AggrekoPPT
-
Upload
vaibhav-kumar -
Category
Documents
-
view
171 -
download
0
Transcript of AggrekoPPT
![Page 1: AggrekoPPT](https://reader031.fdocuments.in/reader031/viewer/2022021322/5571fe3b49795991699aecc3/html5/thumbnails/1.jpg)
5/11/2018 AggrekoPPT - slidepdf.com
http://slidepdf.com/reader/full/aggrekoppt 1/27
An introduction to Aggreko
![Page 2: AggrekoPPT](https://reader031.fdocuments.in/reader031/viewer/2022021322/5571fe3b49795991699aecc3/html5/thumbnails/2.jpg)
5/11/2018 AggrekoPPT - slidepdf.com
http://slidepdf.com/reader/full/aggrekoppt 2/27
Brand
aggregaten
+
koopman
= AGGREKO
![Page 3: AggrekoPPT](https://reader031.fdocuments.in/reader031/viewer/2022021322/5571fe3b49795991699aecc3/html5/thumbnails/3.jpg)
5/11/2018 AggrekoPPT - slidepdf.com
http://slidepdf.com/reader/full/aggrekoppt 3/27
Company facts
• Aggreko is the world leader in the supply of temporary power andtemperature control solutions.
• We have approximately 3,800 highly skilled and experienced permanentemployees operating from over 148 locations based in over 34 countries.
• Our fleet comprises of 13,600 generators ranging in size from 15 kW to2MW, which in aggregate amount to over 6,700 MW of generatingcapacity
• In 2010, Aggreko had revenues of approximately £1.2bn (USD$1.9bn)
and operating profit of £317m (USD$491m)
• Aggreko plc is listed on the London Stock Exchange (AGK.L), is amember of the FTSE-100 index
![Page 4: AggrekoPPT](https://reader031.fdocuments.in/reader031/viewer/2022021322/5571fe3b49795991699aecc3/html5/thumbnails/4.jpg)
5/11/2018 AggrekoPPT - slidepdf.com
http://slidepdf.com/reader/full/aggrekoppt 4/27
Brief history of Aggreko
• 1962 - Aggreko founded in the Netherlands
• 1973 - UK business established in Scotland
• 1986 - Entry into North America
• 1989 - Entry into Asia Pacific Region
• 1991 – Entry into the Middle East
• 1997 - De-merger from Christian Salvesen
• 1999 - Established Aggreko International Power
Projects (AIPP) in Dubai to execute multi--megawatt power projects around the world.
![Page 5: AggrekoPPT](https://reader031.fdocuments.in/reader031/viewer/2022021322/5571fe3b49795991699aecc3/html5/thumbnails/5.jpg)
5/11/2018 AggrekoPPT - slidepdf.com
http://slidepdf.com/reader/full/aggrekoppt 5/27
§ 2002 § FIFA World Cup Japan
§ 200 MW in Sri Lanka
§ 2003
§ First depot in Brazil
§ First utility contract in South America
§ 2004
§ First utility contract in Philippines
§ ME network extends to Baku
§ First power project, India
Brief history of Aggreko
![Page 6: AggrekoPPT](https://reader031.fdocuments.in/reader031/viewer/2022021322/5571fe3b49795991699aecc3/html5/thumbnails/6.jpg)
5/11/2018 AggrekoPPT - slidepdf.com
http://slidepdf.com/reader/full/aggrekoppt 6/27
2006
§ Tanzania 40 MW natural gas project
§ Shanghai depot opened
§ Acquisition of GE-ER
2007
§ Major contracts continue:-
§ Yemen 225 MW , Uganda 100 MW, Kenya 100 MW
§ Cricket World Cup
§ Mining contract in Yunan, China
2008
§ Beijing Olympics
§ 40 MW Khulna, Bangladesh
§ First utility project in Argentina
§ Over 1 billion US$ revenue in Aggreko International
2009
§ Entry into India with the opening of the Pune Depot
§ South Africa depot opening
Brief history of Aggreko
![Page 7: AggrekoPPT](https://reader031.fdocuments.in/reader031/viewer/2022021322/5571fe3b49795991699aecc3/html5/thumbnails/7.jpg)
5/11/2018 AggrekoPPT - slidepdf.com
http://slidepdf.com/reader/full/aggrekoppt 7/27
2010
§ 100 MW in Panama
§ 21 MW for the opening ceremony - Shanghai Expo
§ First temperature control project in Mexico
§ 56 MW of Power – 2010 FIFA World Cup South Africa
§ 200 MW of utility power in Bangladesh
§ 70 MW of natural-gas fuelled power in Cote d’Ivoire
§ 142 MVA of power for theGuangzhou 2010 Asian Games
§ 53 MW of power for Refinery in Bina, India
Brief history of Aggreko
![Page 8: AggrekoPPT](https://reader031.fdocuments.in/reader031/viewer/2022021322/5571fe3b49795991699aecc3/html5/thumbnails/8.jpg)
5/11/2018 AggrekoPPT - slidepdf.com
http://slidepdf.com/reader/full/aggrekoppt 8/27
The Aggreko International Network
Dubai
Melbourne
Singapore
Rio de Janeiro
Houston
GlasgowCannock
Shanghai
Dalian
Campinas
Mexico City
Santiago
Caracas
Paris
Sri Lanka
Maceio
JohannesburgSao Paolo
Beijing
NigeriaPune
ArgentinaPuerto Montt
Antofagasta
ManausPanama
![Page 9: AggrekoPPT](https://reader031.fdocuments.in/reader031/viewer/2022021322/5571fe3b49795991699aecc3/html5/thumbnails/9.jpg)
5/11/2018 AggrekoPPT - slidepdf.com
http://slidepdf.com/reader/full/aggrekoppt 9/27
Generators
Generators from 250 kVA up to 500 kVAare housed in robust steel canopies and
contain fork pockets, lifting eyes
Generators from 500 kVA up to 1250 kVAare housed in 20’ ISO standard containers
Suitable for low / high ambient temperaturesand harsh environments
Dual frequency capable – 50 Hz or 60 Hzcycles
Power plants
tailored to 200 MW & above
Power Equipment
![Page 10: AggrekoPPT](https://reader031.fdocuments.in/reader031/viewer/2022021322/5571fe3b49795991699aecc3/html5/thumbnails/10.jpg)
5/11/2018 AggrekoPPT - slidepdf.com
http://slidepdf.com/reader/full/aggrekoppt 10/27
![Page 11: AggrekoPPT](https://reader031.fdocuments.in/reader031/viewer/2022021322/5571fe3b49795991699aecc3/html5/thumbnails/11.jpg)
5/11/2018 AggrekoPPT - slidepdf.com
http://slidepdf.com/reader/full/aggrekoppt 11/27
Loadbanks
• A.C. Load banks (Resistive only) 300 / 1266kW
• A.C. Load banks (Resistive /Inductive): Up to 6MVA
• Resistive and reactive with variable power factor control
• Purpose-built in ISO standard 10 and 20 foot containers for easyhandling and transportation
• Automatic load test program capability
• Remote control and monitoring (up to 3 Km)
• D.C. Load Banks
Loadbanks & Transformers
Transformers•
Multi-tap, multi-voltage for range of common utilityvoltages from 3.3 kV to 132 kV, 50 Hz or 60 Hz.• Self-contained modules with switchgear and built-inprotection.
•Upto 6,300 KVA capacity in single unit.
![Page 12: AggrekoPPT](https://reader031.fdocuments.in/reader031/viewer/2022021322/5571fe3b49795991699aecc3/html5/thumbnails/12.jpg)
5/11/2018 AggrekoPPT - slidepdf.com
http://slidepdf.com/reader/full/aggrekoppt 12/27
Power Generation Equipment
• Distribution
- LV cables supplied as
part of service
- HV cables can also be
supplied
- All cables are EFR/CSP
sheathed & conform to
BS 6007 specifications
- Highly resistant to abrasion,fuel, oil & water
![Page 13: AggrekoPPT](https://reader031.fdocuments.in/reader031/viewer/2022021322/5571fe3b49795991699aecc3/html5/thumbnails/13.jpg)
5/11/2018 AggrekoPPT - slidepdf.com
http://slidepdf.com/reader/full/aggrekoppt 13/27
• Control Room
- Large installations have a central control room
- Monitoring, metering & control of all gensets
from a single location
- Fully integrated system• Switchgear
- Switchgear for large power
evacuations
- High level of safety
- Multi-compartment housing
- Interlocking schemes
- Facility for energy metering
Power Generation Equipment
![Page 14: AggrekoPPT](https://reader031.fdocuments.in/reader031/viewer/2022021322/5571fe3b49795991699aecc3/html5/thumbnails/14.jpg)
5/11/2018 AggrekoPPT - slidepdf.com
http://slidepdf.com/reader/full/aggrekoppt 14/27
Air conditioners
Chillers
CoolingTowers
Temperature Control
- Upto 80 tonnes in single unit- Industrial/Commercial use
- Up to 1500 KW in single units- Multi-MW cooling capacity
- Up to 10,000 KW capacity- Discharge water treatment
Aggreko’s temperature control equipment is used for a variety of applications
across many industries from Oil & Gas through to mining, manufacturing and
events etc.
Heat Exchangers Air Handling Units(AHUs)
![Page 15: AggrekoPPT](https://reader031.fdocuments.in/reader031/viewer/2022021322/5571fe3b49795991699aecc3/html5/thumbnails/15.jpg)
5/11/2018 AggrekoPPT - slidepdf.com
http://slidepdf.com/reader/full/aggrekoppt 15/27
Equipment
Save-ALL containment base prevents spillage of engine fluids or fueland avoids the need for temporary bunds
Sound attenuated, weatherproof enclosures are standard
Noise levels well belowthose specified by latestEC directives
![Page 16: AggrekoPPT](https://reader031.fdocuments.in/reader031/viewer/2022021322/5571fe3b49795991699aecc3/html5/thumbnails/16.jpg)
5/11/2018 AggrekoPPT - slidepdf.com
http://slidepdf.com/reader/full/aggrekoppt 16/27
QHSE
§Aggreko processes are ISO 9001:2000 compliant
§Environmental Health and Safety ( EH&S) system implemented at all sites
§EH&S kits delivered to every site with initial mobilisation
§EH&S training provided to employees in…
ü Basic first aid
ü Fire fightingü Crane & forklift operation
ü High voltage operation
ü Defensive driving
§All sites audited by trained auditors – covers ISO 9001 and EH&S procedures
§EH&S key performance indicators (KPIs) monitored and reported to the Aggreko Senior
Management
![Page 17: AggrekoPPT](https://reader031.fdocuments.in/reader031/viewer/2022021322/5571fe3b49795991699aecc3/html5/thumbnails/17.jpg)
5/11/2018 AggrekoPPT - slidepdf.com
http://slidepdf.com/reader/full/aggrekoppt 17/27
Industries Served
UtilityOil&
GasIndustrial
Mining&
Quarrying
EventServices
PeaceSupportServices
Construction Shipping Manufacturing
![Page 18: AggrekoPPT](https://reader031.fdocuments.in/reader031/viewer/2022021322/5571fe3b49795991699aecc3/html5/thumbnails/18.jpg)
5/11/2018 AggrekoPPT - slidepdf.com
http://slidepdf.com/reader/full/aggrekoppt 18/27
Sector: Manufacturing Location: Uttarakhand, India
7 MW Power for base load operation to Polyplex Corporation
![Page 19: AggrekoPPT](https://reader031.fdocuments.in/reader031/viewer/2022021322/5571fe3b49795991699aecc3/html5/thumbnails/19.jpg)
5/11/2018 AggrekoPPT - slidepdf.com
http://slidepdf.com/reader/full/aggrekoppt 19/27
Sector: Manufacturing Location: Chennai, India
Amara Raja Batteries Ltd- 7 x 1250kVA, 5 x 1000, 1 x 500kVA - 415V at 3 locations
![Page 20: AggrekoPPT](https://reader031.fdocuments.in/reader031/viewer/2022021322/5571fe3b49795991699aecc3/html5/thumbnails/20.jpg)
5/11/2018 AggrekoPPT - slidepdf.com
http://slidepdf.com/reader/full/aggrekoppt 20/27
Sector: Power Location: Chennai, India
6.6 MW HV Job in Kaveri Gas Power Limited
![Page 21: AggrekoPPT](https://reader031.fdocuments.in/reader031/viewer/2022021322/5571fe3b49795991699aecc3/html5/thumbnails/21.jpg)
5/11/2018 AggrekoPPT - slidepdf.com
http://slidepdf.com/reader/full/aggrekoppt 21/27
Sector: Manufacturing Location: Rajasthan, India
1.1 MW Gas Based Power to Samtel Glass Ltd., Kota.
![Page 22: AggrekoPPT](https://reader031.fdocuments.in/reader031/viewer/2022021322/5571fe3b49795991699aecc3/html5/thumbnails/22.jpg)
5/11/2018 AggrekoPPT - slidepdf.com
http://slidepdf.com/reader/full/aggrekoppt 22/27
Situation: Load shedding leading to power shortages from utility gridSolution : 200 MW base load power plant supplied to support local grid
Sector: Utility Location: Bangladesh
![Page 23: AggrekoPPT](https://reader031.fdocuments.in/reader031/viewer/2022021322/5571fe3b49795991699aecc3/html5/thumbnails/23.jpg)
5/11/2018 AggrekoPPT - slidepdf.com
http://slidepdf.com/reader/full/aggrekoppt 23/27
Situation: Cooling required for underground gold mining operations to combathealth and safety risks and increase productivity
Solution : 600 Tonne chilling package provided to cool and support mining
operations
Sector: Mining Location: Australia
![Page 24: AggrekoPPT](https://reader031.fdocuments.in/reader031/viewer/2022021322/5571fe3b49795991699aecc3/html5/thumbnails/24.jpg)
5/11/2018 AggrekoPPT - slidepdf.com
http://slidepdf.com/reader/full/aggrekoppt 24/27
Sector: Event Services Location: Beijing Olympics
Situation: 100% guaranteed power supply for broadcast & media facilitiesSolution : 128 MW of uninterrupted power supplied designed and installed at
37 Olympic venues
![Page 25: AggrekoPPT](https://reader031.fdocuments.in/reader031/viewer/2022021322/5571fe3b49795991699aecc3/html5/thumbnails/25.jpg)
5/11/2018 AggrekoPPT - slidepdf.com
http://slidepdf.com/reader/full/aggrekoppt 25/27
Sector: Event Services Location: Shanghai
Situation: Power supply needed at 13 different location for the opening andclosing ceremony of the Shanghai Expo
Solution : 16.8 MW of uninterrupted power supplied designed and installed
![Page 26: AggrekoPPT](https://reader031.fdocuments.in/reader031/viewer/2022021322/5571fe3b49795991699aecc3/html5/thumbnails/26.jpg)
5/11/2018 AggrekoPPT - slidepdf.com
http://slidepdf.com/reader/full/aggrekoppt 26/27
Advantages of Aggreko temporary power services• No Capital Expenditure
• Rapid availability
• Guaranteed power supply
• Complete power solution including
– transformers, switchgear, fuel tanks, etc
• Flexible packages, tailored to individual situations
• Cost management
• Engineering design & technical support
Click to edit Master text styles (f32)Second level (f28)
● Third level (f24)● Fourth level (f20)
● Fifth level (f18)●
Arial (headings) type● Arial (body) typeface
![Page 27: AggrekoPPT](https://reader031.fdocuments.in/reader031/viewer/2022021322/5571fe3b49795991699aecc3/html5/thumbnails/27.jpg)
5/11/2018 AggrekoPPT - slidepdf.com
http://slidepdf.com/reader/full/aggrekoppt 27/27
Aggreko International
Thank you…
Any questions?