Outline
• Project Overview• Research Findings• Signage• Challenges• Guidance Document• Lessons Learned
![Page 3: AGood ER presentation4 - Copy€¦ · Installation Note: Signs should be field located based on local conditions, presence of existing signs, and engineering judgment.](https://reader034.fdocuments.in/reader034/viewer/2022042306/5ed1b7c476a00015387f8ee2/html5/thumbnails/3.jpg)
PROJECT OVERVIEW
![Page 4: AGood ER presentation4 - Copy€¦ · Installation Note: Signs should be field located based on local conditions, presence of existing signs, and engineering judgment.](https://reader034.fdocuments.in/reader034/viewer/2022042306/5ed1b7c476a00015387f8ee2/html5/thumbnails/4.jpg)
Michigan Road Network
• 7 Regions• MDOT Responsible for Trunkline Routes
– Direct vs. Contract• Counties/Municipalities Responsible for their Respective Routes
• Predominately Rural Areas– Detroit and Surrounding Suburbs– Grand Rapids– Lansing
![Page 5: AGood ER presentation4 - Copy€¦ · Installation Note: Signs should be field located based on local conditions, presence of existing signs, and engineering judgment.](https://reader034.fdocuments.in/reader034/viewer/2022042306/5ed1b7c476a00015387f8ee2/html5/thumbnails/5.jpg)
Project Overview
• Research Project– 1 year
• Guidance Document – Recommendations for a consistent approach to developing emergency reroutes and signage on those routes
![Page 6: AGood ER presentation4 - Copy€¦ · Installation Note: Signs should be field located based on local conditions, presence of existing signs, and engineering judgment.](https://reader034.fdocuments.in/reader034/viewer/2022042306/5ed1b7c476a00015387f8ee2/html5/thumbnails/6.jpg)
Assumptions
Manual Intended• Serve as a reference that summarizes
best practices from other states• Provide information stakeholders
should consider when developing emergency reroutes
• Be a guide on how to evaluate the effectiveness of reroutes
• Present recommendations on signage for the developed routes
• Be updated periodically as technology changes, lessons learned are revealed, or other supporting information is identified as beneficial to include
Manual Not Intended• Describe how to handle incident
management• Provide or document specific
emergency rerouting plans• Specify when and how to
implement emergency rerouting plans
• Require specific signage for all reroutes implemented
• Remain a static unchanging document
![Page 7: AGood ER presentation4 - Copy€¦ · Installation Note: Signs should be field located based on local conditions, presence of existing signs, and engineering judgment.](https://reader034.fdocuments.in/reader034/viewer/2022042306/5ed1b7c476a00015387f8ee2/html5/thumbnails/7.jpg)
Project Process
![Page 8: AGood ER presentation4 - Copy€¦ · Installation Note: Signs should be field located based on local conditions, presence of existing signs, and engineering judgment.](https://reader034.fdocuments.in/reader034/viewer/2022042306/5ed1b7c476a00015387f8ee2/html5/thumbnails/8.jpg)
RESEARCH FINDINGS
![Page 9: AGood ER presentation4 - Copy€¦ · Installation Note: Signs should be field located based on local conditions, presence of existing signs, and engineering judgment.](https://reader034.fdocuments.in/reader034/viewer/2022042306/5ed1b7c476a00015387f8ee2/html5/thumbnails/9.jpg)
Methodology
• Literature Review– 7 states– 4 Federal reports
• Survey– 9 states
• Interview– 5 states
![Page 10: AGood ER presentation4 - Copy€¦ · Installation Note: Signs should be field located based on local conditions, presence of existing signs, and engineering judgment.](https://reader034.fdocuments.in/reader034/viewer/2022042306/5ed1b7c476a00015387f8ee2/html5/thumbnails/10.jpg)
Best Practices
• Areas of Commonalities• Areas of Divergence• Challenges• Process Recommendations
![Page 11: AGood ER presentation4 - Copy€¦ · Installation Note: Signs should be field located based on local conditions, presence of existing signs, and engineering judgment.](https://reader034.fdocuments.in/reader034/viewer/2022042306/5ed1b7c476a00015387f8ee2/html5/thumbnails/11.jpg)
Stakeholder Feedback
• Half Day Workshops– 3 locations
• Break‐Out Groups– 2 hypothetical locations for emergency rerouting vs. incident management
• Conference Call
![Page 12: AGood ER presentation4 - Copy€¦ · Installation Note: Signs should be field located based on local conditions, presence of existing signs, and engineering judgment.](https://reader034.fdocuments.in/reader034/viewer/2022042306/5ed1b7c476a00015387f8ee2/html5/thumbnails/12.jpg)
Existing Elements
• Existing Reroutes– Varies among regions
• Existing Signage– Less frequent and not the same– MMUTCD
![Page 13: AGood ER presentation4 - Copy€¦ · Installation Note: Signs should be field located based on local conditions, presence of existing signs, and engineering judgment.](https://reader034.fdocuments.in/reader034/viewer/2022042306/5ed1b7c476a00015387f8ee2/html5/thumbnails/13.jpg)
![Page 14: AGood ER presentation4 - Copy€¦ · Installation Note: Signs should be field located based on local conditions, presence of existing signs, and engineering judgment.](https://reader034.fdocuments.in/reader034/viewer/2022042306/5ed1b7c476a00015387f8ee2/html5/thumbnails/14.jpg)
SIGNAGE
![Page 15: AGood ER presentation4 - Copy€¦ · Installation Note: Signs should be field located based on local conditions, presence of existing signs, and engineering judgment.](https://reader034.fdocuments.in/reader034/viewer/2022042306/5ed1b7c476a00015387f8ee2/html5/thumbnails/15.jpg)
Guidance
• Urban/Suburban/Rural • Placement• Density
Recommended Sign Design Non‐Recommended Sign Design
![Page 16: AGood ER presentation4 - Copy€¦ · Installation Note: Signs should be field located based on local conditions, presence of existing signs, and engineering judgment.](https://reader034.fdocuments.in/reader034/viewer/2022042306/5ed1b7c476a00015387f8ee2/html5/thumbnails/16.jpg)
Installation Note:Signs should be field located based on local conditions, presence of existing signs, and engineering judgment.
B Street
C Street
SR‐200
E Street
F Street
G Street
US–50
US‐51
Based on distance to first intersection, install within 300
feet max prior to A Street for route confirmation
Install within 300 feet max prior to
left turn on US-50
Install within 200 feet max after left
turn from US-51
Install within 300 feet max prior to
left turn on US-51
Install within 200 feet max after major
cross-street for route confirmation
Install within 200 feet max after left turn from SR-100
Interstate A
Example Signing Plan for Emergency Reroute
Optional:Install supplemental sign at intersection (on shoulder or mast arm)
Legend
(Not to Scale)
Emergency Reroute Permanent SignEmergency Reroute Direction
US–50
![Page 17: AGood ER presentation4 - Copy€¦ · Installation Note: Signs should be field located based on local conditions, presence of existing signs, and engineering judgment.](https://reader034.fdocuments.in/reader034/viewer/2022042306/5ed1b7c476a00015387f8ee2/html5/thumbnails/17.jpg)
CHALLENGES
![Page 18: AGood ER presentation4 - Copy€¦ · Installation Note: Signs should be field located based on local conditions, presence of existing signs, and engineering judgment.](https://reader034.fdocuments.in/reader034/viewer/2022042306/5ed1b7c476a00015387f8ee2/html5/thumbnails/18.jpg)
Considerations
• Challenging Interagency Relationships• Regional Stakeholder Relationships• Local Decisions• Resources• Commercial Freight
– Oversize/Overweight– Permits
![Page 19: AGood ER presentation4 - Copy€¦ · Installation Note: Signs should be field located based on local conditions, presence of existing signs, and engineering judgment.](https://reader034.fdocuments.in/reader034/viewer/2022042306/5ed1b7c476a00015387f8ee2/html5/thumbnails/19.jpg)
GUIDANCE DOCUMENT
![Page 20: AGood ER presentation4 - Copy€¦ · Installation Note: Signs should be field located based on local conditions, presence of existing signs, and engineering judgment.](https://reader034.fdocuments.in/reader034/viewer/2022042306/5ed1b7c476a00015387f8ee2/html5/thumbnails/20.jpg)
Guidance Tools
• Tools to Help Guide Stakeholders:– Evaluation Methods– Letter of Agreement Draft (or Memorandum Of Understanding)
– Case Study• Examples• Response Plan
– Checklists
![Page 21: AGood ER presentation4 - Copy€¦ · Installation Note: Signs should be field located based on local conditions, presence of existing signs, and engineering judgment.](https://reader034.fdocuments.in/reader034/viewer/2022042306/5ed1b7c476a00015387f8ee2/html5/thumbnails/21.jpg)
Guidance Tools
• Checklists Include:– Stakeholder Identification– Roles and Responsibilities– Road Network Considerations– Intersection Analysis– Regional Considerations (Urban/Rural)– Communication– Evaluation– Signage
![Page 22: AGood ER presentation4 - Copy€¦ · Installation Note: Signs should be field located based on local conditions, presence of existing signs, and engineering judgment.](https://reader034.fdocuments.in/reader034/viewer/2022042306/5ed1b7c476a00015387f8ee2/html5/thumbnails/22.jpg)
Road Name: Date:
Timeframe: During the development of emergency rerouting plans.
Involvement: State and local transportation agencies.
Process: Choices for rerouting traffic will depend on the length of the detour, available roadways for the detour and their characteristics, and connections to intersecting roadways along the detour. All potential characteristic should be considered when deciding on potential alternates. It is important for the estimated volume of detoured traffic to be evaluated against the capacity of the identified reroute. It is understood that the roadway likely will be over capacity, butthis analysis will assist in planning effective traffic control measures in response to the projected traffic conditions. References for this include: local maps, ADT, weight restriction maps, and/or height restriction maps.
Checklist: Review the characteristics of the potential alternate routes and determine if they may impact the plans.
Characteristics Alternate Emergency Route 1
Alternate Emergency Route 2
Alternate Emergency Route 3
□ Identify segment of each alternative route (road name, and end points)
*Note: see intersection checklist for specific analysis of intersections.
Segment 1
Segment 2
Segment 3
Segment 4
Segment 5
Segment 6
Segment 7
Segment 8
Segment 9
□ Length of roadway (mainline and alternative route)Mainline:
Alternate:
□ Volume thresholds by time of dayMainline: AM/PM
Diversion: AM/PM
□ Capacity of roadwayMainline:
Diversion:
□ Background V/C levels of diversion roadway(s) by time of day
Mainline: AM/PM
Diversion: AM/PM
□ Queue length adequacy
□ Roadway geometry
□ Lane geometry
□ Horizontal curvature
□ Vertical curvature
![Page 23: AGood ER presentation4 - Copy€¦ · Installation Note: Signs should be field located based on local conditions, presence of existing signs, and engineering judgment.](https://reader034.fdocuments.in/reader034/viewer/2022042306/5ed1b7c476a00015387f8ee2/html5/thumbnails/23.jpg)
LESSONS LEARNED
![Page 24: AGood ER presentation4 - Copy€¦ · Installation Note: Signs should be field located based on local conditions, presence of existing signs, and engineering judgment.](https://reader034.fdocuments.in/reader034/viewer/2022042306/5ed1b7c476a00015387f8ee2/html5/thumbnails/24.jpg)
Lessons Learned
I. Stakeholders had a hard time distinguishing between alternate route process and incident management
II. Several areas unaware of the types of pre‐planned routing strategy in place
III. A regional contact list can help impact the coordinationIV. Stakeholders wanted an interactive format for the
document
![Page 25: AGood ER presentation4 - Copy€¦ · Installation Note: Signs should be field located based on local conditions, presence of existing signs, and engineering judgment.](https://reader034.fdocuments.in/reader034/viewer/2022042306/5ed1b7c476a00015387f8ee2/html5/thumbnails/25.jpg)
QUESTIONS
Presenters: Amanda GoodAngie Kremer