AGATA Pre-processing team report
AGATA Week, July 2008
Overview of talk
• The team• Progress on carrier • Progress on mezzanines• Some problems fixed since AGATA week• Readiness for triple cluster tests
(October)• Finances• Timescales• Conclusion
Reminder of team and responsibilities
• IPN Orsay– Carrier VHDL design (FPGA2- trigger distribution)– Carrier VHDL production code– Carrier commissioning (production run of 34 cards)– Original carrier design
• INFN Padua – Carrier rework (prototype and pre-production)– Carrier VHDL (release 0 for initial tests)– Carrier VHDL (FPGA 0- data readout)– Delivery of 6 tested carriers for October tests– GTS Mezzanine
• CSNSM Orsay– Segment mezzanine (hardware and VHDL)– Core mezzanine (hardware and VHDL)– Production run of core and segment mezzanines
• IPHC Strasbourg– Supply of MWD code for use in core and segment mezzanines in “black box”
format• STFC RAL and LPC CAEN
– VHDL code for carrier readout (PCIe and proprietry “FASTER” protocols)• Team size
– On average between 10 and 15 people are working on this project at the moment.
Progress since last AGATA week-
Carrier • Carrier rework
– commissioning of prototype finished November 2007
– small revisions made to PCB layout Dec07/Jan08
– pre-production version manufactured. Delivered early April 2008
– pre-production version commissioned April; ready to use May 2008Photo- INFN Padova
Progress since last AGATA week-
Carrier– JTAG test code written
(R.Matson, RAL)– VHDL code
development (Orsay and Padua)
– Test system set-up (Orsay)
– Carrier production run.• 5 cards from Padua-
PCB received, assembly started (due end July)
• Remaining cards (Orsay)- purchasing started. Problems with location of funding being resolved
Photo- INFN Padova
Progress since last AGATA week-
Mezzanines
• Segment and Core Mezzanine rework– Commissioning of prototype v2.0
finished December 2007.– small revisions made to PCB layout
Dec07/Jan08 (v2.0 to v2.1)– Final v2.0 prototype tests on carrier
using BERT to validate high speed links Feb 2008 Padua.
– Pre-production version (v2.1) manufacturing started Feb 2008, Delivered April 2008 (3x core), May 2008 (10x segment)
– Commissioning for 1st pre-production version (v2.1) segment cards completed mid-May 2008
– pre-production version (v2.1) commissioning for core and 4 more segment cards due for completion end July 2008.
Photos- CSNSM Orsay
Progress since last AGATA week-
Mezzanines
• Core and segment mezzanine production run.– Despite successful February BERT
tests, some improvements to MGT clock jitter have been found.
– Power supplies and clock routing are being modified before the full production run.
– Modifications tested on pre-production cards
• 10 more of the existing segment card design are being made now for October tests (€16k) They will be modified to include the same changes as will be made to the other cards
Photos- CSNSM Orsay
Testing pre-production cards
• May– Carrier and 2 segment mezzanines available for test.– Digitiser set up in Padova
• Last week of May– first traces with pulser through digitiser and pre-processing
Carefully attended by the LLP team, on May 22, 2008,
THE FIRST AGATA TRACEmade its way from the digitiser to theATCA-carrier, via segment mezzanine.
Digitized, optically-transmitted
and pre-processed AGATA traces
May 28, 2008
Testing pre-production cards
• May– Carrier and 2 segment mezzanines available for test.– Digitiser set up in Padova
• Last week of May– first traces with pulser through digitiser and pre-processing
• June– Investigate the 2 “unusual” traces
• End June- – Taking spectra with 1 segment card (6 ch) on 1 carrier using
AGATA detector and digitiser• Early July (now)-
– Connect 2 carrier cards and exchange trigger data• End July
– build up to full configuration (2 carrier cards, 6 segment cards, 1 core card, 1 GTS) for tests with 1 crystal and full digitiser.
Progress since last AGATA week- fixing problems
• Fast serial- parallel readout mezzanine to carrier– Synchronisation problems
fixed- now working at full speed.
• Intermittent connection to carrier DPRAM– Used to test JTAG (blind test-
found faulty pin)– Discussions held with
assembly company to prevent recurrence
• Trace corruption seen in first results– Tracked down to a VHDL
error- now fixed– Resulted in stringent jitter
testing and improvements to mezzanines
Eye opening VS Patterns
0.00%
10.00%
20.00%
30.00%
40.00%
50.00%
60.00%
70.00%
80.00%
90.00%
Prbs7 Prbs23
Pattern
Eye
op
en
ing
(%
of
UI) Xilinx evb FX100
#1 v2.0 original
#2 v2.0 clk patch & PSfilter
#5 v2.1 clk patch
#5 v2.1 clk patch & PSfilter
#4 v2.1 clk patch
Plot from INFN Padova and CSNSM Orsay
Readiness for Tests with Triple cluster in October.
Card Number needed
Existing Extra cards to be built
Funding Notes
Carrier 6 2 5 OK (Italy) PCB manufacture now; all assembled by late July (1 spare)
Seg mezz
18 10 10 Germany and GANIL
Delivery due early September. Tested cards due early October. Includes 2 spares.
Core mezz
3 3 0 n/a Testing now- due to complete testing end of July
GTS 3 5 (rev 2) 0 (final)
0 (rev 2) 3 (final)
OK (Italy) Rev 2 card is OK for these tests
TCLK 3 0 3 OK (IPN) Being manufactured now. 3 assembled boards due end July.
Cost Savings
• Investigated using slower (cheaper) FPGAs on the mezzanines. Decided against this due to risk and also revised FPGA pricing.
• FPGA- Xilinx assisted pricing obtained. About 30% savings.
• Cut out segment offset fibres for LNL phase (€10k saving)
Funding for production run
• Carrier– 2 pre-production + 5 cards funded from Italy, built in Italy– Remaining 34 cards (including 3 spares) will be built in France– Cost €178k– Some funds available in France– Missing funds coming from
• Germany (FPGA order) (complete)• Sweden funds transfer plus orders for PCBs and other FPGAs (not complete)
• Core and segment mezzanines– All 140 (108 segment + 18 core + spares) will be built in France– Cost €310k – Some funds available in France – Missing funds coming from
• Germany (FPGA Order) (complete)• Loan from GANIL (EXOGAM) against future funds transfer, (loan complete)
Compare to planned timescales
Jan 2007 Report
Nov 2007 Report July 2008 Report
Carrier update Layout Phase Done Q1 2007
Segment & core mezzanine update
Start of layout phase
Done Q1 2007
Expect to get prototypes of both by July 2007
Deliver prototypes July 2007
Delivered July 2007 (Carrier and segment mezzanine*)
Test prototypes Autumn 2007 Expected to complete Nov. 2007
Completed Nov- Dec 2007
Designs finalised Dec 2007 Expected to complete Nov - Dec. 2007
Dec 2007-Jan 2008
Production beginning 2008 (phased delivery)
Phased, starting beginning of 2008
Pre-production cards early 2008
Pre-production cards delivered April/May 2008
Pre-production tests complete March 2008 May 2008
Build up system- test 1 cluster
July 2008
1st Phase production (triple cluster)
Commissioning Apr 2008 onwards
Manufacture now. Commissioning July-Sept 2008
2nd Phase production (5 triple clusters)
Ready now- depends on funds. End 2008?
VHDL and software 1st Release Autumn 08
1st Release Autumn 08* Core mezzanine prototype assembly was delayed until tests were complete on segment mezzanine. Designs were ready for delivery in July 2007 if required.
Conclusions
• Timescales are tight but with continued hard work the triple cluster test date Oct 2008 is achievable (but there is no schedule contingency)
• Funding has been a big problem- its in the wrong place and significant effort has been diverted into moving it to where it can be used.
• Bigger spend on travel than expected.• Huge amount of work by the whole pre-processing
team:– Long periods spent away from home by some people
working in Padua.– Long hours were worked over the last 18 months by some
members of the pre-processing team.• Significant progress has been made with end to end
tests, but we’ve still got more to do so we need to keep up or even increase the effort.
Thanks
• Thank you to the pre-processing team for their very hard work!