A Technical and Economic Assessment of Co2 Capture Technology for Igcc Power Plants MUST READ
Advanced IGCC with Partial Carbon Capture · CO2 Removal CO2 Raw Syngas Nitrogen Shifted Syngas...
Transcript of Advanced IGCC with Partial Carbon Capture · CO2 Removal CO2 Raw Syngas Nitrogen Shifted Syngas...
Advanced IGCC with Partial Carbon Capture Presented at:
GTC Conference
October 2013
Jacobs1500 Hughes Way, Pod B Suite 400Long Beach, CA 90810www.jacobs.com
Slide 2
Introduction to Jacobs
• Safety is key to everything we do• A global leader in technical professional services• 65,000 professional staff at 200+ locations in 25
countries• $11 billion in revenue• $16 billion in backlog• Publicly traded on NY stock exchange• Sound financial base• Business model is long term client alliances
Slide 3
Who Is the CCPC?
The CCPC is an association of Canadian and U.S. coal and coal-fired electricity producers, government agencies and research organizations
Industry participants include: Alberta Innovates – Energy and Environment Solutions Capital Power Corporation Electric Power Research Institute (EPRI) Nova Scotia Power Inc. Sherritt International Corporation SaskPower TransAlta Corporation
The CCPC's mandate is to research technologies with the goal of developing and advancing commercially viable solutions that lower coal power plant emissions
Slide 4
Introduction
Canadian and US Government have new regulations limiting the emissions from new Fossil Fuel power plants to below 500 kg CO2/MWh.
This equates to about 60% carbon capture. Most published work on carbon capture has focused on
capturing over 90% of the carbon emitted with a limited number of processes and configurations.
Limiting the level of carbon captured enables alternative technologies and process configurations to be used.
Significant increase in overall plant efficiency and reduced capital cost.
Slide 5
Base Case – Unit Operations
Gasification
ASU
Sour Shift & Gas Cooling
SulphurRemoval
CombinedCycle
Oxygen
Coal
Sulphur
Electricity
CO2 Removal
CO2
Raw Syngas
Nitrogen
Shifted Syngas
ConditionedFuel Gas
Slide 6
Base Cases
Unit Operation
Technology
Air Separation • Cryogenic • Cryogenic
Gasifier • AR (Aerojet Rocketdyneformerly PWR)
• SES U-Gas
Shift • Sour• Full
• Sour• Full
Sulphur Removal
• Selective Selexol • Selective Selexol
CO2 Removal • Selective Selexol • Selective Selexol
Sulphur Recovery
• Claus • Claus
Gas Turbine • 2 x GE 7 F • 2 x GE 7 F
Slide 7
Technologies Identified for EvaluationUnit Operation
Technology
Air Separation • Cryogenic • Air Products ITM
Gasifier • AR • SES U-Gas
Shift • Sweet• Full
• Sour• Partial
Sulphur Removal
• RTI WGCU • Selective Solvent
CO2 Removal • CO2 Selective Membrane• High Recovery PSA• Selective Solvent
• Non-selective solvent• H2 selective membrane• Cryogenics
Sulphur Recovery
• Claus• Wet Sulphuric Acid
• RTI Direct Sulphur Recovery Process (DSRP)
• LoCat
Slide 8
Option Matrix
AR
Partial
RTI Warm Gas
ClausSelective SelexolSour Shift
SES
Full
Modified Claus
Sweet Shift
Sour High Recovery
PSA
H2 membrane
CO2 membrane
RTI DSRP
Partial
Full
Sweet High Recovery
PSA
Sour H2 membrane
Sour CO2 membrane
Wet Sulphuric Acid
ITM
Cryogenic
Low Pressure
LoCat
High Pressure
LoCat
High Pressure
LoCat
H2 membrane
CO2 membrane
Sweet High Recovery
PSA
Non-Selective Solvent
Cryogenic Separation
Cryogenic Separation
Sulphur Recovery
CO2 Removal
Sulphur RemovalShift ExtentShiftGasifierASU
Non-Selective Solvent
Non-Selective Solvent
Slide 9
Selected Configurations (1) Case 1 2 3
ASU Cryogenic Cryogenic Cryogenic
Feed Preparation Dry Milling Dry Milling Dry Milling
Gasification AR AR AR
Shift & Gas Cooling Double Sour Shift Double Sour Shift Double Sour Shift
Sulphur Removal LoCat LoCat LoCat
CO2 Removal Partial Condensation with by-pass
High Recovery PSA with by-pass
CO2 Membrane with by-pass
CO2 Compression & Drying
Pumped Liquid CO2, Included with CO2Removal
CO2 Compressor CO2 is compressed, Liquefied, then Pumped
Sulphur Recovery Unit
LoCat LoCat LoCat
Power Block 2 x 1 7F Syngas no airside integration
2 x 1 7F Syngas no airside integration
2 x 1 7F Syngas no airside integration
Slide 10
Selected Configurations (2)
Case 4 5-2 5-4
ASU Cryogenic ITM ITM
Feed Preparation Dry Crushing Dry Milling Dry Crushing
Gasification SES U-Gas AR SES U-Gas
Shift & Gas Cooling Double Sour Shift, partial by-pass
Double Sour Shift Double Sour Shift, partial by-pass
Sulphur Removal LoCat LoCat LoCat
CO2 Removal Non-selective solvent High Recovery PSA with by-pass
Non-selective solvent
CO2 Compression & Drying
CO2 Compressor CO2 Compressor CO2 Compressor
Sulphur Recovery Unit
LoCat LoCat LoCat
Power Block 2 x 1 7F Syngas no airside integration
2 x 1 7F Syngas airside integration
2 x 1 7F Syngas airside integration
Slide 11
Overall Summary of AR CasesBase Case Case 1 Case 2 Case 3 Case 5-2
Gasifier Technology AR AR AR AR ARAir Separation Cryo Cryo Cryo Cryo ITMSulphur Capture Selexol LoCat LoCat LoCat LoCat
CO2 Capture SelexolPartial
Condensation PSA Membrane PSA
Coal Feed (AR) t/d 6,881 7,011 7,053 6,994 7,948CO2 Produced t/d 12,509 12,740 12,817 12,711 14,443CO2 Captured t/d 11,626 7,544 7,280 7,752 7,844CO2 Released t/d 883 5,196 5,537 4,959 6,599
CO2 Intensity kg/MWh 80.0 418.0 417.9 418.9 416.3
Gross Power Produced MW 656.4 681.1 693.7 678.8 653.1Total Power Consumed MW 230.9 163.2 171.3 186.8 24.7Net Power Output MW 425.5 517.9 522.4 492.0 628.4
Heat Rate LHV kJ/kWh 12,159 10,178 10,152 10,688 9,510Efficiency LHV % 29.61 35.37 35.42 33.68 37.86
Capital Cost (USCG) MM USD 2,303 2,107 2,126 2,108 2,616Specific Cost $/kW 5,461 4,068 4,070 4,283 4,163
Slide 12
Overall Summary of SES CasesBase Case Case 4 Case 5-4
Gasifier Technology SES SES SESAir Separation Cryo Cryo ITMSulphur Capture Selexol LoCat LoCatCO2 Capture Selexol Selexol CO2 Selexol CO2
Coal Feed (AR) t/d 6,401 6270.4 7,591CO2 Produced 11,067 10,838 13,122CO2 Captured t/d 8,711 5,796 6,766CO2 Released t/d 2,356 5,042 6,356
CO2 Intensity kg/MWh 212.0 417.2 416.7
Gross Power Produced MW 604.7 639.1 584.5
Total Power Consumed MW 163.0 156.2 -27.1Net Power Output MW 441.8 482.9 611.6
Heat Rate LHV kJ/kWh 10,894 9,763 9,334Efficiency LHV % 33.05 36.88 38.57
Capital Cost (USCG) MM USD 2,129 1,892 2,238Specific Cost $/kW 4,838 3,917 3,660
Slide 13
Cost of Electricity – First Year
0
25
50
75
100
125
150
175
Cost of E
lectric
ity ($
/MWh)
Transmission
O & M
Fuel Costs
Capex
Slide 14
Cost of CO2 Capture – First Year
0
20
40
60
80
100
120
140
160
180
200
Cost of C
O2 Ca
ptured
($/M
T
O & M
Fuel Costs
Capex
Slide 15
Avoided Cost of CO2 – First Year
0
50
100
150
200
250
300
Avoide
d Co
st of C
O2 ($/M
T)
O & M
Fuel Costs
Capex