Page 1: Advanced Vibration Analysis on Gear Box Train

Advanced Vibration Analysis on Gear Box Train and vibration

elimination

by

Udayashankar P. Eng., MBA,CMRP Suncor Energy

359

Page 2: Advanced Vibration Analysis on Gear Box Train

Machine Train configuration

Brief History

Problem description

Analysis

Rectification

Conclusions

360

Page 3: Advanced Vibration Analysis on Gear Box Train

Machine Train Configuration

Compressor Gearbox Turbine

361

Page 4: Advanced Vibration Analysis on Gear Box Train

Machine Train Configuration GA Drawing

Compressor Gear Box Turbine

362

_ ,. ---.~: ..... ~~---.-.---~ .. ~--_ .... _.-;- -:;cr-~ ..... ,._---... -:--.----~-..;:- - ""' ~- -- ·,- --. -,....,..~~- ~-~-.,....-.... -~ . .... ~ - -- -- . -·.· . · - - -- · -: ... • · - ~ -

!. I

i

~.f/N£ • nt0~<"0"Z:LJ~.Jt~.I..C-I. ~l ll'_,.;•to.rJUt ..... /0. ;.(

G"I HA."'Dl £0 "",..C L:.L:s..t!iN~• AVLLr~<.U.J -"""'UI"T'tll..OC D>NMP~Ir.,.__..~ -.err~? Ui!J"r our. Lr r.r.- u a .,.~.._

.,-rzl:h :.:v.;r A- -'. U l '$

D#''4Jiir' -.:;:M'"~U0/(11~ ..rr..:_..,,.,r ,..-.,-:••Nt£ r- h"'• T.6-~A .r-.1>#'- - ZS.._5~ - ,..,~ S'I"'UU.O J4DD .or...-....

•Ni-Cr .-.rc$'1._1!. - 'fS'~4-

£.JIJOo"~,- P<CC:~JWCL. ~U 1":;1,14

. • • •• . _ c q .. r01C'i!'·J aAI'§W r <efYrcnOC'l

;..fL.;_ .....--;;;,..~=~~~-~~~;:' _,~;t ~ ~u o-o c_..-c£"~ ·~£Sso.r -..£.r·

=-l:J.:= ~-f:~a,.G!~~~:;i~:J:~-=-I / ± r.t-~~~£~: ~L~tr.?_..:: J-:.t:. ~ 1J C

! . ·.--

' •

I

~.o ~'"""' ·~~·~ llot..t"r•

I

I . ~ ,.,_~ rUN

(JtJN~,~DM.r)

-------~~~~~~·~·L----~--+----------------~

- ... 1-J ... t' 6-"-4

t$Li¥C'ALtlll,lfftii/'~Nr

"""' r,ll~II.J£ .D1:7VLN C"'()Ad~£JJt:Jtli!

:=;. ~:.Dfu-~~~9.-: ,.,-

.. .. ~ .....

Page 5: Advanced Vibration Analysis on Gear Box Train

Unit Details• Service: Gas oil Recycle Gas

• Driver: Steam Turbine

• Compressor: Centrifugal Compressor

• Gear Box: Double Helical Gear ( 109 teeth), Pinion ( 50 teeth)

• Ratio: 2.18:1

• RPM: Low Speed Shaft:5609 & High Speed Shaft :12228

• Suction Pressure (Psig): 1250

• Discharge Pressure (Psig): 1450-1500• Temperature Suction ( 0 F ) 188; Discharge ( 0 F ) 190-220

• Discharge Flow (MSCFH): 4500 TO 5000 SCFM

• Monitoring system for Gear Box: Casing mounted accelerometers one each for Low Speed and High speed. Online monitoring system is provided for analysis, trending, etc

363

Page 6: Advanced Vibration Analysis on Gear Box Train

Brief History-7K-20 Gear box •Gear Box was overhauled in1999, 2003,2005, 2006, 2008.

•The gears were not changed from 1999 onwards as per the records available.

•In general contact pattern of the gears was good; Dimensional, run out & clearance checks within specs

•Bearings on the high-speed shaft were in poor condition. Some damage and overheating of the Babbitt was evident in the top halves. Low speed shaft bearings did not have any major damage.

•2005 Inspection did reveal some deposit and discoloration due to overheating on the GB Bearings. However the Bearings were replaced.

•GB vibration acceleration was trending high from the start up on April 15 th 2005 though the vibration velocity did not trend that high. Vibration alarms occurred on this gear box & alarm levels were re-adjusted up to an overall level of 18 g’s on low speed shaft.

•April 2006 Specialised Machinery Consultant deployed to conduct a vibration & operating deflecting shape analysis (ODS).

•Dominant frequency at 15 times the running speed of the pinion. There was no abnormal gear mesh vibration.

364

Page 7: Advanced Vibration Analysis on Gear Box Train

Brief History ( Continued)• Engineering evaluation at that time in 2003-2005 recommended that:

• Frequency of 5 years between major inspections for the gearbox is considered too long*

• Evidence of overheating at the bearing as indicated by:1) melting of white metal 2) by the evidence of varnish deposition on the bearing top half.

• The overheating is considered to be caused by the effect of the following:

– Use of higher viscosity oil. (ISO 46 grade instead of the original ISO 32)– Increase in speed ratio and higher output speed for the pinion shaft.

• Increase the alarm limits from 10g-12g-14g-18g-22g. No real effort done to address root cause....... The high vibes resulted in frequent failure of Compressor also.

We were trusting the Experts.........

365

Page 8: Advanced Vibration Analysis on Gear Box Train

Problem Description

•High Vibration acceleration of Low and High Speed shafts

•Both the speed and the compressor flow rate have a significant effect on the gear box vibration.

•Vibration levels are at the worst in the speed range of 5420 to 5620 rpm of the low speed shaft i.e. 11,815 to 12,252 rpm of the high speed shaft. If we do not operate in this range catalyst life will be affected. Catalysts change: $5M

•Spectrum showed high vibration at a single frequency that is 15X Compressor speed.

366

Page 9: Advanced Vibration Analysis on Gear Box Train

ObservationsThe vibration amplitude (units in g – peak) with stud mounted accelerometers at 3.056 KHz frequency i.e. 15 times run speed frequency of the high speed shaft at 12,224 rpm:

Gear Box Front Right Side Gear Box Left SideG measured before correction were in the range of 40 g

H=4

A=29

V=10

H=15V=16

H=40

H=27V=27

H=3.4V=25.5

V=4

H=25V=16

H=7V=18

H=28

A=3.6

A=47

H=13A=2

H=10A=8

367

Page 10: Advanced Vibration Analysis on Gear Box Train

Analysis• The casing vibration velocities on the GB were comparable to sister

compressors 7K-10 and &7K-01.

• The acceleration trend was increasing slowly on both the LS and HS side of the gears.

• Had there been a defect in the gears the GB would not have sustained that long service in spite of indications of High Vibes.

• The predominant frequency was 15 times the high speed shaft frequency which again did not seem to correlate to any mechanical components of the assembly train.

• It was suspected that this is also due to possible excitations. Can only be confirmed if a natural frequency test of the gears or a hammer test is done.

• New instrumentation specific for capturing high frequency vibration data- the 2nd and 3rd harmonic associated with this 15X fundamental frequency was captured.

368

Page 11: Advanced Vibration Analysis on Gear Box Train

Analysis• As per API guidelines the acceleration is a parameter for

assessing the condition only but not for Machinery Protection.

• From the machinery protection point of view, velocity is the more appropriate value to be monitored which is already being done using portable data collectors.

• Further from Vibration perspective it is the TREND that counts most rather than the absolute values.

• For the gearbox in question the casing vibration velocities have not changed significantly in spite of an increase in the acceleration.

369

Page 12: Advanced Vibration Analysis on Gear Box Train

Analysis

Following types of Vibration data were collected :

• Time waveforms from the Online system and field data using stud mounted accelerometers.

• Frequency averaging from Bently panel and field data using stud mounted accelerometers.

• Peak hold vibration data from Bently panel and field data using stud mounted accelerometers.

• Operating deflecting shape data of the gear box, its pedestal, grout and foundation.

370

Page 13: Advanced Vibration Analysis on Gear Box Train

Analysis

• GB Pedestal is made of two metal plates & two C-Channels welded together

• No anchor bolts used to anchor these plates to the concrete

• Anchor bolts can also get loose with time

• Unit is running over 30 years and Oil spills observed all over the area including foundation, base plate & pedestal

• Chances of weak bond between pedestal & concrete, base plate and grout are high

• Vibrations at all the test points had a dominant peak at 3.056 KHz. i.e. 15 times running speed of high speed shaft at 12 224 rpm. The gear mesh frequency at 12224 rpm of high speed shaft was 10.187 KHz.

• Compressor impeller has 18 vanes and diffuser has 14 vanes.

371

Page 14: Advanced Vibration Analysis on Gear Box Train

Rectification- Action Plan• GB Inspected in 2005

• Continuously Monitored

• Correlation between Vibes & Process identified. Marginal reduction in RPM to keep vibe levels recommended

• ODS done using External Expertise.

• Based on this it was decided to rectify the foundation & fill up the voids during an Opportunity

• GB vendor (OEM) was consulted

• Vibes alarm levels adjusted safely (twice)

• Circuits checked for integrity of the readings.

372

Page 15: Advanced Vibration Analysis on Gear Box Train

Efforts Made

Stiffen the steel pedestal and attempt to repair the bond to the concrete.

Ensure that the gear box is properly anchored to the pedestal

If we do nothing, the vibration levels will likely worsen. As the vibrations increase the Gear Box deflections will increase to the point the failure will occur

373

Page 16: Advanced Vibration Analysis on Gear Box Train

CH - 7K-20 Gas/Oil Recycle Comp7K-20 -1

Analyze Spectrum 24-Jan-06 16:00:38

PK = 19.42 LOAD = 100.0 RPM = 60. (1.00 Hz)

0 100 200 300 400 500 600

0

4

8

12

16

20

24

Frequency in kCPM

PK

Acc

eler

atio

n in

G-s

Freq: Ordr: Spec:

177.51 2958.5 17.41

Spectrum on gearbox with high frequency accelerometer showing 2nd & 3rd harmonic of the

fundamental frequency- Aug 2005

Figure - Spectrum from Data Manager - Spectrum does not show 2nd or 3rd harmonic of frequency- August 2005

Before rectification- Vibration Spectra374

Page 17: Advanced Vibration Analysis on Gear Box Train

Animation- ODS of the Gear Box375

Page 18: Advanced Vibration Analysis on Gear Box Train

Rectification Plan

•Gear box was removed & sent to a specialized Gear Box facility

•Adhesive anchors were installed

•Pressure grouting was done to fill the voids

•Additional reinforcement plates installed

•Old grouting was removed & refilled with fresh grout••In situ machining of the base done to level the base

•All base bolts replaced

•The Machinery train realigned and running ever since.

•Compressor overhaul extended to at least 2 to 4 years.

376

Page 19: Advanced Vibration Analysis on Gear Box Train

Installed ½” Adhesive anchorbolts at approx. 4” apart

Installed 3/4” Adhesive anchor bolts at approx. 12” apart on the base plate

Rectification Plan- Adhesive anchors377

Page 20: Advanced Vibration Analysis on Gear Box Train

Top 7K-20 TurbineGearbox Mount

7K-20 Compressor

Void Locations

Top view

Side View

7K-20 Voids In the Gear Box Foundation378

Page 21: Advanced Vibration Analysis on Gear Box Train

Rectification Plan-Reinforcement379

.-- .

-~

~ I

I !__l

--.._

-'

..

I

I

•I i I I I I. I : I 1 I

7fo=..~ 0. ___b

4XISTr'-/.P£DcSTAL

< • - -

' -~

~~~-~ ~

"-~ .._

.._ - '

~ _/ STiFF.. IE i j/

PL~N N O SCALE

' I

'

.---

~

.__

STI FF Fe II'

~r

SK~\C\-\ S V- OOi_ / 2-!3-9 4

/ E .-'f...-1 '.:::::>_~_l_P_E_D_E-.'25\ A L

/ I SliFF i12. \ ''

- -- , I

-- I p--,r--:r--<;. g:f? G >/ • !

- . - : I

SE-C~~ 10"--1 A

Page 22: Advanced Vibration Analysis on Gear Box Train

CH - 7K-20P Bently PanelTREND DISPLAY OF Overall Value

0 100 200 300 400 500 600 700 800

0

3

6

9

12

Days: 18-Jan-06 To 13-Feb-08

RMS A

ccel

erat

ion

in G

-s

=7K-20P -B1P

=7K-20P -B2P

23-J

ul-0

6

Date: Time: Amp1:

13-Feb-08 13:17:55 1.005

Vibration Trend- Pre and Post Correction cases

Reduction in Vibration

380

Page 23: Advanced Vibration Analysis on Gear Box Train

Figure - Spectrum from Data Manager - Spectrum does not show 2nd or 3rd harmonic of frequency- August 2005

Post Rectification- Spectrum381

Page 24: Advanced Vibration Analysis on Gear Box Train

Gear Box Vibration Before/ After correction

• Before: 18g to 22g for 20 years approximately• Predominant: 15 times RPM• RPM restricted to Max 5000• After: 3 to 3.5g• Predominant: 1 x RPM• RPM: 5650• Result: Catalyst life increase due to increased

run time & higher pressure• Estimated Annual Benefit: at least $1 million &

one extra outage avoided

382

Page 25: Advanced Vibration Analysis on Gear Box Train

Conclusions• Highest amplitude vibrations on the gearbox are not frequencies that would be normally associated with a gearbox mechanical issue.

• It was challenging to absolutely identify the source without doing a speed sweep and mechanical impact tests (with the machine shutdown).

• The increased levels were well above any industry guidelines for long-term reliability.

• The ODS showed significant motion of the gearbox pedestal at those frequencies.

• The pedestal is concrete filled and the bond between the steel pedestal and the concrete must have failed. ODS showed that at, at least on one anchor bolt foot, the gearbox is not well attached to the pedestal.

• The pedestal and concrete were contaminated with oil. Oil and ANY relative motion at micro-cracks in the concrete or between the concrete and bonded steel will cause the cracks to grow or the bond to fail.

383