Agenda for General Manager's Conferencener.indianrailways.gov.in/uploads/files/1402488880426...SN...
Transcript of Agenda for General Manager's Conferencener.indianrailways.gov.in/uploads/files/1402488880426...SN...
![Page 1: Agenda for General Manager's Conferencener.indianrailways.gov.in/uploads/files/1402488880426...SN Section Name of Station No.of Spur CSL (Mts) Type of Siding Remarks 1 Siwan 2 686](https://reader030.fdocuments.in/reader030/viewer/2022040919/5e94d11cfaec561b7935a473/html5/thumbnails/1.jpg)
1 N. E. Railway , Varanasi
Operating Department
![Page 2: Agenda for General Manager's Conferencener.indianrailways.gov.in/uploads/files/1402488880426...SN Section Name of Station No.of Spur CSL (Mts) Type of Siding Remarks 1 Siwan 2 686](https://reader030.fdocuments.in/reader030/viewer/2022040919/5e94d11cfaec561b7935a473/html5/thumbnails/2.jpg)
Geo-Physics
2
No. of states
coverage 2
UP &
Bihar
No. of Districts
coverage
11 UP
3 Bihar
Contd…
![Page 3: Agenda for General Manager's Conferencener.indianrailways.gov.in/uploads/files/1402488880426...SN Section Name of Station No.of Spur CSL (Mts) Type of Siding Remarks 1 Siwan 2 686](https://reader030.fdocuments.in/reader030/viewer/2022040919/5e94d11cfaec561b7935a473/html5/thumbnails/3.jpg)
Jurisdiction Six Control Boards
1 2 3 4 5 6
Main Board(CTC) BTT Board CPR Board ALY Board CPJ Board MHC Board
CI-GKP BTT-ARJ-JNU CPR-ARJ
ARJ-ALD
GKP-PNYA CPR-THE(MG)
DDA-MHZ
MAU-SHG
PEP-IAA CPJ-THE
SV-THE
SRU-BHJ HTW-BHBR
IAA-DIT(MG)
Jurisdiction of TenTIs HQs
1 2 3 4 5 6 7 8 9 10
CPR SV BTT CPJ POU MAU BCY MUV GCT BUI
CP
R-G
OP
G
TKV-SV
ZR
DE
-KH
M U
NL
A-P
NY
A
CP
J(Ex
cl)-
TH
E(E
xcl)
SRU-MAU PPH-ARJ
MU
V-A
LY
SY
H-K
MD
R
GTST-PEP
MAU-DJD
ARJ-MFJ
PEP-RTP SV-THE
HTW-BHBR ARJ-BCY
![Page 4: Agenda for General Manager's Conferencener.indianrailways.gov.in/uploads/files/1402488880426...SN Section Name of Station No.of Spur CSL (Mts) Type of Siding Remarks 1 Siwan 2 686](https://reader030.fdocuments.in/reader030/viewer/2022040919/5e94d11cfaec561b7935a473/html5/thumbnails/4.jpg)
Assets BG MG Total
Single Line 981.14 KM 143.77 KM 1124.91 KM
Double Line 118.68 KM -- 118.68 KM
Twin Single Line 8.3 KM -- 8.3 KM
Total 1108.12 KM 143.77 KM 1251.89 KM
No. of Block Stations 109 11 120
No. of Halt/Flag Stations 56 19 75
Type of Signalling
(No. of stations )
Colour Light Semaphore Total
BG MG BG MG
Modified Non
Interlocked (MNI) 1 -- -- -- 1
Standard-I 3 -- 13 11 27
Standard-III 92 -- -- -- 92
Total 96 -- 13 11 120
Contd…
![Page 5: Agenda for General Manager's Conferencener.indianrailways.gov.in/uploads/files/1402488880426...SN Section Name of Station No.of Spur CSL (Mts) Type of Siding Remarks 1 Siwan 2 686](https://reader030.fdocuments.in/reader030/viewer/2022040919/5e94d11cfaec561b7935a473/html5/thumbnails/5.jpg)
System of working BG MG Total
Absolute Block System 105 Block Stations 11 Block Sations 116
Automatic Block System 4 Block Stations -- 4
One Train Only 3 sections (9 Halts) 1 Section (5 Halts) 4 sections
Railway Electrification
Section Status
BJU-CI-CPR Completed
CPR-GKP Work in Progress
SV-THE Work in Progress
5
Contd…
Contd…
![Page 6: Agenda for General Manager's Conferencener.indianrailways.gov.in/uploads/files/1402488880426...SN Section Name of Station No.of Spur CSL (Mts) Type of Siding Remarks 1 Siwan 2 686](https://reader030.fdocuments.in/reader030/viewer/2022040919/5e94d11cfaec561b7935a473/html5/thumbnails/6.jpg)
SN Sections Jurisdiction D. Line/
S .Line Gauge KM
No . of
Stations +Halts
Inter
locking
System of
Working
1
CI-
GK
P
CI-NRA DL BG 118.68 16+3=16 Std-III Absolute Block
System
NRA-CC SL BG 38.42 3+1=4 Std-III Automatic
Block System
CC-KHM DL BG 21.32 3+0=3 Std-III Absolute Block
System
2 GKP-PNYA UNLA-PNYA SL BG 86.06 8+3=11 Std-III Absolute Block
System
3 CPJ-THE CPJ-THE SL BG 98.8 10+6=16 Std-III Absolute Block
System
4
BT
T-B
SB
BTT-IAA SL BG 59.91 5+4=9 Std-III Absolute Block
System
IAA-MAU TSL BG 8.3 1+0=1 Std-III Absolute Block
System
MAU-BSB SL BG 92.39 10+3=13 Std-III Absolute Block
System
5 BSB-ALD
BSB-KWH SL BG 38.52 4+3=7 Std-I Absolute Block
System
KWH-ALY SL BG 85.23 13+3=14 Std-III
(Excl DRGJ)
Absolute Block
System
6 CPR-ARJ CPR-ARJ SL BG 172.45 20+7=27 Std-III Absolute Block
System Contd..
Contd…
![Page 7: Agenda for General Manager's Conferencener.indianrailways.gov.in/uploads/files/1402488880426...SN Section Name of Station No.of Spur CSL (Mts) Type of Siding Remarks 1 Siwan 2 686](https://reader030.fdocuments.in/reader030/viewer/2022040919/5e94d11cfaec561b7935a473/html5/thumbnails/7.jpg)
Contd…..
SN Sections Jurisdiction D.Line/
S .Line Guage KM
No . of
Stations +Halts
Inter
locking
System of
Working
7 MAU-SHG MAU-SHG SL BG 99.46 9+4=13 Std-I Absolute
Block System
8 PEP-IAA PEP-IAA SL BG 49.68 3+4=7 Std-I Absolute
Block System
9 SRU-BHJ SRU-BHJ SL BG 20.25 0+4=4 -- One Train
Only
10 DDA-MHZ DDD-MHZ SL BG 5.7 0+1=1 Std-III One Train
Only
11 SV-THE SV-THE SL BG 28.17 3+1=4 Std-III Absolute
Block System
12 HTW-BHBR HTW-BHBR SL BG 22 0+4=4 -- One Train
Only
13 ARJ-JNU ARJ-MFJ SL BG 63.2 2+5=7 Std-III Absolute
Block System
Total BG Route KM 1108.12 109+56=165 --
14 CPR-THE CPR-THE SL MG 108.95 11+14=25 Std-I Absolute
Block System
15 IAA-DIT IAA-DIT SL MG 35 0+5=5 -- One Train
Only
Total MG Route KM 143.77 11+19=30 --
Total Route KM 1251.89 Total No. of Stations =109+11= 120
Total No. of Halts =56+19=75
Contd…
![Page 8: Agenda for General Manager's Conferencener.indianrailways.gov.in/uploads/files/1402488880426...SN Section Name of Station No.of Spur CSL (Mts) Type of Siding Remarks 1 Siwan 2 686](https://reader030.fdocuments.in/reader030/viewer/2022040919/5e94d11cfaec561b7935a473/html5/thumbnails/8.jpg)
SN Section Name of Station No.of Spur CSL (Mts)Type of
SidingRemarks
1 Siwan 2 686 Each Rly Round the clock
2 Mairwa 1 686 Rly Ready for work
3 Deoria Sadar 2 653 , 706 Rly Round the clock
4 Baitalpur (BPOB) 2 ( One in Use) 686 Each Pvt. S iding Round the clock
5 Sardarnagar 1 716 Rly
6 Kushumhi 2 710 Each Rly
7 Mau 1 695 Rly
8 Azamgarh 1 716 Rly
9 Gautam Asthan 1 670 RlyTeporarily provided
with one sided entry.
10 Ballia 1 645 Rly
11 Phephna 1 686 Rly
12 Gajipur City 1 686 Rly
13 Manduadih 1 600 Rly Round the clock
14 Katka 1 705 Rly
15 1 875 Rly Round the clock
16 1 730 Pvt.Siding CONCOR
17 Siwan-Thawe Hathua 1 686 Rly
18 Bhatni-Aurihar Indara 1 686 Rly
1 Varanasi-Aurihar Varanasi City One 465 Rly
2 Chhapra-Gorakhpur Chauri Chaura One 300 Rly
3 Chhapra-Gorakhpur Chhapra Two 309 , 277 Rly Round the clock
Ch
hap
ra-G
orak
hp
ur
Mau-Shahganj
Aurihar-Chhapra
Varanasi-Allahabad
CityMadhosingh
Half Rake
Rake Handling Terminals
Contd…
Contd…
![Page 9: Agenda for General Manager's Conferencener.indianrailways.gov.in/uploads/files/1402488880426...SN Section Name of Station No.of Spur CSL (Mts) Type of Siding Remarks 1 Siwan 2 686](https://reader030.fdocuments.in/reader030/viewer/2022040919/5e94d11cfaec561b7935a473/html5/thumbnails/9.jpg)
:Others:
Assets Available at At
Running Rooms 8 stations CPR, BUI, MAU, BTT, SV, THE , ALY, CPJ
Washing Pits 4 Station MUV , CPR(BG/MG) , BUI and AMH
TRD 1 station CPR
Crew Changing Point 8 Stations CPR, BUI, MAU, BTT, SV, THE , ALY, CPJ Manduadih
Contd…
Contd…
SN Name of Station With Div/Rly. Avr. no. of Goods
trains daily
Total no. of
Mail/Exp
Total no.
of pass.
1 Chhapra Kacheri Sonpur/ECR 12 pairs 50 pairs 5 pairs
2 Paniyahwa Samastipur/ECR 6 pairs 10 pairs 6 pairs
3 Gorakhpur Cantt Lucknow/NER 13 pairs 49 pairs 12 pairs
4 Shahganj Lucknow/NR 2 pairs 12 pairs 4 pairs
5 Jaunpur Lucknow/NR 3 pairs 2 pairs 2 pairs
6 Varanasi Lucknow/NR 1 pair 18 pairs Nil
7 Allahabad City Allahabad/NCR 7 pairs 15 pairs Nil
Interchange Points
![Page 10: Agenda for General Manager's Conferencener.indianrailways.gov.in/uploads/files/1402488880426...SN Section Name of Station No.of Spur CSL (Mts) Type of Siding Remarks 1 Siwan 2 686](https://reader030.fdocuments.in/reader030/viewer/2022040919/5e94d11cfaec561b7935a473/html5/thumbnails/10.jpg)
Notice Stations for Caution Orders
Varanasi Division (N.E.Railway) ( 16 stations )
Chhapra Jn. Indara Jn. Kaptanganj Jn.
Siwan Jn. Ballia Manduadih
Bhatni Jn. Aundihar Jn. Duraundha Jn.
Thawe Jn. Varanasi Jn. Azamgarh
Mau Jn. Allahabad City Varanasi City
Salempur Jn.
Other Division & Railways (05 station)
Gorakhpur Jn.
(LJN,NER)
Shahganj Jn.
(LKO,NR)
Narkatiaganj
(SPJ,ECR)
Allahabad Jn.
(ALD,NCR)
Jaunpur (NR ,LKO)
Contd…
Contd…
10
![Page 11: Agenda for General Manager's Conferencener.indianrailways.gov.in/uploads/files/1402488880426...SN Section Name of Station No.of Spur CSL (Mts) Type of Siding Remarks 1 Siwan 2 686](https://reader030.fdocuments.in/reader030/viewer/2022040919/5e94d11cfaec561b7935a473/html5/thumbnails/11.jpg)
Items No. of location Stations
CMS Integrated 3 (A-Class ) BSB, CPR, MAU
CMS handled by
SM/ASM
2 BUI , BTT
7 (Sanctioned)
( Work in progress)
THE,CPJ,SV,ALY,MUV,ARJ,BCY
FOIS 2 CPR , BSB Control
TMS 12 DEOS , KHM , BALR , SV , CPR , MAU ,
BUI , AMH , MUV , GCT ,IAA , MBS
COIS 3 MUV , CPR , Control (BSB)
COA 1 Control room ( Connected to NTES)
Contd…
11
![Page 12: Agenda for General Manager's Conferencener.indianrailways.gov.in/uploads/files/1402488880426...SN Section Name of Station No.of Spur CSL (Mts) Type of Siding Remarks 1 Siwan 2 686](https://reader030.fdocuments.in/reader030/viewer/2022040919/5e94d11cfaec561b7935a473/html5/thumbnails/12.jpg)
Coaching Operations
Contd…
12
Type Org. Trains Total Remarks Org. Station Dest.
ME 24 91 pairs
2 p
airs
to
be
intr
od
uce
d
15238/37 DBG Ajmer
15114/13
(After BG
Conversion of
CPR-THE via
MHC)
CPR LKO
Passengers BG 44 44 pairs --
DMU BG 9 9 Pairs --
Passengers MG 6 06 pairs --
DMU MG 4 04 Pairs --
Total 87 154 Pairs --
![Page 13: Agenda for General Manager's Conferencener.indianrailways.gov.in/uploads/files/1402488880426...SN Section Name of Station No.of Spur CSL (Mts) Type of Siding Remarks 1 Siwan 2 686](https://reader030.fdocuments.in/reader030/viewer/2022040919/5e94d11cfaec561b7935a473/html5/thumbnails/13.jpg)
Contd…
M/EXP PASS Total
GKP-BTT 39 4 43 25
BTT-SV 31 4 35 21
SV-DDA 31 10 41 25
DDA-CPR 31 8 39 25
GKP-PNYA 10 8 18 13
BTT-SRU 13 6 19 15
SRU-IAA 12 4 16 12
IAA-MAU 21 8 29 20
MAU-ARJ 10 6 16 13
ARJ-BSB 26 8 34 21
BSB-MUV 19 3 22 15
MUV-ALY 16 3 19 12
ARJ -PEP 18 3 21 10
PEP-BUI 28 6 34 18
BUI-CPR 29 3 32 16
CPR-CI 50 5 55 28
PEP-IAA 10 3 13 8
MAU-SHG 12 4 16 10
SRU-BHJ - 4 4 4
CPJ-THE - 4 4 4
DDA-MHZ - 5 5 5
THE-SV - 7 7 7
HTW-PLWR - 1 1 1
CPR-THE(MG) - 6 6 6
IAA-DIT - 4 4 4
ARJ-JNU 2 2 4 4
No. of trains in pairsSection
Avr. Traffic
Daily
Contd…
13
![Page 14: Agenda for General Manager's Conferencener.indianrailways.gov.in/uploads/files/1402488880426...SN Section Name of Station No.of Spur CSL (Mts) Type of Siding Remarks 1 Siwan 2 686](https://reader030.fdocuments.in/reader030/viewer/2022040919/5e94d11cfaec561b7935a473/html5/thumbnails/14.jpg)
Stations No. of Mail/Exp No. Of Pass.
Allahabad City 1 3
Manduadih 5 7
Aurihar Jn. NIL 2
Ballia 1 3
Chhapra. 11 BG 9 , MG 6
Varanasi 3 1
Mau 1 1
Azamgarh 2 1
Salempur Nil 2
Bhatni Nil 6
Siwan Nil 11
Thawe Nil BG-6 ,MG-6
Kaptanganj Nil 2
Barhaj Bazar Nil 4
Indara Nil 4 RAIL BUS(MG)
Dohri Ghat Nil 4 RAIL BUS(MG)
Duraundha Nil 7
Varanasi City Nil 4
Bathua Bazar Nil 1
Maharaj Ganj Nil 5
Contd…
Contd…
![Page 15: Agenda for General Manager's Conferencener.indianrailways.gov.in/uploads/files/1402488880426...SN Section Name of Station No.of Spur CSL (Mts) Type of Siding Remarks 1 Siwan 2 686](https://reader030.fdocuments.in/reader030/viewer/2022040919/5e94d11cfaec561b7935a473/html5/thumbnails/15.jpg)
Freight Movement
Features
Average No. of Goods Trains Interchange Per Day 78 per day
Average No. of Inward Rakes Per Month(2013-14) 202 per month
Average No. of Jumbo Interchange (Thr. + Org.) 25 per day
No. of Rake Handling Terminals Major 13
Minor 8
Contd…
15
![Page 16: Agenda for General Manager's Conferencener.indianrailways.gov.in/uploads/files/1402488880426...SN Section Name of Station No.of Spur CSL (Mts) Type of Siding Remarks 1 Siwan 2 686](https://reader030.fdocuments.in/reader030/viewer/2022040919/5e94d11cfaec561b7935a473/html5/thumbnails/16.jpg)
Plan in concept for Varanasi Area
16
Varanasi Cantt Rly Station (NR)
To Lohta Station (NR)
To Manduadih NER
Existing Unused Alignment
Contd…
Contd…
To Shivpur (NR)
![Page 17: Agenda for General Manager's Conferencener.indianrailways.gov.in/uploads/files/1402488880426...SN Section Name of Station No.of Spur CSL (Mts) Type of Siding Remarks 1 Siwan 2 686](https://reader030.fdocuments.in/reader030/viewer/2022040919/5e94d11cfaec561b7935a473/html5/thumbnails/17.jpg)
Plan further in concept
1. Need to develop BSB area (BCY-BSB-MUV) in an integrated manner combining
traffic requirements and Land availability of NR & NER.
2. Need to decongest BSB & develop adequate through capacity so that BSB Yard
does not become a bottle neck after doubling and electrification on ‘B’ route and
clearance of higher traffic ex MGS is facilitated.
3. Major space constraint as BSB Yard (NR) for expansion by way of additional PF as
it is land locked by cantonment area on north side & GT road on south side.
4. Criteria of forward movement as discussed is the guiding concern.
5. Need to develop additional Washing Lines & Stabling lines for terminating trains as
per above criteria and as per land availability.
6. Direct connectivity of MUV with LOT side so that terminating trains can be dealt
directly at MUV without requiring them to be dealt at BSB
7. Connectivity to entire BSB yard from BCY side .
8. Provision of connectivity from MUV to PF 5 to 9 will require closure of Goods shed
at BSB & its relocation at Babatpur .
17
Contd…
![Page 18: Agenda for General Manager's Conferencener.indianrailways.gov.in/uploads/files/1402488880426...SN Section Name of Station No.of Spur CSL (Mts) Type of Siding Remarks 1 Siwan 2 686](https://reader030.fdocuments.in/reader030/viewer/2022040919/5e94d11cfaec561b7935a473/html5/thumbnails/18.jpg)
Thanks
18