CORPORATE BUSINESS PLAN 2013/2014 - 2016/2017 ADOPTED BY COUNCIL 1 JUNE 2013 Shire of Mount Magnet Corporate Business Plan 1 of 43

Transcript of ADOPTED BY COUNCIL 1 JUNE 2013 - Shire of Mount Magnet · • Co-ordinate and expand community...

Page 1: ADOPTED BY COUNCIL 1 JUNE 2013 - Shire of Mount Magnet · • Co-ordinate and expand community activities with an emphasis on youth. ... viability of the pastoral industry. ... Prior

CORPORATE BUSINESS PLAN

2013/2014 - 2016/2017

ADOPTED BY COUNCIL 1 JUNE 2013

Shire of Mount Magnet Corporate Business Plan 1 of 43

Page 2: ADOPTED BY COUNCIL 1 JUNE 2013 - Shire of Mount Magnet · • Co-ordinate and expand community activities with an emphasis on youth. ... viability of the pastoral industry. ... Prior

TABLE OF CONTENTS

SUMMARY ............................................................................................................................ 3 INTRODUCTION ................................................................................................................... 5 COMMUNITY ENGAGEMENT .............................................................................................. 6 SHIRE OF MOUNT MAGNET WORKFORCE PLAN ............................................................. 7 SECTION 1 – COUNCIL FINANCES ................................................................................... 10 1. Financial Management ................................................................................................ 10 2. Investments ................................................................................................................ 10 3. Loans .......................................................................................................................... 10 4. Rates .......................................................................................................................... 10 5. Waste Management Charges ..................................................................................... 12 6. Revenue Summary ..................................................................................................... 12 7. Outstanding Rates Debtors ......................................................................................... 13 8. Fees and Charges ...................................................................................................... 13 9. Plant Charges ............................................................................................................. 13 10. Depreciation ............................................................................................................... 14 11. Reserves .................................................................................................................... 15 12. Valuation of Non Current Assets ................................................................................. 16 SECTION 2 - ADMINISTRATION SERVICES ...................................................................... 17 1. Human Resources ...................................................................................................... 17 2. Information Technology .............................................................................................. 17 3. Elected Members – Support........................................................................................ 18 4. Occupational Health & Safety ..................................................................................... 18 5. Shire Office and Council Chambers ............................................................................ 19 6. Committees ................................................................................................................ 19 SECTION 3 - MAJOR INFRASTRUCTURE ......................................................................... 20 1. Town Centre ............................................................................................................... 20 2. Senior Citizen's Centre ............................................................................................... 22 3. Federation & Foster Parks .......................................................................................... 22 4. Recreation Centre and Sports Ground ........................................................................ 22 5. Mount Magnet Memorial Swimming Pool .................................................................... 24 6. Anzac Hall and Outdoor Cinema ................................................................................. 25 7. Rural Transaction Centre/Library ................................................................................ 26 8. Old Hospital ................................................................................................................ 27 9. Pensioner Units .......................................................................................................... 27 10. Staff Housing .............................................................................................................. 28 11. Urban Roads .............................................................................................................. 29 12. Unsealed Rural Roads ................................................................................................ 30 SECTION 4 - SERVICES ..................................................................................................... 32 1. Waste Collection and Landfill Operations.................................................................... 33 2. Library Services .......................................................................................................... 33 3. Community Development/Community Events/Youth ................................................... 34 4. Cemetery .................................................................................................................... 35 5. Visitor Centre and Museum......................................................................................... 35 6. Regulatory Services .................................................................................................... 36 7. Bluey Osmond Mount Magnet Aerodrome .................................................................. 38 8. Caravan Park .............................................................................................................. 40 9. Murchison Regional Vermin Council ........................................................................... 41 10. Plant ........................................................................................................................... 42

Shire of Mount Magnet Corporate Business Plan 2 of 43

Page 3: ADOPTED BY COUNCIL 1 JUNE 2013 - Shire of Mount Magnet · • Co-ordinate and expand community activities with an emphasis on youth. ... viability of the pastoral industry. ... Prior

SUMMARY

Cr Ashley Dowden

Cr Greg Scott

Cr Kevin Brand

Cr Wendy McGorman

Cr Jorgen Jensen

Cr Jason Homewood

Cr Bob Ford

It is a pleasure to present Council’s second Corporate Business Plan which incorporates a four year operating and capital works budget. This document should be read in conjunction with Council’s ten year Strategic Community Plan which was adopted at the Ordinary Meeting on 12 April 2013 and is available on the Shire website. Council is very appreciative of the input from the community into the development of the Plan. The Corporate Business Plan sets out the strategic direction for the Shire and provides a management tool for its achievement. The Corporate Business Plan also sets out Council’s goals and objectives and includes both operating and capital funding projections. The Plan is a living document that will be monitored and updated as required. The 2013/2014 Financial Year is intended to be a period during which plans commenced in the previous year are finalised and implemented. A major focus will be the maintenance and upgrade of Council’s road network and sustainable management of community buildings and other assets. The 2013/2014 Budget makes provision for a capital works program of some $2,700,000, much of which will be funded by grants, as well as the transfer to reserves of $300,000. The budget assumes an overall rate revenue CPI increase of 3.0% and in general fees and charges have been increased by this amount also. New rating categories of Commercial and Industrial will be implemented in the coming year with rate increases of 6% intended to make our rating system more equitable. Domestic waste collection charges are to increase from the current $220 pa to $245 pa to complete the two year phase in process implemented to fully cover the cost of collection. Key initiatives included in the Corporate Business Plan in 2013/2014: • Finalisation and implementation of the Master Plan for the

Mainstreet and Central Business area. This plan will address Issues such as entrance signage, street furniture, traffic movement and shop fronts.

• Finalisation and implementation of the Master Plan for the Recreation Centre Precinct including the provision of a youth space. Council has allocation $397,885 in individual Country Local Government Funding to this project. A key component of this project will be the replacement of the existing skatepark, a priority for our young people.

• Upgrade of the Mount Magnet Memorial Pool by replacing the stained and unsightly tiles on the north and south ends. The upgrade will also include the installation of shade sails.

• Finalize the Conservation Plan for the Old Hospital and in conjunction with the community determine the future of this building.

Shire of Mount Magnet Corporate Business Plan 3 of 43

Page 4: ADOPTED BY COUNCIL 1 JUNE 2013 - Shire of Mount Magnet · • Co-ordinate and expand community activities with an emphasis on youth. ... viability of the pastoral industry. ... Prior

SUMMARY • Allocate additional funding for the next four years to upgrade and maintain the Mount

Magnet Pensioner Units. Seek funding for the construction of an additional four units. • Upgrade works on the Cue Paynesville Road, unsealed road network and town

streets. This work will involve the forming up of unsealed roads and improvements to drainage in both the rural and urban areas.

• Co-ordinate and expand community activities with an emphasis on youth. • In conjunction with Landcorp provide additional light industrial lots in the Moses Street

industrial area. • Replace the amenities block at the Mount Magnet Caravan Park at a cost of

$650,000. Federal funding of $250,000 has been obtained for this project. • In conjunction with other Murchison Councils develop a regional approach to tourism

that will enhance the role of the Mount Magnet Visitors Centre and increase visitation to the Mining and Pastoral Museum.

• Commitment of Mount Magnet’s 2012/2013 Regional Group Country Local Government allocation of $397,885 to extend the No. 2 Vermin Fence as a first step in the construction of the Murchison Region Vermin Cell. Our Shire will continue to call on all Councils in the Murchison region and also the Mid West Development Commission, to commit funding and work together to construct the Murchison Region Vermin Cell as a means of reducing the impact of wild dogs and helping restore the viability of the pastoral industry.

The Shire of Mount Magnet is committed to monitoring progress on the implementation of this Corporate Business Plan through quarterly reviews and careful scrutiny of actual and budgeted expenditure. Questions and input relating to the Plan are welcome. The Plan is available at the Library, Shire Administration Building and Council's website www.mtmagnet.wa.gov.au

.

Ashley Dowden PRESIDENT

Shire of Mount Magnet Corporate Business Plan 4 of 43

Page 5: ADOPTED BY COUNCIL 1 JUNE 2013 - Shire of Mount Magnet · • Co-ordinate and expand community activities with an emphasis on youth. ... viability of the pastoral industry. ... Prior

INTRODUCTION In June 2012 Council adopted the Shire of Mount Magnet 2012/2013 to 2016/2017 Corporate Business Plan and Four Year Budget. The 2013/2014 to 2017/2018 Corporate Business Plan updates this earlier document. These plans have been prepared in accordance with the Integrated Planning and Reporting Guidelines developed by the Department of Local Government. As detailed in the Guidelines the Corporate Plan is intended to: • Drive the development of the Annual Budget. • Identify external trends and key issues that will impact on Council’s operations for the

ensuing financial year. • Identify actions relating to services, assets and projects with a linkage to short,

medium and long term community aspirations as set out in Council’s Strategic Community Plan and Forward Capital Works Plan.

• Identify performance measures by which the success of the Corporate Business Plan can be measured and improvements implemented.

At the Ordinary Meeting on 24 February 2012 Council approved the following framework for implementation of the Integrated Planning and Reporting Requirements: Prior to 30 June 2012 • Prepare a Corporate Business Plan and a four year capital works and operating

budget. • Arrange for a valuation of noncurrent assets as a first step in the preparation of an

Asset Management Plan. • As part of the process of developing the Corporate Business Plan and associated

four year budget arrange a program of community consultation. • Prior to 30 June 2013 • Develop a ten year Community Strategic Plan in conjunction with an ongoing program

of community consultation. • Prepare an Asset Management Plan and Long Term Financial Plan. • Update the Corporate Business Plan and four year capital works program and

operating budget.

Shire of Mount Magnet Corporate Business Plan 5 of 43

Page 6: ADOPTED BY COUNCIL 1 JUNE 2013 - Shire of Mount Magnet · • Co-ordinate and expand community activities with an emphasis on youth. ... viability of the pastoral industry. ... Prior

COMMUNITY ENGAGEMENT As indicated above the preparation of this Corporate Business Plan involved a program of community consultation with meetings arranged as follows: 21 May 2012 Mount Magnet Aboriginal Corporation at Bidi Bidi (Attendance 9) 21 May 2012 Mount Magnet DHS senior students and teachers (Attendance 12) 21 May 2012 Mount Magnet DHS Council parents and teachers (Attendance 10) 25 May 2012 Community Meeting (Attendance 14) 17 October 2012 Mount Magnet DHS classes 5, 6 and 7 (Attendance 28) 14 November 2012 Mount Magnet DHS parents, teachers and residents (Attendance 19) 13 December 2012 Annual Meeting of Electors (Attendance 13) 8 February 2013 Mount Magnet Aboriginal Corporation at Bidi Bidi (Attendance 4) 22 February 2013 Mount Magnet DHS students and teachers (Attendance 60) 23 February 2013 Display outside the Mount Magnet Post Office 8:30am to 12:00 noon

(Discussion with 60 residents) 23 February 2013 Community workshop and BBQ at the Recreation Centre (Attendance 12) 24 February 2013 Display at the Mount Magnet Memorial Swimming Pool

(Discussion with 20 mainly indigenous youth) Following consideration of the Draft 2013/2014 – 2017/2018 Corporate Business Plan at the Ordinary Meeting on 12 April 2013 the Plan will be advertised for public comment in the April edition of “Council Comments”.

Shire of Mount Magnet Corporate Business Plan 6 of 43

Page 7: ADOPTED BY COUNCIL 1 JUNE 2013 - Shire of Mount Magnet · • Co-ordinate and expand community activities with an emphasis on youth. ... viability of the pastoral industry. ... Prior

SHIRE OF MOUNT MAGNET WORKFORCE PLAN This Shire of Mount Magnet Workforce Plan form part of this Corporate Business Plan and has been prepared in accordance with Department of Local Government guidelines. Where Are We Now?- November 2011 Review of Organisational Structure In November 2011 a review of Council’s organisational structure was conducted. This process involved extensive consultation with staff and Elected Members and was commenced in conjunction with the development of Council’s first Corporate Business Plan and Strategic Community Plan. Key objectives to emerge from this review were: • To balance staff numbers with workload on a financially sustainable basis. • To develop an organisation chart that clearly defines the duties and responsibilities of

each position and links in with position duty statements. • To develop an organisation chart that clearly defines the grading of each position and

identifies career paths. • To put in place training opportunities for staff with a particular emphasis on

Occupational Health and Safety and formal recognition of skills held. • To address gaps in specialist areas such as finance and human resources. Strategic Community Plan and Corporate Business Plan – Organisational Structure The Corporate Business Plan and Community Strategic Plan have been formulated on the basis of financial and other resources that are considered to be realistically available on a sustainable basis. Every effort has been made to avoid presenting the community with impractical and unrealistic expectations. One of the features of most local government authorities is the need to prioritise as generally resources are insufficient to meet the expectations of all. The attached organisational structure has been developed in accordance with priorities identified in both the Corporate Business Plan and Strategic Community Plan and is fully funded in the four year budget. Principle functions provided for in the organisational structure include: • Works – roads, parks and gardens, cemetery and waste management. • Caravan Park • Airport • Swimming Pool • Tourism Promotion and Development • Youth and Community • Environment and Building • Regulatory – dogs/cats, fire breaks and litter • Grant Writing and Administration • Financial Management • Administration and Customer Service As indicated in the organisational chart The Shire of Mount Magnet has a full time equivalent staff of 21. Shire indoor staff are employed under conditions laid down the Local Government Interim Award (WA) and the grading of positions determined in accordance with this award. Shire outdoor staff are employed under the Municipal Employees Interim Award with grading of positions being determined in accordance with this award.

Shire of Mount Magnet Corporate Business Plan 7 of 43

Page 8: ADOPTED BY COUNCIL 1 JUNE 2013 - Shire of Mount Magnet · • Co-ordinate and expand community activities with an emphasis on youth. ... viability of the pastoral industry. ... Prior

The organisational review referred to above confirmed and identified a number of gaps in service delivery resulting from difficulties in recruitment of staff and workloads that do not justify a full time appointment. As indicated in the attached organisational chart these gaps have been filled by contractors/consultants as follows: • Regulatory – part time Ranger. The Ranger attends Mount Magnet three times per

month and in the event of an emergency such as a dog attack generally responds within two to three hours.

• Environment and Building – part time Environment and Health Officer/Building Surveyor. The Environment and Health Officer/Building Survey visits Mount Magnet for one week in every month.

• Finance – Consultant Mid West Financial. Provision of professional accountancy services including preparation of budgets and financial reports on an as required basis.

• Grant Writing and Administration – Consultant Grants Empire. Grant writing and administration on an as required basis.

Strategies To Meet Future Workforce Requirements Over the last twelve months in discussion with staff and Elected Members and at various community meetings the following components have been identified to meet future work force requirements: • Provide training opportunities for staff that result in the attainment of formal or

accredited qualifications • Recruit staff where possible from within the Mount Magnet community • Provide flexible working arrangements that support family life • Provide well maintained affordable housing • Establish regular communication processes and encourage staff feedback • Provide safe working conditions with up to date well maintained equipment and

systems. • Review existing award arrangements with a view to entering into an Enterprise

Bargaining Agreement. Monitoring and Evaluation of Outcomes Workforce planning is ongoing and outcomes will be monitored annually as part of the development and review of the Corporate Business Plan. During the 2012/2013 financial year progress in the following areas has been made: • In February 2012 the Durack Institute of Technology were engaged to assist outdoor

staff attain Certificate II qualifications in Civil Construction and Horticulture. By December 2012 all staff had achieved this qualification following a program of on the job training arranged by the Durack Institute including formal assessment of skills held. Council’s outdoor staff are experienced and capable and a formal qualification such as this gives recognition to their abilities and raises awareness in the importance of working safely.

• Funding has been obtained from the Country Local Government Fund to construct new duplex housing consisting of two self contained two bedroom, two bathroom units for council staff and a doctor.

• On a monthly basis the CEO meets with all staff to advise of outcomes from the previous Ordinary Meeting of Council and give an opportunity for staff to raise any issues.

Shire of Mount Magnet Corporate Business Plan 8 of 43

Page 9: ADOPTED BY COUNCIL 1 JUNE 2013 - Shire of Mount Magnet · • Co-ordinate and expand community activities with an emphasis on youth. ... viability of the pastoral industry. ... Prior

COUNCIL

CEO Contract

Geoff Brooks

WORKS MANAGER Contract

Jon Jones

• Maintenance of Roads and all Council

owned properties • Airport Manager

FINANCE MANAGER LGO Level 9 + 12%

Maureen Murat

• Accounts Payable • Accounts Receivable • Payroll • Rates • Budget • Reporting • Information Technology • Insurance • MRVC Financials

YOUTH & COMMUNITY EVENTS OFFICER LGO Level 4 + 12%

John McKrill (Casual)

Kylee Mollentze (Casual) Meleisha Exon (Casual)

• Youth Engagement • Community Events • Community Liaison

TOURISM PROMOTIONS & DEVELOPMENT OFFICER

LGO Level 4 + 12%

Karen Morrissey

• Tourist Information Centre • Tourist Promotion & Marketing • Website

ADMINISTRATION MANAGER LGO Level 8-9 + 12%

Vacant

• Administration • Elected Member Support • Council Meetings • Records • Website • Housing • Cemetery Registry • HR Recruitment & Training • MRVC Administration

EHO/BUILDING SURVEYOR Contract

Bill Atyeo

• Town Planning • Building • Health

WORKS SUPERVISOR MEIA O/Award Negotiated

Vacant

FINANCE ASSISTANT LGO Level 3-5 + 12%

Helga Goerigk

• Synergy Data Processing • Finance Filing

ADMINISTRATION ASSISTANT LGO Level 3-5 + 12%

Ronella Kelly

• Advertisements • Central Records Maintenance • Compile Council Comments • Council Meetings • Purchase Orders • Register of Resolutions • Website • Reception; and • General Office Duties

CUSTOMER SERVICE OFFICER LGO Level 2-3 + 12%

Amber Seivwright

• Customer Service • Reception • Mail • Banking

CLEANERS MEIA Level 2 + $5.00

Sophie Singh Kathy Brand

CARAVAN PARK MANAGER Contract

Bill Moses & Kate Hutchison

SWIMMING POOL MANAGER Contract

JJ Amella

WORKS CREW MEIA Level 5 + $5.00

Plant Operator Noel Curley Neville Kelly

MEIA Level 4A + $5.00

Labourer/Gardener Clayton Gilbert Robyn Norman

Adrian Moses (Casual)

RANGER Contract

Peter Smith

LIBRARY OFFICER LGO Level 3-4 + 12%

Bruce Green (Casual)

• Library Operations

LGO ...........Local Government Officers (Western Australia) Interim Award 2011 MEIA ..........Municipal Employee (Western Australia) Interim Award 2011 Contract ....Negotiated with Employee, other award. Or contractor.

May 2013

GRANT WRITING & ADMINISTRATION SERVICES

Contract

Empress Administration

• Research Grants • Grant Submissions • Grant Administration Services

LEADING HAND MEIA O/Award Negotiated

Peter Lethborg

Shire of Mount Magnet Corporate Business Plan 9 of 43

Page 10: ADOPTED BY COUNCIL 1 JUNE 2013 - Shire of Mount Magnet · • Co-ordinate and expand community activities with an emphasis on youth. ... viability of the pastoral industry. ... Prior

SECTION 1 – COUNCIL FINANCES

1. Financial Management Council’s financial management is governed by the Local Government Act 1995, the Local Government Act Financial Regulations 1996 and other relevant Regulations. Council’s auditors are Chartered Accountants Anderson, Munro and Wylie. Accounting firm Midwest Financial provides Council with specialist financial advice and prepares monthly financial statements for the consideration of Elected Members at each Ordinary Meeting. Midwest Financial also prepares Council’s Annual Budget and Forward Capital Works Program. Council banks with the Commonwealth Bank of Australia. This Corporate Business Plan should be read in conjunction with the Four Year Budget and Forward Capital Works Program and the 2013/2014 Statutory Budget . Council’s 2013/2014 Fees and Charges are included as part of the Statutory Budget. The 2013/2014 Annual Budget provides for a Comprehensive Operating Income as at 30 June 2013 of ($381,634) which after adding back deprecation of $1,145,065 equates to a surplus of $763,431. Of the surplus, before depreciation, approximately $300,000 will be allocated to Council’s Reserve account.

2. Investments Council invests money not required to meet immediate operational needs. Legislation restricts whom Council can invest with to minimise risk to ratepayer funds. Currently Council’s Reserves and surplus funds are invested with the Commonwealth Bank in interest bearing deposits. Returns on investments are expected to remain low over the next twelve months pending action by the Reserve bank to raise interest rates as the economy starts to pick up following the global economic crisis. Council’s estimated interest revenue in 2013/14 is $133,102. Much of this interest is applied to specific projects under various Government grant agreements.

3. Loans Council had two outstanding loans at 1 July 2013 as follows: • Loan 38 Staff Housing $83,687 • Loan 39 Museum Construction $240,436 There are no additional borrowings planned for 2013/2014.

4. Rates Council charges rates using the Differential Rating System. Council calculates rates by using a combination of Gross Rental Values (GRV) and Unimproved Capital Values (UV). These values are updated every five years by the Valuer General with the most recent revaluation taking effect from 1 July 2010.

Shire of Mount Magnet Corporate Business Plan 10 of 43

Page 11: ADOPTED BY COUNCIL 1 JUNE 2013 - Shire of Mount Magnet · • Co-ordinate and expand community activities with an emphasis on youth. ... viability of the pastoral industry. ... Prior

A 4% increase in the overall current rate revenue applied in 2012/13 and Council has budgeted for a 3% increase in 2013/2014. Rate increases are based on the estimated Perth CPI as at 1 July plus an additional locality allowance of 1%. In 2013/2014 it is proposed to introduce two new rating categories aligned with the commercial and industrial zones in the new Mount Magnet Local Planning Scheme No 2. Prior to 1 July 2013 commercial and industrial properties were rated the same a residential properties which for many years has been considered an inequitable arrangement. In 2013/2014 it is proposed to raise rates payable for commercial and industrial properties by 6%. Rates for 2013/2014 are as follows:

FREEHOLD

ZONE GRV* $

Cents In $

Estimated Income

2013/2014 $

% of Total GRV

% of Total Income

Budget Income

2012/2013 $

Urban 1,655,006 9.0788 162,718 59.4 55.9 235,336 Commercial 600,718 9.3433 56,802 21.6 19.5 0 Light Industrial 253,907 9.3433 24,726 9.1 8.5 0 Boogardie and Lennonville

120 9.0788 744 0.0 0.3 720

Single Persons Quarters

275,080 16.5833 46,312 9.9 15.8 44,964

TOTAL 2,784,831 291,302 100.0 100.0 281,020 *Minimum Rates apply in some cases.

LEASEHOLD

ZONE UV* $

Cents In $

Estimated Income

2013/2014 $

% of Total UV

% of Total Income

Budget Income

2012/2013 $

Mining 1,871,052 28.0830 532,571 65.5 76.4 505,373 Pastoral 606,922 6.0105 36,824 21.2 5.3 36,917 Exploration 214,375 28.0830 65,718 7.5 9.4 80,358 Prospecting 163,580 28.0830 61,908 5.8 8.9 77,284 Gold Mining Lease

266 28.0830 420 0.0 0.0 408

TOTAL 2,856,195 697,441 100.0 100.0 700,340 *Minimum Rates apply in some cases. It is Council’s intention to increase rates annually by the estimated Perth Consumer Price Index as at 30 June plus an additional 1% to account for higher costs experienced in regional areas. The estimated rate revenue for 2013/2014 is $988,743. Estimated rate revenue for 2012/2013 was $981,360. The actual increase from 2012/2013 to 2013/2014 is 0.8% despite the rate in the dollar and the minimums being increased by 3%. The reason for this is a reduction in the number of assessments from 718 in 2012/2013 to 674 in 2013/2014 caused in the main by removing expired exploration and prosecuting leases from the rates data base.

Shire of Mount Magnet Corporate Business Plan 11 of 43

Page 12: ADOPTED BY COUNCIL 1 JUNE 2013 - Shire of Mount Magnet · • Co-ordinate and expand community activities with an emphasis on youth. ... viability of the pastoral industry. ... Prior

5. Waste Management Charges Council provides a waste collection service within the township of Mount Magnet. The following charges apply: SERVICE 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 Domestic $195 $195 $220 $245 Commercial $429 $429 $440 $490 Blackcat Camp $1,870 $1,870 $1,995 $2,075 Hotels $1,606 $1,606 $1,671 $1,738

The domestic charge is based on collection of one 240 litre bin per week with the commercial charge being based on the collection of two 240 litre bins per week. Domestic charges have been increased in two stages to ensure the full recovery of collection costs. The Black Cat Camp is charged at a rate of $5.25 per accommodation unit. CPI increases as previously mentioned have been applied. Charges for dumping bulk materials such as concrete and asbestos also apply at the Waste Management Landfill.

6. Revenue Summary Council’s major recurrent revenue sources (budget estimates only) are: The reduction indicated in the Federal Assistance Grant road component in 2011/2012 resulted from the handover of the Sandstone Road to Main Roads WA.

REVENUE SOURCE 2010/11 $

2011/12 $

2012/13 $

2013/14 $

2014/15 $

2015/16 $

Rates & Charges 963,446 942,841 981,406 1,010,848 1,041,174 1,072,409 Waste Charges 80,244 76,971 90,000 92,700 95,481 98,345 Grants Commission General Purpose Grant

1,163,575 1,531,761 1,114,130 1,147,545 1,181,971 1,217,430

Grants Commission – Local Road Grant

429,860 345,695 298,947 298,947 298,947 298,947

Roads to Recovery Funding

451,084 116,605 232,672 359,709 370,500 381,615

MRWA Regional Roads Direct and Other Grants

253,123 56,255 120,000 152,500 152,500 152,500

Caravan Park 173,736 244,883 225,000 222,485 229,160 236,036 Airport Usage Fees 76,549 265,105 200,000 222,485 229,160 236,036 Visitor Centre 6,322 9,980 15,000 15,450 15,914 16,391 Interest Revenue 115,512 134,987 158,565 122,122 125,786 129,559 TOTAL 3,713,451 3,082,212 3,392,717 3,644,791 3,740,593 3,839,268

Shire of Mount Magnet Corporate Business Plan 12 of 43

Page 13: ADOPTED BY COUNCIL 1 JUNE 2013 - Shire of Mount Magnet · • Co-ordinate and expand community activities with an emphasis on youth. ... viability of the pastoral industry. ... Prior

7. Outstanding Rates Debtors The current level of outstanding rates at the commencement of the financial year is listed below: The recent increase in outstanding rate debtors has been a great concern to Council. An outstanding debt ratio of nearly 43% is clearly unacceptable. As approved in December 2011, Council will instigate legal action where appropriate to recover unpaid rates. In instances where legal action is instigated under the Local Government Act most costs are recoverable from the rate payer. At the end of the 2012/2013 Financial Year Council expects to write off some $120,000 in rates that are believed to be irrecoverable. Most of these write off are expected to be from mining tenements that have been inactive for many years thus making the task of holding the past lessee to account impractical.

8. Fees and Charges Fees and Charges for 2013/2014, which have been increased by 3%, are included at the end of the Statutory Budget document. It is Council’s intention to increase Fees and Charges annually by the Perth Consumer Price Index plus 1%.

9. Plant Charges Currently Council’s plant costing system does not make provision for the replacement of any major items of plant. It is for this reason that the Plant Reserve is significantly underfunded. Over the coming twelve months a system will be put in place whereby a component of the plant charge is transferred to the plant reserve thereby ensuring, over time, that sufficient funds are available to meet the requirements of council’s plant replacement program.

OUTSTANDING RATES DEBTORS

2009/10 $

2010/11 $

2011/12 $

2012/13 $

2013/14 $

2014/15 $

2015/16 $

Rates & Charges 312,395 468,902 434,318 434,319 400,000 280,000 150,000

Shire of Mount Magnet Corporate Business Plan 13 of 43

Page 14: ADOPTED BY COUNCIL 1 JUNE 2013 - Shire of Mount Magnet · • Co-ordinate and expand community activities with an emphasis on youth. ... viability of the pastoral industry. ... Prior

10. Depreciation It is not a requirement under the Local Government Act and Accounting Regulations that depreciation is funded. Notwithstanding this, Council has established reserve accounts in an effort to at least partly ensure adequate resources are available in the future to replace and maintain infrastructure assets. Council has set as an objective that within the next four years 30% of the annual depreciation of buildings, plant and equipment and infrastructure such as the Airport and Caravan Park will be placed in reserve annually. Annual estimated depreciation, capital expenditure, transfers to and from reserves and reserve account balances are as follows: ESTIMATED DEPRECIATION EXPENSE

2010/11 $

2011/12 $

2012/13 $

2013/14 $

2014/15 $

2015/16 $

Land and Buildings 245,023 318,010 300,000 290,000 280,000 270,000 Plant and Equipment 265,512 246,709 225,000 215,000 205,000 195,000 Furniture and Equipment 57,381 54,541 50,000 50,000 50.000 50,000 Infrastructure Roads 583,355 264,519 300,000 325,000 350,000 375,000 Infrastructure Other 205,993 191,300 283,853 300,000 310,000 320,000 TOTAL 1,357,264 1,075,079 1,158,853 1,180,000 1,195,000 1,210,000

CAPITAL WORKS PROGRAM

2010/11 $

2011/12 $

2012/13 $

2013/14 $

2014/15 $

2015/16 $

Land and Buildings 1,361,578 506,359 1,151,141 1,815,000 1,902,000 867,000 Plant and Equipment 374,149 71,099 92,603 135,881 73,368 72,804 Furniture and Equipment 26,226 20,000 84,000 24,000 27,000 22,000 Infrastructure Roads 440,221 428,422 726,000 471,000 388,000 388,000 Infrastructure Other 207,103 154,487 142,215 319,000 360,000 150,000 TOTAL 2,409,277 1,109,268 2,195,959 2,764,881 2,750,368 1,499,804

Shire of Mount Magnet Corporate Business Plan 14 of 43

Page 15: ADOPTED BY COUNCIL 1 JUNE 2013 - Shire of Mount Magnet · • Co-ordinate and expand community activities with an emphasis on youth. ... viability of the pastoral industry. ... Prior

TRANSFER TO RESERVES

2010/11 $

2011/12 $

2012/13 $

2013/14 $

2014/15 $

2015/16 $

Leave 1,504 1,405 2,541 1,562 1,632 1,706 Airport 35,904 6,886 96,069 104,778 107,581 109,047 Plant 30,233 5,143 8,643 105,689 110,445 115,415 Building 113,555 22,300 33,575 121,772 127,252 132,978 Community Bus 1,838 1,716 2,884 1,899 1,984 2,074 Roads 1,671 1,561 2,712 1,730 1,808 1,890 Infrastructure 158,471 27,037 47,154 29,987 31,336 32,747 Museum/Pool (R4R) 8,294 903,376 176,000 Housing Construction 397,885 25,825 1,162 1,214 TOTAL 351,470 969,424 767,463 393,242 383,200 397,074

TRANSFER TO RESERVES

2010/11 $

2011/12 $

2012/13 $

2013/14 $

2014/15 $

2015/16 $

Leave 0 0 0 0 0 0 Airport 0 0 147,604 42,500 75,000 0 Plant 0 0 0 0 0 0 Building 0 372,000 0 0 0 0 Community Bus 0 0 0 0 0 0 Roads 0 0 0 0 0 0 Infrastructure 0 512,631 0 0 0 0 Museum/Pool (R4R) 668,909 37,705 1,007,456 0 0 0 Housing Construction 0 0 0 573,885 0 0 TOTAL 668,909 560,131 1,155,060 616,385 75,000

11. Reserves Council Reserves at 30 June 2013 are estimated to be $1,896,053. These Reserves are made up of: In recent times Council’s reserves have been used to create new assets. The forecast reserves as at 30 June 2014 do not provide adequately for the maintenance or replacement of the assets with which they are associated. As indicated above it is Council’s intention to fund at least 30% of annual depreciation and place these funds in appropriate reserve accounts. It is considered that for a Council such as Mount Magnet, reserves should at a minimum be maintained at $2-3 Million, excluding external project specific grant funding that may also be held in reserve.

RESERVES CLOSING BALANCE

2010/11 $

2011/12 $

2012/13 $

2013/14 $

2014/15 $

2015/16 $

Leave 30,703 32,168 34,709 36,271 37,903 39,609 Airport 150,534 157,715 106,179 168,457 201,038 310,085 Plant 112,419 117,782 126,425 232,114 342,559 457,974 Building 799,169 450,253 483,828 605,600 732,852 865,830 Community Bus 37,524 39,314 42,198 44,097 46,081 48,155 Roads 34,112 35,740 38,451 40,181 41,989 43,879 Infrastructure 591,031 619,224 666,378 696,365 727,701 760,448 Museum/Pool (R4R) 0 831,456 176,000 0 0 0 Housing Construction 0 0 573,885 25,825 26,987 28,201 TOTAL 1,755,492 2,283,652 1,896,053 1,848,910 2,157,110 2,554,181

Shire of Mount Magnet Corporate Business Plan 15 of 43

Page 16: ADOPTED BY COUNCIL 1 JUNE 2013 - Shire of Mount Magnet · • Co-ordinate and expand community activities with an emphasis on youth. ... viability of the pastoral industry. ... Prior

12. Valuation of Non Current Assets Council has adopted a five year cycle for the valuation of noncurrent assets. In March 2012 Prime Property Valuations based in Geraldton were engaged to value Council’s land, buildings and plant at a cost of $26,000 plus GST. The valuations carried out were for insurance purposes and to determine fair value for financial reporting purposes. These valuations were applied in the 2012/2013 financial year. In March 2012 Greenfield Technical Services were engaged to value the road network utilising the West Australian Local Government Association Roman II methodology. Due to problems with the Roman II software this work was not completed until February 2013. Of concern, the valuations so determined varied greatly from those calculated using the Roman I methodology in 2005. In particular a threefold increase in the annual depreciation of the road network was an outcome of the Roman II exercise. On the basis of discussion with Greenfield Technical Services and Council’s Asset Management Plan consultant Morrison Low the Roman II valuations will not be applied in 2013/2014. This deferment will enable comparisons with other Council’s and potential modifications to the Roman II software.

Shire of Mount Magnet Corporate Business Plan 16 of 43

Page 17: ADOPTED BY COUNCIL 1 JUNE 2013 - Shire of Mount Magnet · • Co-ordinate and expand community activities with an emphasis on youth. ... viability of the pastoral industry. ... Prior

SECTION 2 - ADMINISTRATION SERVICES

1. Human Resources The Shire of Mount Magnet has an establishment of 21 full time equivalent positions as indicated on the organisational structure in the previous section. All staff vacancies will be advertised in “Council Comments”, on town noticeboards and Council’s web site. Senior or specialist positions will be advertised in the Geraldton Guardian and/or the West Australian newspapers. Interview panels will consist of a minimum of 3 members made up, where practical, of the following people: • Administration Manager/Chief Executive Officer as the HR representative • Related department member (i.e. representatives from Works, Finance etc) • Independent community member New staff are provided with an induction manual and relevant information about the Council and its responsibilities. New staff are required to sign a Code of Conduct. Over the coming twelve months the Code of Conduct will be reviewed to strengthen requirements. Annual performance appraisals are undertaken to provide two way feedback and identify future training requirements. Shire of Mount Magnet staff are currently employed under the Local Government Officers (WA) Interim Award and the Municipal Employees (WA) Interim Award. Contracted positions include the Chief Executive Officer, Works Manger and Swimming Pool Manager. External contractors/consultants are engaged to provide Environmental Heath and Building Services, Regulatory Services, Grant Writing and Administration Services and Financial Services. Office staff are paid a 12% loading over and above the Interim Award rate. Outdoor staff are paid an additional $5.00 per hour over and above the Interim Award rate. Australian industrial legislation allows for the possibility of an Enterprise Agreement should Council and staff wish to negotiate and agree on one. For 2013/2014 the negotiation of an enterprise agreement is not anticipated. Over the coming year staff training will be a priority with an emphasis on Occupational and Health training for outdoor staff. The Durack Institute of Technology have been engaged to provide on the job training with a view to ensuring that all outdoor staff have an opportunity to achieve Certificate II or III qualifications. All outdoor staff employed prior to Christmas 2012 have attained Certificate II qualifications A provision of $1,500 per staff member per year is included in the four year budget for staff training.

2. Information Technology Council utilises Synergy, a specialist local government financial and document management software system. The system operates in house on a dedicated server that was upgraded in November 2012 at a cost of some $17,000. Microsoft applications such as Outlook and Word etc are hosted on a second server, known as the Domain server. This server was installed approximately four years ago and is functioning satisfactorily.

Shire of Mount Magnet Corporate Business Plan 17 of 43

Page 18: ADOPTED BY COUNCIL 1 JUNE 2013 - Shire of Mount Magnet · • Co-ordinate and expand community activities with an emphasis on youth. ... viability of the pastoral industry. ... Prior

Annual 0perating costs including licence fees and IT service provider charges are some $28,000 pa. The lease on Council’s photocopier has recently been paid out. Provision has been included in 2013/2014 for the purchase of a new photocopier at a cost of $10,000. Provision of $12,000 per year has been made for replacement of office computers. Provision of $2,000 in 2013/2014 has been made for the purchase of an electric binder. Council’s web site was updated in 2012 to include a content management system and new home page at a cost of $11,000. Provision of $5,000 has been included in the 2013/2014 Capital Budget to further improve the content and functionality of web site. Statutory information such as agendas and minutes is managed on the web site by Council’s administration assistant with tourist and community information being managed by the Tourism Promotions and Development Officer. Council’s IT/Office Equipment Capital Works Program is as follows:

3. Elected Members – Support Elected member support is available through the Chief Executive Officer. Support is provided in the way of provision of information and preparation of correspondence/reports. Council has an ongoing commitment to provide training and development opportunities for Elected Members. The 2013/2014 Budget provides an allocation of $20,600 for Local Government Week and for other conferences and training opportunities. Immediately following the local government elections in October 2013 training for Elected Member in roles and responsibilities and financial management will be arranged. From 1 July 2013 Elected Member fees and allowances will be determined by the Salaries and Allowances Tribunal in accordance with the newly proclaimed Local Government Amendment Act 2012 (Elected Member Fees and Allowances). It is expected that details of the Tribunals determination of fees and allowances will be available in May 2013.

4. Occupational Health & Safety Council is bound by Occupational Health & Safety Acts/Regulations. Council has a current Occupational Health & Safety Policy and holds regular staff meetings in all operational areas. All staff are encouraged to complete a Senior First Aid Certificate which is a requirement for attaining Certificate II qualifications currently being arranged by the Durak Institute of Technology.

DESCRIPTION 2012/13 $

2013/14 $

2014/15 $

2015/16 $

2016/17 $

Replace Synergy Server – Upgrade to Version 9

17,000 25,000

Replace photocopier 10,000 Install Overhead Projector in Council Chambers

19,000

Establish New Council Web Site 11,000 5,000 Replace Office Computers 2,000 12,000 12,000 12,000 12,000 TOTAL 49,000 27,000 12,000 12,000 37,000

Shire of Mount Magnet Corporate Business Plan 18 of 43

Page 19: ADOPTED BY COUNCIL 1 JUNE 2013 - Shire of Mount Magnet · • Co-ordinate and expand community activities with an emphasis on youth. ... viability of the pastoral industry. ... Prior

5. Shire Office and Council Chambers The Shire Office was built in 1898 and has been modified on a number of occasions since this time. The Shire Office is listed on the Heritage Council of Western Australia Register of Heritage Places and a conservation plan has recently been prepared for the facility. The Capital Works Program for the Shire Office and Council Chambers is as follows: A number of the items listed above are based on the Conservation Plan prepared in 2011. As indicated it is expected that grant funding may be available for some of the above work.

6. Committees Council has established an internal advisory committee, known as the Finance and Audit Committee, to assist in the formulation of financial and corporate/operational strategies. The committee monitors Council’s finances in accordance with Part 7, Division 1A of the Local Government Act. In February 2013 the Local Government Amendment Regulation (2013) was gazetted. This regulation expands the role of the Audit Committee to consider issues such as risk management, internal control and legislative compliance. The Finance and Audit Committee meets on an as required basis and membership consists of all Councillors. Elected Members also represent Council as delegates to the following: • Murchison Zone of the WA Local Government Association • Murchison Regional Vermin Council • Regional Road Group • Mount Magnet Mining and Pastoral Museum Committee • Development Assessment Panel

DESCRIPTION 2012/13 $

2013/14 $

2014/15 $

2015/16 $

2016/17 $

Prepare Condition Report With Costs 3,000 Repair external walls and roofing (Lotterywest grant lodged - $34,000)

84,000

Upgrade Storm Water Disposal 50,000 Replace Roof Sheeting 25,000 Repaint External Walls and Fascias 25,000 Recarpet Office and Council Chambers 35,000 Repaint Internal Offices and Council Chambers/Replace Blinds

25,000

Construct Cleaners Storage Room 25,000 Install Archive Storage Container 10,000 Establish Off Street Carpark 12,000 Replace External Fence 15,000 TOTAL 3,000 119,000 112,000 40,000 35,000

Shire of Mount Magnet Corporate Business Plan 19 of 43

Page 20: ADOPTED BY COUNCIL 1 JUNE 2013 - Shire of Mount Magnet · • Co-ordinate and expand community activities with an emphasis on youth. ... viability of the pastoral industry. ... Prior

SECTION 3 - MAJOR INFRASTRUCTURE One of the Shire of Mount Magnet’s principal responsibilities is the care and management of community infrastructure. Under this Plan it is intended to group infrastructure on a geographical basis namely: • Town Centre (Hepburn Street) • Senior Citizens Centre • Federation/Foster Park • Recreation Centre/Sports Ground/Adventure Playground • Swimming Pool • Anzac Hall/Outdoor Cinema • Rural Transaction Centre • Old Hospital • Pensioner Units • Staff Housing • Urban Roads • Rural Roads • Cemetery The overall goal for community infrastructure is to ensure that it is managed for the benefit of Mount Magnet residents in a sustainable way. This Corporate Business Plan endeavors to quantify the current position with regard to community infrastructure and then look ahead to what is required in the future and how best to meet this requirement.

1. Town Centre The town centre is the area of Hepburn Street between Welcome Street and Carroll Street. Hepburn Street is the Great Northern Highway and as such the road pavement and traffic control is the responsibility of Main Roads WA. Council is responsible for the cleaning of the footpaths and kerbing and for maintenance of the median strip garden beds. Council is also responsible for the town centre irrigation system and security cameras. Annual maintenance costs for the town centre are of the order of $70,000.

Shire of Mount Magnet Corporate Business Plan 20 of 43

Page 21: ADOPTED BY COUNCIL 1 JUNE 2013 - Shire of Mount Magnet · • Co-ordinate and expand community activities with an emphasis on youth. ... viability of the pastoral industry. ... Prior

Projects for the Town Centre include: Following the installation of indent parking and paving of footpaths in 1995 and then the reconstruction of the median strips in 2007 there has not been a requirement for capital expenditure in the town centre. In February 2013 Council engaged community planning consultant CCS Strategic to prepare a Mainstreet Master Plan for the Town Centre which is expected to be finalized by 30 June 2013. Preparation of the Mainstreet Master Plan commenced with a program of community consultation and workshops with issues being addressed to include: • Entrance statements on the Great Northern Highway and Sandstone Road • Provision of information bays • Provision of street furniture and signage • Upgrade of Barimala Creek Reserve • Beautification of shop fronts • Upgrade of median strips It is anticipated that funding assistance will be obtained for many of the projects listed above that are to be implemented under the Mainstreet Master Plan. A major source of such assistance is expected to be the Mid West Development Commission’s Investment Plan for Town Revitalization. In a submission to the development of the Plan the issue of safety and truck speeds in the 50kph section of Hepburn Street was raised. In view of these concerns approval will be made Main Roads WA to review traffic speed and considered implementation of 40kph restrictions.

DESCRIPTION 2012/13 $

2013/14 $

2014/15 $

2015/16 $

2016/17 $

Prepare Mainstreet Master Plan (MWDC Grant Funding of $7,500 obtained)

27,000

Drainage Improvements Barimala Creek 20,000 Contribution - Beautification of shop fronts in accordance with Mainstreet Master Plan

6,000 6,000 6,000 6,000

Install Bin Enclosures and Street Furniture in accordance with Mainstreet Master Plan

5,000 30,000 5,000

Construct Entry Statements in accordance with Mainstreet Master Plan

50,000

Construct Information Bays in accordance with Mainstreet Master Plan

50,000

Upgrade Barimala Reserve in accordance with Mainstreet Master Plan

25,000

Tourist Park Install Shade Structure Over Picnic Table

5,000

Upgrade CCTV in Mainstreet (Grant Funding of $27,000 required)

43,000

Senior Citizen's Centre (Grant Funding of $52,000 required)

78,000

TOTAL 27,000 207,000 111,000 11,000 6,000

Shire of Mount Magnet Corporate Business Plan 21 of 43

Page 22: ADOPTED BY COUNCIL 1 JUNE 2013 - Shire of Mount Magnet · • Co-ordinate and expand community activities with an emphasis on youth. ... viability of the pastoral industry. ... Prior

2. Senior Citizen's Centre The Mount Magnet Senior's Group occupies the old Tourist Information Centre Building located on Lot 386 Hepburn Street. The Senior's Group has a lease on this facility until 2019. The building is provided rent free and the Senior's Group have lodged a funding application with Lotterywest for plumbing works at the Centre valued at $2,365.00. The Mount Magnet Seniors Group have requested that a kitchen, toilet and small storage room is added on to the existing building. The cost of this work has been estimated by Teakle & Lalor to be $78,000 approx (Ex GST). Provision of $26,000 has been included in the Capital Works Program. The balance of funding required will be sought externally from organisations such as Lotterywest and Mid West Development Commission.

3. Federation & Foster Parks The Federation/Foster Park facility is an important component of Council’s tourism and community infrastructure. The area includes a shaded children’s playground, a BBQ and a toilet block. Utilisation by travelers is high and it is used for community events. The water reticulation system which was installed ten years ago is currently being repaired as a short term measure, however, it is recognized that to perform as intended replacement of the current system is a requirement. Members of the community are currently maintaining and adding colour to existing garden beds that front the Highway. Projects for Federation and Foster Parks include: DESCRIPTION 2012/13

$ 2013/14

$ 2014/15

$ 2015/16

$ 2016/17

$ Federation/Foster Park Install Security Lighting 20,000 Federation/Foster Park Upgrade Irrigation 12,000 30,000 Federation/Foster Park Toilets Enclose Entrance Veranda

Federation/Foster Park Playground Equipment Construct Surround To Retain Sand

14,000

TOTAL 12,000 20,000 34,000 Future requirements for Federation and Foster Parks are being addressed in the Mainstreet Master Plan referred to above.

4. Recreation Centre and Sports Ground The Recreation Centre and Sportsground adjoin the Mount Magnet District High School and are used extensively by students. The Sportsground is illuminated for night time use and incorporates a full size AFL Oval. Netball/Basketball Courts adjoin the Sports Ground and High School as well as a children’s adventure playground and disused tennis courts. Squash courts are attached to the Recreation Centre. The Recreation Centre is an open plan building constructed in 2007, which is used by many community groups and sporting bodies. Funding of the maintenance of the Sportsground facility is a joint Shire/Department of Education responsibility and a formal five year agreement has been entered into to facilitate the arrangement.

Shire of Mount Magnet Corporate Business Plan 22 of 43

Page 23: ADOPTED BY COUNCIL 1 JUNE 2013 - Shire of Mount Magnet · • Co-ordinate and expand community activities with an emphasis on youth. ... viability of the pastoral industry. ... Prior

Annual maintenance costs are of the order of $54,000 pa of which the Department of Education is responsible for 50%. The oval irrigation system was upgraded in early 2013 at a cost of $52,000. In February 2013 community planning consultants CCS Strategic were engaged to prepare a Recreation Centre Precinct Master Plan with a focus on the needs of Mount Magnet youth. Preparation of the Master Plan commenced with a program of community consultation during the last weekend in February 2013. The Recreational Centre Precinct Master Plan will address issues such as: • Way to improve the functionality and utilisation of the existing Recreation Centre. • The upgrade of the existing skatepark and BMX track. • The requirement for a youth centre and community centre. • The future of the tennis courts and squash courts. • Ways to improve the utilization of the oval and netball/basketball courts. This Master Plan (along with the Mainstreet Master Plan mentioned above) is expected to be completed by 30 June 2013. It is anticipated that Council’s individual 2012/2013 Royalties for Regions funding allocation of $397,885 will be applied to the Community/Youth Centre project. Council’s application for this funding allocation is currently being considered by the Department of Regional Development and Lands with project approval expected towards the end of the 2012/2013 financial year. Projects included in Council’s Capital Works Program for the Recreation Centre and Sportsground are:

DESCRIPTION 2012/13 $

2013/14 $

2014/15 $

2015/16 $

2016/17 $

Prepare Community/Youth Centre Master Plan (DSR Grant Funding of $11,000 Obtained)

10,000

Upgrade Sportsground Irrigation System (DSR Grant Funding of $22,000 Obtained)

52,000

Community/Youth Centre Project Including Upgrade of the Skatepark (2012/2013 CLGF Individual Grant Funding of $397,885 applied for plus additional grant funding required)

400,000 400,000

Replace Oval Flood Lights 400,000 Replace Oval Treated Pine Barriers 25,000 Upgrade Irrigation Dam Security Fence 20,000 Upgrade Irrigation Dam Pump Support Structure

20,000

TOTAL 62,000 445,000 420,000 400,000

Shire of Mount Magnet Corporate Business Plan 23 of 43

Page 24: ADOPTED BY COUNCIL 1 JUNE 2013 - Shire of Mount Magnet · • Co-ordinate and expand community activities with an emphasis on youth. ... viability of the pastoral industry. ... Prior

5. Mount Magnet Memorial Swimming Pool The Mount Magnet Memorial Swimming Pool was constructed in 1965 and is a well used facility. The Pool is open six months of the year from October to March inclusive. In recent years the filtration system has been upgraded and water quality standards meeting current health requirements are being achieved. Operating costs excluding depreciation and administration overheads are some $155,000 pa. Deprecation is some $35,000 pa and Revenue in the 2012/2013 year was nil as entry to the pool was free due to the disruption caused by construction activities in the pool grounds. Entry charges will be reinstated in 2013/2014 now that construction works are completed ($3 per adult and $2 per pensioner/child). Revenue for 2013/2014 is estimated to be $6,000. In January 2012 a new Pool Amenities building was completed which included change rooms, toilets, showers, kiosk, first aid room and a fitness centre. The cost of this building was $947,000 which was funded under the CLGF Program ($850,516) and Council funds ($96,484). Shade Structures over the main pool, toddler pool and grassed areas will be erected at a cost of $80,000 prior to the commencement of the 2013/2014. The Fitness Centre was fitted out at a cost of some $20,000 with funding assistance of $10,000 being provided by the Mid West Development Commission. Membership of the fitness centre, which is open from 4.00am to 10.00pm daily, is available to all residents over the age of 18 years at a cost of $350 pa including GST. The Fitness Centre is unsupervised with access controlled by security system installed as part of the new amenities building project. Projects for Swimming Pool include:

DESCRIPTION 2012/13 $

2013/14 $

2014/15 $

2015/16 $

2016/17 $

Construct Amenities, Kiosk and Fitness Centre. (CLGF Individual Grant Funding Obtained) 2010/2011 CLGF $452,631 2011/2012 CLGF $397,885

947,000

Install Shade Structures (DSR Funding of $32,000 obtained)

80,000

Purchase Fitness Centre Equipment (MWDC Funding of $10,000 obtained)

18,000

Replace Water Line Tiles Both Ends of Main Pool

40,000

Upgrade Two Children’s Pools (Grant Funding Required)

180,000 180,000

Repair Ballast Tank 15,000 Pool Surround Furniture 10,000 TOTAL 965,000 135,000 190,000 180,000

Of the above projects the upgrade of the children’s pools is a priority project with sourcing of funds being a key focus over the next twelve months.

Shire of Mount Magnet Corporate Business Plan 24 of 43

Page 25: ADOPTED BY COUNCIL 1 JUNE 2013 - Shire of Mount Magnet · • Co-ordinate and expand community activities with an emphasis on youth. ... viability of the pastoral industry. ... Prior

6. Anzac Hall and Outdoor Cinema The Anzac Hall and Outdoor Cinema adjoins the Mount Magnet War Memorial Park on the corner of Hepburn and Naughton Streets. In recent years the Hall has been refurbished and it has a long history as a venue for community events. A future project for the Anzac Hall is the installation of suitable materials on the walls and ceiling to improve the building acoustics and overcome current problems with echoing. The 2012/2013 maintenance budget for this facility is $5,000 with income from hall hire being some $500 pa. Depreciation is $24,000 pa. The outdoor cinema is equipped with high quality projection equipment and is a unique and functional facility. In early 2012/2013 Council called for expressions of interest from community groups or individuals wishing to conduct Friday night screenings during the warmer months. Interested community groups will not be required to pay for use of the Outdoor Cinema and it is hoped that the Friday night screening will prove to be an excellent funding raising opportunity. Financial assistance will also be given in sourcing movies. Projects for Anzac Hall and Outdoor Cinema include:

DESCRIPTION 2012/13 $

2013/14 $

2014/15 $

2015/16 $

2016/17 $

Anzac Hall - Upgrade Internal Finishes to Improve Acoustics

10,000

Repaint External Walls and Fascias 40,000 Replace Unstable Brick Dividing Wall War Memorial Park

5,000

TOTAL 65,000 10,000

Shire of Mount Magnet Corporate Business Plan 25 of 43

Page 26: ADOPTED BY COUNCIL 1 JUNE 2013 - Shire of Mount Magnet · • Co-ordinate and expand community activities with an emphasis on youth. ... viability of the pastoral industry. ... Prior

7. Rural Transaction Centre/Library The Rural Transaction Centre occupies the old Mount Magnet Primary School building that was transferred to the Shire when the school relocated to new premises in 1990. This building, initially constructed in 1898, has been extensively modified over the years and is listed on the Heritage Council of Western Australia’s, Register of Heritage Places. To-day the Rural Transaction Centre houses the Public Library and a Youth Space. Up until March 2013 the Department of Mines and Petroleum leased part of the building on a temporary basis, pending construction of the a new Mining Registry Office. In 2011 a Conservation Plan was prepared for the Rural Transaction Centre by consultants Heritage and Conservation Professionals. The Conservation Plan identified a significant amount of work requiring attention with the highest short term priority being to re-stump the southern wall of the library section of the building and modify the drainage so that water is diverted away from the building supports. The Conservation Plan advises that this work may require removal of some windows and wall cladding, all of which should be done under the supervision of a Conservation Architect. The Plan also refers to the deteriorated condition of the verandah and internal floor boards many of which require replacement. The Conservation Plan highlights the poor state of repair of the building and the need for regular inspection and maintenance. In November 2012 an assessment of the repairs to the flooring required in the library section of the building was conducted. Based on this assessment and the 2011 Conservation Plan, an application for financial assistance has been lodged with Lotterywest. The estimated cost of the re-stumping and floor repairs is $156,000 of which 50% is being sought from Lotterywest. Along with the Council Chambers this is considered a very significant building which is part of the heritage of Mount Magnet. As such Council is committed to ensure the Rural Transaction Centre is maintained appropriately to ensure it is safe and functional for many years to come. The annual maintenance budget is some $20,000pa. Annual depreciation is $20,000. Projects for the Rural Transaction Centre include:

DESCRIPTION 2012/13 $

2013/14 $

2014/15 $

2015/16 $

2016/17 $

Prepare Condition Report with Costs 3,000 Replace Footings and Restore Floor Levels (Lotterywest Grant Funding Application $78,000 Lodged)

156,000

Replace Verandas and Internal Flooring and Access Paths.

100,000 30,000

Repair/Repaint Internal Walls 25,000 Repair/Repaint External Walls 30,000 Landscaping/Courtyard Construction 10,000 TOTAL 3,000 156,000 125,000 70,000

Shire of Mount Magnet Corporate Business Plan 26 of 43

Page 27: ADOPTED BY COUNCIL 1 JUNE 2013 - Shire of Mount Magnet · • Co-ordinate and expand community activities with an emphasis on youth. ... viability of the pastoral industry. ... Prior

8. Old Hospital When the Mount Magnet Hospital was closed in the late 1990’s responsibility for the building was transferred to the Shire. Currently the various rooms in the building are occupied by the Mount Magnet Playgroup, and the Art and Craft Group. The building is in a very rundown condition and maybe beyond economic repair. In July 2012 Heritage Architect Stephen Carrick was engaged to prepare a Conservation Plan to enable an informed decision on the future of the building to be made. In September 2012 the architect visited Mount Magnet and preparation of Plan is currently in progress. The challenge for the future is to find suitable alternative accommodation for current users of the Old Hospital. As mentioned previously improvements to the functionality of existing buildings, such as the Recreation Centre and Rural Transaction Centre will be important in achieving this. Capital Works Program:

DESCRIPTION 2012/13 $

2013/14 $

2014/15 $

2015/16 $

2016/17 $

Old Hospital – Secure building by erecting external fencing

16,000

Prepare conservation plan with costs (Lotterywest Grant $19,100 obtained)

19,100

TOTAL 27,100 16,000

9. Pensioner Units In the 1986, as a joint venture with the Department of Housing, four pensioner units on Lot 42 Criddle Street were constructed. The Department’s contribution was the provision of the initial capital. Over the coming months it is expected that a formal agreement will be entered into with the Department of Housing that recognises their capital contribution. In recent years the demand for these units has fluctuated, however currently the units are fully occupied. Annual maintenance expenditure on the units is $8000. Rental income is some $5000. The units are in sound condition with future works involving the replacement of bathrooms and kitchens and internal painting. On a number of occasions during the development of Council’s Community Strategic Plan and this Corporate Business Plan residents have suggested the need for additional pensioner units. Full capital grant funding would be essential if new units are to be constructed. Capital projects for Pensioner Units include:

DESCRIPTION 2012/13 $

2013/14 $

2014/15 $

2015/16 $

2016/17 $

Improvements and Upgrade of the Units 20,000 20,000 20,000 20,000 20,000 Construct Additional Four Pensioner Units (Grant Funding Required)

400,000 400,000

TOTAL 20,000 20,000 420,000 420,000 20,000

Shire of Mount Magnet Corporate Business Plan 27 of 43

Page 28: ADOPTED BY COUNCIL 1 JUNE 2013 - Shire of Mount Magnet · • Co-ordinate and expand community activities with an emphasis on youth. ... viability of the pastoral industry. ... Prior

10. Staff Housing Council owns ten houses which are provided as accommodation for members of staff. Occupancy of the houses is as follows: Lot 43 Hepburn Street (CEO) Lot 151 Hepburn Street (Administration Assistant) Lot 157 Hepburn Street (Works Manager) Lot 226 Watson Street (Finance Manager) Lot 343 Laurie Street (Tourist Officer) Lot 397 Hepburn Street (Caravan Park) Lot 398 Hepburn Street (Pool Manager) Lot 452 Dowden Place (Leading Hand) Lot 453 Jensen Close (Administration Manager - Vacant) Lot 460 Jensen Close (GRAMS Doctor)

An annual provision of $25,000 is made for maintenance. Annual rental for non contracted staff is charged at a rate of $55 per week. Non contract staff also meet full utility costs. Under the Royalties for Regions Program the Shire of Cue, in conjunction with the Shires of Sandstone and Mount Magnet, has obtained funding to upgrade existing staff housing in each of these Shires. In the case of Mount Magnet the plan is to build new duplex accommodation on Lot 225 in Watson Street. It is anticipated that one of the duplex units when completed would be made available to a full time doctor employed by the Geraldton Regional Aboriginal Medical Service. The cost of the duplex accommodation, which will be of modular construction, is expected to be approximately $480,000 with funding of $397,000 coming from the Royalties for Regions Program and the balance funded by Council. A condition assessment of staff housing is currently being carried out, from which a four year capital works program will be determined. The capital budget for staff housing works is:

DESCRIPTION 2012/13 $

2013/14 $

2014/15 $

2015/16 $

Upgrade Works 20,000 50,000 50,000 50,000 Lot 225 Watson Street Construct Duplex Units (2011/2012 Regional CLGF funding of $397,885)

TOTAL 20,000 530,000 50,000 50,000

Shire of Mount Magnet Corporate Business Plan 28 of 43

Page 29: ADOPTED BY COUNCIL 1 JUNE 2013 - Shire of Mount Magnet · • Co-ordinate and expand community activities with an emphasis on youth. ... viability of the pastoral industry. ... Prior

11. Urban Roads The Shire of Mount Magnet has a sealed urban road network of approximately 25.24 km. In recent years a significant portion of Councils Roads to Recovery Funding has been invested in the construction of kerbing and footpaths. Operating expenditure relating to urban roads is as follow:

DESCRIPTION 2012/13 $

2013/14 $

2014/15 $

2015/16 $

2016/17 $

Maintenance 58,000 60,000 Street Lighting 45,000 47,000 Footpaths 7,500 8,000 TOTAL 110,500 115,000

Capital Projects for the Urban Roads include:

DESCRIPTION 2012/13 $

2013/14 $

2014/15 $

2015/16 $

2016/17 $

Rectify Drainage –Laurie/Naughton Street Intersection

35,000

Implement Street Number System – Stencil On Kerbs

5,000 5,000

Reinstate Footpath Criddle Street to Laurie Street (DOT Shared Path Application Lodged $12,000)

24,000

Update Roman II Road Inventory Including Valuations (above four projects funded in part from MRWA Direct Grant $52,470 in 2012/2013)

22,000 10,000

Town Streets Reseal/Repair Program including rectification of drainage at the Laurie/Naughton Street intersection (2012/2013 R2R Funding $100,000 Obtained)

100,000

Town Streets Reseal/Repair Program (R2R Funding of $100,000 pa Assumed)

100,000 100,000 100,000 100,000

TOTAL 186,000 115,000 100,000 100,000 100,000 In addition to the above, improvements to nature strips in Watson & Attwood Streets will be beautified with the planting of native and other appropriate species.

Shire of Mount Magnet Corporate Business Plan 29 of 43

Page 30: ADOPTED BY COUNCIL 1 JUNE 2013 - Shire of Mount Magnet · • Co-ordinate and expand community activities with an emphasis on youth. ... viability of the pastoral industry. ... Prior

12. Unsealed Rural Roads The Shire of Mount Magnet has a rural road network of approximately 620.59 km. The majority of Council roads provide station access. The Mount Farmer and Cue/Paynesville Roads are regional roads which link to road networks outside the Shire boundaries. The Youanmi Road is also classed as a Regional Road and provides access to two stations as well as access to the Midwest Vanadium mining operations at Windimurra. The Mount Farmer and Youanmi Roads are Category 1 Regional Roads and the Cue/Paynesville Road is a Category 2 Regional Road. Operating expenditure relating to unsealed rural roads is as follow:

DESCRIPTION 2012/13 $

2013/14 $

2014/15 $

2015/16 $

2016/17 $

Maintenance 280,000 288,000 TOTAL 280,000 288,000

Maintenance service levels are two grades per annum where there is a requirement to do so.

Shire of Mount Magnet Corporate Business Plan 30 of 43

Page 31: ADOPTED BY COUNCIL 1 JUNE 2013 - Shire of Mount Magnet · • Co-ordinate and expand community activities with an emphasis on youth. ... viability of the pastoral industry. ... Prior

Projects for the Rural Roads include: Negotiations are currently in progress with Midwest Vanadium Pty Ltd for the transportation of Magnetite over the Youanmi Road. Projected quantities are 1.2 Million tonnes per annum and the company is seeking a concessional permit to allow the use of tri drive road trains. A trial shipment of 120,000 tonnes is currently proposed on the basis of a formal road access agreement under which Mid West Vanadium fund required upgrade works and the ongoing maintenance. Maintenance grading techniques for unsealed rural roads have been reviewed. It is expected in future where appropriate that maintenance grading will involve the recovery of material from the road shoulders and improvements to drainage.

DESCRIPTION 2012/13 $

2013/14 $

2014/15 $

2015/16 $

2016/17 $

Mount Farmer Road Re-Sheeting (2012/13 Regional Road Funding $72,333 Obtained)

110,000

Establishment of Bores and Soaks – adjoining Rural Roads

25,000

Upgrade Cue/Paynesville Road (2013/14 Regional Road Funding of $100,000 Obtained)

150,000

Upgrade Regional Roads (Regional Road Funding of $100,000 pa Assumed)

150,000 150,000 150,000

Cue/Paynesville Road Realign and Replace Grid (2013/2014 Black Spot Funding of $45,000 obtained)

68,000

Realign and Form Up Wondinong Road (2012/2013 R2R Funding $132,000 Obtained)

132,000

Unsealed Roads Form Up and Improve Drainage (R2R Funding $132,000 pa Assumed)

132,000 132,000 132,000 132,000

Road Safety Audits – for Black Spot Funding Applications

18,000 6,000 6,000 6,000 6,000

TOTAL 285,000 356,000 288,000 288,000 288,000

Shire of Mount Magnet Corporate Business Plan 31 of 43

Page 32: ADOPTED BY COUNCIL 1 JUNE 2013 - Shire of Mount Magnet · • Co-ordinate and expand community activities with an emphasis on youth. ... viability of the pastoral industry. ... Prior

SECTION 4 - SERVICES The Shire of Mount Magnet delivers the following services: • Waste Collection/Landfill Operation • Library • Community Development/Community Events/Youth • Cemetery • Visitor Centre and Museum • Regulatory Services • Bush Fire Services • Mount Magnet Aerodrome • Caravan Park • Murchison Regional Vermin Council • Plant

Shire of Mount Magnet Corporate Business Plan 32 of 43

Page 33: ADOPTED BY COUNCIL 1 JUNE 2013 - Shire of Mount Magnet · • Co-ordinate and expand community activities with an emphasis on youth. ... viability of the pastoral industry. ... Prior

1. Waste Collection and Landfill Operations A weekly kerbside waste collection service is available within the township of Mount Magnet. This service is operated on the basis of a three year contract that commenced in April 2012. The annual budget for waste collection is $103,000. Experience over the last few years has shown that recycling of cardboard, beverage containers and the like is not cost effective. The landfill at the end of Leap Year Road is operated by Council on the basis of a licence issued by the Department of Environment and Conservation. The operating position for waste collection and the landfill is as follows: Expenditure 2011/12

$ 2012/13

$ 2013/14

$ 2014/15

$ 2015/16

$ Waste collection contract (117,000) (101,000) (103,000) Landfill operations (3,748) (5,000) (6,000) Depreciation (170) (170) (170) INCOME Collection Charges 80,500 90,000 101,500 TOTAL (40,418) (16,170) (7,670)

Commencing 1 July 2012 it was determined to increase waste collection charges to fully recover the cost of collection over a two year period. 2011/2012 charges were $195 per 240 litre bin. In 2012/2013 charges rose to $220 per 240 litre bin and in 2013/2014 charges will rise to $245 per 240 litre bin.

2. Library Services The Mount Magnet Public Library is located in the Rural Transaction Centre. The library provides internet based computing facilities that are available to the public on a fee for service basis. Prior to 30 June 2012 the Shire provided Centrelink Services through the Library. The failure of the Federal Department of Human Services to agree to meet the actual costs incurred in operating the Centrelink Agency made it impossible for Council to continue to provide this important service. The operating position for Library is as follows:

EXPENDITURE 2011/12 $

2012/13 $

2013/14 $

2014/15 $

2015/16 $

Staff Costs (59,234) (61,700) (35,000) Library Maintenance & Expenses (18,273) (14,000) (15,000) Depreciation (780) (780) (780) INCOME Centrelink Contract & Library Charges 25,000 25,000 0 Library Charges 1,500 1,500 1,000 TOTAL (51,787) (49,980) (49,780)

The library operates four hours per day, Tuesday to Friday inclusive. Patron numbers are modest averaging some 80 per month during the summer months increasing to over 110 per month during the cooler months of the tourist season.

Shire of Mount Magnet Corporate Business Plan 33 of 43

Page 34: ADOPTED BY COUNCIL 1 JUNE 2013 - Shire of Mount Magnet · • Co-ordinate and expand community activities with an emphasis on youth. ... viability of the pastoral industry. ... Prior

Recent initiatives to increase patronage have included the implementation of “e books”, a process where books are available in electronic format and the waiving of long outstanding fines on the condition that rules of borrowing are adhered to in the future.

3. Community Development/Community Events/Youth Council’s organizational structure provides for the appointment of a Youth and Community Events Officer. Council employs two casual staff members in this role, one with a focus on the younger children and the other on youth. There is capacity to employ additional casual staff to provide other activities for young people. The role of the Youth and Community Events Officer is to: • Engage with Mount Magnet children/youth and organize sporting and other activities. • Co-ordinate community events. • Liaise with and assist community groups. • Oversee the operation of the Youth Centre. Ongoing support and funding for the following community events has been included in the four year budget: • Mount Magnet Festival/ Astro Fest • Family Fun Days • Australia Day • Cleanup Australia Day • Anzac Day • NAIDOC Week • Mount Magnet Races Provision to fully fund public liability insurance costs for community groups such as the Mount Magnet Seniors Group has been included in the four year budget. Other than the Royal Flying Doctor Service ($1,000) and St John Ambulance ($1,000) it is not proposed to make direct donations to community organisations after 30 June 2013. Provision of $5,000 will however be made in 2013/2014 to fund a community grant scheme under which community groups can apply for funding for activates/equipment that during the normal course of their operations they may be unable to afford. This will involve a simple application process with the award of community grants being determined by Elected Members.

EXPENDITURE 2011/12 $

2012/13 $

2013/14 $

2014/15 $

2015/16 $

Staff Costs (176,686) (68,000) (70,000) Programs & Expenses (148,118) (50,000) (51,000) Community Groups – Funding assistance for Insurance and community events/activities, donations. Community grants scheme.

(20,500) (20,500) (21,500)

Grant writing and administration consultancy

(50,000) (50,000)

INCOME Various Grants 47,500 TOTAL (297,804) (188,500) (192,500)

Shire of Mount Magnet Corporate Business Plan 34 of 43

Page 35: ADOPTED BY COUNCIL 1 JUNE 2013 - Shire of Mount Magnet · • Co-ordinate and expand community activities with an emphasis on youth. ... viability of the pastoral industry. ... Prior

A key component of community development is the capacity to obtain and administer grants from all levels of government, including organizations such as Lotterywest. In May 2012 Council sought expressions of interest from individuals and organizations to provide a grant writing and administration service and as a result provider Grants Empire has been engaged. Provision for the following community development projects has been included in the Council’s four year budget: As indicated previously 2012/2013 Individual CLGF Royalties for Regions grant funding of $398,885 will be allocated to the construction of youth facilities to be identified in the Recreation Centre Precinct Master Plan.

4. Cemetery The Mount Magnet cemetery is located on Leap Year Road and is of great historical significance. On average there are three burials per year. Operating costs are some $28,000pa with an annual income of $3,500. Council’s burial fee is $1,260 excluding GST. Projects at the cemetery include:

5. Visitor Centre and Museum The new $1.6 Million Mount Magnet Mining and Pastoral Museum was opened in April 2012. The Museum also houses the Mount Magnet Visitor Centre. Funding for the Museum has been obtained from the Country Local Government Fund and also from the Mid West Development Commission. Council has borrowed $300,000 to contribute to the construction of the building. Operating costs for the Visitor Centre and Museum are as follows:

EXPENDITURE 2011/12 $

2012/13 $

2013/14 $

2014/15 $

2015/16 $

Staff Costs (76,912) (51,000) (55,000) Promotion and Merchandise Expenses (27,280) (24,500) (25,000) Museum Maintenance (2,000) (24,000) (25,000) Utilities (3,000) (15,000) (15,000) Depreciation Nil Nil (35,000) INCOME Merchandise 5,000 2,000 2,000 TOTAL (104,192) (112,500) (153,000)

DESCRIPTION 2012/13 $

2013/14 $

2014/15 $

2015/16 $

2016/17 $

Racecourse – Install Generator and Upgrade Power Distribution

30,000

TOTAL 30,000

DESCRIPTION 2012/13 $

2013/14 $

2014/15 $

2015/16 $

2016/17 $

Installation of Toilet 50,000 TOTAL 50,000

Shire of Mount Magnet Corporate Business Plan 35 of 43

Page 36: ADOPTED BY COUNCIL 1 JUNE 2013 - Shire of Mount Magnet · • Co-ordinate and expand community activities with an emphasis on youth. ... viability of the pastoral industry. ... Prior

It should be noted that 2011/2012 cost are for operations prior to the Centre being relocated to the Museum. Depreciation costs for the newly constructed Museum are $35,000 pa. The Mount Magnet Visitor Centre provides information to tourists travelling throughout the region and has the potential to significantly influence decisions made by holiday makers regarding their destination. Every opportunity will be taken to join with neighboring Councils and Tourism WA in the development of a regional approach to tourism that achieves better value for money and increases visitation to the region. Further it is considered that there is potential to gain significant revenue at the Visitor Centre by offering tourists a forward booking service. In 2013/2014 Council will join with the Shires of Yalgoo, Cue, Sandstone, Meekatharra and Murchison in the development of a Regional Tourism Strategy. The cost of the development of this strategy is estimated to be $80,000 with 50% of funding anticipated from the Federal Tourism Industry Regional Development Fund and 25% from the Mid West Development Commission. Individual council contributions will be $3,300 which has been provided in Council’s 2013/2014 administration consultancy budget. Projects at the Museum include:

6. Regulatory Services (Environmental, Health, Planning, Building & Ranger Services, Bush Fire Services) Regulatory and Planning Services Regulatory Services include Environment and Health Services, Building and Planning Services and Ranger Services. These services are provided to Mount Magnet by specialist visiting contractors on a periodic basis. Fees for Regulatory Services as listed in the Annual Budget – Fees and Charges.

EXPENDITURE 2011/12 $

2012/13 $

2013/14 $

2014/15 $

2015/16 $

Contractor: Environment, Health, Building and Planning

(65,160) (46,000) (47,500)

Contractor: Ranger Services (39,780) (34,000) (40,000) Expenses (6,000) (10,500) (11,000) Vacant Land Maintenance (15,000) INCOME Fees 1,700 1,700 1,700 TOTAL (109,240) (88,800) (111,800)

The increase in Ranger Service costs results from an expansion of the role to encompass litter enforcements, fire break management and the implementation of the new Cat Act. The new Cat Act requires the upgrade of the pound to accommodate cats and introduction of a system to register and microchip cats. Grant funding to assist in the implementation of the new cat management legislation has been provided by the Department of Local Government.

DESCRIPTION 2012/13 $

2013/14 $

2014/15 $

2015/16 $

2016/17 $

Acquire Crown Land to the South of the Museum Lot 618

10,000 5,000

Install Museum Security System 10,000 Install Footpaths and Landscaping 3,000 8,000 TOTAL 20,000 8,000 8,000

Shire of Mount Magnet Corporate Business Plan 36 of 43

Page 37: ADOPTED BY COUNCIL 1 JUNE 2013 - Shire of Mount Magnet · • Co-ordinate and expand community activities with an emphasis on youth. ... viability of the pastoral industry. ... Prior

Provisions of $15,000 in 2013/2014 has been made to enable a clean-up of the litter in the "Dolly Dump" area south of the township. The illegal dumping of rubbish in the area will be monitored by Council's Ranger and fines issued where ever possible. Planning projects included in the Capital Works program are as follows: There is a significant demand for industrial land in Mount Magnet, particularly with the recent upsurge in mining activity. Council has obtained planning approval to create seven light industrial blocks on crown land located at the end of Moses Street. Lot sizes vary from 2000 m² to 8393 m². The estimated cost of developing the seven lots is $860,000. As the land involved is crown land an application has been lodged under the Regional Development Assistance Program seeking development of the lots by Landcorp. An important component of Council’s application to Landcorp is a willingness to contribute financially and on this basis provision for a payment of $150,000 has been made. Bush Fire Services Until 2011/2012 the Shire of Mount Magnet went for many years without experiencing a significant bush fire. In January and November 2012 this situation changed with some major fires being experienced in the west and north of the Shire. Operational expenditure is as follows:

EXPENDITURE 2011/12 $

2012/13 $

2013/14 $

2014/15 $

2015/16 $

Maintenance of Equipment (3,000) (3,000) 6,000 Insurance (1,687) (1,900) 2,000 INCOME DFES Grant 5,000 5,000 7,000 TOTAL (112) 100 (1,000)

Funding of $140,000 has been obtained from the Department of Fire and Emergency Services (DFES) for procurement of a 1,600 litre capacity tanker which is expected to be delivered in July 2013. An application has been lodged with the Department for funding to construct a shed on Council owned Lot 472 Laurie Street which adjoins the existing Mount Magnet Fire and Rescue headquarters. Council is providing the shed in kit form at no cost for erection on Lot 472. Maintenance of this equipment will be funded by DFES. Projects for Bush Fire Services include:

DESCRIPTION 2012/13 $

2013/14 $

2014/15 $

2015/16 $

2016/17 $

Moses Street Industrial Sub- Division Development of 7 Light Industrial Blocks

10,000 75,000 75,000

TOTAL 10,000 75,000 75,000

DESCRIPTION 2011/12 $

2012/13 $

2013/14 $

2014/15 $

2015/16 $

1600 litre Rural Tanker (DFES Grant Funding $140,000 obtained)

140,000

Erect Shed to House Rural Tanker on Lot 472 (DFES Grant Funding $20,000 applied for)

20,000

TOTAL 140,000 20,000

Shire of Mount Magnet Corporate Business Plan 37 of 43

Page 38: ADOPTED BY COUNCIL 1 JUNE 2013 - Shire of Mount Magnet · • Co-ordinate and expand community activities with an emphasis on youth. ... viability of the pastoral industry. ... Prior

7. Bluey Osmond Mount Magnet Aerodrome The Mount Magnet Airport is operated by the Shire. Regular passenger transport (RPT) flights are available three times per week to Perth and utilization of the facility is increasing significantly as a result fly in fly out operations associated with mining activities being conducted by Ramelius Resources and Midwest Vanadium. The facility is also used by the Royal Flying Doctor Service for medical emergency evacuations. The aerodrome is a certified facility operated in accordance with the requirements of the Commonwealth Air Safety Authority (CASA). The Operating Budget position is as follows:

EXPENDITURE 2011/12 $

2012/13 $

2013/14 $

2014/15 $

2015/16 $

Operating Costs (101,257) (106,000) (110,000) Depreciation (98,550) (97,000) (97,000) Administration Overheads (53,931) (55,000) (56,000) INCOME Landing Fees/Passenger Service Charges

127,000 200,000 225,000

TOTAL (127,738) (58,000) (38,000) The above revenue figures are based on a per 1000kg Landing Charge and inbound/outbound Passenger Service Charges as specified in the Council’s Fees and Charges. From 1 July 2011 Passenger Service Charges have been collected from charter operators in addition to the RPT operator. Airport operating surpluses are placed in the Airport Reserve which at 30 June 2013 is expected to stand at $106,179. Council’s objective for the Airport is to ensure full cost recovery.

Shire of Mount Magnet Corporate Business Plan 38 of 43

Page 39: ADOPTED BY COUNCIL 1 JUNE 2013 - Shire of Mount Magnet · • Co-ordinate and expand community activities with an emphasis on youth. ... viability of the pastoral industry. ... Prior

Projects for the Mount Magnet Airport include: The viability of the Mount Magnet Aerodrome is dependent on ongoing financial assistance provided under the WA Department of Transport’s Regional Airport Development Scheme (RADS). Under this scheme a contribution of 50% of capital expenditure for approved projects is provided.

DESCRIPTION 2012/13 $

2013/14 $

2014/15 $

2015/16 $

2015/17 $

Automatic Weather Information Broadcaster (RADS grant of $7,604 Obtained)

32,604

Resealing of Apron, Taxiway, and Turning Nodes. Fog Seal Runway (RADS Grant of $115,000 Obtained)

230,000

Rectify Runway Smoothness Non Compliance (RADS Grant of $25,000 Lodged)

50,000

Replace Illuminated Wind Indicator (RADS Grant of $7,500 Lodged)

15,000

Renew Cones and Gables (RADS Grant of $10,000 Lodged)

20,000

Extend Apron to Accommodate Multiple Aircraft (RADS Grant of $75,000 Lodged)

150,000

Upgrade Emergency Runway Lighting (Grant Funding Required)

100,000

Reseal Main Runway (Grant Funding Required)

600,000

TOTAL 262,604 85,000 150,000 100,000 600,000

Shire of Mount Magnet Corporate Business Plan 39 of 43

Page 40: ADOPTED BY COUNCIL 1 JUNE 2013 - Shire of Mount Magnet · • Co-ordinate and expand community activities with an emphasis on youth. ... viability of the pastoral industry. ... Prior

8. Caravan Park Council operates the Mount Magnet Caravan Park on a year round basis. The caravan park has 36 powered sites, 8 cabins with ensuites and 9 cabins without ensuites. The operating position as indicted in the Annual Budget is as follows:

EXPENDITURE 2011/12 $

2012/13 $

2013/14 $

2014/15 $

2015/16 $

Staff Costs (149,881)

(155,000)

159,000

Maintenance/Costs (37,460) (47,000) 50,000 Utilities (32,900) (36,000) 38,000 Depreciation (70,550) (70,000) 70,000 INCOME Tariffs 205,000 225,000 224,000 TOTAL (85,791) (83,000) (93,000)

Significant upgrade works are required to amenities and the like. Projects for Caravan Park include:

DESCRIPTION 2012/13 $

2013/14 $

2014/15 $

2015/16 $

2016/17 $

Upgrade Power Outlets and Main Switchboard 70,000

Replace Amenities (Grant Funding Required) 250,000 400,000

Seal Driveways 20,000 Install Irrigation 35,000 Install Playground 10,000 Extend Number of Powered Sites 120,000 Upgrade Cabins to Include Ensuites 100,000 Upgrade Bottom Ablutions 60,000 TOTAL 355,000 480,000 110,000 120,000

Shire of Mount Magnet Corporate Business Plan 40 of 43

Page 41: ADOPTED BY COUNCIL 1 JUNE 2013 - Shire of Mount Magnet · • Co-ordinate and expand community activities with an emphasis on youth. ... viability of the pastoral industry. ... Prior

9. Murchison Regional Vermin Council The Murchison Regional Vermin Council (MRVC) is made up the Shires of Yalgoo, Sandstone, Cue, Meekatharra and Mount Magnet. The Shire of Mount Magnet provides administrative services to the MRVC and the Shire’s CEO is also the CEO of this regional council. The role of the MRVC is to manage, upgrade and maintain the No1 Vermin Fence and the No 2 Vermin Fence. The section of the No 1 Vermin Fence under the control of the MRVC commences at the 80 mile peg in the south near Lake Moore and ends at the 553 km mark in the north, at a location 20 km north of where the fence intersects the Kumarina/Wiluna Road. The No 2 Vermin Fence extends west from the No 1 Fence at the 394.4 km mark for a distance of 72 km following the northern boundary of the property Hillview. In 2010/2011 all the member shires of the MRVC along with the Shire of Wiluna agreed to make the upgrade of the No 1 Vermin Fence their regional Country Local Government Fund (CLGF) project for that year. As a consequence $1.557 Million in Royalties for Regions funding was obtained for the upgrade work. This upgrade work commenced in December 2011 and is scheduled for completion at the end of May 2013. On completion some 165 km of fencing will have been replaced, an amount well in excess of estimated length predicted in the project business case. At the end of 2012 Shire of Mount Magnet sought the support of Murchison councils for a further allocation of regional CLGF funding to carry out upgrade works on the No 2 Vermin Fence. As a result the Shires of Sandstone, Mount Magnet, Yalgoo, Cue and Wiluna have agreed to allocate $1.023 Million of 2012/2013 Regional Group CLGF funding to extend the length of the No 2 Vermin Fence by 100 km. A business case is currently being prepared for the allocation of these funds to the extension of the No 2 Vermin Fence for consideration by the Minister for Regional Development. The extension of the No 2 Vermin Fence by 100 km is part of a plan to construct 480 km of fencing that will join up with the State Barrier Fence to the west thus creating a Murchison Region Vermin Cell. When complete this Cell will encompass an area of 88,000 km² helping to protect over 50 pastoral properties from wild dog attack. Funding of some $4.8 million is currently being sought under the Mid West Development Commission’s Investment Plan for the completion of the Murchison Region Vermin Cell. Further it is believed important that Councils also commit some of their own funding to the Vermin Cell project as this would significantly strengthen the case for financial support to come from the Mid West Development Commission. To this end the Shire of Mount Magnet has allocated $50,000 to the project in 2013/2014 and 2114/2015 and agrees to the allocation of its share of regional 2012/2013 CLGF funding ($397,885) to the project. Council has also agreed to double precept payments to the MRVC in 2013/2014 and beyond to fund the sustainable maintenance of the No. 1 and No. 2 Vermin Fences. By all Councils working together it is it is considered reasonable to expect that capital funding of $4.8 Million could be obtained under the Mid West Development Investment Plan for the construction of the additional 380 km of fencing required to connect up with the State Barrier Fencing, thus creating the Murchison Region Vermin Cell.

DESCRIPTION 2011/12 $

2012/13 $

2013/14 $

2014/15 $

2015/16 $

Murchison Region Vermin Cell Contribution 50,000 50,000 Precept Payments to MRVC 12,037 12,400 12,800 TOTAL 62,037 62,400 12,800

Shire of Mount Magnet Corporate Business Plan 41 of 43

Page 42: ADOPTED BY COUNCIL 1 JUNE 2013 - Shire of Mount Magnet · • Co-ordinate and expand community activities with an emphasis on youth. ... viability of the pastoral industry. ... Prior

10. Plant The following Four Year Major plant replacement program has been incorporated in the four year budget.

Shire of Mount Magnet Corporate Business Plan 42 of 43

Page 43: ADOPTED BY COUNCIL 1 JUNE 2013 - Shire of Mount Magnet · • Co-ordinate and expand community activities with an emphasis on youth. ... viability of the pastoral industry. ... Prior

Trade in 2012/13

Replace 2012/13

Trade in 2013/14

Replace 2013/14

Trade in 2014/15

Replace 2014/15

Trade in 2015/16

Replace 2015/16

Trade in 2016/17

Replace 2016/17

P002 MA 30 n/a Works 4wd Toyota Hilux Tray Top 4x4 Utilities 28/06/2006 25 April 2124 4yrs/80000km $31,116.00 replace with diesel 2wd tray top ute $15,000 $31,116 $15,000 $31,116P005 MA 80 n/a Community Mitsubishi Rosa Community Bus Bus 28 June 1905 19 March 2063 10yrs/150000km $125,000.00 $50,000 $125,000P006 MA 178 n/a Gardener Toro Ride On Mower Mower 22 June 1905 n/a 5yrs/2000hrs n/a not to be replaced - sell this unit $1P008 MA1491 n/a Works Box Trailer - "Sign Trailer" Trailer Light 13 June 1905 n/a 10yrs $1,216.00P013 MA 2099 n/a Gardener 2wd Toyota Hilux Tray Top - Gardener 2wd Utilities 28 June 1905 20 March 2105 4yrs/8000km $19,000.00 replace with diesel 2wd tray top ute $13,000 $31,116 $13,000 $31,116P017 MA 2132 n/a Works Nissan Tip Truck Truck 12/12/2007 25 March 2041 8yrs/150000km $62,458.00 $40,000 $62,458P018 MA 2134 n/a Caravan Pk Ford Courier 4x2 Single Cab - Caravan Park 2wd Utilities 27 June 1905 11 August 2001 4yrs/80000km $19,000.00 replace with diesel 2wd tray top ute $12,000 $31,116P019 MA 2136 n/a Works 4wd Mazda Bravo Ute - Grader 4x4 Utilities 27 June 1905 8 September 2149 4yrs/80000km $31,116.00 replace with diesel 4wd tray top ute $13,000 $31,116 $13,000 $31,116P022 MA 3054 n/a Works Speed Alert Trailer (SAM) - Single Axle Trailer Light 3 July 1905 n/a 10yrs $17,908.00

P029 MA 2155 n/a Works Tennant Road Sweeper Sweeper 28 June 1905 20 December 1901 12yrs/7500hrs $68,000.00Continue use of existing machine. Utilise contractor truck mounted broom if and when required

P030 MA 2170 n/a Works CAT 12H Grader Grader 28 June 1905 16 December 1912 10yr/8000hrs $350,000.00 $150,000 $350,000P031 1TCM988 n/a Works Trailer - HP Side Tipping Trailer Heavy 1/01/2001 n/a 20yrs $19,500.00P032 1TFG 459 n/a Works Papas Boxtop Trailer Dual Axle - Caged Trailer Light 23/07/2004 n/a 10yrs $1,216.00 $1,216P033 6RH 640 n/a Works Boxtop Trailer - Fogger Trailer - Dual Axle Trailer Light 8 June 1905 n/a 10yrs $1,216.00 $1,216 $1,500P034 7UE080 n/a Works Polmac Boxtop Trailer - PWWORKS Trailer Light 8 June 1905 n/a 10yrs $1,216.00 not located $1,500P036 UUI 305 n/a Works Pull Along Roller Trailer Heavy n/a n/a n/a n/a not to be replaced P039 n/a n/a Gardener Mowers - Various P&G Light Equip n/a n/a 2yrs listed separately below $5,000 $5,000P040 n/a n/a Gardener Other Plant - P&G Light Equip n/a n/a 2yrs listed seperately below $2,000 $2,000P041 n/a n/a Depot Other Plant - Depot Light Equip n/a n/a 2yrs listed separately below $5,000 $5,000P043 n/a n/a Pool Other Plant - Swimming Pool Light Equip n/a n/a 2yrs listed separately below $2,000 $2,000

P044 n/a n/a Airport Lister Diesel Generator - AIRPORT Generator n/a n/a 15yrs/5000hrs

g p g g low hrs recorded, Replacement not required in forseeable future

P049 MA 3089 n/a Polmac Cinema Equip. Trailer - Enclosed - Dual Axle Trailer Light 24/05/2007 n/a 10yrs $2,627.00P050 MA 2190 n/a Gardener 2wd Toyota Hilux - GARDENER 2wd Utilities 31/10/2007 5 July 2037 4yrs/80000km $19,000.00 Replace with 2wd tray top ute $13,000 $31,116P052 n/a 0901 Works Fogger - Truck Mounted - SS400F Fogger 12/11/2007 n/a 4yrs $4,700.00 current unit not working $1 $7,000 $7,000P053 n/a 0902 Works Fogger - Hand Held -SS150AF Fogger 14/11/2007 n/a 10yrs $1,950.00 not to be replacedP054 MA 043 0941 Gardener Mower Ride On Husqvana HUEZ4220 [42"] Mower 23/04/2008 11 September 1900 6yrs/2000hrs $10,446.00 $3,000 $10,446P055 MA006 0973 Works 2010 Bobcat S185 Skid Steer Loaders 17/11/2010 18 April 1903 6yrs/5000hrs $55,760.00 $20,000 $55,760P0972 MA003 0972 Works 2010 Volvo SD100 Single Drum Roller Rollers 2/11/2010 18 January 1901 10yrs/5000hrs $118,000.00P101 0MA 0384 Admin Toyota Prado Wagon - OFFICE 4x4 Wagon 24/02/2009 4yrs/100000km $52,309.00 Replace with suitable administration vehicle $35,000 $45,000P102 1DPA933 AS102 CEO Toyota Prado Wagon - CEO 4x4 Wagon 5/04/2011 3yrs/100000km $57,022.00 $35,000 $58,500P151 MA 039 Supervisor 2009 Toyota Hilux Dual Cab 4wd D/C Utilities 25/08/2009 4 May 2096 4yrs/80000km $39,018.00 Not to be replaced, sell this plant $28,000P152 MA 2 AS152 Admin 2010 Holden Colorado LX 4x4 Crew Cab 4wd D/C Utilities 7/09/2010 26 November 2027 4yrs/80000km $35,795.00 Replace with suitable vehicle $20,000 $39,990P201 MA 029 Works Volvo 2088 L90F Wheel Loader Loaders 13/02/2009 16 October 1905 10yrs/8000hrs $295,000.00

P221 1DOZ344 AS221 Works Nissan Tip Truck Truck 9/03/2011 13 August 1984 8yrs/200000km $214,046.00purchase price did not include fitment of trailer controls

P222 MA 17 Works Mitsubishi Fuso Truck (Patrol/Patching) Truck 21/11/2011 22 October 1958 8yrs/150000km $86,920.00

retain as road maintenance support/road furniture & signage repair unit. Fit with refueling tank, air-comp.

P251 1CZS671 Gardener New Holland TD70D 4WD Tractor Tractors 5/01/2009 1 March 1901 15yrs/5000hrs $45,700.00P301 1TJE 790 Works Box Trailer Trailer Light 22/07/2008 n/a 10yrs $1,216.00P302 1TJE 791 Gardener Box Trailer Trailer Light 23/07/2008 n/a 10yrs $1,216.00P310 1TKO 114 Works Plant Trailer Trailer Med 18/11/2009 n/a 10yrs $11,500.00P350 1TLD 778 AS350 Works Southern Cross Drop Deck Trailer Trailer Heavy 27/07/2010 n/a 15yrs $77,500.00P351 MA3078 AS351 Works Semi Water Tanker Trailer Heavy 25/11/2010 n/a 15yrs $36,363.00P360 1TIY535 Works Roadwest Dolly Trailer Heavy 11/01/2011 n/a 15yrs $16,363.00P681 MA 038 PE0681 Manager 4WD Dual Cab Hilux Toyota 4wd D/C Utilities 1/07/2012 14 November 1984 3yrs/100000km $39,018.00 $28,000 $47,000

n/a Works Croplands Boom Spray Unit 3pt linkage Plant Other 30/09/2009 n/a 15yrs $13,975.00n/a Caravan Pk Husqvana Ride-on Mower Mower n/a 27 May 1900 6yrs/2000hrs $10,446.00 $1,000 $10,446n/a Gardener Howard HS20RM/HD180 Slasher Plant Other 5/01/2009 n/a 10yrs $6,700.00n/a Works Skid Mounted Water Tank 9000ltr/Pump/piping Plant Other n/a n/a 15yrs $3,000.00 $20,000

560mm Pedestrian Roller Plant Other 10yrs $10,000.00 $10,0004" Pump and Diesel Generator Plant Other 10yrs $20,000.00 $20,000600l Diesel Fuel tank and Pump Plant Other 10yrs $2,000.00 $2,000Chainsaw Plant Other 2-3yrs $750.00 $1 $750 $750Pressure Washer Plant Other 2-3yrs $5,000.00 $100 $5,000 $100 $5,000

$100,348 $178,982 $111,368 $141,904 $631,858 $1,164,460$41,002 $88,101 $58,000 $69,100 $261,000 $517,203

Balance $59,346 $90,881 $53,368 $72,804 $370,858 $647,257

Operator Use

Plant/Asset Description Class Date Purchased

Current Km/HrsYear 5Life Exp.

yrs/km/hrsHistorical Cost

exc. GSTComment

Year 1

Shire of Mount MagnetFour Year Major Plant Replacement Program 2012/13 > 2016/17

Plant NO

Reg. NOAsset NO

4 YEAR PurchacesTrade/Sold Values

Total

Year 2 Year 3 Year 4

Shire of Mount Magnet Corporate Business Plan 43 of 43