    Index

    ItemTest

    DescriptionReference

    Date of Test(D/M/Y)

    Result Location of Test Page

    A. Characteristic Tests

    A-1 Visual inspection EN 50155:2001, 10.2.1 PASS AAEON LAB 3

    A-2Performance Test(where applicable)

    EN 50155:2001, 10.2.2 Supply variations: 0,7 UPASS Cerpass 3

    A-3 Insulation test EN 50155:2001, 10.2.9.1 500 V DC PASS Cerpass 3

    A-4Voltage withstandtest

    EN 50155:2001, 10.2.9.2 1000 Vrms, sinusoidalPASS Cerpass 3

    B. Environmental Tests

    B-1 Cooling testEN 50155:2001, 10.2.3EN60068-2-1, Ad

    Ambient temperature: TX:Internal cubicleTemp 0~+55

    PASS AAEON LAB 3

    B-2 Dry heat testEN 50155:2001, 10.2.4EN60068-2-2, Bd

    PASS AAEON LAB 4

    B-3Vibration, Shock,and Bump test

    EN50155:2001, 10.2.11EN 61373

    PASS King Design 5

    B-4 Damp heat testcyclic

    EN50155:2001, 10.2.5EN 60068-2-30, Db

    +25C/+55C @ 2 x 24h,2cycles

    PASS AAEON LAB 11

    C. EMC Tests

    C-3Conductedemission

    EN 50155:2001, 10.2.8.2EN 50121-3-2 (Table 4)EN 55011

    79 dBV QP @ 150 - 500 kHz73 dBV QP @ 500 kHz - 5 MHz73 dBV QP @ 5MHz - 30 MHz

    PASSCOMPLIANCELAB

    12

    C-4 Radiated emission

    EN 50155:2001, 10.2.8.2EN 50121-3-2(Table 6)EN 55011

    40 dBV/m QP @ 30 230kHz,10m47 dBV/m QP @ 230-1GHz,10m

    PASSCOMPLIANCELAB

    15

    C-5Fast transient burstimmunity

    EN 50155:2001, 10.2.7EN 50121-3-2 (Table 8)EN 61000-4-4

    2 kV (capacitive clamp)

    PC = A PASSCOMPLIANCELAB

    20

    C-6 Surge immunityEN 50155:2001, 10.2.6.2EN 50121-3-2 (Table 7)

    1,8 kV, 5/50 us

    2 Kv

    PC = B

    PASSCOMPLIANCELAB

    22

    C-7RFI immunity,Conducted

    EN 50155:2001, 10.2.8.1EN 50121-3-2 (Table 7)EN 61000-4-6

    10Vrms @ 0.15 - 80 MHz, 80 %AM (1 kHz)PC = A

    PASSCOMPLIANCELAB

    24

    C-8RFI immunity,radiated

    EN 50155:2001, 10.2.8.1EN 50121-3-2 (Table 9)EN 61000-4-3

    10 V/m @ 80 - 1000 MHz, 80 %AM (1 kHz)PC = A

    PASSCOMPLIANCELAB

    26

    C-9Electrostaticdischarge

    EN 50155:2001, 10.2.6.4EN 50121-3-2 (Table 9)EN 61000-4-2

    6 kV contact discharge

    8 kV air discharge

    PC = B

    PASSCOMPLIANCELAB

    28

  • 8/10/2019 AEC-6910 en-50155 Test Report

    3/29

    R/N:Page: 3 of 68

    A. Characteristic Tests

    A-1 Visual inspectionA-1-1 Inspection Request

    The visual inspection shall be carrier out to ensure that the equipment is of sound construction and, so far

    as can be ascertained, meets its specified requirements.A-1-2 Inspection Result

    Pass:This is a FAN less product, therefore without any noise leakage except the Hard Disk Driver motor.

    A-2 Performance Test (where applicable)A-2-1 Test Condition

    1. Supply variations:- Supply voltage: (1) rated input voltage x 0.7 (2) rated input voltage x 1.25- Operation function shall be worked normally at the supply variations.

    2. Supply interruption:- Supply voltage: rated input voltage.- Interruption classification: Class S1.- Repeated 10 times at random and covered all modes of operation.

    - Operation function shall be worked normally at supply variations.A-2-2 Test Result

    1. Supply variations:

    Test voltage (V) Result / Observation

    DC 23.75 No malfunction

    DC 13.3 No malfunction

    2. Supply interruption:

    Test voltage (V) Result / Observation

    DC 19 No malfunction

    A-3 Insulation testA-3-1 Test Condition

    - Test voltage: 500 Vdc.- No fundamental deterioration from the initial measurement.- Test voltage is applied between the power supply sides of external power adaptor and I/O ports

    equipment under test.

    A-3-2 Test Result

    Test voltage (V) Result / Observation

    DC 500 No fundamental deterioration

    A-4 Voltage withstand testA-4-1 Test Condition

    - Test voltage: 1000 Vac or 1414Vdc.- Test time: one minute.- Neither disruptive discharge nor flashover shall occur.- Test voltage is applied between the power supply sides of external power adaptor and I/O ports

    equipment under test.

    A-4-2 Test Result

    Test voltage (V) Result / Observation

    DC 1414 No disruptive discharge / no flashover

    B. Environmental TestsB-1 Cooling test

    B-1-1 Test EquipmentProgrammable Temperature & Humidity ChamberK.SON. INS. TECH. CORP.Model: TS-F3L+-100

    Date of Calibration: 04/01/05

  • 8/10/2019 AEC-6910 en-50155 Test Report

    4/29

    R/N:Page: 4 of 68

    Serial Number: 1467

    B-1-2 Test Condition

    1. Test Temperature: 02. Test Times: 96Hrs3. Test Software: Windows 2000 / Run PassMark Burn In Test Pro 4.0

    B-1-3 Machine Curve

    B-1-4 Test Result

    The system structure doesnt have any deformation; All functions are passed after low temperature

    operation test.

    B-2. Dry heat test

    B-2-1 Test EquipmentProgrammable Temperature & Humidity ChamberK.SON. INS. TECH. CORP.Model: TS-F3L+-100

    Date of Calibration: 04/01/05Serial Number: 1467

    B-2-2 Test Condition

    1. Test Temperature: 552. Test Times: 96Hrs3. Test Software: Windows 2000 / Run PassMark Burn In Test Pro 4.0

    B-2-3 Machine Curve

  • 8/10/2019 AEC-6910 en-50155 Test Report

    5/29

    R/N:Page: 5 of 68

    B-2-4 Test ResultThe system structure doesnt have any deformation; All functions are passed after high temperature

    operation test.

    B-3 Vibration, Shock, and Bump testB-3-1 Test Equipment

    SHOCK TEST

    EQUIPMENT MFR MODELSERIAL

    NUMBER

    CAL.

    DUE

    Shock Testing System King Design KD-DP-1200-60 KDS11054989 No Cal. Required

    Controller King Design KD-1200-03 KD674 No Cal. Required

    Accelerometer B&K B&K 4398 2209043 No Cal. Required

    VIBRATION TEST

    EQUIPMENT MFR MODELSERIAL

    NUMBER

    CAL.

    DUE

    Vibration Tester King DesignKD-9363EM-600F2K-

    50N120KDS11054783 No Cal. Required

    Controller DACTRON FRONT-End Box 5250251 No Cal. Required

    Control Accelerometer Wilcoxon Research WR-77 4208 No Cal. Required

    B-3-2 Shock Test ConditionTemperature : 202

    Humidity : 7020%RHEUT : AEC-6910 with HDDWave From : Half sine wave(operation)Acceleration : 30gDuration Time : 18msNo. of Shock : Each axis 3 timesShock of direction : X, Y, Z axis

  • 8/10/2019 AEC-6910 en-50155 Test Report

    6/29

    R/N:Page: 6 of 68

    B-3-3 Shock Test Photograph of test setup

  • 8/10/2019 AEC-6910 en-50155 Test Report

    7/29

    R/N:Page: 7 of 68

    B-3-4 Shock Test Curve

  • 8/10/2019 AEC-6910 en-50155 Test Report

    8/29

    R/N:Page: 8 of 68

    B-3-5 Shock Test Result

    B-3-6 Vibration Test Condition

    Temperature : 202

    Humidity : 7020%RH

  • 8/10/2019 AEC-6910 en-50155 Test Report

    9/29

    R/N:Page: 9 of 68

    EUT : AEC-6910 with HDDWave From : Random vibration test(operation)

    Test Axis : VerticalFrequency : 5~20 Hz

    Acceleration : 5.40 m/s rms

    P.S.D. : 5~10 Hz +9 dB/Oct10~100 Hz 0.190 (m/s)/Hz

    100~250 Hz -6 dB/OctTest Time : 1 hr

    Test Axis : TransverseFrequency : 5~250 HzAcceleration : 4.71 m/s rms

    P.S.D. : 5~10 Hz +9 dB/Oct

    10~100 Hz 0.144 (m/s)/Hz

    100~250 Hz -6 dB/OctTest Time : 1 hr

    Acceleration : 5.40m/s rmsAcceleration : 5.40m/s rms

    Test Axis : Longitudinal axisFrequency : 5~250 HzAcceleration : 2.52 m/s rms

    P.S.D. : 5~10 Hz +9 dB/Oct10~100 Hz 0.0414 (m/s)/Hz

    100~250 Hz -6 dB/OctTest Time : 1 hr

    Total test Time : 3 hrs

    B-3-7 Vibration Test Photograph of test setup

  • 8/10/2019 AEC-6910 en-50155 Test Report

    10/29

    R/N:Page: 10 of 68

    B-3-8 Vibration Test Curve

  • 8/10/2019 AEC-6910 en-50155 Test Report

    11/29

    R/N:Page: 11 of 68

    B-3-5 Vibration Test Result

    B-4. Damp heat test cyclicB-4-1 Test Equipment

    Programmable Temperature & Humidity ChamberK.SON. INS. TECH. CORP.Model: TS-F3L+-100

    Date of Calibration: 04/01/05Serial Number: 1467

    B-4-2 Test Condition

    1. Test Temperature: 25 / 552. Test Humidity: 93~95%RH3. Test Cycle: 2 Cycle

    B-4-3 Machine Curve

  • 8/10/2019 AEC-6910 en-50155 Test Report

    12/29

    R/N:Page: 12 of 68

    3 h 6 h

    95%

    93%

    24 h (1 Cycle)

    25

    9 h

    T1

    Ambient temp.

    10 min

    relative humidity

    45 to 75%

    dielectric test

    B-4-4 Test ResultPass: The system structure doesnt have any deformation; All functions are passed during humidity test.

    C. EMC TestsC-1 EUT DESCRIPTIONProduct Embedded Control PC

    Trade Name AAEON

    Model AEC-6910

    Housing Type Metal case

    EUT Power Rating 100~240VAC

    AC Power During Test 230VAC / 50Hz

    Power Adaptor Manufacturer FSP

    Power Adaptor Model Number FSP120-AAB

    Power Adaptor Power Rating I/P: 100-240VAC 50-60Hz O/P: 19VDC

    AC Power Cord Type Unshielded, 1.8m (Detachable)

    DC Power Cord Type Unshielded, 1.6m (Non-detachable, with a core)EUT I/O Cable Unshielded, 0.3m (Detachable)

    OSC/Clock Frequencies 32.768kHz; 14.31818MHz; 25MHz

    C-2 I/O PORT OF EUT

    I/O Port Type QTY TESTED WITH

    PIO Port 1 1

    SIO Port 4 4

    PS/2 Keyboard Port 1 1

    PS/2 Mouse Port 1 1

    VIDEO-OUT Port (VGA) 1 1

    AUDIO IN/OUT/ MIC Port 1 1

    LAN Port 1 1USB Port 4 4

    PCMCI Port 2 2

    CF Slot 1 1

    C-3 Conducted emission

    C-3-1 Test Equipment

    Conducted Emission Test Site # B

    EQUIPMENT MFR MODELSERIAL

    NUMBER

    CAL.

    DUE

    TEST RECEIVER R&S ESHS10 843743/015 03/31/2006

    LISN (EUT) EMCO 3825/2 9106-1810 01/16/2006LISN EMCO 3825/2 1382 01/16/2006

    BNC CABLE MIYAZAKI 5D-FB BNC B1 07/14/2006

    Pulse Limiter R&S ESH3-Z2 100374 08/25/2006

    THERMO-HYGRO METER TOP HA-202 9303-3 03/02/2006

  • 8/10/2019 AEC-6910 en-50155 Test Report

    13/29

  • 8/10/2019 AEC-6910 en-50155 Test Report

    14/29

    R/N:Page: 14 of 68

  • 8/10/2019 AEC-6910 en-50155 Test Report

    15/29

    R/N:Page: 15 of 68

    C-3-4 Performance and Result:Pass:No any emission over the limit line.

    C-4. Radiated emission

    C-4-1 Test Equipment

    Open Area Test Site J

    EQUIPMENT MFR MODEL SERIAL no. CAL. DUE

    SITE NSA CCS J Site N/A 10/15/2006

    MEASURE RECEIVER SCHAFFNER SCR3501 330 06/13/2006

  • 8/10/2019 AEC-6910 en-50155 Test Report

    16/29

    R/N:Page: 16 of 68

    SPECTRUM ANALYZER ADVANTEST R3132 120900003 No Cal. Required

    ANTENNA SCHAFFNER CBL 6112B 2800 09/24/2006

    PRE-AMPLIFIER SCHAFFNER CPA9231A 3629 10/08/2006

    CABLE BELDEN 9913 N-TYPE #J2 02/18/2006

    ATTENUATOR MCL UNAT-6 AT06-8 12/03/2005

    THERMO-HYGRO METER TFA N/A NO.3 11/02/2006

    C-4-2 Test Photograph of test setup

  • 8/10/2019 AEC-6910 en-50155 Test Report

    17/29

    R/N:Page: 17 of 68

    C-4-2 Emission Profile

  • 8/10/2019 AEC-6910 en-50155 Test Report

    18/29

  • 8/10/2019 AEC-6910 en-50155 Test Report

    19/29

    R/N:Page: 19 of 68

    C-4-3 Performance and Result:Pass:No any emission over the limit line.

  • 8/10/2019 AEC-6910 en-50155 Test Report

    20/29

    R/N:Page: 20 of 68

    C-5. Fast transient burst immunityC-5-1 Test Equipment

    Fast Transients/Burst Test Site (EN 61000-4-4)

    Manufacturer/Type Model No. Serial No. Cal. Due

    Schaffner / EFT Generator BEST EMC V2.3 200031A024SC 11/07/2006

    Schaffner / Capacitive Clamp N/A N/A No Cal. Required

    C-5-2 Test ConditionPort : AC Power Port and RJ45 PortBasic Standard : IEC/EN 61000-4-4

    Requirements : 2 kV for AC Power Port 2 kV for RJ45 Port

    Performance Criterion : The Equipment or System shall be able to provide the essential performance andremain safe.

    Tested by : ALEX PANTemperature : 18

    oC

    Humidity : 56%Pressure : 1005mbar

    C-5-3 Test Block Diagram of Test Setup

    Controller Computer

    EFT/Burst/Surge Generator

    EUT SupportUnits

    0.8mNon-Conductive Table

    AC

    Injection ClampBurst Generator

    To Load

    AC

    Comm. Line 3 m

    EUT

    80cmNon-Conductive

    Table

    10cm

    C-5-4 Test Photograph of test setup

  • 8/10/2019 AEC-6910 en-50155 Test Report

    21/29

    R/N:Page: 21 of 68

    (IEC 61000-4-4 FOR I/O)

    C-5-5 Performance and ResultImpulse Frequency : 5kHzTr/Th : 5/50nsBurst Duration : 15msBurst Period : 300ms

  • 8/10/2019 AEC-6910 en-50155 Test Report

    22/29

    R/N:Page: 22 of 68

    Inject Line Voltage kV Inject Method Result (Pass/Fail)

    L 2 Direct Pass

    N 2 Direct Pass

    PE 2 Direct Pass

    L + N 2 Direct PassL + PE 2 Direct Pass

    N + PE 2 Direct Pass

    L + N + PE 2 Direct Pass

    RJ45 2 Clamp Pass

    Pass:No function degraded during the tests.

    The apparatus continues to operate as intended. No degradation of performance or loss of function is

    allowed below a performance level specified by the manufacturer, when the apparatus is used as

    intended. In some cases the performance level may be replaced by a permissible loss of performance.

    C6 Surge immunityC-6-1 Test Equipment

    Surge Immunity Test Site (EN 61000-4-5)

    Manufacturer/Type Model No. Serial No. Cal. Due

    Schaffner / Surger Generator BEST EMC V2.3 200031A024SC 11/07/2006

    Schaffner / Signal and Data

    Lines Coupling NetworkCDN118 19328 No Cal. Required

    C-6-2 Test ConditionPort : AC Power PortBasic Standard : IEC/EN 61000-4-5

    Requirements : 2 kV(Line to Ground)) for AC Power Port

    1.8kV(Line to Line) for AC Power PortPerformance Criteria : The Equipment or System shall be able to provide the

    essential performance and remain safe.Tested by : ALEX PANTemperature : 20

    oC

    Humidity : 56%Pressure : 1010mbar

    C-6-3 Test Block Diagram of Test Setup

    Surge Immunity

    Test

    Controller Computer

    EUT

    &

    Support Units

    0.8m

    To AC

    Source

    C-6-4 Test Photograph of test setup

  • 8/10/2019 AEC-6910 en-50155 Test Report

    23/29

    R/N:Page: 23 of 68

    C-6-5 Test Procedure1. The EUT and support units were located on a wooden table 0.8 m away from ground floor.

    2. Injected test voltage to the EUT ports from minimum to standard request or client request.3. Recorded the test result as shown in following table.

    C-6-6 Performance and ResultVoltage Waveform : 5/50 usCurrent Waveform : 8/20 usPolarity : Positive/NegativePhase angle : 0

    o, 90

    o, 270

    o

    Number of Test : 5

    Coupling Line Voltage (kV) Polarity Coupling Method Result (Pass/Fail)

    L1-L2 11.8 Positive Capacitive Pass

    L1-PE 12 Positive Capacitive Pass

    L2-PE 12 Positive Capacitive Pass

    L1-L2 11.8 Negative Capacitive Pass

    L1-PE 12 Negative Capacitive Pass

    L2-PE 12 Negative Capacitive Pass

    Pass : Where normal functioning of LAN cant be achieved because of the impact of CDN on the EUT, notest be required.

    The apparatus continues to operate as intended. No degradation of performance or loss of function is

    allowed below a performance level specified by the manufacturer, when the apparatus is used as

    intended. In some cases the performance level may be replaced by a permissible loss of performance.

  • 8/10/2019 AEC-6910 en-50155 Test Report

    24/29

    R/N:Page: 24 of 68

    C-7 RFI immunity, Conducted

    C-7-1 Test Equipment

    CS test (EN 61000-4-6)

    Manufacturer/Type Model No. Serial No. Cal. Due

    Schaffner / RF Generator NSG 2070-1 1061 08/03/2006Schaffner / CDN CDN M316 19600 08/02/2006

    Schaffner / CDN CDN M216 19294 08/02/2006

    FCC / CDN FCC-801-M3-16A 99122 08/02/2006

    Schaffner / EM Clamp KEMZ 801 19227 02/23/2006

    Schaffner / CDN CDN T002 15881 01/13/2006

    FCC / CDN FCC-801-T8-RJ45 04025 06/23/2006

    Schaffner / Attenuator INA2070-1 2061 No Cal. Required

    FCC / CDN FCC-801-T4-RJ45 04031 08/02/2006

    C-7-2 Test Condition

    Port : AC Power Port and RJ45 PortBasic Standard : IEC/EN 61000-4-6Requirements : 10V, with 80% AM. 1kHz Modulation.Injection Method : CDN-M3 for AC Power Port

    CDN-T4 for RJ45 PortPerformance Criterion : A (Standard Required)Tested by : ALEX PANTemperature : 20

    oC

    Humidity : 56%Pressure : 1010mbarFrequency Range : 0.15MHz-80MHzFrequency Step : 1% of fundamentalDwell Time : 3 sec

    C-7-3 Test Block Diagram of Test Setup

    CDN

    EUT and

    Support units Power

    AmplifierPC

    Controller

    Ground Reference

    10 cm isolation

    supporter

    0.1m< L

  • 8/10/2019 AEC-6910 en-50155 Test Report

    25/29

    R/N:Page: 25 of 68

    C-7-5 Test Procedure1. The EUT and support units were located at a ground reference plane with the interposition of a 0.1 m

    thickness insulating support and the CDN was located on GRP directly.2. Set the testing parameters of CS test software as per IEC/EN 61000-4-6.

    C-7-6 Performance and Result:

  • 8/10/2019 AEC-6910 en-50155 Test Report

    26/29

    R/N:Page: 26 of 68

    Range (MHz) Field Modulation Result (Pass/Fail)

    0.15-80 10V Yes Pass

    Pass:No function degraded during the tests.The apparatus continues to operate as intended. No degradation of performance or loss of function isallowed below a performance level specified by the manufacturer, when the apparatus is used asintended. In some cases the performance level may be replaced by a permissible loss of performance.

    C-8 RFI immunity, radiatedC-8-1 Test Equipment

    Radiated Electromagnetic Field Immunity Test Site (EN 61000-4-3)

    Manufacturer/Type Model No. Serial No. Cal. Due

    Calibration of Field Chamber#RS RS3H-7 / RS3V-7 07/01/2006

    Agilent / Signal Generator E4421B MY43350597 05/16/2006

    AR / Electric Field Probe FP6001 305650 02/03/2006

    Boonton / RF Voltmeter 9200B 328001AE 02/23/2006

    BNC / Function Generator 625A 25451 02/17/2006

    AR / Amplifier 100W1000M1 17564 No Cal. RequiredWerlatone Inc. / Direction Coupler C2630 4121 No Cal.Required

    Frankonia /Broadband Antenna BTA-M 030001M No Cal. Required

    TOP / Thermo-Hygro meter HA-202 9303-2 03/02/2006

    C-8-2 Test Condiction

    Port : EnclosureBasic Standard : IEC/EN 61000-4-3Requirements : 10V/m / with 80% AM. 1kHz Modulation.Performance Criterion : A (Standard Required)Tested by : ALEX PANTemperature : 18

    oC

    Humidity : 56%Pressure : 1010mbar

    C-8-3 Test Block Diagram of Test Setup

    0.8m

    Power Amp Signal

    GeneratorEUT Monitoring by

    using a camera

    Control Room

    7x3x3

    EUT &

    Support Units

    PC Controller to

    control S.G. & PA as

    well as forward

    power

    3 meter

    1.5 meter

  • 8/10/2019 AEC-6910 en-50155 Test Report

    27/29

    R/N:Page: 27 of 68

    C-8-4 Test Procedure1. The EUT and support units were located at the edge of supporting table keep 3 meter away from

    transmitting antenna, it just the calibrated square area of field uniformity.2. Adjusting the cables to be exposed to the electromagnetic filed as possible.

    3. Performing a Radiated Emission Scan in range of 80 to 1000 MHz prior to do RS test and records themore higher emission frequencies for the reference of RS test, due to antenna effectiveness.

    4. Adjusting the monitoring camera to monitor the H message as clear as possible.5. Setting the testing parameters of RS test software per IEC 61000-4-3.6. Referring to the tested data of step 3 to performing the RS test from 30 to 2300 MHz.7. Recording the test result in following table.8. Changing the EUT to the other side and repeat step 3 to 6, until 4 sides of EUT were verified.

    C-8-5 Test Photograph of test setup

    C-8-6 Performance and Result:

    Test level : 10V/m

    Steps : 1 % of fundamental

    Dwell Time : 3 sec

    Range (MHz) Field Modulation Polarity Position () Result (Pass/Fail)

    80-1000 10V/m Yes H Front Pass

    80-1000 10V/m Yes V Front Pass

    80-1000 10V/m Yes H Right Pass

    80-1000 10V/m Yes V Right Pass

    80-1000 10V/m Yes H Back Pass

    80-1000 10V/m Yes V Back Pass

    80-1000 10V/m Yes H Left Pass

    80-1000 10V/m Yes V Left Pass

    Pass:No function degraded during the tests.The apparatus continues to operate as intended. No degradation of performance or loss of function isallowed below a performance level specified by the manufacturer, when the apparatus is used asintended. In some cases the performance level may be replaced by a permissible loss of performance.

  • 8/10/2019 AEC-6910 en-50155 Test Report

    28/29

    R/N:Page: 28 of 68

    C-9 Electrostatic dischargeC-9-1 Test Equipment

    ESD Test Site (EN 61000-4-2)

    Manufacturer/Type Model No. Serial No. Cal. Due

    Schaffner / ESD Simulator NSG 438 129 04/20/2006

    Sato / Aneroid Barometer 7610-20 89090 08/29/2006TOP / Thermo-Hygro meter HA-202 9303-1 03/02/2006

    C-9-2 Test Condition

    Port : EnclosureBasic Standard : IEC/EN 61000-4-2Test Level : 8kV (Air Discharge)

    6kV (Contact Discharge)Performance Criterion : The Equipment or System shall be able to provide the

    essential performance and remain safe.Tested by : ELVIS ZENGTemperature : 19

    oC

    Humidity : 59% RH

    Pressure : 1005mbar

    C-9-3 Test Block Diagram of Test Setup

    Ground Reference Plane

    Wooden Table

    Indirect

    Support units

    EUT & its direct

    Support Units

    VCP

    HCP

    >1m

    0.8m

    (The 470 k resistors are installed per standard requirement.)

    C-9-4 Test Photograph of test setup

  • 8/10/2019 AEC-6910 en-50155 Test Report

    29/29

    R/N:Page: 29 of 68

    C-9-5Test Performance and ResultThe electrostatic discharges were applied as follows:

    Amount of Discharges Voltage Coupling Result20 / Point 8kV Air Discharge Pass

    20 / Point 6 kV Contact Discharge Pass

    20 / Point 2, 4, 6 kV Indirect Discharge HCP Pass

    20 / Point 2, 4, 6 kV Indirect Discharge VCP (Front) Pass

    20 / Point 2, 4, 6 kV Indirect Discharge VCP (Left) Pass

    20 / Point 2, 4, 6 kV Indirect Discharge VCP (Back) Pass

    20 / Point 2, 4, 6 kV Indirect Discharge VCP (Right) Pass

    Observation: No function degraded during the tests.