AFE IIt Project Status. Current Status AFE II Prototype Testing Complete u Detailed ch by ch...

10
D D AFE IIt Project Status

Transcript of AFE IIt Project Status. Current Status AFE II Prototype Testing Complete u Detailed ch by ch...

Page 1: AFE IIt Project Status. Current Status  AFE II Prototype Testing Complete u Detailed ch by ch testing has been done s 3071 good channels out of 3072.

DD

AFE IIt Project Status

Page 2: AFE IIt Project Status. Current Status  AFE II Prototype Testing Complete u Detailed ch by ch testing has been done s 3071 good channels out of 3072.

DD Current Status

AFE II Prototype Testing Complete Detailed ch by ch testing has been done

3071 good channels out of 3072 through comprehensive test Continuing with some long-term (weeks) testing of cryo

control and stability on the VLPC CC cryostat Packaged TriPt (MOSIS) in house TriPt/FPIX submission - OUT Design input for AFE IIt board finished Schematic Complete – 6/20 4 weeks behind - but Layout Complete – 6/28 about 2 weeks behind

We have authorized OT and it is being used Will try to add a second Layout tech towards the end.

For technical reasons this is not appropriate at this time Only issue

Could use 1 additional person to work on FPGA programming

Page 3: AFE IIt Project Status. Current Status  AFE II Prototype Testing Complete u Detailed ch by ch testing has been done s 3071 good channels out of 3072.

DD Current Status AFE II Prototype- Gain

Gain (lin fit)

0

20

40

60

80

100

120

110 112 114 116 118 120 122 124 126 128 130 132 134 136

Gain (arb units )

Nu

m e

ntr

ies

Page 4: AFE IIt Project Status. Current Status  AFE II Prototype Testing Complete u Detailed ch by ch testing has been done s 3071 good channels out of 3072.

DD Current Status AFE II Prototype - Noise

Histogram of ped noise

0

20

40

60

80

100

120

140

160

1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2 2.1 2.2 2.3 2.4 2.5 2.6

ADC counts

Nu

m e

ntr

y

2 ADC counts= ~1fC

1 pe 6 fC

Page 5: AFE IIt Project Status. Current Status  AFE II Prototype Testing Complete u Detailed ch by ch testing has been done s 3071 good channels out of 3072.

DD Current Status - TriPt

Out for Fab

Proposed reticule layoutfor TriPt/FPIX

Proposed wafter map70 reticules

Page 6: AFE IIt Project Status. Current Status  AFE II Prototype Testing Complete u Detailed ch by ch testing has been done s 3071 good channels out of 3072.

DD Current Status - Layout

Page 7: AFE IIt Project Status. Current Status  AFE II Prototype Testing Complete u Detailed ch by ch testing has been done s 3071 good channels out of 3072.

DD Current Status - Layout

Page 8: AFE IIt Project Status. Current Status  AFE II Prototype Testing Complete u Detailed ch by ch testing has been done s 3071 good channels out of 3072.

DD Current Status - TriPt

TriPt: Packaged “MOSIS” parts are here Robot tester work progressing: adapter

board in layout (estimate: 1 week) Mechanical parts for robot complete

Page 9: AFE IIt Project Status. Current Status  AFE II Prototype Testing Complete u Detailed ch by ch testing has been done s 3071 good channels out of 3072.

DD Response to Recommendations from Director’s Review

We have modified the project plan to include: A second submission of the TriPt chip

This, of course, does produce a delay in the project completion. The funds are there if needed, however

We believe that the probability for a successful run is very high

Production of 350 boards. Over time for layout technician(s) for AFE IIt board

Bob Demaat has joined the AFE IIt project as L2 production manager

Weekly reporting will occur via the AFE IIt production meeting with progress and schedule status from the L3 managers written up and published as minutes of this meeting

Page 10: AFE IIt Project Status. Current Status  AFE II Prototype Testing Complete u Detailed ch by ch testing has been done s 3071 good channels out of 3072.

DD Milestone List with 2nd TriPt submission

AFE II/TriPt Project Start 1/5/04 AFE II Prototype Testing Complete 5/12/05 AFE IIt Layout Complete 6/17/05 Ready for Production TriPt Testing 7/18/05 AFE II Prototype Under Test 7/18/05 Certify for Production 10/13/05 TriPt Production Started (Round 1) 5/20/05 TriPt Production Started (Round 2) 10/31/05 TriPts Ready for Board Stuffing 3/6/06 AFE IIt pre-Production Board under Test 3/20/06 Certify for Full Production 4/19/06 Board Assembly Complete 6/29/06 First Crate Ready for Installation 7/13/06 203 Boards Ready 8/10/06