AFC Schedules and Status
Tom BradshawJohn CobbWing LauMatt Hills
MICE MICO Meeting12th October 2011
Elwyn BaynhamMike CourtholdVictoria Bayliss
![Page 2: AFC Schedules and Status Tom Bradshaw John Cobb Wing Lau Matt Hills MICE MICO Meeting 12 th October 2011 Elwyn Baynham Mike Courthold Victoria Bayliss.](https://reader038.fdocuments.in/reader038/viewer/2022110207/56649d2d5503460f94a04512/html5/thumbnails/2.jpg)
2
Talk will cover
• Status of the project• Work and spend:
– Schedule of work and spend this Financial Year
– Schedule and spend estimates for next FY
– Forward look and spend requirements to completion
Introduction
![Page 3: AFC Schedules and Status Tom Bradshaw John Cobb Wing Lau Matt Hills MICE MICO Meeting 12 th October 2011 Elwyn Baynham Mike Courthold Victoria Bayliss.](https://reader038.fdocuments.in/reader038/viewer/2022110207/56649d2d5503460f94a04512/html5/thumbnails/3.jpg)
3
Status of the project
Winding of AFC 1 and 2 are complete and look to be of very good quality – shown here with outer insulation prior to welding of bobbin outer (right)
•Most components are in hand and assembly is proceeding•Welding of covers on bobbin nearly complete
![Page 4: AFC Schedules and Status Tom Bradshaw John Cobb Wing Lau Matt Hills MICE MICO Meeting 12 th October 2011 Elwyn Baynham Mike Courthold Victoria Bayliss.](https://reader038.fdocuments.in/reader038/viewer/2022110207/56649d2d5503460f94a04512/html5/thumbnails/4.jpg)
4
Recent Progress and Status
Parts look to be of good quality
Current lead assemblies
Suspension System
![Page 5: AFC Schedules and Status Tom Bradshaw John Cobb Wing Lau Matt Hills MICE MICO Meeting 12 th October 2011 Elwyn Baynham Mike Courthold Victoria Bayliss.](https://reader038.fdocuments.in/reader038/viewer/2022110207/56649d2d5503460f94a04512/html5/thumbnails/5.jpg)
5
Critical areas
Schedule analysed at meetings to highlight critical path items – this has worked well – used this to get engineering support in the right areas
Critical path at the moment is the Outer Vacuum Can assembly which is proving complex and time consuming. WL spending some time with them to understand this
Some risk mitigated by testing cryocoolers prior to installation – this has been very valuable
Control system needs to be ready – trying to keep on top of this issue
Power supply specifications have been difficult to interpret in the context of operation with the AFC – we are keeping on top of this
![Page 6: AFC Schedules and Status Tom Bradshaw John Cobb Wing Lau Matt Hills MICE MICO Meeting 12 th October 2011 Elwyn Baynham Mike Courthold Victoria Bayliss.](https://reader038.fdocuments.in/reader038/viewer/2022110207/56649d2d5503460f94a04512/html5/thumbnails/6.jpg)
6
Sch
ed
ule
sModule/Activity Due Date
AFC1 at RAL January 2012
Absorber integration and test +3mths elapsed
AFC2 at RAL June 2012 – worst case trying to improve on this
Absorber integration and test <3mths
Task Comments
Acceptance tests Will be completed at RAL
Field Mapping CERN personnel
Absorber integration
To fit in with hydrogen and hall scheduleR
AL
task
s 201
1/1
2R
AL
task
s 201
2/1
3
Task Comments
Module 2 monitoring
Delivery as above
Acceptance tests #2
Will be completed at RAL
Field Mapping #2 CERN personnel
Absorber integration
To fit in with hydrogen and hall schedule
![Page 7: AFC Schedules and Status Tom Bradshaw John Cobb Wing Lau Matt Hills MICE MICO Meeting 12 th October 2011 Elwyn Baynham Mike Courthold Victoria Bayliss.](https://reader038.fdocuments.in/reader038/viewer/2022110207/56649d2d5503460f94a04512/html5/thumbnails/7.jpg)
7
END