Aerodrome Standards Manual of Pakistan Aerodrome Design and Operations Module - 6
description
Transcript of Aerodrome Standards Manual of Pakistan Aerodrome Design and Operations Module - 6
1
Aerodrome Standards Manual of
Pakistan
Aerodrome Design and Operations
Module - 6
AERODROME CERTIFICATIONCOURSE
Apr 21, 2023 Module -6
Objectives: To understand State’s obligation to the
Convention on ICAO to adopt SARPs of ICAO Annexes.
To develop National Aerodrome Standards based on ICAO Annex 14, Volume I – Aerodrome Design and Operations.
To develop by aerodrome operator a compliance checklist with respect to SARPs of Aerodrome Standards Manual, Pakistan - Aerodrome Design and Operations.
Apr 21, 2023 Module -6 2
Aerodrome Standards Manual of Pakistan“Aerodrome Design and Operations”
Adoption of international standards and proceduresEach contracting State undertakes to collaborate in securing the highest practicable degree of uniformity in regulations, standards, procedures, and organization in relation to aircraft, personnel, airways and auxiliary services in all matters in which such uniformity will facilitate and improve air navigation.
Apr 21, 2023 Module - 2 3
Article 37 of the Convention on International Civil Aviation
Section 4 (a) of CA Ordinance 1960 empowers the Central Government to make rules to implement the Convention of 1944.
Section 5 (2)(c) of CA Ordinance 1960 empowers the Federal Government to make rules for “the licensing, inspection and regulation of aerodromes or airports, the conditions under which aerodromes may be maintained, …….”
Apr 21, 2023 Module -4 5
“Civil Aviation Ordinance 1960” [CE – 1]
Rule 4 (2h) of CAR 94 empowers the Director General, with the approval of the Federal Government, issue Operating Regulations to meet the requirements of the ICAO Standards, Recommended Practices and Procedures.
Apr 21, 2023 Module -4 6
“Civil Aviation Rules 1994 ” The Secondary Level of Aviation Law in Pakistan
[CE – 2]
To fulfill the State’s obligation to the Convention on ICAO, in addition to Ordinances and Rules promulgated by the Federal Government, the CAA Pakistan has developed Aerodrome Standards Manual in order to incorporate the relevant SARPs of ICAO Annex 14 Volume I – Aerodrome Design and Operations.
Apr 21, 2023 Module -6 7
Aerodrome Standards Manual of Pakistan“Aerodrome Design and Operations”
Module -6 8
Aerodrome Standards Manual, Pakistan
“Aerodrome Design and Operations”
Apr 21, 2023
Module -6 9
National Aerodrome Standards
Standards are of critical importance.
Standards are:
component of a regulatory framework
the basis of:
- explaining safety requirements;
- assessing compliance.
Operators need to be completely familiar.
Apr 21, 2023
Aerodrome Standards Manual of Pakistan“Aerodrome Design and Operations”
Contents of ASMPINTRODUCTION1. GENERAL2. AERODROME DATA 3. PHYSICAL CHARACTERISTICS4. OBSTACLE RESTRICTION AND REMOVAL 5. VISUAL AIDS FOR NAVIGATION6. VISUAL AIDS FOR DENOTING OBSTACLES7. VISUAL AIDS FOR DENOTING RESTRICTED USE AREAS8. ELECTRICAL SYSTEMS9. AERODROME OPERATIONAL SERVICES, EQUIPMENT AND
INSTALLATIONS10.AERODROME MAINTENANCE
Apr 21, 2023 Module -6 10
Aerodrome Standards Manual of Pakistan“Aerodrome Design and Operations”
Contents of ASMP (contd.)APPENDIX 1 - COLOURS FOR AERONAUTICAL
GROUND LIGHTS, MARKINGS, SIGNS AND PANELSAPPENDIX 2 - AERONAUTICAL GROUND LIGHT
CHARACTERISTICSAPPENDIX 3 - MANDATORY INSTRUCTION
MARKINGS AND INFORMATION MARKINGSAPPENDIX 4 - REQUIREMENTS CONCERNING
DESIGN OF TAXIING GUIDANCE SIGNSAPPENDIX 5 - AERONAUTICAL DATA QUALITY
REQUIREMENTSAPPENDIX 6 - LOCATION OF LIGHTS ON OBSTACLESATTACHMENT A - GUIDANCE MATERIAL
SUPPLEMENTARY TO CAR SECTION 4, SERIES “B” PART I
ATTACHMENT B - OBSTACLE LIMITATION SURFACES
Apr 21, 2023 Module -6 11
Aerodrome Standards Manual of Pakistan“Aerodrome Design and Operations”
1.2 Applicability:1.2.2 The specifications, unless otherwise indicated
in a particular context, shall apply to all aerodromes open to public use. The specifications of this Manual Chapter-3 shall apply only to land aerodromes.
Note: - Although there are at present no specifications relating to stolports, it is intended that specifications for these aerodromes will be included as they are developed. In the interim, guidance material on stolports is given in the ICAO Stolport Manual.
Apr 21, 2023 Module -6 12
Aerodrome Standards Manual of Pakistan“Aerodrome Design and Operations”
D6. Obligation of the Aerodrome Operators:
D6.1 The Aerodrome Operator shall comply with the standards specified in Aerodrome Standards Manual of Pakistan, Civil Aviation Rules, 1994, this ANO, directives issued from time to time by the Authority / Director General and with such terms and conditions as endorsed in the Aerodrome Certificate.
Apr 21, 2023 Module -6 13
ANO-001-DRAS-1.0, Dated 05/10/2009 – Requirement for Issue and/or Renewal of
Aerodrome Certificate
ASMP SARP
Ref.
(1)
SARPs of Aerodrome Standards Manual of
Pakistan
(2)
ASMP for XYZ
Aerodrome (ARC – 4E)
(3)
Existing Characteristics / Parameters of
XYZ Aerodrome
(4)
Deviation of XYZ
Aerodrome from ASMP
(5)
Remarks
C = Complianc
e
NC = Non- Complianc
e(6)
3.1.13 Longitudinal slopesRecommendation.— The slope computed by dividing the difference between the maximum and minimum elevation along the runway centre line by the runway length should not exceed:- 1 per cent where the code number is 3 or 4; and- 2 per cent where the code number is 1 or 2.
< 1 per cent
0.8% Nil
Apr 21, 2023 Module -6 14
Aerodrome Standards Manual of PakistanCompliance Checklist
ASMP SARP
Ref.
(1)
SARPs of Aerodrome Standards Manual of Pakistan
(2)
ASMP for XYZ
Aerodrome (ARC – 4E)
(3)
Existing Characteristics / Parameters of XYZ Aerodrome
(4)
Deviation of XYZ
Aerodrome from ASMP
(5)
Remarks
C = Complianc
e
NC = Non- Complianc
e(6)
3.2.3Width of runway shouldersRecommendation.— The runway shoulders should extend symmetrically on each side of the runway so that the overall width of the runway and its shoulders is not less than:— 60 m where the code letter is D or E; and— 75 m where the code letter is F.
≥ 60 m 60 m Nil
Apr 21, 2023 Module -6 15
Aerodrome Standards Manual of PakistanCompliance Checklist
ASMP SARP
Ref.
(1)
SARPs of Aerodrome Standards Manual of Pakistan
(2)
ASMP for XYZ
Aerodrome (ARC – 4E)
(3)
Existing Characteristics / Parameters of
XYZ Aerodrome
(4)
Deviation of XYZ
Aerodrome from ASMP
(5)
Remarks
C = Complianc
e
NC = Non- Complianc
e(6)
3.4.2Length of runway stripsA strip shall extend before the threshold and beyond the end of the runway or stopway for a distance of at least:— 60 m where the code number is 2, 3 or 4;— 60 m where the code number is 1 and the runway is an instrument one; and— 30 m where the code number is 1 and the runway is a non-instrument one.
≥ 60m 60 m Nil
Apr 21, 2023 Module -6 16
Aerodrome Standards Manual of PakistanCompliance Checklist
ASMP SARP
Ref.
(1)
SARPs of Aerodrome Standards Manual of Pakistan
(2)
ASMP for XYZ
Aerodrome (ARC – 4E)
(3)
Existing Characteristics / Parameters of
XYZ Aerodrome
(4)
Deviation of XYZ
Aerodrome from ASMP
(5)
Remarks
C = Complianc
e
NC = Non- Complianc
e(6)
3.4.3Width of runway stripsA strip including a precision approach runway shall, wherever practicable, extend laterally to a distance of at least:— 150 m where the code number is 3 or 4; and— 75 m where the code number is 1 or 2;on each side of the centre line of the runway and its extended centre line throughout the length of the strip.
≥ 150 m 120 m Less by 30 m
Non-compliance to 3.4.3.
Apr 21, 2023 Module -6 17
Aerodrome Standards Manual of PakistanCompliance Checklist
ASMP SARP
Ref.
(1)
SARPs of Aerodrome Standards Manual of Pakistan
(2)
ASMP for XYZ
Aerodrome (ARC – 4E)
(3)
Existing Characteristics / Parameters of
XYZ Aerodrome
(4)
Deviation of XYZ
Aerodrome from ASMP
(5)
Remarks
C = Complianc
e
NC = Non- Complianc
e(6)
3.5.2 A runway end safety area shall extend from the end of a runway strip to a distance of at least 90 m. ≥ 90 m 60 m Less by 30
mNon-compliance to 3.5.2.
Apr 21, 2023 Module -6 18
Aerodrome Standards Manual of PakistanCompliance Checklist
ASMP SARP
Ref.
(1)
SARPs of Aerodrome Standards Manual of Pakistan
(2)
ASMP for XYZ
Aerodrome (ARC – 4E)
(3)
Existing Characteristics / Parameters of
XYZ Aerodrome
(4)
Deviation of XYZ
Aerodrome from ASMP
(5)
Remarks
C = Compliance
NC = Non- Compliance
(6)
4.2.13 The following obstacle limitation surfaces shall be established for a precision approach runway category I:— conical surface;— inner horizontal surface;— approach surface; and— transitional surfaces. As
specified in 4.2.13
Established as required by 4.2.13
Nil
Apr 21, 2023 Module -6 19
Aerodrome Standards Manual of PakistanCompliance Checklist
Module -6 20
Runway Aircraft Parked within the
Runway Strip
Dog
Apr 21, 2023
Uses of Compliance Checklist:1.Aerodrome operator’s self assessment of the
aerodrome for compliance with the SARPs of Aerodrome Standards Manual of Pakistan.
2.Baseline data for audit and inspection of the aerodrome operators by the officials of DAAR, CAA Pakistan.
3.Aerodrome operator to seek exemptions from DG CAA Pakistan for those non-compliances with SARPs of ASMP.
Apr 21, 2023 Module -6 21
Aerodrome Standards Manual of PakistanCompliance Checklist
Aerodrome Standards Manual of Pakistan“Aerodrome Design and Operations”
Questions?
Apr 21, 2023 Module -6 22
Thank you
End of Module – 6 Aerodrome Standards Manual of
Pakistan“Aerodrome Design and Operations”
Module -6 23Apr 21, 2023