AFE IIt Project Status
DD Current Status
AFE II Prototype Testing Complete Detailed ch by ch testing has been done
3071 good channels out of 3072 through comprehensive test Continuing with some long-term (weeks) testing of cryo
control and stability on the VLPC CC cryostat Packaged TriPt (MOSIS) in house TriPt/FPIX submission - OUT Design input for AFE IIt board finished Schematic Complete – 6/20 4 weeks behind - but Layout Complete – 6/28 about 2 weeks behind
We have authorized OT and it is being used Will try to add a second Layout tech towards the end.
For technical reasons this is not appropriate at this time Only issue
Could use 1 additional person to work on FPGA programming
DD Current Status AFE II Prototype- Gain
Gain (lin fit)
0
20
40
60
80
100
120
110 112 114 116 118 120 122 124 126 128 130 132 134 136
Gain (arb units )
Nu
m e
ntr
ies
DD Current Status AFE II Prototype - Noise
Histogram of ped noise
0
20
40
60
80
100
120
140
160
1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2 2.1 2.2 2.3 2.4 2.5 2.6
ADC counts
Nu
m e
ntr
y
2 ADC counts= ~1fC
1 pe 6 fC
DD Current Status - TriPt
Out for Fab
Proposed reticule layoutfor TriPt/FPIX
Proposed wafter map70 reticules
DD Current Status - Layout
DD Current Status - Layout
DD Current Status - TriPt
TriPt: Packaged “MOSIS” parts are here Robot tester work progressing: adapter
board in layout (estimate: 1 week) Mechanical parts for robot complete
DD Response to Recommendations from Director’s Review
We have modified the project plan to include: A second submission of the TriPt chip
This, of course, does produce a delay in the project completion. The funds are there if needed, however
We believe that the probability for a successful run is very high
Production of 350 boards. Over time for layout technician(s) for AFE IIt board
Bob Demaat has joined the AFE IIt project as L2 production manager
Weekly reporting will occur via the AFE IIt production meeting with progress and schedule status from the L3 managers written up and published as minutes of this meeting
DD Milestone List with 2nd TriPt submission
AFE II/TriPt Project Start 1/5/04 AFE II Prototype Testing Complete 5/12/05 AFE IIt Layout Complete 6/17/05 Ready for Production TriPt Testing 7/18/05 AFE II Prototype Under Test 7/18/05 Certify for Production 10/13/05 TriPt Production Started (Round 1) 5/20/05 TriPt Production Started (Round 2) 10/31/05 TriPts Ready for Board Stuffing 3/6/06 AFE IIt pre-Production Board under Test 3/20/06 Certify for Full Production 4/19/06 Board Assembly Complete 6/29/06 First Crate Ready for Installation 7/13/06 203 Boards Ready 8/10/06