AGONA EAST DISTRICT ASSEMBLY
IMPLEMENTATION OF DISTRICT
MEDIUM-TERM DEVELOPMENT PLAN
(2014-2017)
ANNUAL PROGRESS REPORT FOR
2016
PREPARED BY:
DISTRICT PLANNING COORDINATING UNIT
1
TABLE OF CONTENTS
CHAPTER ONE ........................................................................................................................ 4
1.0 LOCATION AND SIZE ...................................................................................................... 4
• 1.1 SUB-DISTRICTS .................................................................................................... 4
• 1.2 RELIEF AND DRAINAGE .................................................................................... 4
• 1.3 SOIL AND LAND USE .......................................................................................... 4
• 1.4 CLIMATE AND VEGETATION ............................................................................ 4
• 1.5 IMPACT OF CLIMATE CHANGE ........................................................................ 4
FIG. 1 DISTRICT IN THE NATIONAL CONTEXT ....................................................... 4
FIG 2: DISTRICT IN THE REGIONAL CONTEXT ....................................................... 4
• 1.6 DEMOGRAPHIC CHARACTERISTICS ............................................................... 4
1.6.1 POPULATION: ........................................................................................................ 4
TABLE 1: MAJOR SETTLEMENTS WITH POPULATION TREND ........................... 4
1.6.2 POPULATION SIZE AND GROWTH RATES ...................................................... 4
1.6.3 AGE-SEX STRUCTURE OF POPULATION: ........................................................ 4
1.6.4 THE IMPLEMENTATION STATUS OF 2016 ....................................................... 4
• 1.7 KEY MONITORING AND EVALUATION OBJECTIVES FOR 2016 ............... 4
1.7.1. ENSURING AND SUSTAINING MACRO-ECONOMIC STABILITY ............... 4
1.7.2. SUSTAINABLE PARTNERSHIP BETWEEN GOVERNMENT AND THE
PRIVATE SECTOR .......................................................................................................... 4
SPECIFIC OBJECTIVES .................................................................................................. 4
1.7.3 ACCELERATED AGRICULTURAL MODERNIZATION & AGRO-BASED
INDUSTRIAL DEVELOPMENT ..................................................................................... 4
SPECIFIC OBJECTIVES WERE: .................................................................................... 4
SUMMARY OF PROGRESS MADE IN THE AGRICULTURE SECTOR ................... 4
1.7.4. HUMAN DEVELOPMENT, PRODUCTIVITY AND EMPLOYMENT .............. 4
• WATER AND SANITATION ...................................................................................... 4
SOLID WASTE MANAGEMENT ................................................................................... 4
• SUMMARY OF PROGRESS MADE IN THE WATER AND SANITATION
SECTOR ........................................................................................................................ 4
1.7.5. TRANSPARENT AND ACCOUNTABLE GOVERNANCE PROGRAMME ..... 4
1.7.6 PROGRAMME FOR THE VULNERABLE AND THE EXCLUDED................... 4
1.7.7 HIV/AIDS INTERVENTION .................................................................................. 4
• 1.8 CHALLENGES ....................................................................................................... 4
• 1.9 RECOMMENDATION ........................................................................................... 4
• 1.10 GENDER ANALYSIS .......................................................................................... 4
1.10.1 GENDER RATIO OF STAFF IN THE DISTRICT ASSEMBLY ......................... 4
TABLE 2: GENDER RATIO ............................................................................................ 4
1.10.2 MAIN GENDER ISSUES ...................................................................................... 4
1.10.3 THE WAY FORWARD ......................................................................................... 4
1.10.3 KEY PROBLEMS AND ISSUES ENCOUNTERED DURING THE
IMPLEMENTATION ........................................................................................................ 4
1.10.4 LESSONS LEARNT WHICH HAVE IMPLICATIONS FOR THE DMTDP
(2014-2017)........................................................................................................................ 4
1.10.5 CONSTRAINTS/CHALLENGES .......................................................................... 4
2
CHAPTER TWO ....................................................................................................................... 6
2.0 LOCATION/SPREAD OF PROJECTS: ............................................................................. 6
TABLE 3: SPREAD OF PROJECTS ................................................................................ 6
FIG 6: A PIE CHART SHOWING THE DISTRIBUTION OF PROJECTS IN THE
VARIOUS SECTORS OF THE ECONOMY. .................................................................. 7
FIG 7: A BAR CHAT SHOWING THE DISTRIBUTION OF PROJECTS IN THE
VARIOUS AREA COUNCILS ......................................................................................... 7
TABLE 4: PROGRAMME/ PROJECT STATUS FOR THE PERIOD JANUARY -
DECEMBER, 2016 ............................................................................................................ 8
CHAPTER THREE ................................................................................................................. 13
PROGRESS OF DEPARTMENTS IN THE DISTRICT ........................................................ 13
3.0 CENTRAL ADMINISTRATION ..................................................................................... 13
TABLE 5: TOTAL NUMBER OF STAFF FOR THE ASSEMBLY AND THE
DECENTRALIZED DEPARTMENTS AS AT 31ST DECEMBER, 2016 ..................... 13
TABLE 6: AGE SEGREGATION .................................................................................. 14
• 3.1 STAFF DEVELOPMENT TRAINING ................................................................. 14
• 3.2 HIV/AIDS ISSUES ................................................................................................ 14
TABLE 7: HIV/AIDS SENSITISATION ....................................................................... 14
TABLE 8: SUMMARY OF HIV/AIDS ACTIVITIES CARRIED OUT
THROUGHOUT THE YEAR 2016 ................................................................................ 14
4.0 DISTRICT FINANCE OFFICE ........................................................................................ 14
• UPDATE ON DISBURSEMENTS FROM FUNDING SOURCES ........................... 14
TABLE 9: INCOME & EXPENDITURE (JAN-DEC, 2016) ......................................... 14
• 4.1 STRATEGIES PUT IN PLACE TO IMPROVE REVENUE GENERATION .... 14
• 4.1.1 OTHER CHALLENGES WITH REGARD TO GENERATING FUNDS
ESPECIALLY INTERNALLY ................................................................................... 14
• 4.1.2 INCENTIVES FOR BUSINESS DEVELOPMENT IN THE DISTRICT ......... 14
5.0 DISTRICT HEALTH DIRECTORATE ............................................................................ 14
TABLE 11: HEALTH FACILITY BY TYPE ................................................................. 15
• 5.1 CHPS IMPLEMENTATION ................................................................................. 16
6.0 ENVIRONMENTAL HEALTH ........................................................................................ 16
7.0 DISTRICT EDUCATION DIRECTORATE .................................................................... 16
• 7.1 ACCESS ................................................................................................................ 16
TABLE 12: TOTAL NUMBER OF SCHOOLS IN THE DISTRICT ............................ 16
TABLE 13: SCHOOL ENROLLMENT: DECEMBER, 2016/17 (PUBLIC BASIC
SCHOOLS) ...................................................................................................................... 17
TABLE 14: PERFORMANCE OF THE EDUCATIONAL SECTOR ........................... 17
TABLE 15: PUPIL TEACHER RATIO .......................................................................... 17
TABLE 16: 2016 BECE RESULTS ................................................................................ 18
• SCHOOL FEEDING PROGRAMME ......................................................................... 18
TABLE 16: GHANA SCHOOL FEEDING PROGRAMME (GSFP) ............................ 18
• 7.1.5 CHALLENGES FACED BY THE PROGRAMME: ......................................... 18
• 7.1.6 RECOMMENDATIONS NEEDED TO IMPROVE THE PROGRAMME
INCLUDE: ................................................................................................................... 18
CHAPTER FOUR .................................................................................................................... 19
8.0 DISTRICT AGRICULTURE DIRECTORATE................................................................ 19
3
• 8.1 WEATHER ............................................................................................................ 20
• 8.2 AGRICULTURAL GROWTH AND PRODUCTIVITY ...................................... 21
8.2.1. AGRICULTURAL GROWTH AND PRODUCTIVITY;..................................... 21
TABLE 17: WHOLESALE PRICE OF MAJOR STAPLE FOOD CROPS (VALUE OF
CROP PRODUCTION) ................................................................................................... 21
8.2.3 ANALYSIS ............................................................................................................. 22
• PROTECTION AND MITIGATION MEASURES .................................................... 22
TABLE 18: DISTRICT DISTRIBUTION OF NATURAL RESOURCE
MANAGEMENT ACTIVITIES UNDERTAKEN ......................................................... 22
8.2.4 ANALYSIS ............................................................................................................. 22
8.2.5 PIGGERY PROJECTS ........................................................................................... 22
8.2.6 CROP SUB-SECTOR PERFORMANCE .............................................................. 22
TABLE 19: TARGET AND ACHIEVEMENT .............................................................. 22
• 8.2.7 ROOT AND TUBER IMPROVEMENT PROGRAMME (WAAPP) ............... 22
DEPARTMENT OF COMMUNITY DEVELOPMENT / SOCIAL WELFARE .................. 23
9.0 INTRODUCTION ............................................................................................................. 23
• 9.1 ADULT STUDY GROUP ..................................................................................... 23
• 9.2 MASS EDUCATION ............................................................................................ 23
9.2.1 HOME / SCHOOL VISITS .................................................................................... 23
• 9.3 EXTENSION SERVICES ..................................................................................... 23
9.4 LIVELIHOOD EMPOWERMENT AGAINST POVERTY (LEAP) ....................... 23
9.4.1 PAYMENT RATES UNDER LEAP PROGRAMME ........................................... 23
9.4.2 CHALLENGES ...................................................................................................... 23
9.4.3 WAY FORWARD .................................................................................................. 23
NATIONAL DISASTER MANAGEMENT ORGANISATION (NADMO) ......................... 23
10.0 ACTIVITIES.................................................................................................................... 23
TABLE 20: PERFORMANCE OF THE NATIONAL DISASTER MANAGEMENT
ORGANISATION UNDER THE PERIOD .................................................................... 24
CHAPTER FIVE ..................................................................................................................... 33
BUSINESS ADVISORY CENTRE (NBSSI-BAC) ................................................................ 33
11.0 INTRODUCTION ........................................................................................................... 33
• 11.1 YOUTH EMPLOYMENT AGENCY ................................................................. 33
TABLE 21: BREAKDOWN OF BENEFICIARIES UNDER THE PROGRAMME..... 33
• 11.1.2 PROSPECTS..................................................................................................... 33
11.2 NATIONAL SERVICE SECRETARIAT ....................................................................... 33
11.3 MAJOR CHALLENGES ................................................................................................. 34
12.0 CHALLENGES OF DEPARTMENTAL HEADS .......................................................... 35
• 12.1 THE WAY FORWARD ...................................................................................... 35
• 12.2 RECOMMENDATIONS ..................................................................................... 35
4
CHAPTER ONE
1.0 LOCATION AND SIZE
Agona East District is situated in the eastern corner of the Central Region within latitudes 5030’
and 5050’N and between longitudes 0035’ and 0055’ W. It has a total land area of 667square
kilometres.
The Agona East District Assembly (AEDA) was carved out of the defunct Agona District
Assembly in 2008 by Legislative Instrument 1921. It is one of the seventeen (17) Political and
Administrative Districts in the Central Region of Ghana with a total land area of 665 km². It is
bounded on the south by the Agona West Municipal and Gomoa East District Assemblies. The
West Akim and Birim South District Assemblies lie to the north of the District whilst it is
bounded on the east by Awutu Senya District.
The District whose capital is Agona Nsaba, falls within the forest belt of Ghana and used to be
a very important cocoa producing area.
1.1 SUB-DISTRICTS
1.2 RELIEF AND DRAINAGE
1.3 SOIL AND LAND USE
1.4 CLIMATE AND VEGETATION
1.5 IMPACT OF CLIMATE CHANGE
1.6 DEMOGRAPHIC CHARACTERISTICS
1.7 KEY MONITORING AND EVALUATION OBJECTIVES FOR 2016
WATER AND SANITATION
SUMMARY OF PROGRESS MADE IN THE WATER AND SANITATION SECTOR
1.8 CHALLENGES
1.9 RECOMMENDATION
1.10 GENDER ANALYSIS
5
6
CHAPTER TWO
2.0 Location/Spread of Projects:
The projects and programs are carved out and targeted to address problems in education, economic,
health, administration, water and sanitation. The Education Sector received 29.1%, Water and
Sanitation Sector received 26.6% whiles the economic sector which is directly linked to our socio-
economic wellbeing and also supposed to generate employment to the teeming unemployed youth
recorded 21.5%. It is refreshing to see the figures pointing at immerse improvement in investments
in the various sectors except Administration which has seen a major decline which recorded 8.9%.
This situation must seriously be given a critical attention to create an unruffled environment for
the workers of the assembly. This is a huge challenge and hence the need for redirection of funds
to the sector that is lacking behind to achieve a total balance in our developmental drive.
The projects executed have been analyzed according to the five (5) Area Councils in the district
(Mankrong, Kwanyako, Asafo, Duakwa and Nsaba). It could be seen from tables below that, most
of these projects were mainly concentrated in the Duakwa area council. Besides, they were not
fairly distributed even at the area council level. Duakwa Councils had the highest with 27.8% of
all the projects in the district. Asafo and Kwanyako Area Council are the least served with each
recording 15.2% and 8.9% respectively.
.
TABLE 3: SPREAD OF PROJECTS
S/N Sector Frequency Percentage Area Council Frequency Percentage
1 Education 23 29.1 Nsaba 21 26.6
2 Admin.
7 8.9 Duakwa 22 27.8
3 Health 11 13.9 Asafo 12 15.2
4 Water & Sanitation 21 26.6 Mankrong 17 21.5
5 Economics 17 21.5
Kwanyako 7
8.9
Total 79 100 79 100
7
FIG 6: A PIE CHART SHOWING THE DISTRIBUTION OF PROJECTS IN THE VARIOUS
SECTORS OF THE ECONOMY.
FIG 7: A BAR CHAT SHOWING THE DISTRIBUTION OF PROJECTS IN THE VARIOUS
AREA COUNCILS
Education
29%
Admin.
9%
Health
14%
Water &
Sanitation
27%
Economics
21%
0
5
10
15
20
25
Nsaba Duakwa Asafo Mankrong Kwanyako
No
. o
f p
roje
cts
Area Council
8
TABLE 4: PROGRAMME/ PROJECT STATUS FOR THE PERIOD JANUARY - DECEMBER, 2016
No.
Project Descript
Project Sector Contract Sum GHc Date Date % of Work
Source Of Remarks
Location Original Revised Awarded Comec,t Comp. D. Actual DONE` FUNDING
1 Const. of a Culvert Agona Asafo Economics 15,702.00 January 2015 May 2015 100 DDF Completed
2 Const. of 1no. 4-unit
Residential Acco-DCE Nsaba Adm. 183,201.60 August, 2014 Mar 2015 90 DACF On-going
3 Const. of 1no. 3-unit
Residential Acc. –DCD Nsaba Adm. 140,691.02, August, 2014 Mar 2015 90 DACF On-going
4 Const. of 1no. 4-in-one
Staff Acc. Nsaba Adm. 65,266.59 NOV, 2010 May, 2011 75 DACF On-going
5 Const. of 6-unit CRB at
Kwanyako Sec/Tech Kwanyako Education 32,000.00 Nov, 2009 Mar, 2010 65 DACF Abandoned
6 Const. of 6-unit CRB & 3-
seater w/c Meth. Pri Nsaba Education 149,930.66 Dec, 2010 July, 2011 100 GET Fund
Completed
7 Const. of 6-unit CRB & 3-
seater w/c Presby JHS Duakwa Education 109,472.33 Dec, 2010 July, 2011 100 GET Fund
Completed
8
Const. of 10-seater Toilet
Facility Sawmill (Kwansakrom Sanitation 19,443.06 Sep. 2010 Jan, 2011 100 DACF
Work is completed
but yet to be
commissioned
9 Const. of 3 unit Pre- school
& W/C Asafo Education 46,220.31 Sept. 2009 Feb. 2010 100 CBRDP The project is in use
10 Const. of 16-seater Aqua –
Privy Toilet Facility Kwanyako Sanitation 25,000.00 21/10/2010 Dec, 2010 100 MP's Fund
Project is completed
and in use
11 Const. of 6-unit CRB
Block, office & store SWESCO Education 260,000.00 July, 2010 Mar, 2011 100 GET Fund Special Program and
work is completed
12 Const. of 6-unit CRB
Block, office & store Kwanyako Sec/Tch Education
260,000.00 July, 2010 Mar, 2011 100
GET Fund Special Program
and completed
13 Const. Of CHPS Center
Kwasitwekwaswe Health 25,000.00 June 2009 July 2010 100 MP`s
Project Completed and in use
14 Construction of CHPS
Center Otwakwaa Health 59,950.80 February, 2011 Ma y,2011 100 DDF Completed but yet to be
commissioned
15 Const. of Multi-purpose
Community center Nsaba Economic 185,363.34 February, 2011 July, 2011 100 DDF Completed but yet to be
commissioned
16 Const. of 1no. 16 unit
lockable stores Duakwa Economic 57, 748.84 February, 2011 May, 2011 100 DDF Completed but yet to be
commissioned
17 Const. of 1no. 16 unit
lockable stores Kwanyako Economics 56,511.53 February, 2011 May, 2011 100 DDF Completed but yet to be
commissioned
18
Construction of 6 unit CRB
with Office & Store NSASS- Nsaba Education 260,000.00 July ,2010 Oct. 2010 100 Getfund
Special Program and
Completed
19 Const. of 6 Unit CRB with
Ancillary facility Kwesi Paintsil Education 196,218.33 November,
2011 July, 2012 80 GET Fund On-going
9
20 Construction of market
(Phase 1) Agona Nsaba Economic 20,000.00 Jan, 2012 May, 2012 100 DACF Phase I has been
completed
21 Const. of 6 Unit CRB with
Ancillary facility Nsaba Presby JHS Education 194,709.87 Nov 2011 July 2012 100 GET Fund Completed
22 Const. of 6 Unit CRB with
Ancillary facility Kwansakrom ADA Education 199,724.25 Nov 2011 July,2012 80 GET Fund Pace of work should
speed up
23
Const. of Vault Chamber
(CIP) Mankrong Junc. Sanitation 57,600.00 100
Community
/French
Embassy
Completed
24 Construction of CHPS
compound Agona Mansofo Health 80,728.55 Jan 2013 21/01/2013 May 2013 100 DDF Completed but yet to be
commissioned
25 Construction of CHPS
compound Agona Brahabekumi Health 80,771.47 Jan 2013 21/01/2013 May 2013 100 DDF Completed but yet to be
commissioned
26 Construction of CHPS
compound Agona Oboyambo Health 80,771.47 Jan 2013 21/01/2013 May 2013 100 DDF Completed
27 Construction of 1no. 12
seater Aqua Privy Latrine Agona Jacob Sanitation 31,237 Jan 2013 20/01/2013 May 2013 100 DDF Completed but yet to be
commissioned
28 Construction of 1no. 12
seater Aqua Privy Latrine Agona Ninta Sanitation 31,215 Jan 2013 20/01/2013 May 2013 70 DDF Ongoing
29
Construction of 1no. 3
seater KVIP latrine for
boys and washing facility at
Methodist prim.
Ninta Sanitation 21,216 July 2013 25/07/2013 January 2014 100 IDA Completed but yet to be
commissioned
30
Construction of 1no. 3
seater KVIP latrine for girls
and washing facility at
Methodist prim.
Ninta Sanitation 21,216 July 2013 25/07/2013 January 2014 100 IDA Completed but yet to be
commissioned
31
Construction of 1no. 3
seater KVIP latrine for
boys at AEDA
Otwekwaa Sanitation 21,216 July 2013 18/07/2013 January 2014 100 IDA Completed but yet to be
commissioned
32
Construction of 1no. 3
seater KVIP latrine for girls
at AEDA
Otwekwaa Sanitation 21,216 July 2013 18/07/2013 January 2014 100 IDA Completed but yet to be
commissioned
33
Construction of 1no. 3
seater KVIP latrine for
boys at AEDA at
Kwesitwekwaa
Kwesitwekwaa Sanitation 21,216 July 2013 17/07/2013 January 2014 100 IDA Completed but yet to be
commissioned
34
Construction of 1no. 3
seater KVIP latrine for girls
at AEDA at Kwesitwekwaa
Kwesitwekwaa Sanitation 21,216 July 2013 17/07/2013 January 2014 100 IDA Completed but yet to be
commissioned
35
Construction of 1 no. 4
seater kVIP latrine for boys
and washing facilities at
AEDA
Akwakwaa Sanitation 25,029 July 2013 15/07/2013 January 2014 100 IDA Completed but yet to be
commissioned
36 Construction of 1 no. 4
seater kVIP latrine for girls Akwakwaa Sanitation 25,029 July 2013 15/07/2013 January 2014 100 IDA Completed but yet to be
commissioned
10
and washing facilities at
AEDA
37
Construction of 1no. 4
seater KVIP latrine for
boys at Prim/JHS
Amanful No. 2 Sanitation 25,029 July 2013 15/07/2013 January 2014 100 IDA Completed but yet to be
commissioned
38
Const. of 1no. 4 seater
KVIP latrine for girls at
Prim/JHS
Amanful No. 2 Sanitation 25,029 July 2013 15/07/2013 January 2014 100 IDA Completed but yet to be
commissioned
39 Const. of Nurses Staff
Accommodation Agona Asafo Health 97,737.90 January 2015 12/01/2015 June
2015 85 DDF On-going
40 Construction of sick bay. Kwanyako Senior High
School Education 115,842.00 January 2015
June
2015 85 DDF On going
41 Rehabilitation of work on
town roads. Mensakrom Adm. 100,031.70 May 2014 November
2014 100 DDF Completed
42 Const. of 1no 8unit market-
stall Agona Esusu Economics 30,612.58 May 2014 01/06/2014 01/12/14 100 DDF Completed
43 Const. of 1no 8unit market-
stall Agona Fawomanye Economics 30,612.58 May 2014 01/06/2014 01/12/14 100 DDF Completed
44 Extension of pipe borne
water Agona Duoto-Agona
Kenyankor Sanitation 1,480,000.44 May 2014 07/06/2014 07/12/14 100 IDA Completed
45 Const. of 1no 8unit market-
stall Agona Ninta Economics 30,114.69 May2014 06/06/2014 06/12/14 100 DDF Completed but yet to be
commissioned
46 Const. of 1no 8unit market-
stall Agona Namanwora Economics 30,127.31 May2014 05/06/2014 05/12/14 100 DDF Completed but yet to be
commissioned
47 Const. of 1no 8unit market-
stall Agona Kwesikum Economics 35,706.56 January 2015 012/01/2015 04/04/15 100 DDF Completed but yet to be
commissioned
48 Const. of a sick Bay Agona Nsaba Presby
SHS Health 100,453.75 May2014 04/08/2014 04/02/15 100 DDF On going
49 Demolition&Reconst. Of
Box Culvert Agona Esusu Adm 36,543.48 May2014 04/08/2014 04/02/15 100 DDF Completed but yet to be
commissioned
50 Completion of 1no 3unit
CRB and 3 seater KVIP Agona Akokoasa Education 108,569.44 May2014 06/08/2014 06/02/15 100 DDF Completed
51 Const. of 1no 8unit market-
stall Agona Kwesikum Economics 30,612.58 May 2014 01/06/2014 01/12/14 100 DDF Completed
52 Const. and completion 1no
3unit CRB&KVIP Facility Agona Kwesikum Education 152,198.73 June 2015 5/07/2015 6/01/2016 80 DACF On going
53 Const. and completion 1no
3unit CRB&KVIP Facility Nsaba Catholic Sch Education 162,636.38 June 2015 5/07/2015 6/01/2016 80 DACF On going
54 Supply of furniture to 5no
CHPS Compounds Mansofo,
Brahabekumi, etc Health 14,800.00 June 2015 5/07/2015 6/01/2016 100 DACF Completed
55 Const. and Completion of
CHPS Compound Kokoado Health 148,414.75 June 2015 5/07/2015 6/01/2016 100 DACF Completed
11
56 Const. and Completion of
CHPS Compound Kwesi Pentil Health 150,727.32 June 2015 5/07/2015 6/01/2016 90 DACF On going
57 Const. of 1No. 20 seater
water closet Swedru senior high Sanitation 140,840.70 June 2015 5/07/2015 6/01/2016 100 DACF Completed
58
Rehabilitation works on
350 metres roads phase 2
lot 1
Mensakrom Adm. 197,930.85 October, 2015 15/10/2015 14/04/2016 100 DACF Completed
59
Rehabilitation works on
350 metres roads phase 2
lot 2
Mensakrom Adm. 173,563.97 October, 2015 15/10/2015 14/04/2016 100 DACF Completed
60 Const. & Completion of
1no 3unit CRB Ninta Education 193,842.88 February, 2016 22/2/2016 1/8/2016 100 DACF Completed
61 Construction of 1no. 4-Unit
Teachers' Quarters Nsaba Education 188,590.57 March, 2016 17/3/2016 16/9/2016 80 DDF On going
62 Construction of 6-Seater
KVIP Oseidu Sanitation 4,180.35 January, 2016 10/1/2016 3/6/2016 100 DDF Completed
63 Construction of 6-Seater
KVIP Bewadze Sanitation 4,180.35 January, 2016 10/1/2016 3/6/2016 100 DDF Completed
64 Construction of 6-Seater
KVIP Mankrong Sanitation 4,180.35 January, 2016 10/1/2016 3/6/2016 100 DDF Completed
65 Construction of 1no. 16-
Unit Open Market Shed Obratwaowu Economic 45,753 March, 2016 17/3/2016 16/9/2016 100 DDF Completed
66
Demolition and
Construction of 0.90m
double concrete pipe
culvert and dredging of
100m river
Brahabekumi Economic 180,660 July, 2016 4/8/2016 3/3/2017 100 DDF Completed
67
Demolition and
Construction of concrete
box culvert and 0.60m X
250m concrete U-drain
Kofikum/Oboyambo Economic 294,560 July, 2016 4/8/2016 3/2/2017 100 DDF Completed
68 Construction of 0.9m
concrete pipe culvert Woraba (Kwansakrom) Economic 34,992 July, 2016 4/8/2016 3/2/2017 75 DACF On going
69 Construction of 0.6m X
250m length U-drain Mankrong Junction Economic 179,150 July, 2016 4/8/2016 3/2/2017 65 DACF On going
70
Demolition and
Construction of 0.9m
concrete pipe culvert
Asafo Economic 34,992 July, 2016 4/8/2016 3/2/2017 100 DACF Completed
71
Paving of Agona East
District Assembly
Compound
Nsaba Sanitation 85,358 July, 2016 4/8/2016 3/2/2017 Newly
awarded DACF Yet to start
72 Construction of Female and
Children's ward Nsaba Health 229,860 July, 2016 4/8/2016 3/2/2017 75 DACF On going
73 Conversion of classroom
pavilion Mankrong Education 203,480 July, 2016 4/8/2016 3/2/2017 80 DACF On going
12
74
Construction 1no. 6-unit
CRB with Ancillary
facilities
Kofikum (AEDA Prim.
Sch.) Education 349,253.1 July, 2016 11/7/2016 10/2/2017 35 Get Fund On going
75
Construction of 1no. 6-unit
CRB with Ancillary
facilities
Obokor (AEDA Prim.
Sch)
Education 359,789 July, 2016 11/7/2016 10/2/2017 30 Get Fund On going
76
Construction of 1no. 6-unit
CRB with Ancillary
facilities
Akroma (AEDA Prim.
Sch.)
Education 359,789 July, 2016 11/7/2016 10/2/2017
Newly
awarded Get Fund Yet to start
77
Construction of 1no. 6-unit
CRB with Ancillary
facilities
Sasakwaa (AEDA
Prim. Sch.)
Education 349,736 July, 2016 11/7/2016 10/2/2017 65 Get Fund On going
78
Construction of 1no. 6-unit
CRB with Ancillary
facilities
Otabilkwaa (AEDA
Prim. Sch.)
Education 349,792.4 July, 2016 11/7/2016 10/2/2017
Newly
awarded Get Fund Yet to start
79
Construction of 1no. 6-unit
CRB with Ancillary
facilities
Abuakwa Akrobon
(AEDA Prim. Sch.) Education 349,807.3 July, 2016 11/7/2016 10/2/2017
Newly
awarded Get Fund Yet to start
13
CHAPTER THREE
PROGRESS OF DEPARTMENTS IN THE DISTRICT
The district has eleven (11) major departments. The following report covers activities undertaken
in the various department of the Assembly.
3.0 CENTRAL ADMINISTRATION
The Human Resource Management analysis for the Assembly and its decentralized departments are shown
below:
TABLE 5: TOTAL NUMBER OF STAFF FOR THE ASSEMBLY AND THE DECENTRALIZED
DEPARTMENTS AS AT 31ST DECEMBER, 2016
NO. DEPARMENT TOTAL PERCENTAGE
(%)
1 Central Administration 29 20.86
2 Environmental Department 27 19.42
3 Finance Department 5 3.59
4 Works Department 6 4.31
5 Social Welfare and Community Development 9 6.47
6 Agricultural Department 24 17.26
7 Disaster Prevention and management Department 32 23.02
8 Information Service Department 2 1.43
9 Department of Physical Planning 4 2.87
10 Department of Trade And Industry(Business Advisory
Centre)
1
0.71
11 Statistical Service Department 1 0.71
TOTAL 139 100
14
The table above depicts the total number of staff during the end of year of the Assembly for both Central
Administration and the Decentralized departments. The staff strength of the Central Administration is
twenty-six (26) representing 17.8% of the total number of staff and the decentralized departments is one
hundred and fifteen (120) representing 82.2% of the total number of staff of the assembly
TABLE 6: AGE SEGREGATION
NO. AGES NO. OF STAFF PERCENTAGE
(%)
1 20-29 10 7.2
2 30-39 52 37.4
3 40-49 29 20.9
4 50-59 42 30.2
5 60+ 6 4.3
TOTAL 139 100
3.1 STAFF DEVELOPMENT TRAINING
3.2 HIV/AIDS ISSUES
4.0 DISTRICT FINANCE OFFICE
The Agona East District Assembly had a total budget of GH₵ 7,277,016.18 for all sources of
funds in 2016. Out of this amount, the total budget for the internally generated fund was GH₵
265,057.32 for 2016. The table below shows the actual revenue and expenditure of the district.
UPDATE ON DISBURSEMENTS FROM FUNDING SOURCES
4.1 STRATEGIES PUT IN PLACE TO IMPROVE REVENUE GENERATION
4.1.1 OTHER CHALLENGES WITH REGARD TO GENERATING FUNDS
ESPECIALLY INTERNALLY
4.1.2 INCENTIVES FOR BUSINESS DEVELOPMENT IN THE DISTRICT
5.0 DISTRICT HEALTH DIRECTORATE
Agona East District Health Directorate (AEDHD) is one of the twenty districts of the Central
Regional Health Administration of the Ghana Health Service (GHS). GHS is one of the Agencies
15
of Ministry of Health responsible for planning and implementing health policies at National,
Regional, District and sub-district levels.
The mandate of the organization is to;
• Implement approved national policies for health delivery in the country
• Increase access to improved health services and
• Manage prudently resources available for provision of health services
TABLE 11: HEALTH FACILITY BY TYPE
NO Name of Facility Provider Type Sub-District Ownership
1 Nsaba H/C Health Centre Nsaba Government
2 Salvation Army
Clinic
Health Centre Duakwa/M’krom Christian Health Association of
Ghana (CHAG)
3 Mensakrom Clinic Health Centre Mensakrom Community initiated/Gov’t
operated
4 Asafo Clinic Health Centre Agona Asafo Gov’t operated
5 Kwanyako H/C Health Centre Agona
Kwanyako
Community initiated/Gov’t
operated
6 Mankrong Clinic Health Centre Agona
Mankrong
Gov’t operated
8 Kenyanko CHPS CHPS Duakwa Government
9 Kwesi Paintsil CHPS Nsaba Government
10 Tawora CHPS Asafo Government
11 Kokoado CHPS Kwanyako Government
12 Fante Bawjiase CHPS Mankrong Government
13 Namanwora CHPS Nsaba Government
14 Brahabekum CHPS Asafo Government
15 Otwekwa CHPS CHPS Kwanyako Government
16 Ofoase CHPS CHPS Duakwa Government
17 KTK CHPS CHPS Kwanyako Government
18 Esusu CHPS CHPS Mankrong Government
16
19 Duabone CHPS CHPS Nsaba Government
21 Otweakwa CHPS Kwanyako Government
22 Mansofo CHPS Mensakrom Government
23 Jacob CHPS Mensakrom Government
24 Oboyambo CHPS Mankrong Government
25 Ninta/Nampong CHPS Nsaba Government
26 Jonof Maternity home Kwanyako Private
5.1 CHPS IMPLEMENTATION
6.0 ENVIRONMENTAL HEALTH
The Environmental health department engaged in series of activities during the year. These includes:
• Conduction of a market survey to measure the level of compliance on the use of iodate salt. The
survey showed 86 percent of the salt sold in Duakwa and Nsaba Markets was iodated.
• A number of premises inspection was organized.
• The monthly sanitation day was successfully oganised in Nsaba and it was well patronised.
• Inspection of 32 toilets in the district depicts that only 7 of those toilets pay their franchise and
base on that a team was form to assess the toilet situation in the district.
7.0 DISTRICT EDUCATION DIRECTORATE
Key activities undertaken involves the four (4) thematic areas identified for implementation under the
education strategic plan. The first thematic area was access.
7.1 ACCESS-
Enrolment in all schools have been the same at all levels. Four Hundred and Twenty-Nine (429)
Students have been enrolled in Community Day SHS recently put up at Namanwora in the Agona
East District. The school offers Programmes in: General Agriculture, General Arts and Business
Studies.
TABLE 12: TOTAL NUMBER OF SCHOOLS IN THE DISTRICT
S/N School Number of Schools
17
1. Public Basic Schools 84
2. Private Basic Schools 53
3. Public Senior High Schools 4
4. Private Senior High Schools 3
TOTAL 144
TABLE 13: SCHOOL ENROLLMENT: DECEMBER, 2016/17 (PUBLIC BASIC SCHOOLS)
S/N Schools No. Of Pupils
Males Female
s
No. of Teachers Males Females
1. Nursery 264 125 139 17 - 17
2. K/G 3,164 1,514 1,650 133 9 124
3. Primary 12,068 4,627 7,441 376 205 171
4. JHS 3,410 1,788 1,622 341 245 96
TOTA
L
18,906 8,054 10,852 867 459 408
TABLE 14: PERFORMANCE OF THE EDUCATIONAL SECTOR
S/N AREA TARGET % ACHIEVEMENT %
1. Effective Tracking of Pupils’ Attendance 86 90
2. Effective Tracking of Pupils’ Attendance 84 90
3. Effective Lesson Delivery of Teachers 88 95
4. Promoting Effective School-Community
Relationship
90 95
5. Ensuring Discipline in Pupils 89 95
TABLE 15: PUPIL TEACHER RATIO
S/N School Ratio
1. Public Basic Schools 22:1
2. Private Basic Schools 26:1
18
3. Public SHS 23:1
4. Private SHS 11:1
TABLE 16: 2016 BECE RESULTS
S/N Subjects Total no of Candidates
obtained grades
1-3
Total no of candidates
obtained grades
4-6
Total no of candidates
obtained grades
1-6
%
Boys Girls Total Boys Girls Total Boys Girls Total
1. English Lang. 120 134 254 469 399 868 589 533 1122 63
2. Social Stud. 98 63 161 407 351 758 505 414 919 52
3. Mathematics 89 55 144 472 380 852 561 435 996 56
4. Int. Science 152 92 244 415 365 780 567 457 1024 58
5. R. M. E. 163 138 301 443 408 851 606 546 1152 65
6. B. D. T. 168 129 297 468 384 852 636 513 1149 65
7. I. C. T. 79 41 120 480 369 849 559 410 969 60
8. Ghanaian. Lang. 147 114 261 508 397 905 655 511 1166 66
9. French 9 8 17 42 62 104 51 70 121 45
SCHOOL FEEDING PROGRAMME
7.1.5 CHALLENGES FACED BY THE PROGRAMME:
7.1.6 RECOMMENDATIONS NEEDED TO IMPROVE THE PROGRAMME INCLUDE:
19
CHAPTER FOUR
8.0 DISTRICT AGRICULTURE DIRECTORATE
The year 2016 under review has been good as compared to the previous year, in terms of the
weather activities, agricultural activities, performance and productivity. The year 2016 under
review had relatively better weather activities than the previous year. Owing to good rainfall
activities, agricultural activities in the District grew marginally. The department put in place
various activities aimed at improving agriculture in the district, which yielded positive results.
Amidst all the challenges, the department of Agriculture implemented various activities in their
action plans.
In effect, the various sectors of DADU, under took most of their plans of activities for the Period.
These sectors are made up of:
• Crops sector
• Livestock sector
• Fisheries sector
• Veterinary sector
• Extension service
• Administration and policy implementation
• Market Enumeration and Survey
In general, cultivation of staple food increased in the District by 2.12% as compared to the previous
year’s 0.25%. Staples such as maize were cropped by farmers extensively in both the major and
minor seasons. Cassava, plantain and cocoyam equally were highly produced during the year 2016
under review. Many farmers also enjoyed the fertilizer subsidy during the production period of the
year. Prices of fertilizers were lower owing to the fertilizer subsidy. However, other agro – inputs
for the 2016 farming seasons were high as compared to the previous years. Increases in the
quantity of food stuff did not reflect in the reduction of commodity prices in the major market
centres during the year under review, ceteris paribus, due to other factors such as transport cost,
20
and increase in the taxes and other financial challenges of the nation. Commodity prices have
market forces.
During the period under review, the following activities were conducted;
• Review of 2015 action plan and activities conducted and strategize a way forward for
2016.
• Discussion of progresses and challenges that emanated during the implementation of 2015
programmes.
• Discussion of the effects of the reluctances in the fluidity in the 2015 fiscal year and the
way forward in 2016.
• Planning, discussion and drafting of 2016work plan and budget.
• Discussion of progresses and challenges of 2015 piggery projects and the way forward.
• Discussion of progresses and challenges of 2015 WAAPP activities and the way forward
in 2016.
• Review of Implementations of the 2015 work plan and budget for the end of the first,
second, third and fourth quarters, challenges and the way forward.
• Progress assessment of the piggery in the District.
• Discussion and planning for 2016 WAAPP activities
• Technical review and Management meetings
• Farmers training and fora
• Staff training
• Organizations of demonstration, field days, group meetings and interactions
• Monitoring, Supervision and Evaluation of policies and activities of all the sectors in the
district.
• Progress reports from the various sectors of DADU
• Farmers’ and fishermen’s day celebration
8.1 WEATHER:
The climatic condition experienced during the year under review on agricultural activities was
highly unpredicting. As at the time of reporting the weather condition during the period was
21
characterized by sunshine, partly dry and cloud formation and intermittent rain showers. The
District also experienced sixty – eight (68) rainy days with sunny weather.
The prevailing conditions were unfavoured most crops performance and generally farming
activities. Harvestings of crops were very prevalent because of the long periods of droughts. The
rains did not fall as expected subsequently, farmers who planted maize suffered crops losses and
low yields. The erratic rains also affected cassava yields and that of cocoyam and yams. Cloudy
weather conditions were also experienced during the day and night, with intensive sunshine during
most of the period of the day. The weather, in general, could not be classified as very good. There
were high water stresses, wilting due to the erratic rains experienced during the year.
8.2 AGRICULTURAL GROWTH AND PRODUCTIVITY;
Crop Sub – Sector Performance;
There is enough food in the market; however, the prices of commodities are on the ascendancy.
8.2.1. AGRICULTURAL GROWTH AND PRODUCTIVITY;
Crop Sub – Sector Performance;
There is enough food in the market; however, the prices of commodities are on the ascendancy.
TABLE 17: WHOLESALE PRICE OF MAJOR STAPLE FOOD CROPS (VALUE OF CROP
PRODUCTION)
COMPARATIVE DISTRICT AVERAGE WHOLESALE PRICES
COMMODITY UNIT OF SALE YEAR 2013
GH¢
YEAR 2014
(GH¢)
YEAR 2015
(GHȼ)
YEAR 2016
(GHȼ)
CEREALS
Maize (Old)
Maize(New)
Millet
Guinea corn
Rice (Local)
Rice (Imported)
Maxi Bag (100kg)
Maxi Bag (100kg)
Maxi Bag ( 93kg)
Maxi Bag (109kg )
Maxi Bag (100kg)
Maxi Bag (50kg)
140.00
100.00
180.00
180.00
120.00
170.00
180.00
160.00
180.00
180.00
140.00
180.00
300.00
250.00
200.00
200.00
150.00
200.00
300.00
140.00
250.00
220.00
180.00
250.00
PULSE/NUTS
Cowpea (white)
Groundnut (Red)
Unshelled Groundnut
Soy bean
Maxi Bag (109kg)
Maxi Bag (82kg)
Maxi Bag (37kg)
Bag(82kg)
250.00
285.00
60.00
280.00
280.00
300.00
70.00
290.00
285.00
300.00
75.00
295.00
300.00
330.00
100.00
330.00
STARCHY FOODS.
Yam (white)
Cocoyam
Cassava
Konkonte (cassava
chips)
Plantain (Apentu)
Plantain (Apem)
Gari
100 Tubers.
Maxi Bag (91kg)
Maxi Bag (91kg)
Mini Bag (40kg)
Av.Bun. (9 – 11kg)
Av.Bun. (9 – 11kg)
Maxi Bag (68kg)
350.00
150.00
90.00
34.04
10.00
25.00
116.00
370.00
180.00
100.00
40.00
26.00
40.00
120.00
380.00
190.00
120.00
40.00
10.00
25.00
116.00
400.00
250.00
150.00
40.00
25.00
50.00
200.00
22
VEGETABLES.
Local Tomato
Tomato
Garden egg
Onion
Dried Pepper
Fresh Pepper
Ginger
Av. Crate (52kg)
Av. Crate (52kg)
Mini Bag (27kg)
Maxi Bag (73kg)
Maxi Bag (16kg)
Maxi bag (20 kg)
Mini Bag (48kg)
250.00
300.00
70.00
200.00
225.00
150.00
85.00
280.00
320.00
85.00
250.00
225.00
200.00
100.00
290.00
320.00
90.00
260.00
230.00
210.00
105.00
400.00
450.00
150.00
300.00
250.00
250.00
150.00
OILS:
Groundnut oil
Palm oil
Coconut oil
4 gallons
4 gallons
4 gallons
-
50.00
60.00
-
65.00
80.00
-
70.00
80.00
-
80.00
100.00
FISH:
Smoked Herring
Salted dried Fish
(Koobi)
Anchovies
100 Singles
100 Singles
Av. Basket (27kg)
50.00
150.00
-
100.00
200.00
-
110.00
200.00
100.00
250.00
500.00
150.00
FRUITS:
Orange
Banana (unripe)
Mango
Pineapple
Water Melon
Coconut
100 Singles (20kg)
Av. Bunch (6 – 9kg)
Crate (100kg)
100 singles (150 kg)
100 singles (450kg)
100 singles (150kg)
10.00
30.00
80.00
80.00
100.00
50.00
10.00
35.00
90.00
120.00
180.00
60.00
15.00
45.00
90.00
130.00
190.00
70.00
60.00
65.00
-
250.00
250.00
100.00
EGGS:(Commercial Crate(30 singles) 9.00 18.00 120.00 120.00
Live Birds Single 20.00 40.00 45.00 50.00
Beef 1 kg 11.00 15.00 16.00 20.00
Pork 1 kg 12.00 17.00 19.00 20.00
Source: DADU/MIS/PPMED/MOFA.
8.2.3 ANALYSIS:
Differences in foodstuff prices as compared to last year may be due to the following
• Market supply and demand conditions
• Prices of petroleum products
• Prices of transportation
• Prices of Agro – chemicals and Agro – inputs
• Consumer preferences.
PROTECTION AND MITIGATION MEASURES
8.2.7 ROOT AND TUBER IMPROVEMENT PROGRAMME (WAAPP)
23
DEPARTMENT OF COMMUNITY DEVELOPMENT / SOCIAL WELFARE
9.0 INTRODUCTION
The department of community development exists to assist in the reduction of poverty in rural
communities through facilitation and mobilization of human and material resource within the
community. Working activities undertaken in 2016 include; the organization of mass education
campaigns, extension service work, organizing of adult education classes, home science extension
service work.
9.1 ADULT STUDY GROUP
9.2 MASS EDUCATION
9.3 EXTENSION SERVICES
NATIONAL DISASTER MANAGEMENT ORGANISATION (NADMO)
10.0 ACTIVITIES
Some of the potential hazards identified in the year 2016 include the following:
• Bush burning
• Dilapidated buildings
• Erection of unauthorized structures on water ways
• Sand winning
• Improper ways of dumping refuse
• Narrow bridges
• Poor road network
• Lack of proper toilet facility
• Improper use of electrical gadgets
24
TABLE 20: PERFORMANCE OF THE NATIONAL DISASTER MANAGEMENT ORGANISATION UNDER THE PERIOD.
DATE OBJECTIVE SPECIFIC
ACTIVITY
LOCATION SOURCES
OF FUND
CHALLENG
ES
ACHIEVEMENT
13/01/16
To
28/01/16
Protection of
properties against
fires
Preventive Measures
on fire disasters and
effective sanitation
management
was made
Mankrong,
Essusu,
Oboyanbo,
Kenyankor,
Kwame Ntsiful,
Fawhia, Fanti
Bawjiase,
Nkumkum,
Mangoase
NADMO Inadequate
equipment
/tools and
funds to extend
the program to
the other
communities
80% of the community
members were educated
18/01/16 To provide acacia
and Cocoa Nursery
Shade
preparing the projects
site to raise acacia and
cocoa seedlings
Kwanyako,
Nsaba, Asafo,
Duakwa,
Mankrong,
Mankrong
Junction
NADMO Lack of
logistics and
motivation for
DVGs to
participate
fully
95% of the projects site
preparation have been
completed
19/01/16 Awareness
Creation on bush
and domestic fires
Education on bush and
domestic fires and its
prevention were taught
Kotokoli Zongo NADMO Lack of funds
to extend the
program to
other nearby
communities
About 70% of the youth
benefited from the
program
25
26/01/16 To ensure clean and
healthy environs
Clean up exercise was
organized
Mankrong
Junction
NADMO Inadequate
working tools
for the staff and
other volunteer
groups.
The exercise was
successfully done though
the participation was not
encouraging due to
inadequate working
materials
27/01/16
To
28/01/16
Education on
Disasters and
Visitation of School
Awareness Clubs
Sensitization on
Disasters and its
prevention
Kofi Kum,
Aboano, Essusu,
Kenyakor,
Oboyambo, Fanti
Bawjiase,
Amanful No. 2
AEDA,
Namanwora,
Asarekwaa
AEDA,
Gyesi
NADMO,PLA
N GHANA
Inadequate
funds to visit
other Schools
The sensitization was
successfully done
16/02/16 Educational
Campaign against
the use of chemicals
for fishing in the
Ayensu river
House to house
educational campaign
on water pollution for
those who use
chemicals for fishing
Oketsiw and
Osedu
NADMO Means of
transportation
made it
impossible to
extend the
exercise to
other villages
60% of the houses in the
communities were visited
and educated
23/02/16 Mass education on
Fire Disasters
Prevention of bush
fire disasters
Obrempong FM NADMO, Lack of funds
to continue
The programme was
successfully done
26
AEDA with the
education on
air
01/03/16
to
10/03/16
Educational
Campaign on
Domestic, bush fire
and tree planting
exercises
Sensitization/Awarene
ss creation on Fire
Disasters and its
prevention
Ninta, Essusu,
Tawora,
Fawomanye,
Namanwora,
Amanful No. 2
NADMO
AEDA
GNFS
Forestry
Commission
Inadequate
funds to extend
the program to
other
communities
98% success. All the Six
(6) Selected Communities
benefited from the
Campaign
05/03/16 National Sanitation
Day
General Cleaning was
organized
Duakwa NADMO,
AEDA,
Environmental
Health,
Zoomlion
Lack of working
tools
85% success
11/03/16
To ensure Clean and
healthy environment
General cleaning was
organized
Kwanyako NADMO
Zoomlion
Participation
was very poor on
the part of town
folks due to
Lack of
motivation
40% of the community was
cleaned
27
DATE OBJECTIVE SPECIFIC
ACTIVITY
LOCATION(S) SOURCE
OF FUND
CHALLENGES ACHIEVEMENT
12/04/16 To ensure clean and
healthy environment
Clean up exercise Mensakrom,
Jacob, Mansofo
NADMO
AEDA
Lack of motivation and
inadequate logistics
The communities
were well cleaned
14/04/16 To ensures that hazards
do not lead to disasters
Identification of
hazards
Tawora,
Anomabo
NADMO
AEDA
Lack of
motivation/funds to
patrol other
communities
Attitudinal Change
of the people
19/04/16 To nurse seeds to be
planted to serve as wind
breaks and income
Preparing of
nursery Site
Domoki NADMO
AEDA
Inadequate/funds to
extend the nursery to
other communities
80% Success
21/04/16 To prevent bush fires in
the District
Educating
farmers on the
need to create fire
belts before
burning bushes
Asarekwaa,
Obosomase
Osonkwaa
NADMO Difficulty in
mobilizing all the
farmers
70% of the farmers
were educated
25/04/16 To nurse seeds to be
planted to serve as wind
breaks and income
To educate/advice
people living in
hazardous areas
Kwansakrom NADMO Lack of
motivation/funds to
patrol other
communities logistics
and motivation
80% of the people
were educated
28
02/05/16 To ensure clean and
healthy environment
Desilting of
chocked gutters
for easy flow of
water
Duakwa
Duotu,
Kenyankor
NADMO Spades, pickaxes,
wheelbarrows were not
sufficient
Only 40% of the
participants got
working tools
03/05/16 To prevent fire disasters
in our communities
Public education
on the causes and
prevention of fire
disasters
Asafo NADMO
AEDA
Inadequate funds to
extend the education to
other communities
90% of the people
benefited from the
program
18/05/16 To ensure conducive and
healthy environs
Cleaning and
weeding of
bushes around
homes
Taatwe, Kofi
Otabilkrom
NADMO Inadequate logistics
and motivations
The targeted
communities were
cleaned
18/05/16 To nurse seeds to be
planted to serve as wind
breaks and income
To educate /
advice people
living in
hazardous areas
Kotokoli Zongo NADMO Means of transport to
all the selected
communities was
difficult to come by
Attitudinal change
of the people
31/05/16 To ensure clean and
healthy environs
Public education
on environmental
sanitation
Nantifa NADMO Lack of funds to extend
the education to other
communities
60% of the people
were educated.
31/05/16 Transplanting of acacia
trees
To plant trees to
serve as wind
breaks and a
conducive
environment
Agona Nkran AEDA
NADMO
GES
Lack of logistics 20% of the nursed
trees were planted
29
6/06/16
to
10/06/16
To prevent malaria,
cholera and yellow fever
in our communities
Awareness
creation on
malaria, cholera
and fever as well
as proper hand
wash
demonstration
Namaawora Sch,
Ofoase,
Nampong,
Amanful no.2
Sch, Fante
Bawjiase Sch,
Kenyankor Sch,
Asarekwaa Sch,
Domoki and
Brahabekum
AEDA,
NADMO
GES
Inadequate funds to
extend the education to
other communities.
The communities
understood the
need to prevent
diseases and
maintain personal
hygiene
DATE OBJECTIVE SPECIFIC
ACTIVITY
LOCATION(S) SOURCE
OF FUND
CHALLENGES ACHIEVEM
ENT
30/06/2016
To
15/07/2016
To raise trees to serve as
windbreaks/afforestation
Transplanting of
acacia seedlings
Agona Nkran Islamic
School, Mankrong
Junction AEDA, Fanti
Bawjiase AEDA,
Kofikum AEDA,
Domoki and
Brahabekum
AEDA
NADMO
inadequate working tools
such as shovels,
wheelbarrow, cutlass to
facilitate smooth work
The targeted
trees have
been
transplanted
06/08/2016
To ensure clean and healthy
environment
Clean up
exercise was
organized
Agona Nsaba AEDA
NADMO
Inadequate logistics/lack
of motivation
80% of the
community
was cleaned
30
Environmen
tal
Health
16/08/2016
To
18/08/2016
To ensure that hazards do
not lead to disasters
Identification of
hazard
(dilapidated
houses)
Amomabo, Tawora
Brahabekum,
Kwansakrom
Kwesitwikwaa
Mensakrom
AEDA
NADMO
Lack of compensation for
victims feeling reluctant
to vacate from
dilapidated houses
75% success
30/08/2016 To ensure that hazards do
not lead to disasters
Identification of
hazards
(dilapidated
houses)
Kwesitwikwaa
Ag. Mankrong Junction
AEDA
NADMO
Victims feeling reluctant
to vacate from
dilapidated houses due to
compensation
40% of the
community
are not ready
to change
03/09/2016
To ensure clean and healthy
environment
Clean up
exercise was
organized
Mankrong AEDA
NADMO
Lack of
motivation/logistics
70% of the
environment
was cleaned
07/09/2016 Capacity building of staff
and DVGS
Training
workshop on
disaster
assessment and
First Aid
AEDA Hall
NADMO
AEDA
Inadequate training
materials/funds to
include most of the
DVGS
All
participants
were well
trained
31
DATE OBJECTIVE SPECIFIC
ACTIVITY
LOCATION(S) SOURCE
OF FUND
CHALLENGES ACHIEVEM
ENT
11/10/2016 To ensure clean and
healthy environment
Weeding around the
planted tress at the
main street of Domoki
and its environs
DOMOKI
NADMO
Lack of community
participation
70% work
done
12/10/2016
To identify hazards in the
community
Education of hazards
and risk reduction
exercise was embarked
on
SALEM,
BROFOYEDU (ALL
IN NSABA)
NADMO
No mandate in
demolishing the
dilapidated houses
85% of the
work was
successfully
done
26/10/2016 To revamp the nursery
project
Maintenances of the
necessary sites
DOMOKI
NADMO
Lack of working tools
such as cutlasses,
shovels hand fork
wheelbarrows etc.
65% of the
work
successfully
achieved
05/11/2016 To ensure clean
environment
Participation in the
National Sanitation
Day Clean up Exercise
SETH OKAI
NADMO,
Inadequate logistics 90% of the
work
successfully
done
08/11/2016
To prevent outbreak of
bush/domestic fires
Public education and
sensitization on
bush/domestic fire
prevention was
KOTOKOLI ZONGO
NADMO
Lacks of funds to
extend the programs to
other communities
Good work
done
32
16/11/2016
organized to mark
Disaster Reduction Day
ASAFO ZONGO
NADMO
22/11/2016
12/12/2016
To maintain project sites
to boost income
generation
Clearing of bushes in/
around the project site
to appeal the customers
DOMOKI
BRAHABEKUM
NADMO,
Low participation by
community members
80% work was
done
successfully
33
CHAPTER FIVE
BUSINESS ADVISORY CENTRE (NBSSI-BAC)
11.0 INTRODUCTION
During the year under review, the Business Advisory Centre engaged in various activities that
include: soap making, Batik tie and dye making pomade and hair care product, small management
Training among others. Small Medium Scale Enterprises (SMEs) were also trained at a workshop
on the work of the Business Advisory Centre. These SMEs were in areas of soap making, Cassava
processing, Grass-cutter rearing, Sachet water producers and oil palm processing.
11.1 YOUTH EMPLOYMENT AGENCY
11.1.2 PROSPECTS
11.2 NATIONAL SERVICE SECRETARIAT
The district has benefitted immensely from the national service scheme since its inception. Although the
scheme is still challenged with getting adequate accommodation for service personnel in the district, their
presence at the user agencies especially, the District Assembly, Education and Health has been fruitful. The
table below gives a breakdown of personnel deployed in the district for the period 2015/2016.
S/N AGENCY MALE FEMALE TOTAL
1 Basic Schools 82 54 140
2 District Assembly 13 3 16
3 S.H.S 7 5 12
4 Health Service 9 2 11
5 Study leave 6 1 7
6 G.E.S 2 2 4
7 Vocational/ Technical 4 2 6
8 Others 4 3 7
9 Extension 12 13 25
GRAND TOTAL 139 85 224
34
11.3 MAJOR CHALLENGES
The Agona East District had so many challenges that hampered the smooth implementation of its
planned activities for the year, 2016. Key among these included;
• Lack or non-functioning markets affecting revenue generation of the district
• Lack of data and revenue data mobilisation software
• Inadequate staffing. The District lack revenue superintendent to head the revenue unit
• Street naming and house numbering exercise has been stalled
• Non availability of a district map
• Low commercial activities
• Bad road network and inadequate street light
Some strides have been made in all sectors of the economy and in providing infrastructure and
enrolment drive especially of girls such that gender parity in education is about equal. Despite
these improvements, the education sector is still bedevilled with the following challenges.
• The District Education Directorate requires Five (5) Motor bikes for Circuit Supervisors and
Field Officers to Intensify Supervision.
• Although there are quite a good number of School Ongoing Projects, there are still some
‘School Under Trees’ in the District (Case Study, Akroma AEDA Basic School). Classes are
also combined in some schools due to lack of teachers and classrooms.
• Inability of parents to live up to their parental responsibilities thereby leaving their children to
be influenced by peers.
• Monthly GOG Administration to the office cannot cater for all transport claims of officers.
Moreover, delay in the release of the fund is a great challenge to the Directorate.
Key among the constraints to the implementation of planned activities in the Agriculture sector
includes;
• Inadequate and late arrival of funds
• Poor road network in farming communities.
• Insufficient motor – cycles.
• Wide Extension officer / farmer ratio.
The Health sector is faced with the following challenges:
• Lack of office for the health directorate
35
• Lack of a district hospital
• Incomplete laboratory facility at Agona Nsaba Health Centre
• Inadequate Account Officers
• Lack of office for NHIS
12.0 CHALLENGES OF DEPARTMENTAL HEADS
The staffing situation in the departments of the Assembly has been boosted by the massive
recruitment made by the government. This has ameliorated the staffing situation in the District.
There are many departmental officers who hardly undergo any refresher training of any sort. The
timely completion of the office complex has solved the office accommodation problem prevailing
in the District. However, there are a few challenges
The challenges of these departments run from residential accommodation to logistics. Some of
the challenges are:
Limited residential accommodation for staff
Inadequate vehicle for office duties
Inadequate refresher training programmes
Inadequate logistics for office work and monitoring
• Means of transport
• Computer and accessories
• Stationery
• Incentives
12.1 THE WAY FORWARD
12.2 RECOMMENDATIONS