Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle...

68
Advanced Pile Encapsulation Solutions for the Repair and Protection of Underwater Structures Hazem Jadallah

Transcript of Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle...

Page 1: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

Advanced Pile EncapsulationSolutions for the Repair and Protection of Underwater Structures

Hazem Jadallah

Page 2: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

LPG Trestle, Ju’Aymah, Saudi Arabia

•Trestle constructed in 1980•Precast concrete cylinder piles

Page 3: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

LPG Trestle, Ju’Aymah, Saudi Arabia

•Routine inspection in 1983 (3 years after construction) revealed severe marine borer attack•616 piles affected

1”

Page 4: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

LPG Trestle, Ju’Aymah, Saudi Arabia

•The owner required that the repair method…•Would eradicate the existing borers•Would repair the damage done by the borers•Would not be susceptible to future borer attack•Would stay in place and continue to provide protection for 20+ years without any maintenance

Page 5: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

LPG Trestle, Ju’Aymah, Saudi Arabia

•The 616 piles were encapsulated using the advanced pile encapsulation technique in 1984

Page 6: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

Repairing Marine Structures

•Marine Structures• Submerged Piles• Submerged Piers• Seawalls• Dams / raceways• Offshore Platform Supports

Page 7: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

The Need for Repair and Protection

•Marine Environment• Highly Corrosive Environment• Susceptible to Rot• Attack from Marine Organisms• Damage from Scour and Abrasion

Page 8: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

Repairs to Marine Structures

•Repair Zones• Atmospheric Zone• Splash Zone• Submerged Zone

Atmospheric Zone

Splash ZoneSubm

erged Zone

Page 9: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

Repairs to Marine Structures

•Splash Zone• Wetting & Drying

Cycles• Available Oxygen• Heavy Wear &

AbrasionSplash Zone

Page 10: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

Repairs to Marine Structures

•Repair Challenges• Durability of Materials for Repair / Protection• Adequate Performance of Materials for Repair / Protection• Proper Placement of Materials for Repair / Protection

Page 11: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

The Encapsulation Process

•Step 1• Surface preparation• Remove marine

growth• Clean rust and scale• Profile substrate

Page 12: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

The Encapsulation Process

•Step 1• Sandblasting• Pneumatic Rotary Grinder

Page 13: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

The Encapsulation Process

•Step 1• Sandblasting• Pneumatic Rotary Grinder

Page 14: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

The Encapsulation Process

•Step 2• Fiberglass Jackets

Placed Around Structure

• Leaving 3/8” to 1/2” Annulus between Jacket and Structure

• Seams are sealed with epoxy

Translucent Fiberglass Jackets

Page 15: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

Purpose Designed FRP Jackets

•Step 2• Appropriately sized FRP

Jackets Delivered to Site• Polymer Stand-offs• Seam adhesive applied

on deck

Page 16: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

Purpose Designed FRP Jackets

•Step 2• Jackets set in place

around pile

Page 17: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

The Encapsulation Process

•Step 3• Seams are riveted

in place• Temporary bracing

is installed• Bottom of Jacket is

sealed w/ epoxy coated backer rod

Temporary Bracing

Epoxy Seal

Page 18: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

Encapsulation Purpose Designed FRP Jackets

•Step 3• Temporary bracing

installed

Page 19: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

The Encapsulation Process

•Step 4•Each component of a two-component marine grade epoxy is mixed with sand

A B

Page 20: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

Epoxy Grout Infill Properly Placed

•Step 4• Plural component

grout plant• Part A & Part B

mixed with sand in each hopper

Page 21: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

The APE Process

•Step 5• Grout plant is

attached to injection port in fiberglass jacket

• Dual-umbilical hose w/ static mixer at injection site

A B

Page 22: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

Epoxy Grout Infill Properly Placed

•Step 5• Downstream mixer

Page 23: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

Epoxy Grout Infill Properly Placed

•Step 5• Fluid sand-filled epoxy

grout is dispensed out of the mixer

Page 24: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

The Encapsulation Process

•Step 6• Epoxy grout is

pumped into annulus

• Water in the annulus is displaced and expunged out of the top of the jacket

A B

Page 25: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

Epoxy Grout Infill Properly Placed

•Step 6•Grout is pumped into the annulus•Water is displaced above grout•Grout progress is monitored

Page 26: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

Epoxy Grout Infill Properly Placed

•Step 6•Water is expunged out of the top of the jacket

Page 27: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

The Encapsulation Process

•Step 7•Top of jacket is sealed with epoxy•Bracing is removed

Seal top of jacket

Page 28: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

The Encapsulation Process

•Encapsulation is complete!

Page 29: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

Complete Encapsulation

•FRP Jacket •Epoxy Grout Infill•Complete Coverage of Grout•Well Bonded to the Pile

Page 30: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

Complete Encapsulation

•Epoxy Grout is pumped under pressure•Grout penetrates into cracks and voids in the substrate

Page 31: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

Lake Pontchartrain Causeway, New Orleans, Louisiana

Page 32: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

Lake Pontchartrain Causeway, New Orleans, Louisiana

•Pile Encapsulation• Started in 1988 – still ongoing• 26 mile long bridge• 54” diameter concrete cylinder

piles

Page 33: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

Lake Pontchartrain Causeway, New Orleans, Louisiana

•Pile Encapsulation• Encapsulations soon after

completion in 1989

Page 34: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

Lake Pontchartrain Causeway, New Orleans, Louisiana

Pile Encapsulation• Encapsulations in 2002

Page 35: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

Lake Pontchartrain Causeway, New Orleans, Louisiana

• Core sample

Page 36: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

Lake Pontchartrain Causeway, New Orleans, Louisiana

•Bond testing 13-year old encapsulations

Page 37: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

Rappahannock River Bridge, Tappahannock, Virginia

Page 38: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

Rappahannock River Bridge, Tappahannock, Virginia

•1993•RC Piers Showing Corrosion and Spalling•Encapsulations all Above Water

Page 39: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

Rappahannock River Bridge, Tappahannock, Virginia

•1993•RC Piers Showing Corrosion and Spalling•Encapsulations all Above Water

Page 40: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

Rappahannock River Bridge, Tappahannock, Virginia

•Jackets placed over spalled areas•No patching was done

Page 41: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

Rappahannock River Bridge, Tappahannock, Virginia

•Completed Encapsulation

Page 42: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

BG&E Facility, Baltimore, Maryland

•Badly deteriorated H-Piles

Page 43: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

BG&E Facility, Baltimore, Maryland

•Encapsulate 44 “H” Piles•Completed in 1993

Page 44: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

BG&E Facility, Baltimore, Maryland

•Corroded steel section replaced with new structural steel•Steel channels bolted and spliced onto existing piles

Page 45: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

BG&E Facility, Baltimore, Maryland

•Jackets sized to H-Pile Profile

Page 46: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

BG&E Facility, Baltimore, Maryland

•Encapsulations in place

Page 47: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

Warren Road Bridge, Baltimore, Maryland

Page 48: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

Warren Road Bridge, Baltimore, Maryland

Deteriorated piers Large concrete pier

Page 49: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

Warren Road Bridge, Baltimore, Maryland

Pier Encapsulation: Large concrete pier

Jacket Fabrication

Page 50: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

Warren Road Bridge, Baltimore, Maryland

Pier Encapsulation: Large concrete pier

Page 51: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

Des Joachims Hydroelectric DamDeep River, Ontario, Canada

•Tailrace Structure• Sits on the Ottawa River between

Ontario and Quebec• 200-km Upstream from Ottawa,

ON• 8 power generation units

Page 52: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

Challenges

•Tailrace Structure• Structure built in 1940’s• Damage to tailrace from scour

and abrasion

Page 53: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

Challenges

•Damage to Piers• Loss of section• 12” to 18” of section loss in

some instances• Reinforcing steel exposed

Page 54: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

Challenges

•Repair Procedure• Restore loss of section• Protect against future abrasion

damage• Protect the downstream

ecosystem• Minimize dam shutdown time to

less than 10-days

Page 55: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

Concept

Epoxy Grout Pumped In

Contaminated Water Vacuumed Out

Fiberglass Jacket

Encapsulation Complete

Page 56: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

Implementation

•FRP Panels • Face of peirs encapsulated using

FRP panels• Thicker than usual panels (1/4”)

were used due to severity of scour and abrasion

• Panels hoisted into place

Page 57: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

Implementation

•Panels Installed• Panels are anchored into the

face of the wall at appx 12”o.c. EW

• Stiffeners are placed to resist grouting pressure

Page 58: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

Implementation

•Grouting Operation• Grout pumped into annular space• Expunged water and excess grout

reclaimed by vacuum pumps installed on upper ports

• Contaminated water disposed of separately to minimize environmental impact

Page 59: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

Des Joachims Hydroelectic DamDeep River, Ontario, Canada

•Encapsulation in Place• Completed without dewatering• Only 7-days of shutdown time for

the generators

Page 60: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

Testing

•Core Samples• Excellent bond to backwall• Good grout consolidation• No cracking in grout from

exotherm

Page 61: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

Conclusion

•Before…

Page 62: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

Conclusion

•…and After

Page 63: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

Des Joachims Hydroelectric DamDeep River, Ontario, Canada

•…and In Service

Page 64: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

Gandy BridgeTampa Bay, FL USA

Page 65: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

Gandy BridgeTampa Bay, FL USA

Page 66: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

Gandy BridgeTampa Bay, FL USA

2010 • Condition Survey• First Encapsulated in 1987

Page 67: Advanced Pile Encapsulation...Hazem Jadallah. LPG Trestle, Ju’Aymah, Saudi Arabia •Trestle constructed in 1980 •Precast concrete cylinder piles. LPG Trestle, Ju’Aymah, Saudi

LPG Trestle, Ju’Aymah, Saudi Arabia

32 years later…

The repair and protection via Advanced Pile Encapsulation remains in place and continues to provided protection without any maintenance