEDSEER SEASONALLY ENERGY EFFICIENT RATIOSP STATIC PRESSURESPEC SPECIFICATIONSQ FT SQUARE FEETSRW SUPPLY AIR REGISTER WALL MOUNTEDSUP SUPPLY

TGC TRANSFER AIR GRILLE CEILING MOUNTEDTGW TRANSFER AIR GRILLE WALL MOUNTEDTSTAT THERMOSTATTYP TYPICAL

V VOLTVCD VOLUME CONTROL DAMPER

W WATT

HVAC ABBREVIATIONS

MATTHEW R. SOTOSKY

P R O F E S S I O N A L

R E G I S T E R E D

E N G I N E E R

045576-E

CO

M

MO NWEA LT H

OF

PE

N N S Y L V A N I A

SHEET NO.

SEAL

ISSUED/ REVISED FOR DATE

2729 Prospect Avenue Cleveland, OH 44115 216.621.79002631 West 8th Street Erie, PA 16505 814.838.7525

BOSTWICKDESIGN.com

P

BostwickDesign

Partnership

GENERAL NOTES

SHEET NOTES

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

A

B

C

D

E

F

G

J

K

L

M

N

H

P

P

C:\R

evit

Loca

l\15-

0951

-SV

H C

hem

o In

fusi

on C

ente

r at

Har

dner

_ME

P_P

aulS

mia

ch.r

vt2/

22/2

016

11:4

9:20

AM

HVAC SCHEDULES,NOTES, SYMBOLS,AND ABBREVIATIONS

H001

AHN SAINTVINCENT

HOSPITALCHEMO INFUSION

CENTER EXPANSIONAT HARDNER

BDP NO. #####

VARIABLE VOLUME BOX SCHEDULE (ELECTRIC)

NUMBER

LOCATION UNIT SIZE CFM STATIC PRESSURE NC LEVELS ELECTRIC HEATING COIL

REMARKSRM. NO. RM. NAME SIZE OUTLET MAX MIN INLET DOWN MIN RAD DISCH CFM KWSTEPS OFCONTROL EAT °F FAT °F

ELECTCHAR MCA MOP

VVB-G07R G04 CORRIDOR 6ø 12x8 320 200 0.0 0.25 0.06 13 19 250 3.5 3 55 99.2 1/60/277 15.8 20VVB-G09R G09 PRIVATE ROOM 1 6ø 12x8 220 150 0.0 0.25 0.03 - 16 220 3.0 3 55 98.1 1/60/277 13.5 15VVB-G11R G11 PRIVATE ROOM 2 6ø 12x8 220 150 0.0 0.25 0.03 - 16 220 3.0 3 55 98.1 1/60/277 13.5 15VVB-G13R G13 ROOM 3 10ø 14x13 690 400 0.0 0.25 0.03 - 14 500 6.5 3 55 96.1 1/60/277 29.3 30VVB-G24R G22 ROOM 12 8ø 12x10 540 300 0.0 0.25 0.02 - 12 450 6.0 3 55 97.1 1/60/277 27.1 30VVB-G35 G35 PHARMACY 6ø 12x8 300 200 0.0 0.25 0.06 12 18 250 3.5 3 55 99.2 1/60/277 15.8 20VVB-G36 G36 OPEN OFFICE 6ø 12x8 140 150 0.0 0.25 0.01 - - 150 2.0 2 55 97.1 1/60/277 9.0 15VVB-G37 G37 EXAM 6ø 12x8 120 150 0.0 0.25 0.01 - - 150 2.0 2 55 97.1 1/60/277 9.0 15VVB-G39 G39 BREAK ROOM 6ø 12x8 180 140 0.0 0.25 0.02 - 12 180 2.5 3 55 98.9 1/60/277 11.3 15VVB-G40 G40 LOCKERS 6ø 12x8 150 150 0.0 0.25 0.01 - - 150 2.0 2 55 97.1 1/60/277 9.0 15

ROOM VENTILATION SCHEDULE

ROOMNO. ROOM NAME

AREA (SQFT)

VOLUME(CU FT)

AIR MOVEMENTRELATIONSHIPTO ADJ AREA

MINIMUM REQ'DAIR CHANGES

OF OA/HR

INSTALLED AIRCHANGES OF

OA/HR

MINIMUM REQ'DTOTAL AIR

CHANGES/HR

INSTALLEDTOTAL AIR

CHANGES/HR SA CFM RA CFM EA CFM

REQ'D ALL AIRCHANGES

EXHAUSTEDOA CFM

PROVIDEDOA CFM

REQUIRED LEVELG07 BREAK ROOM 150 1301 3.0 10.1 220 0 0 No 66 GROUND

FLOORG09 PRIVATE ROOM 1 133 1151 2 3.4 6 11.5 220 220 0 No 66 38 GROUND

FLOORG10 PATIENT T.R. 51 445 IN 10 0.0 0 0 75 Yes GROUND

FLOORG11 PRIVATE ROOM 2 129 1119 2 3.5 6 11.8 220 220 0 No 66 37 GROUND

FLOORG13 ROOM 3 101 880 2 5.1 6 17.1 250 0 0 No 75 29 GROUND

FLOORG14 ROOM 4 83 724 2 5.5 6 18.2 220 0 0 No 66 24 GROUND

FLOORG15 ROOM 5 83 724 2 5.5 6 18.2 220 0 0 No 66 24 GROUND

FLOORG24 ROOM 14 85 743 2 2.7 6 8.9 110 0 0 No 33 25 GROUND

FLOORG25 ROOM 15 83 726 2 8.2 6 27.3 330 0 0 No 99 24 GROUND

FLOORG26 INTAKE 64 560 2 3.2 6 10.7 100 0 0 No 30 19 GROUND

FLOORG34 CORRIDOR 97 848 0.0 2 0.0 0 140 0 No 0 GROUND

FLOORG35 PHARMACY 313 2712 2.0 6.6 300 300 0 No 90 GROUND

FLOORG36 OPEN OFFICE 137 1186 2.1 7.1 140 0 0 No 42 GROUND

FLOORG37 EXAM 112 995 2 2.2 6 7.2 120 140 0 No 36 33 GROUND

FLOORG39 BREAK ROOM 158 1368 2.4 7.9 180 180 0 No 54 GROUND

FLOORG40 LOCKERS 39 341 OUT 4.0 13.2 75 0 0 No 23 GROUND

FLOORG41 MEN'S T.R. 50 437 IN 10 0.0 0 0 75 Yes GROUND

FLOORG42 LOCKERS 39 341 OUT 4.0 13.2 75 0 0 No 23 GROUND

FLOORG43 WOMEN'S T.R. 50 437 IN 10 0.0 0 0 75 Yes GROUND

FLOOR

DIFFUSER/REGISTER/GRILLE SCHEDULE

NUMBER NECK SIZE TYPECFM

RANGEMODULE

SIZEMAX PD

(FT) MAX NCBASIS OFDESIGN MOUNTING REMARKS

0.050 <15 LAY-INE1 8"x8" EGC 0-140 - 0.050 <15 PRICE 630 SURFACE -E3 12"x12" EGC 275-450 - 0.066 19 PRICE 630 SURFACE -R1 8"x8" RGC 0-140 - 0.050 <15 PRICE 630 SURFACE -R2 10"x10" RGC 145-270 - 0.052 15 PRICE 630 SURFACE -R3 12"x12" RGC 275-450 - 0.066 19 PRICE 630 SURFACE -R7 20"x20" RGC 1045-1390 - 0.074 24 PRICE 630 SURFACE -S1 6"ø SDC 0-140 24"x24" 0.050 <15 PRICE ASPD LAY-IN -S2 8"ø SDC 145-240 24"x24" 0.050 <15 PRICE ASPD LAY-IN -S3 10"ø SDC 245-330 24"x24" 0.066 <15 PRICE ASPD LAY-IN -S4 12"ø SDC 335-470 24"x24" 0.076 <15 PRICE ASPD LAY-IN -

PLAN REVIEW SUBMISSION FEB 2016

Page 17: AHN SAINT VINCENT HOSPITAL · ed103 ground floor plan - hvac power demolition e001 symbols, abbreviations, notes and schedules e101 ground floor plan - lighting e102 ground floor

REF.N.I.C.

RE

F.

N.I.

C.

T

TT

TT

T

T

T

T

T

EXIST. SOILED HOLDG28

EXIST. PATIENT T.R.G27

EXIST.STAFF T.R.G08

EXIST. PATIENT T.R.G12

EXIST. CLEAN SUPPLYG29

MAIL ROOMG33

EXIST STAIRG-SA

SHELVINGG06

BREAK ROOMG07

CLOSETG03

PRIVATE ROOM 1G09

PRIVATE ROOM 2G11

STORAGEG05

WAITINGG01

MEN'S T.R.G41

LOCKERSG40

INTAKEG26

ROOM 7G17

ROOM 5G15

ROOM 4G14

ROOM 3G13

CORRIDORG02

CORRIDORG04

VENDINGG32

NURSE STATION/ RECEPTIONG31

EXIST. NURSEG30

CORRIDORG34

OPEN OFFICEG36

EXAMG37

PATIENT T.R.G10

ROOM 13G23

ROOM 11G21 ROOM 9

G19 ROOM 8G18

LOCKERSG42

WOMEN'S T.R.G43

PHARMACYG35

CORRIDORG38

BREAK ROOMG39

ROOM 10G20

ROOM 12G22

ROOM 15G25

ROOM 14G24

ROOM 6G16

10/1

0

6ø8ø

6ø12/8

10/6

10/6

12/126ø

10ø

8ø 8ø

10ø

12ø

12/6

12/6

22/10

S2

180 S1

120

S1

140

S1

75

S1

75

S2

150

S2

150

S1

100 S3

330

S1

110

S2

220

S3

250

S2

220S2

220

S1

100

S2

220

S1

100

E1

75

S2

220

12ø8ø

S3

300

S1

110

S3

330

S3

300

S3

260

VVB-G09

12/6

18/12

12/6

8/6

12/8

12/6

20/12

10ø16/1012/6

10/6

10/6

S3

290S2

220

S2

220

VVB-G16

8/6

8/68/6

10/6

8/6

10/1

0

22/1

0

S2

150

S1

120

S1

100

VVB-G07

20/14

20/20

20/1

2

10/6

10/6

10/6

14/8

E1

100

E1

100E1

100 12/810/6

14/8

S2

180

S2

180

S1

100

VVB-G03

38/1

8

10/1

0

8/6

8/6

22/1

0

S1

100

S2

230

VVB-G23

10/6

12ø 10ø

E1

75

E1

75

10/6

14/6

42/1

4

42/14

10/6

12/6

VVB-G07R

VVB-G09RVVB-G11R

VVB-G13R

VVB-G24R

VVB-G36

VVB-G37VVB-G39

VVB-G35

VVB-G40

CONNECT TOEXISTINGEXHAUST DUCT

48/2

0

48/1

8

38/1

8

12/8

E1

100

E3

275

E1

100

32/18

12/8

12/8

R7

R7

R2 R2

R1

R1

R2

R3

R3

R7

EXISTING 20/20EXHAUST DUCT UPTO EF-3 ON ROOF

EXISTING 20/14EXHAUST DUCTUP FROM BELOW

EXISTINGSUPPLY DUCT

EXISTINGEXHAUST DUCT

EXISTINGTRANSFERDUCT

EXISTINGTRANSFERDUCT

EXISTINGSUPPLY DUCT

EXISTINGEXHAUST DUCT

MATTHEW R. SOTOSKY

P R O F E S S I O N A L

R E G I S T E R E D

E N G I N E E R

045576-E

CO

M

MO NWEA LT H

OF

PE

N N S Y L V A N I A

SHEET NO.

SEAL

ISSUED/ REVISED FOR DATE

2729 Prospect Avenue Cleveland, OH 44115 216.621.79002631 West 8th Street Erie, PA 16505 814.838.7525

BOSTWICKDESIGN.com

P

BostwickDesign

Partnership

GENERAL NOTES

SHEET NOTES

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

A

B

C

D

E

F

G

J

K

L

M

N

H

P

P

C:\R

evit

Loca

l\15-

0951

-SV

H C

hem

o In

fusi

on C

ente

r at

Har

dner

_ME

P_P

aulS

mia

ch.r

vt2/

22/2

016

11:4

9:21

AM

GROUND FLOOR PLAN- NEW WORK

H101

AHN SAINTVINCENT

HOSPITALCHEMO INFUSION

CENTER EXPANSIONAT HARDNER

BDP NO. #####

1/8" = 1'-0"1 GROUND FLOOR PLAN

PLAN REVIEW SUBMISSION FEB 2016

Page 18: AHN SAINT VINCENT HOSPITAL · ed103 ground floor plan - hvac power demolition e001 symbols, abbreviations, notes and schedules e101 ground floor plan - lighting e102 ground floor

EXIST. CLEAN SUPPLYG29

EXIST. PATIENT T.R.G27 EXIST. SOILED HOLD

G28

EXIST. NURSEG30

NURSE STATION/ RECEPTIONG31

STORAGEG05

EXIST.STAFF T.R.G08

EXIST. PATIENT T.R.G12

1 1

11

1

1

1

1

1

ETR ETR ETR ETR ETR

ETR

ETR

ETRETR

ETR

ETR

ETR ETR

ETR

ETRETR

MATTHEW R. SOTOSKY

P R O F E S S I O N A L

R E G I S T E R E D

E N G I N E E R

045576-E

CO

M

MO NWEA LT H

OF

PE

N N S Y L V A N I A

SHEET NO.

SEAL

ISSUED/ REVISED FOR DATE

2729 Prospect Avenue Cleveland, OH 44115 216.621.79002631 West 8th Street Erie, PA 16505 814.838.7525

BOSTWICKDESIGN.com

P

BostwickDesign

Partnership

GENERAL NOTES

SHEET NOTES

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

A

B

C

D

E

F

G

J

K

L

M

N

H

P

P

C:\U

sers

\Bria

nSel

epac

k\D

ocum

ents

\Rev

it-Lo

cal\1

5-09

51-S

VH

Che

mo

Infu

sion

Cen

ter

at H

ardn

er_M

EP

_Bria

nSel

epac

k.rv

t2/

22/2

016

11:4

2:15

AM

GROUND FLOOR PLAN- PLUMBINGDEMOLITION

PD100

AHN SAINTVINCENT

HOSPITALCHEMO INFUSION

CENTER EXPANSIONAT HARDNER

BDP NO. #####

1/8" = 1'-0"1 GROUND FLOOR - PLUMBING DEMOLITION

1 DISCONNECT AND REMOVE EXISTING PLUMBING FIXTURE,APPURTENANCES AND ALL ASSOCIATED PIPING,INCLUDING ALL PIPING EXPOSED BY DEMOLITION. CAPAND CONCEAL PIPING BELOW FINISHED FLOOR, ABOVEFINISHED CEILING AND WITHIN FINISHED WALL.

PLAN REVIEW SUBMISSION FEB 2016

Page 19: AHN SAINT VINCENT HOSPITAL · ed103 ground floor plan - hvac power demolition e001 symbols, abbreviations, notes and schedules e101 ground floor plan - lighting e102 ground floor

X

X

ABV ABOVEAC ABOVE CEILINGAFF ABOVE FINISHED FLOORAFL ABOVE FIXTURE LEVELAHAP AS HIGH AS POSSIBLEAHJ AUTHORITY HAVING JURISDICTIONAP ACCESS PANEL

BF BELOW FLOORBLW BELOWBS BALANCING STATIONBV BALL VALVE

CFM CUBIC FEET PER MINUTECHKV CHECK VALVECLG CEILINGCO CLEAN OUTCONT CONTINUATIONCONTR CONTRACTORCW COLD WATER

DWG DRAWING

EC ELECTRICAL CONTRACTOREQUIP EQUIPMENTETC ETCETERAETR EXISTING TO REMAINEXIST EXISTING

FP FIRE PROTECTIONFA FROM ABOVEFB FROM BELOWFD FLOOR DRAINFFD FUNNEL FLOOR DRAINFLR FLOORFPC FIRE PROTECTION CONTRACTORFPM FEET PER MINUTEFPS FEET PER SECONDFT FEETFTG FITTING

G NATURAL GAS

GC GENERAL CONTRACTORGPH GALLONS PER HOURGPD GALLONS PER DAYGPM GALLONS PER MINUTEGRAV GRAVITY

HD HEADHP HORSEPOWERHORIZ HORIZONTALHR HOURHTG HEATINGHW HOT WATERHWR HOT WATER RETURN

UNION, SCREWED

PIPE ELBOW UP

PIPE ELBOW DOWN

PIPE TEE UP

PIPE TEE DOWN

GATE VALVE ORGENERIC ISOLATION VALVE

BALL VALVE

BALANCING VALVE

CAPPED PIPE

CHECK VALVE

CLEAN OUT

PRESSURE GAUGE WITHSHUT OFF COCK

STRAINER

THERMOMETER WITHSEPARABLE WELL

DIRECTION OF FLOW

CONNECT TO EXISTING

THERMOSTATIC MIXING VALVE

EXTERIOR WALL HYDRANT

PIPE CONNECTION

NEW SANITARY/STORM CONNECTION

PIPE BREAK

PRESSURE / FLOW SWITCH

WATER HAMMER ARRESTOR

DUALCHECK BACKFLOW PREVENTER

COMPRESSED AIR PIPING (A)

COLD WATER PIPING (CW)

FIRE PROTECTION PIPING (F OR FP)

HOT WATER PIPING (HW)

HOT WATER RETURN PIPING (HWR)

OXYGEN PIPING (O)

SANITARY PIPING (SAN)

STORM PIPING (ST)

VENT PIPING (V)

LBS POUNDSLF LINEAR FEET

MA MEDICAL AIRMAX MAXIMUMMBH THOUSAND BTU'sMC MECHANICAL CONTRACTORMIN MINIMUMMH MANHOLEMPH MILES PER HOURMTD MOUNTED

N/A NOT APPLICABLENC NORMALLY CLOSEDNIC NOT IN CONTRACTNO NORMALLY OPENNTS NOT TO SCALEO OXYGENOZ OUNCES

% PERCENTPC PLUMBING CONTRACTORPD PRESSURE DROPPG PRESSURE GAUGE WITH COCKPRV PRESSURE REDUCING VALVEPSIG POUNDS PER SQUARE INCH GAUGE

QNTY QUANTITY

REV REVOLUTIONSREQD REQUIREDRPM REVOLUTIONS PER MINUTERPS REVOLUTIONS PER SECONDRWC RAIN WATER CONDUCTOR

S SECONDSAN SANITARYSCH SCHEDULESPEC SPECIFICATIONSQ FT SQUARE FEETSS SANITARY STACKST STORMSTD STANDARD

TEMP TEMPORARYTYP TYPICAL

UG UNDERGROUND

V VOLT OR VENTVAC VACUUMVEL VELOCITYVFS VENTURIVOL VOLUMEVTR VENT THRU ROOF

WATT OR UNDERGROUND WATERWW/ WITH

FLOOR DRAIN (FD)

NATURAL GAS COCK

66" 66" 66"62" 60" 62" IN

ALL OR'S

GENERAL NOTE:ALL DIMENSIONS SHOWN SHALL BE MAXIMUM. REFER TOARCHITECTURAL PLANS FOR ALL MOUNTING HEIGHTREQUIREMENTS FOR EACH SPECIFIC AREA.

AREA ALARM MASTER ALARM ZONE VALVE BOX GAS PANEL

OUTLETS

FINISHED FLOOR

NUMBERED NOTE PER DRAWING

EQUIPMENT BY OTHERS

REVISION SEQUENCE NUMBER

X

MEDICAL GAS OUTLET

O

A

F

ST

SAN

ELECTRICAL REQUIREMENTS FORPLUMBING EQUIPMENT

PLUMBING ABBREVIATIONS PLUMBING PIPING ABBREVIATIONS PLUMBING SYMBOLS PLUMBING PIPING GENERAL NOTESPROJECT GENERAL NOTESPLUMBING ABBREVIATIONS (CONT.)

MEDICAL GAS GENERAL NOTES

MEDICAL GAS EQUIPMENT MAXIMUM MOUNTING HEIGHTS

1. GENERAL REQUIREMENTS

A. PLUMBING CONTRACTOR SHALL PROVIDE MECHANICAL EQUIPMENT WITHVOLTAGES AND OTHER ELECTRICAL CHARACTERISTICS AS INDICATED ONTHE DRAWINGS AND WITHIN THE SPECIFICATIONS.

B. PLUMBING CONTRACTOR SHALL FULLY COOPERATE WITH THE OTHERDIVISIONS AND TRADES ON THE PROJECT, AND THEIR MANUFACTURERS, INPROMPTLY PROVIDING THE INFORMATION REQUIRED FOR PROPERCOORDINATION OF MOTOR PROTECTION, CONTROL EQUIPMENT AND WIRING,AND THE OTHER CHARACTERISTICS OF THE EQUIPMENT.

C. IT SHALL BE THE RESPONSIBILITY OF THE DIVISION 23 AND DIVISION 26CONTRACTORS TO CHECK FOR ADEQUACY OF SUPPLY WIRING,OVERCURRENT PROTECTION, PROPER VOLTAGE, PHASE ROTATION AND FINALLOCATION OF EQUIPMENT PROVIDED PRIOR TO THE RUNNING OF ANY CONDUITOR WIRING. COORDINATE WITH DIVISION 26 TO ASSURE PROPER ELECTRICALSERVICE IS PROVIDED TO EQUIPMENT UNDER DIVISION 22.

D. EQUIPMENT CONNECTIONS SHALL BE MADE THROUGH CONDUIT ORRACEWAYS IN ACCORDANCE WITH DIVISION 26, WITH THE EXCEPTION THATCONNECTIONS TO MOTORS SHALL BE MADE THROUGH LIQUID TIGHT FLEXIBLEMETAL CONDUIT WITH EQUIPMENT GROUNDING CONDUCTOR.

2. POWER REQUIREMENTS

A. ALL POWER WIRING FOR MECHANICAL EQUIPMENT PROVIDED UNDERDIVISION 22 SHALL BE FURNISHED AND INSTALLED UNDER DIVISION 26 TO THEPOINT OF FINAL CONNECTION. EXCEPT WHERE SPECIFICALLY INDICATEDOTHERWISE, ALL POWER WIRING TO THE POINT OF FINAL CONNECTION FOREQUIPMENT PROVIDED UNDER DIVISION 22 SHALL BE ACCOMPLISHED UNDERDIVISION 26.

B. FINAL ELECTRICAL POWER CONNECTIONS TO ALL EQUIPMENT SHALL BEFURNISHED AND INSTALLED UNDER DIVISION 26. IN GENERAL, THE POINT OFFINAL CONNECTION SHALL BE THE EQUIPMENT CONTROL PANEL PROVIDEDBY DIVISION 22. WIRE LEADS OF ADEQUATE LENGTH TO ENSURE A PROPERCONNECTION AT THE FINAL LOCATION SHALL BE FURNISHED AND INSTALLEDUNDER DIVISION 26.

C. WIRING, OVERCURRENT PROTECTION DEVICES, VOLTAGE, PHASE,ROTATION AND FINAL LOCATION OF ALL EQUIPMENT PROVIDED UNDERDIVISION 22 SHALL BE COORDINATED WITH ALL SIMILAR DEVICES AND POWERWIRING FURNISHED AND INSTALLED UNDER DIVISION 26. COORDINATIONSHALL BE ACCOMPLISHED PRIOR TO THE RUNNING OF ANY CONDUIT ORWIRING.

3. CONTROL REQUIREMENTS

A. ALL CONTROL WIRING (LINE VOLTAGE AND/OR LOW VOLTAGE) FORMECHANICAL EQUIPMENT PROVIDED UNDER DIVISION 22, SHALL BEFURNISHED AND INSTALLED UNDER DIVISION 22. WIRING FROM THE POWERSOURCE TO ALL CONTROL PANELS, DDC CONTROL PANELS, STARTERS, ANDOTHER CONTROL EQUIPMENT REQUIRED FOR A COMPLETE AND OPERABLECONTROL SYSTEM SERVING MECHANICAL EQUIPMENT PROVIDED UNDERDIVISION 22 SHALL BE FURNISHED AND INSTALLED UNDER DIVISION 22.

B. ALL WIRING FROM CONTROL PANELS TO CONTROL DEVICES FORMECHANICAL EQUIPMENT PROVIDED UNDER DIVISION 22 SHALL BEFURNISHED AND INSTALLED UNDER DIVISION 22. ALL CONTROL WIRE ANDCONDUIT SHALL COMPLY WITH THE NATIONAL ELECTRIC CODE AND DIVISION26 OF THE SPECIFICATIONS. ALL CONTROL WIRING SHALL BE IN CONDUIT.

4. SPECIALTIES

A. ALL CONTROL WIRING FROM MEDICAL GAS PRESSURE-SENSINGDEVICES TO MEDICAL GAS ALARM PANELS SHALL BE UNDER DIVISION 22.THE ELECTRICAL CONTRACTOR SHALL PROVIDE POWER WIRING TO THEALARM PANEL.

1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIREDTO INSTALL COMPLETE AND OPERABLE MECHANICAL SYSTEMS AS INDICATED ON THEDRAWINGS, AS SPECIFIED AND AS REQUIRED BY CODE.

2. CONTRACT DOCUMENT DRAWINGS FOR PLUMBING WORK ARE DIAGRAMMATICAND ARE INTENDED TO CONVEY SCOPE AND GENERAL ARRANGEMENT ONLY.

3. INSTALL ALL PLUMBING EQUIPMENT AND APPURTENANCES IN ACCORDANCE WITHMANUFACTURERS' RECOMMENDATIONS, CONTRACT DOCUMENTS AND APPLICABLECODES AND REGULATIONS.

4. THE LOCATION OF EXISTING EQUIPMENT AND UTILITIES IS SHOWN IN ANAPPROXIMATE WAY ONLY. THE CONTRACTOR SHALL DETERMINE THE EXACTLOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK. THECONTRACTOR SHALL PAY FOR AND REPAIR ALL DAMAGES CAUSED BY FAILURE TOEXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES UNLESSOTHERWISE INDICATED.

5. COORDINATE CONSTRUCTION OF ALL PLUMBING WORK WITH ARCHITECTURAL,STRUCTURAL, CIVIL, ELECTRICAL, HVAC WORK, ETC., SHOWN ON OTHER CONTRACTDOCUMENT DRAWINGS.

6. MAINTAIN A MINIMUM OF 6'-8” CLEARANCE TO THE UNDERSIDE OF PIPES, DUCTS,CONDUITS, SUSPENDED EQUIPMENT, ETC., THROUGHOUT ACCESS ROUTES INMECHANICAL ROOMS.

7. CEILING AREAS DIRECTLY BELOW HEATING EQUIPMENT MUST BE KEPT CLEAR OFALL OTHER UTILITIES, INCLUDING FIRE PROTECTION COMPONENTS, TO ALLOW FORUNIT ACCESS FOR SERVICING AND/OR REMOVAL. WHERE PIPING, CONDUIT, AND LIKEITEMS ARE SHOWN IN THIS AREA, IT IS THE ENGINEER'S INTENTION THAT THIS PIPINGBE INSTALLED ABOVE THE EQUIPMENT AND THAT BRANCH VALVING, WHEREAPPLICABLE, BE INSTALLED IN AN ACCESSIBLE LOCATION. PROVIDE NECESSARYOFFSETS, ETC., TO ACCOMPLISH THIS CLEARANCE REQUIREMENT.

8. ALL TESTS SHALL BE COMPLETED BEFORE ANY MECHANICAL EQUIPMENT ORPIPING INSULATION IS APPLIED.

9. LOCATE ALL TEMPERATURE, PRESSURE, AND FLOW MEASURING DEVICES INACCESSIBLE LOCATIONS WITH THE STRAIGHT SECTION OF PIPE OR DUCT UP- ANDDOWNSTREAM AS RECOMMENDED BY THE MANUFACTURER FOR PROPER ACCURACY.

10. TESTING, ADJUSTING, AND BALANCING AGENCY SHALL BE A MEMBER OF THEASSOCIATED AIR BALANCE COUNCIL (AABC) OR THE NATIONAL ENVIRONMENTALBALANCING BUREAU (NEBB). TESTING, ADJUSTING, AND BALANCING SHALL BEPERFORMED IN ACCORDANCE WITH THE AABC STANDARDS.

11. WHERE TWO OR MORE ITEMS OF THE SAME TYPE OF EQUIPMENT AREREQUIRED, THE PRODUCT OF ONE MANUFACTURER SHALL BE USED.

12. COORDINATE ALL EQUIPMENT CONNECTIONS WITH MANUFACTURERS' CERTIFIEDDRAWINGS. COORDINATE AND PROVIDE ALL PIPING TRANSITIONS REQUIRED FORFINAL EQUIPMENT CONNECTIONS TO FURNISHED EQUIPMENT. FIELD VERIFY ANDCOORDINATE ALL PIPING DIMENSIONS BEFORE FABRICATION.

13. ALL CONTROL WIRE AND CONDUIT SHALL COMPLY WITH THE NATIONAL ELECTRICCODE AND DIVISION 26 OF THE SPECIFICATION.

14. REINFORCEMENT, DETAILING, AND PLACEMENT OF CONCRETE SHALL CONFORMTO ASTM 315 AND ACI 318. CONCRETE SHALL CONFORM TO ASTM C94. CONCRETEWORK SHALL CONFORM TO ACI 318, PART ENTITLED “CONSTRUCTIONREQUIREMENTS.” COMPRESSIVE STRENGTH IN 28 DAYS SHALL BE 3,000 PSI. TOTALAIR CONTENT OF EXTERIOR CONCRETE SHALL BE BETWEEN 5 AND 7 PERCENT BYVOLUME. SLUMP SHALL BE BETWEEN 3 AND 4IN. CONCRETE SHALL BE CURED FOR 7DAYS AFTER PLACEMENT.

15. WHEN PLUMBING WORK IS SUBCONTRACTED, IT SHALL BE THE PLUMBINGCONTRACTOR'S RESPONSIBILITY TO COORDINATE SUBCONTRACTORS AND THEASSOCIATED CONTRACTS. WHEN DISCREPANCIES ARISE PERTAINING TO WHICHCONTRACTOR PROVIDED A PARTICULAR ITEM OF THE PLUMBING CONTRACT OR WHICHCONTRACTOR PROVIDES FINAL CONNECTIONS FOR A PARTICULAR ITEM OF THEPLUMBING CONTRACT, IT SHALL BE BROUGHT TO THE ATTENTION OF THE PLUMBINGCONTRACTOR, WHOSE DECISION SHALL BE FINAL.

16. THE LOCATIONS OF ALL ITEMS SHOWN ON THE DRAWINGS OR CALLED FOR INTHE SPECIFICATIONS THAT ARE NOT DEFINITELY FIXED BY DIMENSIONS AREAPPROXIMATE ONLY. THE EXACT LOCATIONS NECESSARY TO SECURE THE BESTCONDITIONS AND RESULTS MUST BE DETERMINED BY THE PROJECT SITE CONDITIONSAND SHALL HAVE THE APPROVAL OF THE ENGINEER BEFORE BEING INSTALLED. DONOT SCALE DRAWINGS.

17. ALL MISCELLANEOUS STEEL REQUIRED TO ENSURE PROPER INSTALLATION ANDAS SHOWN IN DETAILS FOR PIPING AND EQUIPMENT (UNLESS OTHERWISE NOTED)SHALL BE FURNISHED AND INSTALLED BY THE PLUMBING CONTRACTOR.

18. PROVIDE ACCESS PANELS FOR INSTALLATION IN WALLS AND CEILINGS, WHEREREQUIRED TO SERVICE VALVES AND OTHER CONCEALED PLUMBING EQUIPMENT.ACCESS PANELS SHALL BE TURNED OVER TO THE GENERAL CONTRACTOR FORINSTALLATION.

19. ALL EQUIPMENT, PIPING, ETC. SHALL BE SUPPORTED AS DETAILED, SPECIFIEDAND REQUIRED TO PROVIDE A VIBRATION-FREE INSTALLATION.

20. ALL PIPING AND EQUIPMENT SUPPORTED FROM STRUCTURAL STEEL SHALL BECOORDINATED WITH THE GENERAL CONTRACTOR. ALL ATTACHMENTS TO STEEL BARJOISTS, TRUSSES, OR JOISTS GIRDERS SHALL BE AT PANEL POINTS. PROVIDE BEAMCLAMPS MEETING MSS STANDARDS. WELDING TO STRUCTURAL MEMBERS SHALL NOTBE PERMITTED. THE USE OF C-CLAMPS SHALL NOT BE PERMITTED.

21. MECHANICAL EQUIPMENT, AND PIPING SHALL NOT SUPPORTED FROM A METALDECK.

22. LOCATIONS AND SIZES OF FLOOR, WALL AND ROOF OPENINGS SHALL BECOORDINATED WITH ALL OTHER TRADES INVOLVED.

23. ALL OPENINGS IN FIRE AND/OR SMOKE RATED CONSTRUCTION DUE TO PIPING,CONDUIT, ETC. SHALL BE FIRE STOPPED WITH AN APPROVED LISTED AND LABELEDFIRE STOPPING MATERIAL.

24. CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTINGEQUIPMENT AND UTILITIES BEFORE COMMENCING WORK.

1. ALL SANITARY AND STORM PIPING 2" AND SMALLER SHALL BE SLOPED ATA MINIMUM 1/4" PER FOOT, AND ALL SANITARY AND STORM PIPING 3" ANDLARGER SHALL BE SLOPED AT A MINIMUM OF 1/8" PER FOOT, UNLESSOTHERWISE NOTED OR AS REQUIRED BY THE LOCAL AUTHORITY HAVINGJURISDICTION.

2. ALL PIPING WORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED.OFFSETS IN PIPING AROUND OBSTRUCTIONS SHALL BE PROVIDED AT NOADDITIONAL COST TO THE OWNER.

3. PROVIDE HOSE END DRAIN VALVES AT THE BOTTOM OF ALL RISERS ANDLOW POINTS.

4. UNLESS OTHERWISE NOTED, ALL PIPING IS OVERHEAD, TIGHT TO THEUNDERSIDE OF THE STRUCTURE OR SLAB, WITH SPACE FOR INSULATION IFREQUIRED.

5. INSTALL PIPING SO ALL VALVES, STRAINERS, UNIONS, TRAPS, FLANGES,AND OTHER APPURTENANCES REQUIRING ACCESS ARE ACCESSIBLE.

6. ALL VALVES SHALL BE INSTALLED SO THAT THE VALVE REMAINS INSERVICE WHEN EQUIPMENT OR PIPING ON THE EQUIPMENT SIDE OF THE VALVEIS REMOVED.

7. ALL BALANCING VALVES AND BUTTERFLY VALVES SHALL BE PROVIDEDWITH POSITION INDICATORS AND THE MAXIMUM ADJUSTABLE STOPS (MEMORYSTOPS).

8. ALL VALVES (EXCEPT CONTROL VALVES) AND STRAINERS SHALL BE THEFULL SIZE OF THE PIPE BEFORE REDUCING IN SIZE TO MAKE CONNECTIONS TOEQUIPMENT AND CONTROLS.

9. UNIONS AND/OR FLANGES SHALL BE INSTALLED AT EACH PIECE OFEQUIPMENT, IN BYPASSES, AND IN LONG PIPING RUNS (100 FT OR MORE) TOPERMIT DISASSEMBLY FOR ALTERNATION AND REPAIRS.

10. INSTALL ALL PIPING WITHOUT FORCING OR SPRINGING.

11. ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY OPERATION.

12. PLUMBING CONTRACTOR SHALL ROUGH-IN AND CONNECT ALL EQUIPMENTREQUIRING GAS, WATER, WASTE, VENT, AND/OR COMPRESSED AIR WHETHEROR NOT EQUIPMENT IS FURNISHED UNDER THIS CONTRACT. ALSO, PLUMBINGCONTRACTOR TO FURNISH AND INSTALL ALL NECESSARY PIPE, FITTINGS,VALVES, TRAPS, ETC., REQUIRED FOR A COMPLETE INSTALLATION, LEAVINGSAME READY FOR SERVICE.

13. ALL CEILING AREAS THROUGHOUT THE BUILDING AS A PART OF THISPROJECT ARE TO BE CONSIDERED 'PLENUM AREAS' AND THEREFORE THECONTRACTOR MUST BE AWARE OF THE ACCEPTABLE PIPING MATERIAL TO BEUSED. REFERENCE MUST BE MADE TO THE PLUMBING SPECIFICATIONS FORADDITIONAL INFORMATION.

1. ALL INDIVIDUAL MEDICAL GAS OUTLETS SHALL BE 1/2', EXCEPT MEDICALVACUUM AND WASTE ANESTHESIA GAS, WHICH SHALL BE 3/4".

2. PLUMBING CONTRACTOR SHALL COMPLY WITH ALL REQUIREMENTSASSOCIATED WITH NFPA 99 AND ASSE SERIES 6000.

3. ALL PRESSURE SWITCHES, PRESSURE GAUGES, AND PRESSURE-SENSINGDEVICES DOWNSTREAM OF THE SOURCE VALVE SHALL BE PROVIDED WITH AGAS SPECIFIC DEMAND CHECK FITTING TO FACILITATE SERVICING, TESTING,AND/OR REPLACEMENT.

4. ALL CONTROL WIRING FROM PRESSURE-SENSING DEVICES TO ALARMPANELS SHALL BE UNDER DIVISION 22. THE ELECTRICAL CONTRACTOR SHALLPROVIDE POWER WIRING TO THE ALARM PANEL.

MATTHEW R. SOTOSKY

P R O F E S S I O N A L

R E G I S T E R E D

E N G I N E E R

045576-E

CO

M

MO NWEA LT H

OF

PE

N N S Y L V A N I A

SHEET NO.

SEAL

ISSUED/ REVISED FOR DATE

2729 Prospect Avenue Cleveland, OH 44115 216.621.79002631 West 8th Street Erie, PA 16505 814.838.7525

BOSTWICKDESIGN.com

P

BostwickDesign

Partnership

GENERAL NOTES

SHEET NOTES

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

A

B

C

D

E

F

G

J

K

L

M

N

H

P

P

C:\U

sers

\Bria

nSel

epac

k\D

ocum

ents

\Rev

it-Lo

cal\1

5-09

51-S

VH

Che

mo

Infu

sion

Cen

ter

at H

ardn

er_M

EP

_Bria

nSel

epac

k.rv

t2/

22/2

016

11:4

2:09

AM

SYMBOLS,ABREVIATIONS,NOTES, ANDSCHEDULES

P001

AHN SAINTVINCENT

HOSPITALCHEMO INFUSION

CENTER EXPANSIONAT HARDNER

BDP NO. #####

1/8" = 1'-0"1 PLUMBING COVER SHEET

PLAN REVIEW SUBMISSION FEB 2016

Page 20: AHN SAINT VINCENT HOSPITAL · ed103 ground floor plan - hvac power demolition e001 symbols, abbreviations, notes and schedules e101 ground floor plan - lighting e102 ground floor

ETR

ETR ETR ETR ETRETR

ETR

ETR ETR

ETR

ETR

ETR

ETR

ETR

ETR

WC-1

L-1

WC-1

L-1

S-1

S-2

S-1

L-1

S-1

S-1

L-1

L-1 WC-1

L-1

1/2"1/2"

1/2"AC

PROVIDE NEWBALL VALVES

CONN NEW1/2"CW, 1/2"HW &1/2"HWR

BS

CONN NEW1/2"CW & 1/2"HW

EX 2"CW, 1 1/2"HW& 3/4"HWR RISER

CONN NEW1/2"CW & 1/2"HW

EX 1/2"CW& 1/2"HW

CONN NEW1/2"CW & 1/2"HW

EX 1/2"CW& 1/2"HW

EX 1"CWEX 1/2"HWEX 1/2"HWR

EX 1"CWEX 1/2"HWEX 1/2"HWR

3/4"CW1/2"HW

WHATYPE "A"

AC

AC

BS

CONN NEW 1"CW,3/4"HW & 1/2"HWR

EX 2"CW, 1 1/2"HW& 3/4"HWR RISER

EX 1 1/4"CW,1"HW & 1/2"HWR

3/4"

1/2"1"

WHATYPE "A"

3/4"

1/2"1/2"1/2"

EXIST. SOILED HOLDG28

EXIST. PATIENT T.R.G27

EXIST.STAFF T.R.G08

EXIST. PATIENT T.R.G12

EXIST. CLEAN SUPPLYG29

MAIL ROOMG33

EXIST STAIRG-SA

SHELVINGG06

BREAK ROOMG07

CLOSETG03

PRIVATE ROOM 1G09

PRIVATE ROOM 2G11

STORAGEG05

WAITINGG01

MEN'S T.R.G41

LOCKERSG40

INTAKEG26

ROOM 7G17

ROOM 5G15

ROOM 4G14

ROOM 3G13

CORRIDORG02

CORRIDORG04

VENDINGG32

NURSE STATION/ RECEPTIONG31

EXIST. NURSEG30

CORRIDORG34

OPEN OFFICEG36

EXAMG37

PATIENT T.R.G10

ROOM 13G23

ROOM 11G21

ROOM 9G19

ROOM 8G18

LOCKERSG42

WOMEN'S T.R.G43

PHARMACYG35

CORRIDORG38

BREAK ROOMG39

ROOM 10G20

ROOM 12G22

ROOM 15G25

ROOM 14G24

ROOM 6G16

TMV-1

TMV-1TMV-1

TMV-1

TMV-1

TMV-1

TMV-1

TMV-1

TMV-1

TMV-1

MATTHEW R. SOTOSKY

P R O F E S S I O N A L

R E G I S T E R E D

E N G I N E E R

045576-E

CO

M

MO NWEA LT H

OF

PE

N N S Y L V A N I A

SHEET NO.

SEAL

ISSUED/ REVISED FOR DATE

2729 Prospect Avenue Cleveland, OH 44115 216.621.79002631 West 8th Street Erie, PA 16505 814.838.7525

BOSTWICKDESIGN.com

P

BostwickDesign

Partnership

GENERAL NOTES

SHEET NOTES

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

A

B

C

D

E

F

G

J

K

L

M

N

H

P

P

C:\U

sers

\Bria

nSel

epac

k\D

ocum

ents

\Rev

it-Lo

cal\1

5-09

51-S

VH

Che

mo

Infu

sion

Cen

ter

at H

ardn

er_M

EP

_Bria

nSel

epac

k.rv

t2/

22/2

016

11:4

2:11

AM

GROUND FLOOR PLAN- WATER PIPING

P101

AHN SAINTVINCENT

HOSPITALCHEMO INFUSION

CENTER EXPANSIONAT HARDNER

BDP NO. #####

1/8" = 1'-0"1 GROUND FLOOR - WATER PIPING

PLAN REVIEW SUBMISSION FEB 2016

Page 21: AHN SAINT VINCENT HOSPITAL · ed103 ground floor plan - hvac power demolition e001 symbols, abbreviations, notes and schedules e101 ground floor plan - lighting e102 ground floor

REF.N.I.C.

RE

F.

N.I.

C.

ETR

ETR ETR ETR ETRETR

ETR

ETR ETR

ETR

ETR

ETR

ETR

ETR

ETR

EX 3"VS& 4"SS

CONN NEW 4"W &2"V TO EX STACKSIN THIS AREA

CO

CO

WC-1WC-1

L-1L-1

S-1

S-2

S-1

S-1

L-1

L-1

S-1

WC-1

L-1

2"

4"

2"

4"

2"

2"V-UPIN WALL

2"W & V

3"1 1/2"

L-1

1 1/2"

3"

AC

BF

1 1/2"

1 1/2"

EX 4"W

EX 2"V

EX 4"WEX 2"V

1 1/2"

1 1/2"

1 1/2"V

4"

2"1 1/2"

4"

EXTEND AND CONN NEW4"S & 2"V TO EX SYSTEMSOF ADEQUATE SIZE INTHIS AREA.

EXTEND AND CONN NEW1 1/2"V TO EX VENT OFADEQUATE SIZE IN THISAREA.

MAIL ROOMG33

VENDINGG32

PHARMACYG35

CORRIDORG34

OPEN OFFICEG36

EXAMG37

BREAK ROOMG39

CORRIDORG38

LOCKERSG40

LOCKERSG42

MEN'S T.R.G41

WOMEN'S T.R.G43

EXIST STAIRG-SA

CORRIDORG02

EXIST. NURSEG30

EXIST. SOILED HOLDG28

EXIST. PATIENT T.R.G27

EXIST. CLEAN SUPPLYG29

NURSE STATION/ RECEPTIONG31

WAITINGG01

STORAGEG05

EXIST. PATIENT T.R.G12

CLOSETG03

CORRIDORG04

EXIST.STAFF T.R.G08

BREAK ROOMG07

PATIENT T.R.G10

PRIVATE ROOM 1G09PRIVATE ROOM 2

G11

ROOM 3G13ROOM 4

G14

ROOM 5G15

ROOM 6G16

ROOM 7G17

ROOM 8G18

ROOM 9G19

ROOM 10G20

ROOM 11G21

ROOM 12G22

ROOM 13G23

ROOM 14G24

ROOM 15G25

INTAKEG26

SHELVINGG06

CO

E N G I N E E R

045691-E

SN N

EP

AY L VI A

N

WR E G I S T E R E D

P R O F E S S I O N A L

RODNEY A. WOLFE

OC

NM O

M

FO

TE A L H

SHEET NO.

SEAL

ISSUED/ REVISED FOR DATE

2729 Prospect Avenue Cleveland, OH 44115 216.621.79002631 West 8th Street Erie, PA 16505 814.838.7525

BOSTWICKDESIGN.com

P

BostwickDesign

Partnership

GENERAL NOTES

SHEET NOTES

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

A

B

C

D

E

F

G

J

K

L

M

N

H

P

P

C:\U

sers

\Bria

nSel

epac

k\D

ocum

ents

\Rev

it-Lo

cal\1

5-09

51-S

VH

Che

mo

Infu

sion

Cen

ter

at H

ardn

er_M

EP

_Bria

nSel

epac

k.rv

t2/

22/2

016

11:4

2:12

AM

GROUND FLOOR PLAN- DRAINAGE ANDVENT PIPING

P102

AHN SAINTVINCENT

HOSPITALCHEMO INFUSION

CENTER EXPANSIONAT HARDNER

BDP NO. #####

1/8" = 1'-0"1 GROUND FLOOR - DRAINAGE AND VENT PIPING

PLAN REVIEW SUBMISSION FEB 2016

Page 22: AHN SAINT VINCENT HOSPITAL · ed103 ground floor plan - hvac power demolition e001 symbols, abbreviations, notes and schedules e101 ground floor plan - lighting e102 ground floor

AAP-1ZVB-1

O

O

O

O

O

OOO

O

O

O

O

OOOOOO

EX 3/4"OXY-AC

EX 1/2"OXY TAP 1/2"

1/2"

1/2"

1/2"1/2"1/2"1/2"

1/2"OXY DNTO OUTLET(TYPICAL)

AC

AC AC

ETR

ETR ETR ETR ETRETR

ETR

ETR ETR

ETR

ETR

ETR

ETR

ETR

ETR

S-1

L-1

S-1

L-1

L-1

WC-1

WC-1 WC-1

L-1L-1

S-1S-2

S-1

COORD FINALLOCATIONWITH OWNER

EXIST. SOILED HOLDG28

EXIST. PATIENT T.R.G27

EXIST.STAFF T.R.G08

EXIST. PATIENT T.R.G12

EXIST. CLEAN SUPPLYG29

MAIL ROOMG33

EXIST STAIRG-SA

SHELVINGG06

BREAK ROOMG07

CLOSETG03

PRIVATE ROOM 1G09

PRIVATE ROOM 2G11

STORAGEG05WAITING

G01

MEN'S T.R.G41

LOCKERSG40

INTAKEG26

ROOM 7G17

ROOM 5G15

ROOM 4G14

ROOM 3G13

CORRIDORG02

CORRIDORG04

VENDINGG32

NURSE STATION/ RECEPTIONG31

EXIST. NURSEG30

CORRIDORG34

OPEN OFFICEG36

EXAMG37

PATIENT T.R.G10

ROOM 13G23

ROOM 11G21

ROOM 9G19

ROOM 8G18

LOCKERSG42

WOMEN'S T.R.G43

PHARMACYG35

CORRIDORG38

BREAK ROOMG39

ROOM 10G20

ROOM 12G22

ROOM 15G25

ROOM 14G24

ROOM 6G16

E N G I N E E R

045691-E

SN N

EP

AY L VI A

N

WR E G I S T E R E D

P R O F E S S I O N A L

RODNEY A. WOLFE

OC

NM O

M

FO

TE A L H

SHEET NO.

SEAL

ISSUED/ REVISED FOR DATE

2729 Prospect Avenue Cleveland, OH 44115 216.621.79002631 West 8th Street Erie, PA 16505 814.838.7525

BOSTWICKDESIGN.com

P

BostwickDesign

Partnership

GENERAL NOTES

SHEET NOTES

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

A

B

C

D

E

F

G

J

K

L

M

N

H

P

P

C:\U

sers

\Bria

nSel

epac

k\D

ocum

ents

\Rev

it-Lo

cal\1

5-09

51-S

VH

Che

mo

Infu

sion

Cen

ter

at H

ardn

er_M

EP

_Bria

nSel

epac

k.rv

t2/

22/2

016

11:4

2:13

AM

GROUND FLOOR PLAN- MEDICAL GAS PIPING

P103

AHN SAINTVINCENT

HOSPITALCHEMO INFUSION

CENTER EXPANSIONAT HARDNER

BDP NO. #####

1/8" = 1'-0"1 GROUND FLOOR - MEDICAL GAS PIPING

PLAN REVIEW SUBMISSION FEB 2016

Page 23: AHN SAINT VINCENT HOSPITAL · ed103 ground floor plan - hvac power demolition e001 symbols, abbreviations, notes and schedules e101 ground floor plan - lighting e102 ground floor

ID #

TMV-1

LOCATION

THERMOSTATIC MIXING VALVE SCHEDULEREMARKS

NOTES:1. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.2 MIXING VALVE SHALL BE ACCESSIBLE ABOVE CEILING OR BELOW FIXTURE .

CONNNECTION SIZEINLETS OUTLET

INLET TEMPERATURE OUTLET TEMPERATURE TEMPERATURE DROP

SINGLE FIXTURE(S) NOTES 1, 21/2" 1/2" 120° F 105° F 25° F

TRAP PRIMER PIPING SCHEMATICNO SCALE

FLOOR DRAIN. REFER TOFLOOR PLAN FOR LOCATION.

DROP 1/2" TRAP PRIMER PIPINGDOWN TO BELOW FLOOR. REFERTO FLOOR PLAN FOR WALL/CHASELOCATIONS FOR PIPE DROP.

DISTRIBUTION UNIT - REFERTO FLOOR PLAN FOR NUMBEROF TRAP PRIMER OUTLETS.

AIR GAP VACUUMBREAKING PORTS

TRAP PRIMER. REFER TOSPECIFICATIONS FORADDITIONAL INFORMATION.

COLD WATER PIPING. REFERTO FLOOR PLAN FOR PIPEROUTING AND SIZING.

TRAP PRIMER CONNECTEDTO COLD WATER PIPING.

BALLVALVE (TYP)

12" MIN TOHORIZONTALRUN OF PIPE

10"T

NO SCALE

EMERGENCY FIXTURE MIXING VALVE PIPING SCHEMATIC

NOTES:1. THIS PIPING ARRANGEMENT IS FOR A SINGLEEMERGENCY FIXTURE WITH MIXING VALVE ABOVECEILING. PROVIDE ACCESS PANEL IN INACCESSIBLECEILING SPACES WHERE REQUIRED. REFER TOARCHITECTURAL DRAWINGS FOR INFORMATION.

2. FOR A SINGLE MIXING VALVE TO SERVE MULTIPLEEMERGENCY FIXTURES, REFER TO FLOOR PLANS FORPIPING SIZING AND ARRANGEMENT. MIXING VALVESHALL BE SIZED AND RATED FOR THE TOTAL FLOWRATE REQUIRED BY THE NUMBER OF FIXTURESCONNECTED TO THAT PARTICULAR MIXING VALVE.

3. FOR COUNTERTOP EMERGENCY FIXTURES WITHCASEWORK BELOW, IT IS ACCEPTABLE TO LOCATE THEMIXING VALVE, WITH ASSOCIATED UNIONS AND SHUT-OFF VALVES, IN THE CASEWORK BELOW FIXTURE,PROVIDED THE OWNER AND AUTHORITIES HAVINGJURISDICTION ALLOW THIS LOCATION.

TEMPERED HOT WATER TO EMERGENCYFIXTURE(S). REFER TO FLOOR PLAN FORPIPE SIZING AND ROUTING

NORMALLY OPENLOCKABLE BALL VALVE (TYP)

COLD WATER PIPING FROM SYSTEM.REFER TO FLOOR PLANS FORPIPE SIZING AND ROUTING.

EMERGENCY FIXTURE MIXING VALVE THATMEETS ANSI Z358.1. SET OUTLET TEMPERATURETO 85° OR AS DIRECTED BY OPERATING PERSONNEL.REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.UNION (TYP)

CHECK VALVE (TYP)

HOT WATER PIPING FROMSYSTEM. REFER TO FLOOR PLANSFOR PIPE SIZING AND ROUTING.

THERMOMETER (TYP)

OO

NON-ANESTHETIC ZONE VALVE BOX PIPING SCHEMATICNO SCALE

MEDICAL GAS PIPING UP TO ABOVE CEILING TOMEDICAL GAS PIPING SYSTEMS IN ZONE. REFERTO FLOOR PLAN(S) FOR TYPES, SIZING, ANDROUTING OF PIPING.

MEDICAL GAS PIPING DOWN FROM ABOVE CEILINGFROM MEDICAL GAS MAINS. REFER TO FLOORPLAN(S) FOR TYPES, SIZING, AND ROUTING OF PIPING.

ZONE VALVE BOX, AS LOCATED ON FLOOR PLAN(S). REFERTO FLOOR PLAN(S) FOR ZONE VALVE BOX SIZE, LOCATION,AND DESIGNATION. VERIFY EXACT LOCATION OF ZONEVALVE BOX LOCATION(S) AND DESIGNATION(S) WITHARCHITECT AND OWNER PRIOR TO INSTALLATION.

INTEGRAL PRESSURE TRANSDUCER. PLUMBINGCONTRACTOR SHALL BE RESPONSIBLE FORCONNECTING TRANSDUCER TO ASSOCIATEDAREA ALARM PANEL. REFER TO ZONE VALVEBOX SCHEDULE FOR ADDITIONAL INFORMATION.

TUBINGPIPE

NOM. SIZE

MAXIMUM PIPE/TUBING SUPPORT SPACING, FEET

1 1/4THRU 3/4"

7 FT 7

6

1 1 1/2

7

7

109

8 8

2

13

16

10

1211

9

2 1/2

14

12

43 5

1917

14 16

6 8

22_

10

5 FT

NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.

NO SCALE

TRAPEZE HANGER FOR UPTO 1000 LB. UNIFORM LOAD

SIDE VIEW

ADJUSTABLE CLEVIS HANGERTYPE 1 IN SPECIFICATIONS

ADJUSTABLE ROLLER HANGERTYPE 44 IN SPECIFICATIONS

PIPE HANGER AND SUPPORT DETAIL

1/2" DIA HANGER RODS WITH36" MAX SPACING ON EACH CHANNEL

1 5/8" 12 GAGE CHANNELOR 2"x 2"x 1/4" ANGLE

PROVIDE INSULATION SHIELDAND INSERT FOR ALL PIPING

BAND

SADDLE

WELD

INSULATION

HANGER ROD

HANGER RODINSULATION(VAPOR BARRIERTYPE IS REQUIRED FORLOW TEMPERATURE PIPE)

PROVIDE HIGH COMPRESSIVESTRENGTH INSULATION INSERTUNDER INSULATION SHIELD

INSULATIONSHIELD AT HANGER

MATTHEW R. SOTOSKY

P R O F E S S I O N A L

R E G I S T E R E D

E N G I N E E R

045576-E

CO

M

MO NWEA LT H

OF

PE

N N S Y L V A N I A

SHEET NO.

SEAL

ISSUED/ REVISED FOR DATE

2729 Prospect Avenue Cleveland, OH 44115 216.621.79002631 West 8th Street Erie, PA 16505 814.838.7525

BOSTWICKDESIGN.com

P

BostwickDesign

Partnership

GENERAL NOTES

SHEET NOTES

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

A

B

C

D

E

F

G

J

K

L

M

N

H

P

P

C:\U

sers

\Bria

nSel

epac

k\D

ocum

ents

\Rev

it-Lo

cal\1

5-09

51-S

VH

Che

mo

Infu

sion

Cen

ter

at H

ardn

er_M

EP

_Bria

nSel

epac

k.rv

t2/

22/2

016

11:4

2:15

AM

PLUMBING DETAILSAND SCHEDULES

P200

AHN SAINTVINCENT

HOSPITALCHEMO INFUSION

CENTER EXPANSIONAT HARDNER

BDP NO. #####

PLUMBING FIXTURE SCHEDULE

ID # FIXTURE DESCRIPTIONSANTIARY, SOIL, & VENT

CONNECTIONWATER SUPPLYCONNECTION NOTES

L-1 WALL MOUNTED LAVATORY WITH MANUAL FAUCET - ADA HEIGHT 1 1/2" W & V 1/2" HW & CW NOTE 1S-1 WORK SINK - DROP-IN -MANUAL FAUCET - ADA HEIGHT 1 1/2" W & V 1/2" HW & CW NOTE 1S-2 EXAM ROOM SINK - DROP-IN -MANUAL FAUCET - ADA HEIGHT 1 1/2" W & V 1/2" HW & CW NOTE 1

WC-1 FLOOR MOUNTED WATER CLOSET - (DUAL FLUSH) TANK TYPE 4" W, 2" V 1/2" CW NOTE 1

PLAN REVIEW SUBMISSION FEB 2016

Page 24: AHN SAINT VINCENT HOSPITAL · ed103 ground floor plan - hvac power demolition e001 symbols, abbreviations, notes and schedules e101 ground floor plan - lighting e102 ground floor

ETR

ETR

ETRETR

ETR ETR

ETR

ETR

ETR

ETRMATTHEW R. SOTOSKY

P R O F E S S I O N A L

R E G I S T E R E D

E N G I N E E R

045576-E

CO

M

MO NWEA LT H

OF

PE

N N S Y L V A N I A

SHEET NO.

SEAL

ISSUED/ REVISED FOR DATE

2729 Prospect Avenue Cleveland, OH 44115 216.621.79002631 West 8th Street Erie, PA 16505 814.838.7525

BOSTWICKDESIGN.com

P

BostwickDesign

Partnership

GENERAL NOTES

SHEET NOTES

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

A

B

C

D

E

F

G

J

K

L

M

N

H

P

P

C:\U

sers

\Bria

nSel

epac

k\D

ocum

ents

\Rev

it-Lo

cal\1

5-09

51-S

VH

Che

mo

Infu

sion

Cen

ter

at H

ardn

er_M

EP

_Bria

nSel

epac

k.rv

t2/

22/2

016

11:4

2:06

AM

GROUND FLOOR PLAN- FIRE PROTECTIONDEMOLITION

FP100

AHN SAINTVINCENT

HOSPITALCHEMO INFUSION

CENTER EXPANSIONAT HARDNER

BDP NO. #####

1/8" = 1'-0"1

GROUND FLOOR PLAN - FIRE PROTECTIONDEMOLITION

REMOVE EXISTING SPRINKLER HEADS ON THISDRAWING THAT ARE NOT INDICATED AS EXISTING TOREMAIN (ETR). REMOVE ASSOCIATED BRANCH PIPINGAS REQUIRED. CAP PIPING AS REQUIRED.

PLAN REVIEW SUBMISSION FEB 2016

Page 25: AHN SAINT VINCENT HOSPITAL · ed103 ground floor plan - hvac power demolition e001 symbols, abbreviations, notes and schedules e101 ground floor plan - lighting e102 ground floor

FIRE PROTECTION LEGEND - SYMBOLS

1. THESE NOTES ARE GENERAL IN NATURE AND PERTAIN TO THE ENTIRE PROJECT UNLESSOTHERWISE NOTED AS SUCH ON AN INDIVIDUAL DRAWING.

2. PRIOR TO BIDDING, THE CONTRACTOR SHALL EXAMINE ALL PROJECT DRAWINGS ANDSPECIFICATIONS TO DEVELOP A COMPLETE UNDERSTANDING OF THE PROJECT SCOPE. THECONTRACTOR SHALL VISIT THE SITE AND VERIFY EXISTING CONDITIONS BEFORE BIDDING. FAILURETO DO THIS WILL NOT RELIEVE THE CONTRACTOR OF HIS RESPONSIBILITIES TO PERFORM ALLREQUIRED WORK. THE CONTRACTOR SHALL ADVISE THE PROFESSIONAL OF ANY DISCREPANCIESWHICH WILL AFFECT THE WORK REQUIRED.

3. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH NFPA 13 AND ALL OTHER PERTINENTCODES AND REGULATIONS. THE CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN ACCORDANCEWITH NFPA 13, OTHER APPLICABLE CODES, MANUFACTURER'S WRITTEN INSTRUCTIONS, ANDRECOGNIZED INDUSTRY PRACTICES. ALL EQUIPMENT, DEVICES, AND MATERIALS SHALL BE ULLISTED AND FM APPROVED.

4. THE CONTRACTOR IS RESPONSIBLE FOR SUBMITTING ALL REQUIRED INFORMATION TO THEAUTHORITY HAVING JURISDICTION TO OBTAIN THE NECESSARY PERMITS AND APPROVALS. ALLFEES ASSOCIATED WITH THIS SUBMISSION ARE THE RESPONSIBILITY OF THE CONTRACTOR. THECONTRACTOR SHALL COORDINATE ALL REQUIRED INSPECTIONS AND BE RESPONSIBLE FOR ALLFEES CHARGED BY THE AUTHORITY HAVING JURISDICTION FOR SUCH INSPECTIONS.

5. REFER TO THE ARCHITECTURAL PLANS FOR DIMENSIONS, ROOM FINISHES, FIRE WALLS, AND LIKEITEMS. REFER TO THE STRUCTURAL DRAWINGS FOR STRUCTURAL MEMBERS. REFER TO OTHERTRADES PLANS TO UNDERSTAND THE EXTENT OF THEIR WORK AS REQUIRED.

6. DO NOT SCALE DRAWINGS. HOLD INDICATED DIMENSIONS WHERE SHOWN. RESOLVE ANYDISCREPANCIES WITH THE PROFESSIONAL PRIOR TO BEGINNING WORK.

7. THE EXISTING FIRE PROTECTION SYSTEM SHALL BE EXTENDED, MODIFIED, AND HYDRAULICALLY SIZEDBY THE FIRE PROTECTION CONTRACTOR, AS NEEDED TO PROVIDE A COMPLETE FIRE PROTECTIONSYSTEM. THE COMPLETE SYSTEM SHALL BE IN ACCORDANCE WITH NFPA 13 AND ALL APPLICABLE CODES.THE FIRE PROTECTION CONTRACTOR SHALL FIELD VERIFY LOCATIONS AND SIZES OF EXISTING FIRE

8. THE CONTRACTOR SHALL SUBMIT ALL SHOP DRAWINGS SHOWING PIPING, PIPE SIZES, ANDSPRINKLER HEAD LAYOUTS, ALONG WITH SUPPORTING HYDRAULIC CALCULATIONS AND CATALOGCUT SHEETS TO THE PROFESSIONAL AND APPROPRIATE STATE AND LOCAL AGENCIES HAVINGJURISDICTION FOR REVIEW AND APPROVAL PRIOR TO INSTALLATION.

9. THE CONTRACTOR IS RESPONSIBLE FOR CONDUCTING A WATER FLOW TEST AND SUBMITTINGTHE INFORMATION TO THE PROFESSIONAL PRIOR TO THE COMPLETION OF THE SHOP DRAWINGS.

10. THE LAYOUT OF THE DRAWINGS IS DIAGRAMMATIC. THE CONTRACTOR SHALL COORDINATE WITHOTHER TRADES TO ELIMINATE CONFLICTS BETWEEN STRUCTURAL ELEMENTS AS WELL AS PIPING,DUCTWORK, ELECTRICAL, AND ARCHITECTURAL WORK. PROVIDE OFFSETS, TRANSITIONS INPIPING, AND AUXILIARY LOW POINT DRAINS AS REQUIRED TO AVOID INTERFERENCES AT NOADDITIONAL COST TO THE PROJECT.

11. THE DRAWINGS MAY NOT SHOW ALL OF THE HEADS REQUIRED. ANY HEADS SHOWN ON THEDRAWINGS ARE INTENDED TO SHOW THE INTENT OF THE LAYOUT WITH RESPECT TOARCHITECTURAL AND OTHER TRADES WORK. THE CONTRACTOR IS ULTIMATELY RESPONSIBLE FORTHE FINAL QUANTITY AND PLACEMENT OF ALL SPRINKLER HEADS IN ACCORDANCE WITH NFPA 13.

12. ALL SPRINKLER HEAD TYPES AND FINISHES SHALL BE COORDINATED WITH THE ARCHITECT.SPRINKLER HEADS INSTALLED IN CEILING TILES ARE TO BE CENTERED IN THE TILE EACH WAY.

13. SPRINKLERS SHALL BE INSTALLED UNDER ALL DUCTS OR OBSTRUCTIONS GREATER THAN 48INCHES IN WIDTH IN ACCORDANCE WITH NFPA 13.

14. ALL SPRINKLER HEADS IN AREAS THROUGHOUT THE BUILDING THAT ARE BELOW 7 FOOTCLEARANCE OR SUBJECT TO MECHANICAL DAMAGE SHALL BE EQUIPPED WITH HEAD GUARDS.

15. THE FIRE PROTECTION CONTRACTOR SHALL BE RESPONSIBLE FOR THE ROUTING OF THESPRINKLER PIPING SUCH THAT ONLY PIPING SERVING ELECTRICAL AND TELECOM ROOMS SHALLENTER THE ROOM ENCLOSURES. ADDITIONALLY, ROUTING OF PIPING DIRECTLY ABOVEELECTRICAL EQUIPMENT SHALL BE AVOIDED.

16. ALL PIPING SHALL BE CONCEALED IN AREAS WITH CEILINGS. PIPING SHALL BE EXPOSED INAREAS WITHOUT CEILINGS. CONTRACTOR SHALL COORDINATE ROUTINGS WITHIN THESE EXPOSEDAREAS TO PRODUCE A SYMMETRIC AND AESTHETIC PIPE AND HEAD LAYOUT.

17. THE AUTOMATIC SPRINKLER SYSTEM SHALL BE HYDRAULICALLY DESIGNED IN ACCORDANCEWITH THE AREA/DENSITY METHOD REQUIREMENTS OF NFPA 13. THE ROOM DESIGN METHODSHALL NOT BE USED.

18. ALL EQUIPMENT SHALL BE COORDINATED WITH OTHER TRADES AND ARCHITECTURAL ANDSTRUCTURAL FEATURES.

19. FIRE STOPPING FOR ALL PIPES PENETRATING FIRE RATED WALLS AND SEALING OF SMOKEBARRIERS SHALL BE IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS, THE UL LISTINGAND THE SPECIFICATIONS TO MAINTAIN THE RATING.

20. CONTRACTOR SHALL REPLACE IN KIND ALL CEILING TILES DAMAGED DURING INSTALLATION ATNO ADDITIONAL COST.

21. CONTRACTOR SHALL REPAINT OR REFINISH ANY AREA IN KIND IF INSTALLATION DEFACESEXISTING WALLS, FLOORS, OR CEILINGS.

22. AFTER ALL EQUIPMENT IS INSTALLED, IT SHALL BE TESTED IN ACCORDANCE WITH NFPA 13 ANDTHE SPECIFICATIONS. EQUIPMENT NOT OPERATING CORRECTLY SHALL BE FIELD CORRECTED ORREPLACED. THE OWNER'S REPRESENTATIVE, PROFESSIONAL, AND AUTHORITY HAVINGJURISDICTION SHALL BE PRESENT FOR THE TEST.

GENERAL FIRE PROTECTION NOTES

FIRE PROTECTION PIPING

FULLY CONCEALED PENDENT-TYPE SPRINKLER HEAD

UPRIGHT-TYPE SPRINKLER HEAD

SEMI-RECESSED SIDEWALL-TYPE SPRINKLER HEAD

WATER FLOW SWITCH

CHECK VALVE

VALVE WITH TAMPER SWITCH

PRESSURE GAUGE

PROTECTION SYSTEM PIPING AND HEADS. ALL CUTTING AND PATCHING REQUIRED FOR THIS WORKSHALL BE BY THE FIRE PROTECTION CONTRACTOR.

EXISTING PENDENT-TYPE SPRINKLER HEAD TO BE REMOVED

EXISTING FIRE PROTECTION PIPING TO REMAINETR

EXISTING UPRIGHT-TYPE SPRINKLER HEAD TO BE REMOVED

MATTHEW R. SOTOSKY

P R O F E S S I O N A L

R E G I S T E R E D

E N G I N E E R

045576-E

CO

M

MO NWEA LT H

OF

PE

N N S Y L V A N I A

SHEET NO.

SEAL

ISSUED/ REVISED FOR DATE

2729 Prospect Avenue Cleveland, OH 44115 216.621.79002631 West 8th Street Erie, PA 16505 814.838.7525

BOSTWICKDESIGN.com

P

BostwickDesign

Partnership

GENERAL NOTES

SHEET NOTES

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

A

B

C

D

E

F

G

J

K

L

M

N

H

P

P

C:\U

sers

\Bria

nSel

epac

k\D

ocum

ents

\Rev

it-Lo

cal\1

5-09

51-S

VH

Che

mo

Infu

sion

Cen

ter

at H

ardn

er_M

EP

_Bria

nSel

epac

k.rv

t2/

22/2

016

11:4

2:02

AM

SYMBOLS, NOTES &ABBREVIATIONS -FIRE PROTECTION

FP001

AHN SAINTVINCENT

HOSPITALCHEMO INFUSION

CENTER EXPANSIONAT HARDNER

BDP NO. #####

1/8" = 1'-0"1 FIRE PROTECTION COVER SHEET

PLAN REVIEW SUBMISSION FEB 2016

Page 26: AHN SAINT VINCENT HOSPITAL · ed103 ground floor plan - hvac power demolition e001 symbols, abbreviations, notes and schedules e101 ground floor plan - lighting e102 ground floor

TR

AC

K

TR

AC

K

TR

AC

K

TR

AC

K

TRACK

TR

AC

K

TR

AC

K

TR

AC

K

TR

AC

K

TR

AC

K

TR

AC

K

TR

AC

K

TR

AC

K

TR

AC

K

EXIST. SOILED HOLDG28

EXIST. PATIENT T.R.G27

EXIST.STAFF T.R.G08

EXIST. PATIENT T.R.G12

EXIST. CLEAN SUPPLYG29

MAIL ROOMG33

EXIST STAIRG-SA

SHELVINGG06

BREAK ROOMG07

CLOSETG03

PRIVATE ROOM 1G09

PRIVATE ROOM 2G11

STORAGEG05

WAITINGG01

MEN'S T.R.G41

LOCKERSG40

INTAKEG26

ROOM 7G17

ROOM 5G15

ROOM 4G14

ROOM 3G13

CORRIDORG02

CORRIDORG04

VENDINGG32

NURSE STATION/ RECEPTIONG31

EXIST. NURSEG30

CORRIDORG34

OPEN OFFICEG36

EXAMG37

PATIENT T.R.G10

ROOM 13G23

ROOM 11G21

ROOM 9G19

ROOM 8G18

LOCKERSG42

WOMEN'S T.R.G43

PHARMACYG35

CORRIDORG38

BREAK ROOMG39

ROOM 10G20

ROOM 12G22

ROOM 15G25

ROOM 14G24

ROOM 6G16

ETR

ETR

ETRETR

ETR ETR

ETRETR

ETR

ETR

MATTHEW R. SOTOSKY

P R O F E S S I O N A L

R E G I S T E R E D

E N G I N E E R

045576-E

CO

M

MO NWEA LT H

OF

PE

N N S Y L V A N I A

SHEET NO.

SEAL

ISSUED/ REVISED FOR DATE

2729 Prospect Avenue Cleveland, OH 44115 216.621.79002631 West 8th Street Erie, PA 16505 814.838.7525

BOSTWICKDESIGN.com

P

BostwickDesign

Partnership

GENERAL NOTES

SHEET NOTES

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

A

B

C

D

E

F

G

J

K

L

M

N

H

P

P

C:\U

sers

\Bria

nSel

epac

k\D

ocum

ents

\Rev

it-Lo

cal\1

5-09

51-S

VH

Che

mo

Infu

sion

Cen

ter

at H

ardn

er_M

EP

_Bria

nSel

epac

k.rv

t2/

22/2

016

11:4

2:08

AM

GROUND FLOOR PLAN- FIRE PROTECTION

FP201

AHN SAINTVINCENT

HOSPITALCHEMO INFUSION

CENTER EXPANSIONAT HARDNER

BDP NO. #####

1/8" = 1'-0"1 GROUND FLOOR PLAN - FIRE PROTECTION

CONNECT NEW SPRINKLER HEADS TO NEARESTADEQUATELY SIZED SPRINKLER MAINS AND BRANCHPIPING. PROVIDE ADDITIONAL PIPING AS REQUIRED.

PLAN REVIEW SUBMISSION FEB 2016

Page 27: AHN SAINT VINCENT HOSPITAL · ed103 ground floor plan - hvac power demolition e001 symbols, abbreviations, notes and schedules e101 ground floor plan - lighting e102 ground floor

E

S

E

S

S

OS

E

S S

OS

OS

OS

OS

OS SS

E

E

OS

OSSS

S

OS

OS

OSOSOS

OS

E

OS

S S

OS

SS

OS OS

OS

E

OS

E

OS

XR

XR XR

XR XR

XR

XR

XR

XR XR XR XR XRXR

XR XR

XR

XR

XRXR

XR XR

XR XR XR XR XR XR XR

XR XR XR XR XR XR XR XR XR XR XR XR

XR XR XR XR XR XR XR XR XR XR XR XR XR XR

XR XR

D DD

DD

REL REL REL

RELREL

DM

DM

DM3

3DM

REL

RELB B

DMDM

REL REL

F

G

F

FF RELREL

REL

RELREL

A A

RELREL

F

FF

REL REL

RELDDM DM

B

REL

A A

RELREL

F

F

FREL REL

REL

XRXR

DM

DMDM

DMDM

DM

DMDMDM

DM DM DM

DMDMDM

DM

XR

XRDDMDM

DM

REL

DM DM

DMDM

DM DMDM

DMDM

DMDM

DM DM

DM DM

DMDM

DM DM

DM

DM DM

DM

DM

DM

DM DM DM

DM

DM

DM

DDM

DM

XR

XRXR

XR

XR XR

REL

DM

DM

DM

XR

DM DM

DMDM

XR XR

XR XR

XRXR

XR XR

DMDM

DM DM

DMDM

XR

DM

DM

E N G I N E E R

045691-E

SN NEP

AY L VI A

N

WR E G I S T E R E D

P R O F E S S I O N A L

RODNEY A. WOLFE

OC

NM O

M

FO

TE A L H

SHEET NO.

SEAL

ISSUED/ REVISED FOR DATE

2729 Prospect Avenue Cleveland, OH 44115 216.621.79002631 West 8th Street Erie, PA 16505 814.838.7525

BOSTWICKDESIGN.com

P

BostwickDesign

Partnership

GENERAL NOTES

SHEET NOTES

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

A

B

C

D

E

F

G

J

K

L

M

N

H

P

P

C:\U

sers

\sm

oehl

er\D

ocum

ents

\Rev

it-Lo

cal\1

5-09

51-S

VH C

hem

o In

fusi

on C

ente

r at H

ardn

er_M

EP_S

Moe

hler

.rvt

2/22

/201

6 11

:43:

39 A

M

GROUND FLOOR PLAN- LIGHTINGDEMOLITION

ED101

AHN SAINTVINCENT

HOSPITALCHEMO INFUSION

CENTER EXPANSIONAT HARDNER

BDP NO. #####

1/8" = 1'-0"1 GROUND FLOOR PLAN - LIGHTING DEMOLITION

PLAN REVIEW SUBMISSION FEB 2016

Page 28: AHN SAINT VINCENT HOSPITAL · ed103 ground floor plan - hvac power demolition e001 symbols, abbreviations, notes and schedules e101 ground floor plan - lighting e102 ground floor

F

F

F

FFF

S

SS

TV TV TV TV TV TVTV

F

F

EP F

NCA

F

TV

S

TV

TV

F

EP TV

F

EP

S

F

F

FF

TV

TVF

F

F

NC N

C

NC NC

NC NC

NC NC

NC

NC

NC

DM

DM

DDDMDM

DMDM

DM

DM

DDDM

DM

DDDM

DM

DM

DM

DM

DM

DDDM

DMDM

DM

DM

DMDM

DM

DM

DM

DM

DMDM

DM

DM

DM

DM

DM

DMDMDM

DM

WDM

DM

DM DM

DM DDXR

DDXR DD

XREM

DDXR DD

XREM

DDXR DD

XREM

DDXR DD

XREM

DDXR DD

XREM

DDXREMXR XR XR XR XRXR

XR

DDDMDMXR XR

XR

XR

XR

XRGF

XRXR

XR

DDXR

XR

XR XR

XRXR

DM

DM DMDDDM

DDDM

DDDM

DM

DM

DM

REL

DM

DM

DMDM

DM

REL

REL

DM

DDDM DM

DM

DMGF

DDDM

RELREL

DMGF

DDDM

REL

DM

DDDM

DMGF

XRGF XR

XR

XR

XR

XR

DM

DM DM DM

DMDM

DM

DM

DM

DM

DM

DMDM

GL-1R

GL-1R

GL-1R

GL-1R

GL-1L

LCP

GL-1H

XR

XR

XR

XR

XR

XR

XR

WDM

RELREL

XR XR XR XR XR

DM

REL

XR XR

XR XR XR XR XR XR XR XR

XR XR XR XR XR XR RELREL

REL

DM

DDXRDD

XREM XR

DM

DM

E N G I N E E R

045691-E

SN NEP

AY L VI A

N

WR E G I S T E R E D

P R O F E S S I O N A L

RODNEY A. WOLFE

OC

NM O

M

FO

TE A L H

SHEET NO.

SEAL

ISSUED/ REVISED FOR DATE

2729 Prospect Avenue Cleveland, OH 44115 216.621.79002631 West 8th Street Erie, PA 16505 814.838.7525

BOSTWICKDESIGN.com

P

BostwickDesign

Partnership

GENERAL NOTES

SHEET NOTES

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

A

B

C

D

E

F

G

J

K

L

M

N

H

P

P

C:\U

sers

\sm

oehl

er\D

ocum

ents

\Rev

it-Lo

cal\1

5-09

51-S

VH C

hem

o In

fusi

on C

ente

r at H

ardn

er_M

EP_S

Moe

hler

.rvt

2/22

/201

6 11

:43:

40 A

M

GROUND FLOOR PLAN- POWER DEMOLITION

ED102

AHN SAINTVINCENT

HOSPITALCHEMO INFUSION

CENTER EXPANSIONAT HARDNER

BDP NO. #####

1/8" = 1'-0"1 GROUND FLOOR PLAN - POWER DEMOLITION

PLAN REVIEW SUBMISSION FEB 2016

Page 29: AHN SAINT VINCENT HOSPITAL · ed103 ground floor plan - hvac power demolition e001 symbols, abbreviations, notes and schedules e101 ground floor plan - lighting e102 ground floor

VVB-G17

VVB-G20

ZVB-10

ZVB-12

ZVB-11

ELECTRIC HEATER

DM

DM

DM

DM

DM

DM

XR

XR

XR

XR

XR

E N G I N E E R

045691-E

SN NEP

AY L VI A

N

WR E G I S T E R E D

P R O F E S S I O N A L

RODNEY A. WOLFE

OC

NM O

M

FO

TE A L H

SHEET NO.

SEAL

ISSUED/ REVISED FOR DATE

2729 Prospect Avenue Cleveland, OH 44115 216.621.79002631 West 8th Street Erie, PA 16505 814.838.7525

BOSTWICKDESIGN.com

P

BostwickDesign

Partnership

GENERAL NOTES

SHEET NOTES

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

A

B

C

D

E

F

G

J

K

L

M

N

H

P

P

C:\U

sers

\sm

oehl

er\D

ocum

ents

\Rev

it-Lo

cal\1

5-09

51-S

VH C

hem

o In

fusi

on C

ente

r at H

ardn

er_M

EP_S

Moe

hler

.rvt

2/22

/201

6 11

:43:

40 A

M

GROUND FLOOR PLAN- HVAC POWERDEMOLITION

ED103

AHN SAINTVINCENT

HOSPITALCHEMO INFUSION

CENTER EXPANSIONAT HARDNER

BDP NO. #####

1/8" = 1'-0"1

GROUND FLOOR PLAN - HVAC POWERDEMOLITION

PLAN REVIEW SUBMISSION FEB 2016

Page 30: AHN SAINT VINCENT HOSPITAL · ed103 ground floor plan - hvac power demolition e001 symbols, abbreviations, notes and schedules e101 ground floor plan - lighting e102 ground floor

OS

OS

NCC

NCA

NCE

D

HM

PB

J

E

FACP

CB

EP

S

S

S

S

S

J

B

F

F

TV

S

SS

MW

DD

GF

WP

LV

EWC

WAP

W

SS

3

4

D

M

THE REMOVAL OR RELOCATION OF EXISTING ELECTRICAL EQUIPMENTPRESENTLY CONCEALED IN EXISTING CONSTRUCTION SHALL BECOORDINATED WITH THE OWNER PRIOR TO REMOVAL OR RELOCATION.

ON THE PLAN SHALL BE MAINTAINED.

THE CONTINUITY OF EXISTING CIRCUITS THAT MAY BE INTERRUPTEDBY THE ALTERATIONS, EVEN THOUGH THEY MAY NOT BE INDICATED

REMOVE ABANDONED CONDUIT, WIRE, JUNCTION BOXES, WORK LIGHTS,ETC WITHIN DEMOLITION AREA EVEN THOUGH THEY ARE NOT SHOWN

REQUIRED FOR ELECTRICAL WORK. CONTRACTOR SHALL ALSOCUT, PATCH, AND RESTORE ALL OPENINGS IN EXISTING STRUCTURE

SURROUNDING CONSTRUCTION.

SYSTEMS ADJACENT AREAS SHALL REMAIN UNDISTRURBED OR BE

WALLS AND FLOORS AFTER ELECTRICAL WORK INSTALLATION IS

PHASES OF CONSTRUCTION. COORDINATE WORK WITH NEW WORK

NECESSARY FOR REMODELING AND RESTORING SUCH CEILINGS,

RECONNECTED AS REQUIRED TO MAINTAIN SERVICE. PATCH AND

WIRING FOR CONTINUITY OF POWER AND

MAINTAIN CONTINUITY OF FIRE ALARM, SECURITY AND ALL SYSTEMS

ELECTRICAL EQUIPMENT TO MAINTAIN CONTINUITY DURING VARIOUS

PAINT ALL OPENINGS LEFT IN EXISTING CONSTRUCTION TO MATCH

AS REQUIRED DURING VARIOUS PHASES OF WORK.

E.C. SHALL BE RESPONSIBLE FOR TEMPORARILY FEEDING AND

PANELBOARDS, BRANCH CIRCUITS, SYSTEMS AND ANY OTHERBACKFEEDING ELECTRICAL DISTRIBUTION EQUIPMENT,

REMOVE PORTIONS OF EXISTING CEILINGS, WALLS, AND FLOORS

ON PLAN.

D8.

D7.

D6.

D5.

DRAWINGS.

D4.

D3.

COMPLETE.

D2.

FINAL CERTIFICATE.

ELECTRICAL CODE.

BY THIS CONTRACTOR.

TO THE NEW LAYOUT.

COMPRESSION FITTINGS.

SUBMIT SHOP DRAWINGS FOR EQUIPMENT.

DRILLING OVERHEAD.

WRITTEN APPROVAL OF THE ENGINEER.

OF THE PROJECT.

RELOCATION WORK IS PERFORMED. EXISTING CONDUIT/WIRING

CONDUIT/WIRING THAT MAY BE CONCEALED IN WALLS THAT ARE

SPECIFICALLY INDICATED) SHALL BE CAPPED AT THE APPROPRIATELOCATION UNLESS SUCH CONDUIT/WIRING MUST REMAIN AS PARTOF AN ACTIVE SYSTEM. THE STATUS OF SUCH CONDUIT/WIRING AS

THAT MUST REMAIN AS A PART OF AN ACTIVE SYSTEM SHALL BE

CONTINUITY OF THAT CIRCUIT, UNLESS NOTED OTHERWISE, ALL

CONTRACTOR SHALL PROVIDE ALL NECESSARY MATERIALS AND

GUARANTEE THE ELECTRICAL WORK FOR ONE YEAR FROM DATE OF

REMOVE ALL DEAD WIRE, CONDUIT, AND BOXES NOT NECESSARY

CLARIFICATIONS REQUIRED SHALL BE REQUESTED AT THAT TIME.

PRIOR TO SUBMITTING A BID, THE CONTRACTOR SHALL VISIT THE

OWNER FOR HIS USE, SHALL BE REMOVED FROM THE PREMISES

AMOUNT OF DUST AND DIRT AND SHALL PROVIDE DROP CLOTHS ANDOTHER DUST PROOFING MATERIAL TO PREVENT DUST AND DIRT

EQUIPMENT. THIS CONTRACTOR WILL BE RESPONSIBLE FOR ALL

THE BUILDING. HE SHALL EXERCISE CARE TO CREATE A MINIMUM

FROM ENTERING OTHER PARTS OF THE BUILDING OR DAMAGING

DAMAGE CAUSED BY HIM, HIS EMPLOYEES OR SUB-CONTRACTORSAND SHALL BE RESPONSIBLE FOR REPAIR OR REPLACEMENT OF THE

NO POWDER ACTUATED FASTENING DEVICE SHALL BE USED WITHOUT

THE CONTRACTOR AND HIS SUB-CONTRACTORS SHALL KEEP THE

OR EQUIVALENT MUST BE USED WITH THE DRILL AND VACUUM WHENMUST BE USED TO ELIMINATE DUST. IN ADDITION, A PLUNGER HEADDURING ANY DRILLING OPERATION, AN INDUSTRIAL TYPE VACUUM

PREMISES FREE FROM ACCUMULATION OF WASTE MATERIAL. AT THE

SUCH CONDUIT/WIRING SHALL BE CONCEALED.

TO BE ACTIVE OR INACTIVE SHALL BE VERIFIED BY THISCONTRACTOR BEFORE ANY DISCONNECTION, CAPPING, OR

RELOCATED AND REARRANGED AS REQUIRED TO MAINTAIN

BEING REMOVED (WHETHER OR NOT SUCH CONDUIT/WIRING IS

SAME WITHOUT ADDITIONAL COMPENSATION.

DOCUMENTS.

ALL NEW WIRING REQUIRED SHALL BE IN EMT CONDUIT WITH

OBTAIN AND PAY FOR ALL PERMITS REQUIRED BY LOCAL

SALVAGED ELECTRICAL EQUIPMENT, NOT DESIGNATED BY THE

SITE TO EXAMINE FIRST HAND THE EXISTING CONDITIONS. ANY

WORK SHALL COMPLY WITH LATEST EDITION OF THE NATIONAL

COMPLY WITH "GENERAL CONDITIONS" SET FORTH IN THE

CONDITION AS DEFINED BY THE ARCHITECT.

PROVIDE AS-BUILT DRAWINGS TO OWNER UPON COMPLETION

WORKMANLIKE MANNER WITH ALL DEBRIS REMOVED FROM

END OF EACH DAY THE WORK AREA SHALL BE LEFT IN A CLEAN

LABOR REQUIRED TO PERFORM THIS WORK IN A NEAT AND10.

D1.

11.

14.

13.

12.

9.

8.

7.

6.

3.ORDINANCES.

5.

4.

2.

1.

NURSE CALL

FIRE ALARM

TELECOMMUNICATIONS

SINGLE POLE SWITCH

WALL MOUNTED OCCUPANCY SENSOR

CEILING MOUNTED OCCUPANCY SENSOR

DIMMER SWITCH

4-WAY SWITCH

3-WAY SWITCH

MOTOR STARTING SWITCH

NEW PANELBOARD - SURFACE

NEW PANELBOARD - RECESSED

FUSIBLE SAFETY SWITCH

JUNCTION BOX - CEILING

EXISTING PANELBOARD

DISTRIBUTION PANELBOARD

MOTOR

PULL BOX

JUNCTION BOX

POWER

INDICATES MOUNT DEVICE 6"-8" ABOVE

DOUBLE DUPLEX RECEPTACLE

DUPLEX RECEPTACLE FOR MICROWAVE. MT.

RECEPTACLE ELECTRIC WATER COOLER

AS DIRECTED BY ARCHITECT

WALL MOUNTED LIGHT FIXTURE

BATTERY PACK WITH HEADS AS INDICATED

INDICATED ON DRAWINGSEXIT SIGN - DIRECTIONAL ARROWS AS

ON DRAWINGS

NORMAL/EMERGENCY LIGHTING FIXTURE -SEE FIXTURE SCHEDULE FOR MORE

LIGHTING FIXTURE ON NORMAL/EMERGENCY

DOWNLIGHT

INFORMATION

RECEPTACLES

DUPLEX RECEPTACLE GROUND FAULTINTERRUPTER TYPE. INSTALL INWEATHERPROOF HOUSING

DUPLEX RECEPTACLE GROUND FAULTINTERRUPTER TYPE

DUPLEX 125V-20A RECEPTACLE

SCHEDULE FOR MORE INFORMATIONLIGHTING FIXTURE - SEE FIXTURE

LIGHTING

NURSE CALL - CODE BLUE

NURSE CALL EMERGENCY PULL CORD

NURSE CALL DOME - W/ONE LAMP

NURSE CALL SYSTEM EQUIPMENT CABINET

NURSE CALL SYSTEM ANNUCIATOR

NURSE CALL SYSTEM CONSOLE

INSTALLED BY MC AND CONNECTED BYDUCT DETECTOR - PROVIDED BY EC,

HEAT DETECTOR CEILING MOUNTED

EC

TELEVISION OUTLET INTERRUPTERWEATHERPROOF/GROUND FAULT

EXISTING TO BE REMAIN

WEATHERPROOF

XR

WP

WPG

WALL MOUNTEDW

TELEPHONE

TAMPER PROOFTP

T

RELOCATE

RELOCATEDRED

REL

REFRIGERATORREF

PANIC ("CODE BLUE")

NORMAL/EMERGENCY

P

NE

SOUND SYSTEM SPEAKER CEILING MOUNTED

FIRE ALARM STROBE - WALL MOUNTED

FIRE ALARM PULL STATION

AUDIO/VISUAL

FIRE ALARM CONTROL PANEL

LOW VOLTAGE WIRING AND CONDUIT

WALLS OR ABOVE CEILING

HOME RUN BACK TO PANEL

BRANCH CIRCUIT WIRING CONCEALED IN

MISCELLANEOUS

DISCREPANCIES TO THE ARCHITECT PRIOR

LIGHT FIXTURES WITH THE ARCHITECT'SCOORDINATE THE FINAL LOCATIONS OF ALL

REFLECTED CEILING PLANS. REPORT ANY

OF ALL UNDERGROUND UTILITIES WITHIN THECONSTRUCTION AREA THREE (3) WORKING DAYSNOTICE BEFORE COMMENCE DIGGING. NOTIFY

THE CONTRACTOR SHALL VERIFY THE LOCATION

NURSE CALL

MICROWAVE

LOW VOLTAGE

MW

N

M

LV

MOTOR

G3.

THE LOCAL OR STATE AUTHORITY HAVING

FLUORESCENT

FUSED SAFETY SWITCH

GROUND FAULT INTERRUPTERG

FSS

FL

ELECTRIC WATER COOLER

EXPLOSION PROOF

FIRE ALARM

EXP

F

EWC

G2.

TO INSTALLATION.

RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THEPLANS WITH THE SYMBOL LIST. IT SHALL BE THESHALL COORDINATE ALL SYMBOLS SHOWN ON THE

WITH THE ELECTRICAL ENGINEER.

UNLESS OTHERWISE NOTED, PROVIDE ALL EQUIPMENT

PLANS AND NOT INDICATED ON THE SYMBOL LIST

SHOWN ON THE PLANS. THE ELECTRICAL CONTRACTOR

INTENT OF ANY SYMBOL THAT IS SHOWN ON THE

GENERAL PROJECT NOTES:

EMERGENCY

DOUBLE DEVICE

E

DD

ABOVE FINISHED FLOORAFF

G1.

DENOTATIONS & ABBREVIATIONS

FIRE ALARM HORN/STROBE - WM

DATA OUTLET FOR WIRELESS ACCESS POINT

INDICATES CONTINUATION OF LINE

COFFEE MAKERCF EXISTING CONDITIONS/DEMOLITION NOTES:

SPECIAL RECEPTACLE - COORDINATE EXACTTYPE WITH EQUIPMENT AT SITE

ELECTRICAL CONTRACTOREC

MECHANICAL CONTRACTORMC

PLUMBING CONTRACTORPLC

GENERAL CONTRACTORGC

SMOKE DETECTOR

SOUND SYSTEM SPEAKER WALL MOUNTED

BEFORE COMMENCING TO DIG.JURISDICTION AND WAIT THE REQUIRED TIME

'Z' = ZONE

'WT' = WATER TIGHT

TELEPHONE OUTLET(S) @ 18" AFF. U.N.O. WITH3/4" RACEWAY TERMINATED ABOVE NEARESTACCESSIBLE CEILING OR TO TELEPHONE TERMINALBOARD IF NO ACCESSIBLE CEILING AVAILABLE. SEE

TERMINATED ABOVE NEAREST ACCESSIBLE CEILING ORWALL MTD. TELEPHONE OUTLET WITH 3/4" RACEWAY

AFF. U.N.O. WITH 1" RACEWAY TERMINATED ABOVECOMBINATION TELEPHONE/DATA OUTLET(S) @ 18"

NEAREST ACCESSIBLE CEILING OR TO TELE/DATA

TO TELEPHONE TERMINAL BOARD IF NO ACCESSIBLE

TELE/DATA RISER DIAGRAM FOR OUTLET ANDCABLE DESCRIPTION

DATA OUTLET(S) @ 18" AFF. U.N.O. WITH 3/4"RACEWAY TERMINATED ABOVE NEAREST ACCESSIBLECEILING OR TO DATA EQUIPMENT RACK IF NOACCESSIBLE CEILING AVAILABLE. SEE TELE/DATARISER DIAGRAM FOR OUTLET AND CABLE DESCRIPTION

TERMINAL AREA IF NO ACCESSIBLE CEILING AVAILABLE.SEE TELE/DATA RISER DIAGRAM FOR OUTLET ANDCABLE DESCRIPTION

CEILING AVAILABLE. SEE TELE/DATA RISER DIAGRAMFOR OUTLET AND CABLE DESCRIPTION

CONTRACTOR TO NOTIFY THE PROFESSIONAL IFA SYMBOL IS USED ON THE PROJECT BUT DOESNOT SHOW IN THE SYMBOL LIST PRIOR TO BID.

IT SHALL BE THE RESPONSIBILITY OF THEG4.

TRADE CONTRACTORS TO AVOID CONFLICTS.OTHER EQUIPMENT LOCATIONS WITH THE OTHERRUNS, CABLE TRAY, LIGHTING FIXTURES ANDTHE CONTRACTOR SHALL COORDINATE CONDUITG5.

COUNTER TOP

GENERAL ELECTRICAL NOTES:

F

E N G I N E E R

045691-E

SN NEP

AY L VI A

N

WR E G I S T E R E D

P R O F E S S I O N A L

RODNEY A. WOLFE

OC

NM O

M

FO

TE A L H

SHEET NO.

SEAL

ISSUED/ REVISED FOR DATE

2729 Prospect Avenue Cleveland, OH 44115 216.621.79002631 West 8th Street Erie, PA 16505 814.838.7525

BOSTWICKDESIGN.com

P

BostwickDesign

Partnership

GENERAL NOTES

SHEET NOTES

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

A

B

C

D

E

F

G

J

K

L

M

N

H

P

P

C:\U

sers

\sm

oehl

er\D

ocum

ents

\Rev

it-Lo

cal\1

5-09

51-S

VH C

hem

o In

fusi

on C

ente

r at H

ardn

er_M

EP_S

Moe

hler

.rvt

2/22

/201

6 11

:43:

35 A

M

SYMBOLS,ABBREVIATIONS,NOTES, ANDSCHEDULES

E001

AHN SAINTVINCENT

HOSPITALCHEMO INFUSION

CENTER EXPANSIONAT HARDNER

BDP NO. #####

LIGHTING FIXTURE SCHEDULE

MARKNUMBER OF LAMPS

AND WATTAGE MANUFACTURER CATALOG NUMBERBALLASTVOLTAGE MOUNTING REMARKS

A (3) 32W T8 WILLIAMS 50G-S24-332-SA12125-EB3-UNV UNV RECESSEDB (2) 32W T8 50G-S24-232-SA12125-EB2-UNV UNV RECESSEDC (2) 32W T8 WILLIAMS DIG-S24-232-WPR-EB2-UNV UNV RECESSEDD (2) 40W TT WILLIAMS DIG-S22-240TTWPR-EB2-UNV UNV RECESSEDF PATHWAY 6VI-4-19-120/6VIMD-SCLPF-27B4 120 RECESSED PROVIDE COMPACT FLUORESCENT LAMP AND MATCH

EXISTING FIXTURES.G (3) 32UT8 WILLIAMS 50G-S22-332U-SA12125-EB3-UNV UNV RECESSEDH (3) 32W T8 WILLIAMS DIG-S24-332-WPR-EB2/1-UNV UNV RECESSED (2) BALLASTS: (1) BALLAST-CENTER LAMP, (1)

BALLAST-OUTISDE LAMPJ LED PATHWAY 6VLBVI54KM/6PLEDSCCPF UNV RECESSEDK (2) 55W TT WILLIAMS DIG-S22-255TT-WPR-EB2/1-UNV UNV RECESSEDL (3) 32W T8 WILLIAMS 50G -S24-332-5A12125-EB2/1-UNV UNV RECESSED

EXIT LED EVENLITE TLT-EM-R-X-W UNV WALL/CEILING DIRECTIONAL ARROWS AND NO. OF FACES ASINDICATED ON THE DRAWINGS.

PLAN REVIEW SUBMISSION FEB 2016

Page 31: AHN SAINT VINCENT HOSPITAL · ed103 ground floor plan - hvac power demolition e001 symbols, abbreviations, notes and schedules e101 ground floor plan - lighting e102 ground floor

TRAC

K

TRAC

K

TRAC

K

TRAC

K

TRACK

TRAC

K

TRAC

K

TRAC

K

TRAC

K

TRAC

K

TRAC

K

TRAC

K

TRAC

K

TRAC

K

S

S

E

E

S

OS

OS

SSS S

SS

SSS S

OS

S

OS OS

OS OS

OS OSS

OS

SS

OS

OS

OS

SSSS

OS

SS

OS OS

OS

E

OS

E

S

S

S

S

S

S

XR

XR XR

XR XR

XR XR

XR XR

XR XR

XR XR

XR XR

XR XR

XR XR

XR XR

XR XR

XR

XR

XR XR

XR XR XR

XRXRXR XR XR XR XR XR XR XR

XR XR XR XR XR XR XR XR

H

H

D D D

DD

RED RED RED

REDRED

J J J

C C3

G G GF

FF

F F

FF

F

B

B

RED

RED

C C C

CJ

RED RED

B B XRA

A

B

A

AAA

F

F F

F F

F F

F

RED

RED RED

DD

XR

F

F F

F F F

FF

F F

FF

G G G

RED RED

REDRED

RED

D D

D

B B

B

H H H

HHH

C

C

K K

KK

L

L

A A

XR

XR

XR

XRXR

XR XR

XR

REDREDD D

XR XR XRXR

XRXR

XR XR

XRXR

XR XR

XRXR

RED

RED

RED RED RED RED

RED

EXIST. SOILED HOLDG28

EXIST. PATIENT T.R.G27

EXIST.STAFF T.R.G08

EXIST. PATIENT T.R.G12

EXIST. CLEAN SUPPLYG29

MAIL ROOMG33

EXIST STAIRG-SA

SHELVINGG06

BREAK ROOMG07

CLOSETG03

PRIVATE ROOM 1G09

PRIVATE ROOM 2G11

STORAGEG05

WAITINGG01

MEN'S T.R.G41

LOCKERSG40

INTAKEG26

ROOM 7G17

ROOM 5G15

ROOM 4G14

ROOM 3G13

CORRIDORG02

CORRIDORG04

VENDINGG32

NURSE STATION/ RECEPTIONG31

EXIST. NURSEG30

CORRIDORG34

OPEN OFFICEG36

EXAMG37

PATIENT T.R.G10

ROOM 13G23

ROOM 11G21

ROOM 9G19

ROOM 8G18

LOCKERSG42

WOMEN'S T.R.G43

PHARMACYG35

CORRIDORG38

BREAK ROOMG39

ROOM 10G20

ROOM 12G22

ROOM 15G25

ROOM 14G24

ROOM 6G16

1

XR

22

1

SEE DRAWING E202 FORPANELS LOCATIONS

1

2

E.C. SHALL CONNECT TO EXISTING LIGHTINGCIRCUIT IN THIS AREA.

E.C. SHALL FURNISH AND INSTALL NEW 20A-1PCIRCUIT BREAKER IN PANEL-GL-1R TO SERVENEW EQUIPMENT.

3

3

3E N G I N E E R

045691-E

SN NEP

AY L VI A

N

WR E G I S T E R E D

P R O F E S S I O N A L

RODNEY A. WOLFE

OC

NM O

M

FO

TE A L H

SHEET NO.

SEAL

ISSUED/ REVISED FOR DATE

2729 Prospect Avenue Cleveland, OH 44115 216.621.79002631 West 8th Street Erie, PA 16505 814.838.7525

BOSTWICKDESIGN.com

P

BostwickDesign

Partnership

GENERAL NOTES

SHEET NOTES

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

A

B

C

D

E

F

G

J

K

L

M

N

H

P

P

C:\U

sers

\sm

oehl

er\D

ocum

ents

\Rev

it-Lo

cal\1

5-09

51-S

VH C

hem

o In

fusi

on C

ente

r at H

ardn

er_M

EP_S

Moe

hler

.rvt

2/22

/201

6 11

:43:

37 A

M

GROUND FLOOR PLAN- LIGHTING

E101

AHN SAINTVINCENT

HOSPITALCHEMO INFUSION

CENTER EXPANSIONAT HARDNER

BDP NO. #####

1/8" = 1'-0"1 GROUND FLOOR PLAN - LIGHTING

PLAN REVIEW SUBMISSION FEB 2016

Page 32: AHN SAINT VINCENT HOSPITAL · ed103 ground floor plan - hvac power demolition e001 symbols, abbreviations, notes and schedules e101 ground floor plan - lighting e102 ground floor

TV TV TV TV TV TV

F

F

EP F

NCA

F

EP

F

F F

F F

FF

F

F

F

F

TV TV

TVF

F

TV

TV

TV TVF

EP

TV TV TV

F

F

F

NC

NC NC N

C

NC NC

NC NC

NC NC NC N

C

NC N

C

NC

F

NC

F

DDXR

DDXREM

DDXR

DDXREM

DDXR

DDXREM

DDXR

DDXRDD

XREM

DDXREM

DDXR

DDXREM

XR

XRXR

XRGF

XR

XR

XRXR

XR

XR DDXR

XR

XR

XRXRGF

XR

XR

GF GF

GFGF

DD DD

DDEM

DDDDEM

DD

GF GF

RED

XR

DDDDEM

DDEM

DDDDEM DD

EM

DDEM

DDEM

REDRED

REDGF

DDXR

DDXR

DDXR

DDXREM

DDXREM

XR

XR

XR

XR

XR

XR

XRGL-1R

GL-1R

GL-1R

GL-1R

GL-1L

LCP

GL-1H

XR XR XR XR XR XR XR

XR XR

RED

RED

REDREDXRXRXRXRXRXRXRXR REDRED

RED

XR XR XR XR XR XR XR XR XRXR XR XR XR XR XR XR XR

EXIST. SOILED HOLDG28EXIST. PATIENT T.R.

G27

EXIST.STAFF T.R.G08

EXIST. PATIENT T.R.G12

EXIST. CLEAN SUPPLYG29

MAIL ROOMG33

EXIST STAIRG-SA

SHELVINGG06

BREAK ROOMG07

CLOSETG03

PRIVATE ROOM 1G09

PRIVATE ROOM 2G11

STORAGEG05

WAITINGG01

MEN'S T.R.G41

LOCKERSG40

INTAKEG26

ROOM 7G17

ROOM 5G15

ROOM 4G14 ROOM 3

G13

CORRIDORG02

CORRIDORG04

VENDINGG32

NURSE STATION/ RECEPTIONG31EXIST. NURSE

G30

CORRIDORG34

OPEN OFFICEG36

EXAMG37

PATIENT T.R.G10

ROOM 13G23

ROOM 11G21

ROOM 9G19

ROOM 8G18

LOCKERSG42

WOMEN'S T.R.G43

PHARMACYG35

CORRIDORG38

BREAK ROOMG39

ROOM 10G20

ROOM 12G22

ROOM 15G25

ROOM 14G24

ROOM 6G16

XR

4 4

4 4

DDDDEM

DDXREM

RED

3

22

1 13

1 1

4

4

4

4

4

1

1

2

3

4

E.C. SHALL INSTALL TV OUTLET AND ADJACENTRECEPTACLE AT HEIGHT TO MATCH EXISTING.

E.C. SHALL FURNISH AND INSTALL NEW 20A-1PCIRCUIT BREAKER IN EXISTING PANEL ELR ONLOWER LEVEL TO SERVE EQUIPMENT.

E.C. SHALL FURNISH AND INSTALL NEW 20A-1PCIRCUIT BREAKER IN EXISTING PANEL GL-1R TOSERVE NEW EQUIPMENT.

E.C. SHALL CONNECT TO EXISTING 20A-1PCIRCUIT BREAKER IN PANEL GL-1R MADEAVAILABLE DUE TO THE RENOVATIONS.

3

3

33

3DD

DD

DD

DD

DD

3

3

3

DD

DDDD

DD

DD

3

3

1

1

E N G I N E E R

045691-E

SN NEP

AY L VI A

N

WR E G I S T E R E D

P R O F E S S I O N A L

RODNEY A. WOLFE

OC

NM O

M

FO

TE A L H

SHEET NO.

SEAL

ISSUED/ REVISED FOR DATE

2729 Prospect Avenue Cleveland, OH 44115 216.621.79002631 West 8th Street Erie, PA 16505 814.838.7525

BOSTWICKDESIGN.com

P

BostwickDesign

Partnership

GENERAL NOTES

SHEET NOTES

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

A

B

C

D

E

F

G

J

K

L

M

N

H

P

P

C:\U

sers

\sm

oehl

er\D

ocum

ents

\Rev

it-Lo

cal\1

5-09

51-S

VH C

hem

o In

fusi

on C

ente

r at H

ardn

er_M

EP_S

Moe

hler

.rvt

2/22

/201

6 11

:43:

38 A

M

GROUND FLOOR PLAN- POWER

E102

AHN SAINTVINCENT

HOSPITALCHEMO INFUSION

CENTER EXPANSIONAT HARDNER

BDP NO. #####

1/8" = 1'-0"1 GROUND FLOOR PLAN - POWER

PLAN REVIEW SUBMISSION FEB 2016

Page 33: AHN SAINT VINCENT HOSPITAL · ed103 ground floor plan - hvac power demolition e001 symbols, abbreviations, notes and schedules e101 ground floor plan - lighting e102 ground floor

VVB-G40 VVB-G35

VVB-G39 VVB-G37

VVB-G36

VVB-G13R

VVB-G11R

VVB-G07R

VVB-G09R

1

1

1

1

1

1

2

#10

1

1

1

2

E.C. SHALL CONNECT TO EXISTING 20A-1P SPARECIRCUIT BREAKER IN EXISTING PANEL GL-1L

E.C. SHALL FURNISH AND INSTALL NEW 30A-1PCIRCUIT BREAKER IN EXISTING PANEL GL-1L TOSERVE NEW EQUIPMENT.

XRXR

XR

XR

XR

VVB-G24R 2#10

E N G I N E E R

045691-E

SN NEP

AY L VI A

N

WR E G I S T E R E D

P R O F E S S I O N A L

RODNEY A. WOLFE

OC

NM O

M

FO

TE A L H

SHEET NO.

SEAL

ISSUED/ REVISED FOR DATE

2729 Prospect Avenue Cleveland, OH 44115 216.621.79002631 West 8th Street Erie, PA 16505 814.838.7525

BOSTWICKDESIGN.com

P

BostwickDesign

Partnership

GENERAL NOTES

SHEET NOTES

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

A

B

C

D

E

F

G

J

K

L

M

N

H

P

P

C:\U

sers

\sm

oehl

er\D

ocum

ents

\Rev

it-Lo

cal\1

5-09

51-S

VH C

hem

o In

fusi

on C

ente

r at H

ardn

er_M

EP_S

Moe

hler

.rvt

2/22

/201

6 11

:43:

38 A

M

GROUND FLOOR PLAN- HVAC POWER

E103

AHN SAINTVINCENT

HOSPITALCHEMO INFUSION

CENTER EXPANSIONAT HARDNER

BDP NO. ##### 1/8" = 1'-0"1 GROUND FLOOR PLAN - HVAC POWER

PLAN REVIEW SUBMISSION FEB 2016