An introduction to Aggreko

Page 2: AggrekoPPT

5/11/2018 AggrekoPPT - slidepdf.com

http://slidepdf.com/reader/full/aggrekoppt 2/27

Brand

 

aggregaten

+

koopman

 

= AGGREKO

Page 3: AggrekoPPT

5/11/2018 AggrekoPPT - slidepdf.com

http://slidepdf.com/reader/full/aggrekoppt 3/27

Company facts

• Aggreko is the world leader in the supply of temporary power andtemperature control solutions.

• We have approximately 3,800 highly skilled and experienced permanentemployees operating from over 148 locations based in over 34 countries.

• Our fleet comprises of 13,600 generators ranging in size from 15 kW to2MW, which in aggregate amount to over 6,700 MW of generatingcapacity

• In 2010, Aggreko had revenues of approximately £1.2bn (USD$1.9bn)

and operating profit of £317m (USD$491m)

• Aggreko plc is listed on the London Stock Exchange (AGK.L), is amember of the FTSE-100 index

Page 4: AggrekoPPT

5/11/2018 AggrekoPPT - slidepdf.com

http://slidepdf.com/reader/full/aggrekoppt 4/27

Brief history of Aggreko

• 1962 - Aggreko founded in the Netherlands

• 1973 - UK business established in Scotland

• 1986 - Entry into North America

• 1989 - Entry into Asia Pacific Region

• 1991 – Entry into the Middle East

• 1997 - De-merger from Christian Salvesen

• 1999 - Established Aggreko International Power 

Projects (AIPP) in Dubai to execute multi--megawatt power projects around the world.

Page 5: AggrekoPPT

5/11/2018 AggrekoPPT - slidepdf.com

http://slidepdf.com/reader/full/aggrekoppt 5/27

§ 2002 § FIFA World Cup Japan

§ 200 MW in Sri Lanka

§ 2003

§ First depot in Brazil

§ First utility contract in South America

§ 2004

§ First utility contract in Philippines

§ ME network extends to Baku

§ First power project, India

Brief history of Aggreko

Page 6: AggrekoPPT

5/11/2018 AggrekoPPT - slidepdf.com

http://slidepdf.com/reader/full/aggrekoppt 6/27

2006

§ Tanzania 40 MW natural gas project

§ Shanghai depot opened

§ Acquisition of GE-ER

2007

§ Major contracts continue:-

§ Yemen 225 MW , Uganda 100 MW, Kenya 100 MW

§ Cricket World Cup

§ Mining contract in Yunan, China

2008

§ Beijing Olympics

§ 40 MW Khulna, Bangladesh

§ First utility project in Argentina

§ Over 1 billion US$ revenue in Aggreko International

2009 

§ Entry into India with the opening of the Pune Depot

§ South Africa depot opening

Brief history of Aggreko

Page 7: AggrekoPPT

5/11/2018 AggrekoPPT - slidepdf.com

http://slidepdf.com/reader/full/aggrekoppt 7/27

2010

§ 100 MW in Panama

§ 21 MW for the opening ceremony - Shanghai Expo

§ First temperature control project in Mexico

§ 56 MW of Power – 2010 FIFA World Cup South Africa

§ 200 MW of utility power in Bangladesh

§ 70 MW of natural-gas fuelled power in Cote d’Ivoire

§ 142 MVA of power for theGuangzhou 2010 Asian Games

§ 53 MW of power for Refinery in Bina, India

Brief history of Aggreko

Page 8: AggrekoPPT

5/11/2018 AggrekoPPT - slidepdf.com

http://slidepdf.com/reader/full/aggrekoppt 8/27

The Aggreko International Network 

Dubai

Melbourne

Singapore

Rio de Janeiro

Houston

GlasgowCannock 

Shanghai

Dalian

Campinas

Mexico City

Santiago

Caracas

Paris

Sri Lanka

Maceio

JohannesburgSao Paolo

Beijing

 NigeriaPune

ArgentinaPuerto Montt

Antofagasta

ManausPanama

Page 9: AggrekoPPT

5/11/2018 AggrekoPPT - slidepdf.com

http://slidepdf.com/reader/full/aggrekoppt 9/27

 

Generators

Generators from 250 kVA up to 500 kVAare housed in robust steel canopies and

contain fork pockets, lifting eyes

Generators from 500 kVA up to 1250 kVAare housed in 20’ ISO standard containers

Suitable for low / high ambient temperaturesand harsh environments

Dual frequency capable – 50 Hz or 60 Hzcycles

 

Power plants

tailored to 200 MW & above

Power Equipment

Page 10: AggrekoPPT

5/11/2018 AggrekoPPT - slidepdf.com

http://slidepdf.com/reader/full/aggrekoppt 10/27

 

Page 11: AggrekoPPT

5/11/2018 AggrekoPPT - slidepdf.com

http://slidepdf.com/reader/full/aggrekoppt 11/27

Loadbanks

• A.C. Load banks (Resistive only) 300 / 1266kW

• A.C. Load banks (Resistive /Inductive): Up to 6MVA

• Resistive and reactive with variable power factor control

• Purpose-built in ISO standard 10 and 20 foot containers for easyhandling and transportation

• Automatic load test program capability

• Remote control and monitoring (up to 3 Km)

• D.C. Load Banks

Loadbanks & Transformers

Transformers•

 Multi-tap, multi-voltage for range of common utilityvoltages from 3.3 kV to 132 kV, 50 Hz or 60 Hz.• Self-contained modules with switchgear and built-inprotection.

•Upto 6,300 KVA capacity in single unit.

Page 12: AggrekoPPT

5/11/2018 AggrekoPPT - slidepdf.com

http://slidepdf.com/reader/full/aggrekoppt 12/27

Power Generation Equipment

• Distribution

- LV cables supplied as

part of service

- HV cables can also be

supplied

- All cables are EFR/CSP

sheathed & conform to

BS 6007 specifications

- Highly resistant to abrasion,fuel, oil & water 

Page 13: AggrekoPPT

5/11/2018 AggrekoPPT - slidepdf.com

http://slidepdf.com/reader/full/aggrekoppt 13/27

• Control Room

- Large installations have a central control room

- Monitoring, metering & control of all gensets

from a single location

- Fully integrated system• Switchgear 

- Switchgear for large power 

evacuations

- High level of safety

- Multi-compartment housing

- Interlocking schemes

- Facility for energy metering

Power Generation Equipment

Page 14: AggrekoPPT

5/11/2018 AggrekoPPT - slidepdf.com

http://slidepdf.com/reader/full/aggrekoppt 14/27

Air conditioners

Chillers

CoolingTowers

Temperature Control

- Upto 80 tonnes in single unit- Industrial/Commercial use

- Up to 1500 KW in single units- Multi-MW cooling capacity

- Up to 10,000 KW capacity- Discharge water treatment

Aggreko’s temperature control equipment is used for a variety of applications

across many industries from Oil & Gas through to mining, manufacturing and

events etc.

 

Heat Exchangers Air Handling Units(AHUs)

Page 15: AggrekoPPT

5/11/2018 AggrekoPPT - slidepdf.com

http://slidepdf.com/reader/full/aggrekoppt 15/27

 

Equipment

Save-ALL containment base prevents spillage of engine fluids or fueland avoids the need for temporary bunds

Sound attenuated, weatherproof enclosures are standard

Noise levels well belowthose specified by latestEC directives

Page 16: AggrekoPPT

5/11/2018 AggrekoPPT - slidepdf.com

http://slidepdf.com/reader/full/aggrekoppt 16/27

 

QHSE

§Aggreko processes are ISO 9001:2000 compliant

§Environmental Health and Safety ( EH&S) system implemented at all sites

§EH&S kits delivered to every site with initial mobilisation

§EH&S training provided to employees in…

ü Basic first aid

ü Fire fightingü Crane & forklift operation

ü High voltage operation

ü Defensive driving

§All sites audited by trained auditors – covers ISO 9001 and EH&S procedures

§EH&S key performance indicators (KPIs) monitored and reported to the Aggreko Senior

Management

Page 17: AggrekoPPT

5/11/2018 AggrekoPPT - slidepdf.com

http://slidepdf.com/reader/full/aggrekoppt 17/27

 

Industries Served

UtilityOil&

GasIndustrial

Mining&

Quarrying

EventServices

PeaceSupportServices

Construction Shipping Manufacturing

Page 18: AggrekoPPT

5/11/2018 AggrekoPPT - slidepdf.com

http://slidepdf.com/reader/full/aggrekoppt 18/27

 

Sector: Manufacturing Location: Uttarakhand, India

7 MW Power for base load operation to Polyplex Corporation 

Page 19: AggrekoPPT

5/11/2018 AggrekoPPT - slidepdf.com

http://slidepdf.com/reader/full/aggrekoppt 19/27

 

Sector: Manufacturing Location: Chennai, India

Amara Raja Batteries Ltd- 7 x 1250kVA, 5 x 1000, 1 x 500kVA - 415V at 3 locations

Page 20: AggrekoPPT

5/11/2018 AggrekoPPT - slidepdf.com

http://slidepdf.com/reader/full/aggrekoppt 20/27

 

Sector: Power Location: Chennai, India

6.6 MW HV Job in Kaveri Gas Power Limited

Page 21: AggrekoPPT

5/11/2018 AggrekoPPT - slidepdf.com

http://slidepdf.com/reader/full/aggrekoppt 21/27

 

Sector: Manufacturing Location: Rajasthan, India

1.1 MW Gas Based Power to Samtel Glass Ltd., Kota. 

Page 22: AggrekoPPT

5/11/2018 AggrekoPPT - slidepdf.com

http://slidepdf.com/reader/full/aggrekoppt 22/27

 

Situation: Load shedding leading to power shortages from utility gridSolution : 200 MW base load power plant supplied to support local grid

Sector: Utility Location: Bangladesh

Page 23: AggrekoPPT

5/11/2018 AggrekoPPT - slidepdf.com

http://slidepdf.com/reader/full/aggrekoppt 23/27

 

Situation: Cooling required for underground gold mining operations to combathealth and safety risks and increase productivity

Solution : 600 Tonne chilling package provided to cool and support mining

operations

Sector: Mining Location: Australia

Page 24: AggrekoPPT

5/11/2018 AggrekoPPT - slidepdf.com

http://slidepdf.com/reader/full/aggrekoppt 24/27

 

Sector: Event Services Location: Beijing Olympics

Situation: 100% guaranteed power supply for broadcast & media facilitiesSolution : 128 MW of uninterrupted power supplied designed and installed at

37 Olympic venues

Page 25: AggrekoPPT

5/11/2018 AggrekoPPT - slidepdf.com

http://slidepdf.com/reader/full/aggrekoppt 25/27

 

Sector: Event Services Location: Shanghai

Situation: Power supply needed at 13 different location for the opening andclosing ceremony of the Shanghai Expo

Solution : 16.8 MW of uninterrupted power supplied designed and installed

Page 26: AggrekoPPT

5/11/2018 AggrekoPPT - slidepdf.com

http://slidepdf.com/reader/full/aggrekoppt 26/27

Advantages of Aggreko temporary power services• No Capital Expenditure

• Rapid availability

• Guaranteed power supply

• Complete power solution including

 –  transformers, switchgear, fuel tanks, etc

• Flexible packages, tailored to individual situations

• Cost management

• Engineering design & technical support

Click to edit Master text styles (f32)Second level (f28)

● Third level (f24)● Fourth level (f20)

● Fifth level (f18)●

Arial (headings) type● Arial (body) typeface

Page 27: AggrekoPPT

5/11/2018 AggrekoPPT - slidepdf.com

http://slidepdf.com/reader/full/aggrekoppt 27/27

Aggreko International

Thank you…

Any questions?