ADJOURNMENT (SUPPORTING DOCUMENTS ARE AVAILABLE AT …

27
NOTICE OF PUBLIC MEETING AND EXECUTIVE SESSION PINAL COUNTY FLOOD CONTROL DISTRICT BOARD OF DIRECTORS AGENDA Wednesday, May 27, 2020 9:30 AM - CALL TO ORDER PINAL COUNTY ADMINISTRATIVE COMPLEX BOARD OF SUPERVISORS HEARING ROOM 135 N. PINAL STREET FLORENCE, AZ 85132 BUSINESS BEFORE THE BOARD (Consideration/Approval/Disapproval of the following:) (1) CONSENT ITEMS: All items indicated by an asterisk (*) will be handled by a single vote as part of the consent agenda, unless a Board Member, County Manager, or member of the public objects at the time the agenda item is called. * A. Discussion/approval/disapproval of Minutes from May 6, 2020, Board of Directors Flood Control District meeting. (Natasha Kennedy) * B. Discussion/approval/disapproval of Resolution No. 052720-FL19-007 Drainage Easement as located in Dudleyville at the Welton Wash/Grantor Frank R. Bufanda (FL19-007) (Robert Pate/Scott Bender) * C. Discussion/approval/disapproval of Resolution No. 052720-FL19-008 PCFCD authorizing the County Engineer to submit a grant application to the Natural Resources Conservation Service (NRCS) under the Watershed and Flood Prevention Operations (WFPO) program for the Lower Santa Rosa Wash Watershed Plan. (FL19-008) (Christopher Wanamaker/Scott Bender) * D. Discussion/approval/disapproval of the authorization of the Chairman of the Pinal County Flood Control District Board of Directors to sign the community acknowledgment section of the Letter of Map Revision (LOMR) application for the Queen Creek and Mine Wash Study located within the Town of Superior. The LOMR submittal requests that a portion of the EFFECTIVE Zone AE and Zone A boundaries be revised based on a more detailed floodplain analysis to include new topographic mapping, updated hydrology, and updated hydraulics. The area affected by the proposed map changes is located within Sections 3 and 4 of Township 2 South, Range 12 East and Section 35 of Township 1 South, Range 12 East Gila and Salt River Base and Meridian, Pinal County, Arizona. The FEMA Effective FIRM Panels for the site are Pinal County Map Numbers 04021C0286E and 04021C0290E with an effective date of December 4th, 2007. (FL19-009) (Christopher Wanamaker/Scott Bender) * E. Discussion/approval/disapproval of authorization of the Pinal County Flood Control District to make a payment to the Lower Santa Cruz River Alliance for continued membership and support, for an amount not to exceed $5,000. (FL19-010) (Christopher Wanamaker/Scott Page 1

Transcript of ADJOURNMENT (SUPPORTING DOCUMENTS ARE AVAILABLE AT …

Page 1: ADJOURNMENT (SUPPORTING DOCUMENTS ARE AVAILABLE AT …

NOTICE OF PUBLIC MEETING AND EXECUTIVE SESSIONPINAL COUNTY FLOOD CONTROL DISTRICT

BOARD OF DIRECTORSAGENDA

Wednesday, May 27, 2020

9:30 AM - CALL TO ORDER

PINAL COUNTY ADMINISTRATIVE COMPLEXBOARD OF SUPERVISORS HEARING ROOM

135 N. PINAL STREETFLORENCE, AZ 85132

BUSINESS BEFORE THE BOARD(Consideration/Approval/Disapproval of the following:)

(1) CONSENT ITEMS:

All items indicated by an asterisk (*) will be handled by a single vote as part of the consent agenda, unless aBoard Member, County Manager, or member of the public objects at the time the agenda item is called.

* A. Discussion/approval/disapproval of Minutes from May 6, 2020, Board of Directors FloodControl District meeting. (Natasha Kennedy)

* B. Discussion/approval/disapproval of Resolution No. 052720-FL19-007 Drainage Easement aslocated in Dudleyville at the Welton Wash/Grantor Frank R. Bufanda (FL19-007) (RobertPate/Scott Bender)

* C. Discussion/approval/disapproval of Resolution No. 052720-FL19-008 PCFCD authorizingthe County Engineer to submit a grant application to the Natural Resources ConservationService (NRCS) under the Watershed and Flood Prevention Operations (WFPO) programfor the Lower Santa Rosa Wash Watershed Plan. (FL19-008) (Christopher Wanamaker/ScottBender)

* D. Discussion/approval/disapproval of the authorization of the Chairman of the Pinal CountyFlood Control District Board of Directors to sign the community acknowledgment section ofthe Letter of Map Revision (LOMR) application for the Queen Creek and Mine Wash Studylocated within the Town of Superior. The LOMR submittal requests that a portion of theEFFECTIVE Zone AE and Zone A boundaries be revised based on a more detailedfloodplain analysis to include new topographic mapping, updated hydrology, and updatedhydraulics. The area affected by the proposed map changes is located within Sections 3 and 4of Township 2 South, Range 12 East and Section 35 of Township 1 South, Range 12 EastGila and Salt River Base and Meridian, Pinal County, Arizona. The FEMA Effective FIRMPanels for the site are Pinal County Map Numbers 04021C0286E and 04021C0290E with aneffective date of December 4th, 2007. (FL19-009) (Christopher Wanamaker/Scott Bender)

* E. Discussion/approval/disapproval of authorization of the Pinal County Flood Control Districtto make a payment to the Lower Santa Cruz River Alliance for continued membership andsupport, for an amount not to exceed $5,000. (FL19-010) (Christopher Wanamaker/ScottPage 1

Page 2: ADJOURNMENT (SUPPORTING DOCUMENTS ARE AVAILABLE AT …

Bender)

ADJOURNMENT

(SUPPORTING DOCUMENTS ARE AVAILABLE AT THE CLERK OF THE BOARD OFSUPERVISORS' OFFICE AND AT https://pinal.novusagenda.com/AgendaPublic/)

NOTE: One or more members of the Board may participate in this meeting by telephonic conference call.

The Board may go into Executive Session for the purpose of obtaining legal advice from the County'sAttorney(s) on any of the above agenda items pursuant to A.R.S. 38-431.03(A)(3).

In accordance with the requirement of Title II of the Americans with Disabilities Act (ADA), the Pinal CountyBoard of Supervisors and Pinal County Board of Directors do not discriminate against qualified individuals withdisabilities admission to public meetings. If you need accommodation for a meeting, please contact the Clerk ofthe Board Office at (520) 866-6068, at least (3) three business days prior to the meeting (not including weekendsor holidays) so that your request may be accommodated.

Page 2

Page 3: ADJOURNMENT (SUPPORTING DOCUMENTS ARE AVAILABLE AT …

AGENDA ITEM

May 27, 2020 ADMINISTRATION BUILDING AFLORENCE, ARIZONA

REQUESTED BY: Funds #: Dept. #: Dept. Name: Clerk of the Board

Director: Natasha Kennedy

BRIEF DESCRIPTION OF AGENDA ITEM AND REQUESTED BOARD ACTION:Discussion/approval/disapproval of Minutes from May 6, 2020, Board of Directors Flood Control District meeting.(Natasha Kennedy)

BRIEF DESCRIPTION OF THE FISCAL CONSIDERATIONS AND/OR EXPECTED FISCAL IMPACT OF THIS AGENDAITEM:

BRIEF DESCRIPTION OF THE EXPECTED PERFORMANCE IMPACT OF THIS AGENDA ITEM:

MOTION:Approve as presented.

History Time Who Approval 5/13/2020 3:50 PM Clerk of the Board Yes

ATTACHMENTS:Click to download

Flood Control Minutes

Page 3

Page 4: ADJOURNMENT (SUPPORTING DOCUMENTS ARE AVAILABLE AT …

PINAL COUNTY FLOOD CONTROL DISTRICT BOARD OF DIRECTORS

MINUTES Wednesday, May 6, 2020

9:42 AM BOARD OF DIRECTORS

Chairman Anthony Smith

Director, District 4

Vice-Chairman Pete Rios Director, District 1

Mike Goodman Director, District 2

Stephen Q. Miller

Director, District 3

Todd House Director, District 5

PINAL COUNTYADMINISTRATIVE COMPLEX BOARD OF SUPERVISORS HEARING ROOM

135 N. PINAL STREET FLORENCE, AZ 85132

Page 4

Page 5: ADJOURNMENT (SUPPORTING DOCUMENTS ARE AVAILABLE AT …

All Presentations are attached to the Agenda at: https://pinal.novusagenda.com/AgendaPublic/MeetingView.aspx? MeetingID=1327&MinutesMeetingID=517&doctype=Agenda

and a Video Recording of this meeting can be viewed at: https://pinalcountyaz.swagit.com/play/05062020-714

The Pinal County Flood Control District Board of Directors convened at 9:42 a.m. this date. The meeting was called to order by Chairman Smith.

Members Present: Chairman Anthony Smith; Vice-Chairman Pete Rios; Director Mike Goodman; Director Stephen Q. Miller; Director Todd House

Staff Present: County Manager, Louis Andersen; Chief Civil Deputy County Attorney, Chris Keller; Clerk of the Board, Natasha Kennedy and Deputy Clerk of the Board, Kelsey Pickard

(1) CONSENT ITEMS: All items indicated by an asterisk (*) will be handled by a single vote as part of the consent agenda, unless a Board Member, County Manager, or member of the public objects at the time the agenda item is called. Chairman Smith asked if there were any requests from a Board Member, staff or the audience to remove a consent agenda item for discussion. There were none. Item Action: Approved Consent Agenda Items A and B. Motion Made By: Supervisor House Seconded By: Supervisor Goodman To approve Consent Agenda Items A and B. Motion Passed

Ayes: Goodman, House, Miller, Rios, Smith (5)

* A. Discussion/approval/disapproval of Minutes from March 11, 2020, Board of Directors Flood Control District meeting. (Natasha Kennedy)

* B. Discussion/approval/disapproval designating the County Manager authority over the Flood Control District, Resolution No. 050620-FCD. (Louis Andersen)

Page 5

Page 6: ADJOURNMENT (SUPPORTING DOCUMENTS ARE AVAILABLE AT …

9:43 a.m. – Chairman Smith adjourned the May 6, 2020, Pinal County Flood Control District Board of Directors Meeting and convened the Pinal County Library District Board of Directors Meeting. PINAL COUNTY FLOOD CONTROL DISTRICT BOARD OF DIRECTORS ________________________________ Anthony Smith, Chairman of the Board ATTEST: ________________________________ Natasha Kennedy, Clerk of the Board Minutes Prepared By: Kelsey Pickard, Deputy Clerk of the Board Approval of Minutes: May 27, 2020

Page 6

Page 7: ADJOURNMENT (SUPPORTING DOCUMENTS ARE AVAILABLE AT …

AGENDA ITEM

May 27, 2020 ADMINISTRATION BUILDING AFLORENCE, ARIZONA

REQUESTED BY: Funds #: 68

Dept. #: 311

Dept. Name: Public Works

Director: Scott Bender

BRIEF DESCRIPTION OF AGENDA ITEM AND REQUESTED BOARD ACTION:Discussion/approval/disapproval of Resolution No. 052720-FL19-007 Drainage Easement as located in Dudleyville atthe Welton Wash/Grantor Frank R. Bufanda (FL19-007) (Robert Pate/Scott Bender)

BRIEF DESCRIPTION OF THE FISCAL CONSIDERATIONS AND/OR EXPECTED FISCAL IMPACT OF THIS AGENDAITEM:There aren't any expected fiscal considerations or impacts associated with this agenda item.

BRIEF DESCRIPTION OF THE EXPECTED PERFORMANCE IMPACT OF THIS AGENDA ITEM:There aren't any expected performance impacts associated with this agenda item.

MOTION:Approve as presented

History Time Who Approval 5/13/2020 2:50 PM Public Works Yes

5/13/2020 2:52 PM County Attorney Yes

5/13/2020 4:21 PM County Manager Yes

5/13/2020 4:23 PM Clerk of the Board Yes

ATTACHMENTS:Click to download

Resolution

Page 7

Page 8: ADJOURNMENT (SUPPORTING DOCUMENTS ARE AVAILABLE AT …

Page 8

Page 9: ADJOURNMENT (SUPPORTING DOCUMENTS ARE AVAILABLE AT …

Page 9

Page 10: ADJOURNMENT (SUPPORTING DOCUMENTS ARE AVAILABLE AT …

Page 10

Page 11: ADJOURNMENT (SUPPORTING DOCUMENTS ARE AVAILABLE AT …

Page 11

Page 12: ADJOURNMENT (SUPPORTING DOCUMENTS ARE AVAILABLE AT …

Page 12

Page 13: ADJOURNMENT (SUPPORTING DOCUMENTS ARE AVAILABLE AT …

Page 13

Page 14: ADJOURNMENT (SUPPORTING DOCUMENTS ARE AVAILABLE AT …

Page 14

Page 15: ADJOURNMENT (SUPPORTING DOCUMENTS ARE AVAILABLE AT …

AGENDA ITEM

May 27, 2020 ADMINISTRATION BUILDING AFLORENCE, ARIZONA

REQUESTED BY: Funds #: 68

Dept. #: 311

Dept. Name: Public Works

Director: Scott Bender

BRIEF DESCRIPTION OF AGENDA ITEM AND REQUESTED BOARD ACTION:Discussion/approval/disapproval of Resolution No. 052720-FL19-008 PCFCD authorizing the County Engineer tosubmit a grant application to the Natural Resources Conservation Service (NRCS) under the Watershed and FloodPrevention Operations (WFPO) program for the Lower Santa Rosa Wash Watershed Plan. (FL19-008) (ChristopherWanamaker/Scott Bender)

BRIEF DESCRIPTION OF THE FISCAL CONSIDERATIONS AND/OR EXPECTED FISCAL IMPACT OF THIS AGENDAITEM:The grant proposal includes a statement of intent to provide a local match of approximately 10% ($58,000) to the studythrough cash and in-kind services to be allocated in current and future budget years, subject to federal funding approval.

BRIEF DESCRIPTION OF THE EXPECTED PERFORMANCE IMPACT OF THIS AGENDA ITEM:This project will serve to prepare a watershed plan for the Lower Santa Rosa Wash watershed which will createopportunities to obtain additional funding for flood mitigation projects including the design and construction of floodcontrol infrastructure.

MOTION:Approve as presented

History Time Who Approval 5/13/2020 2:50 PM Public Works Yes

5/13/2020 2:52 PM County Attorney Yes

5/13/2020 4:21 PM County Manager Yes

5/13/2020 4:23 PM Clerk of the Board Yes

ATTACHMENTS:Click to download

Page 15

Page 17: ADJOURNMENT (SUPPORTING DOCUMENTS ARE AVAILABLE AT …

When recorded return to: Pinal County Flood Control District P.O. Box 727 Florence, Arizona 85132

RESOLUTION No. ______________ A RESOLUTION OF THE PINAL COUNTY FLOOD CONTROL DISTRICT TO FILE A GRANT APPLICATION WITH THE NATURAL RESOURCES CONSERVATION SERVICE (NRCS) UNDER THE WATERSHED AND FLOOD PREVENTION OPERATIONS (WFPO) PROGRAM FOR FUNDING OF THE LOWER SANTA ROSA WASH WATERSHED PLAN.

WHEREAS, the Pinal County Flood Control District (District) was established in accordance with provisions of Arizona Revised Statutes Title 48, Chapter 21, which authorizes the Board of Directors of the Pinal County Flood Control District (Board) to apply for grants to obtain federal funds to develop plans and to design, construct, operate and maintain flood control works and storm drainage facilities within or without the District for the benefit of the District; and, WHEREAS, the District has identified a need to develop a watershed plan for the Lower Santa Rosa Wash which will support future efforts to mitigate flooding, provide watershed protection, reduce soil erosion, and to improve groundwater recharge; and, WHEREAS, the District desires to leverage available federal funds from the Natural Resources Conservation Service (NRCS) by filing a grant application (Grant) to develop the Lower Santa Rosa Wash Watershed Plan; and, WHEREAS, the District desires to develop within the Lower Santa Rosa Wash Watershed Plan which will create opportunities to obtain additional federal funds in the future to support the design and construction of flood control improvements within the Lower Santa Rosa Wash Watershed. NOW, THEREFORE, BE IT RESOLVED that the Board of Directors of the Pinal County Flood Control District authorizes an application to be filed for NRCS Grant funding in support of the Lower Santa Rosa Wash Watershed Plan; and, BE IT FURTHER RESOLVED that Scott Bender, the County Engineer is authorized and directed to provide signatures on all documents, forms, and paperwork necessary to obtain funding from the NRCS in support of the Lower Santa Rosa Wash Watershed Plan; and, BE IT FURTHER RESOLVED that Scott Bender, the County Engineer is authorized and directed to allocate in the District’s current and future budget to support the Lower Santa Rosa Wash Watershed Plan, subject to the ratification and approval of this Board; Dated this ______ day of _______, 20____, by the PINAL COUNTY FLOOD CONTROL DISTRICT BOARD OF DIRECTORS.

Anthony Smith Chairman, Board of Directors ATTEST: Natasha Kennedy Clerk of the Board

APPROVED AS TO FORM: __________________________________ Kevin Costello Pinal County Flood Control District

Page 17

Page 18: ADJOURNMENT (SUPPORTING DOCUMENTS ARE AVAILABLE AT …

84 84

8484

347

84

84 287287 287

84

347

387

387

84

8 8

MARICOPA-CASA GRANDE HWY

10

10

8 8

Copyright:© 2013 National Geographic Society, i-cubed, Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS,AeroGRID, IGN, and the GIS User Community

LegendLower Santa Rosa Watershed

FEMAFlood Zone

AAEAHAO ®

0 7 143.5 Miles

Page 18

ChrisWa
Text Box
Lower Santa Rosa Wash Watershed Plan Area = 122,123 acres (190.82 sqmi) Study Cost = $573,000 ($58,000 Local)
Page 19: ADJOURNMENT (SUPPORTING DOCUMENTS ARE AVAILABLE AT …

AGENDA ITEM

May 27, 2020 ADMINISTRATION BUILDING AFLORENCE, ARIZONA

REQUESTED BY: Funds #: 68

Dept. #: 311

Dept. Name: Public Works

Director: Scott Bender

BRIEF DESCRIPTION OF AGENDA ITEM AND REQUESTED BOARD ACTION:Discussion/approval/disapproval of the authorization of the Chairman of the Pinal County Flood Control District Boardof Directors to sign the community acknowledgment section of the Letter of Map Revision (LOMR) application for theQueen Creek and Mine Wash Study located within the Town of Superior. The LOMR submittal requests that a portionof the EFFECTIVE Zone AE and Zone A boundaries be revised based on a more detailed floodplain analysis to includenew topographic mapping, updated hydrology, and updated hydraulics. The area affected by the proposed mapchanges is located within Sections 3 and 4 of Township 2 South, Range 12 East and Section 35 of Township 1 South,Range 12 East Gila and Salt River Base and Meridian, Pinal County, Arizona. The FEMA Effective FIRM Panels for thesite are Pinal County Map Numbers 04021C0286E and 04021C0290E with an effective date of December 4th, 2007.(FL19-009) (Christopher Wanamaker/Scott Bender)

BRIEF DESCRIPTION OF THE FISCAL CONSIDERATIONS AND/OR EXPECTED FISCAL IMPACT OF THIS AGENDAITEM:There will be no fiscal impact to Pinal County due to the approval of this LOMR.

BRIEF DESCRIPTION OF THE EXPECTED PERFORMANCE IMPACT OF THIS AGENDA ITEM:This action will serve to approve a floodplain map change based on a more detailed floodplain analysis. Review ofLetters of Map Revision (LOMR) is required by Pinal County’s participation in the National Flood Insurance Program.

MOTION:Approve as presented.

History Time Who Approval 5/13/2020 4:01 PM Public Works Yes

5/13/2020 4:03 PM County Attorney Yes

5/13/2020 4:21 PM County Manager Yes

5/13/2020 4:24 PM Clerk of the Board Yes

Page 19

Page 20: ADJOURNMENT (SUPPORTING DOCUMENTS ARE AVAILABLE AT …

ATTACHMENTS:Click to download

Agreement

Page 20

Page 21: ADJOURNMENT (SUPPORTING DOCUMENTS ARE AVAILABLE AT …

FEMA Form 086-0-27, (2/2011) Previously FEMA Form 81-89 MT-2 Form 1 Page 1 of 3

U.S. DEPARTMENT OF HOMELAND SECURITY FEDERAL EMERGENCY MANAGEMENT AGENCY

OVERVIEW & CONCURRENCE FORM

O.M.B No. 1660-0016

Expires February 28, 2014

PAPERWORK BURDEN DISCLOSURE NOTICE

Public reporting burden for this form is estimated to average 1 hours per response. The burden estimate includes the time for reviewing instructions, searching existing data sources, gathering and maintaining the needed data, and completing, reviewing, and submitting the form. You are not required to respond to this collection of information unless it displays a valid OMB control number. Send comments regarding the accuracy of the burden estimate and any suggestions for reducing this burden to: Information Collections Management, Department of Homeland Security, Federal Emergency Management Agency, 1800 South Bell Street, Arlington, VA 20958-3005, Paperwork Reduction Project (1660-0016). Submission of the form is required to obtain or retain benefits under the National Flood Insurance Program. Please do not send your completed survey to the above address.

PRIVACY ACT STATEMENT

AUTHORITY: The National Flood Insurance Act of 1968, Public Law 90-448, as amended by the Flood Disaster Protection Act of 1973, Public Law 93-234.

PRINCIPAL PURPOSE(S): This information is being collected for the purpose of determining an applicant's eligibility to request changes to National Flood Insurance Program (NFIP) Flood Insurance Rate Maps (FIRM).

ROUTINE USE(S): The information on this form may be disclosed as generally permitted under 5 U.S.C § 552a(b) of the Privacy Act of 1974, as amended. This includes using this information as necessary and authorized by the routine uses published in DHS/FEMA/NFIP/LOMA-1 National Flood Insurance Program (NFIP); Letter of Map Amendment (LOMA) February 15, 2006, 71 FR 7990.

DISCLOSURE: The disclosure of information on this form is voluntary; however, failure to provide the information requested may delay or prevent FEMA from processing a determination regarding a requested change to a (NFIP) Flood Insurance Rate Maps (FIRM).

A. REQUESTED RESPONSE FROM DHS-FEMA

This request is for a (check one):

CLOMR: A letter from DHS-FEMA commenting on whether a proposed project, if built as proposed, would justify a map revision, or proposed hydrology changes (See 44 CFR Ch. 1, Parts 60, 65 & 72).

LOMR: A letter from DHS-FEMA officially revising the current NFIP map to show the changes to floodplains, regulatory floodway or flood

elevations. (See 44 CFR Ch. 1, Parts 60, 65 & 72)

B. OVERVIEW

1. The NFIP map panel(s) affected for all impacted communities is (are):

Community No. Community Name State Map No. Panel No. Effective Date

Example: 480301 480287

City of Katy Harris County

TX TX

48473C 48201C

0005D 0220G

02/08/83 09/28/90

040119 Town of Superior AZ 04021C 0286E 12/4/200

2. a. Flooding Source: Queen Creek & Mine Wash b. Types of Flooding: Riverine Coastal Shallow Flooding (e.g., Zones AO and AH)

Alluvial fan Lakes Other (Attach Description) 3. Project Name/Identifier: Alamo, Sahuara and Van Buren Washes LOMR 4. FEMA zone designations affected: A, AH, AE (choices: A, AH, AO, A1-A30, A99, AE, AR, V, V1-V30, VE, B, C, D, X) 5. Basis for Request and Type of Revision:

a. The basis for this revision request is (check all that apply)

Physical Change Improved Methodology/Data Regulatory Floodway Revision Base Map Changes

Coastal Analysis Hydraulic Analysis Hydrologic Analysis Corrections

Weir-Dam Changes Levee Certification Alluvial Fan Analysis Natural Changes

New Topographic Data Other (Attach Description)

Note: A photograph and narrative description of the area of concern is not required, but is very helpful during review.

Page 21

Page 22: ADJOURNMENT (SUPPORTING DOCUMENTS ARE AVAILABLE AT …

FEMA Form 086-0-27, (2/2011) Previously FEMA Form 81-89 MT-2 Form 1 Page 2 of 3

b. The area of revision encompasses the following structures (check all that apply)

Structures: Channelization Levee/Floodwall Bridge/Culvert

Dam Fill Other (Attach Description)

6. Documentation of ESA compliance is submitted (required to initiate CLOMR review). Please refer to the instructions for more information.

C. REVIEW FEE

Has the review fee for the appropriate request category been included? Yes Fee amount: $

No, Attach Explanation

Please see the DHS-FEMA Web site at http://www.fema.gov/plan/prevent/fhm/frm_fees.shtm for Fee Amounts and Exemptions.

D. SIGNATURE

All documents submitted in support of this request are correct to the best of my knowledge. I understand that any false statement may be punishable by fine or imprisonment under Title 18 of the United States Code, Section 1001.

Name: John Wallace, PE Company: JE Fuller/Hydrology & Geomorphology

Mailing Address: 40 E. Helen Street Tucson, AZ 85701

Daytime Telephone No.: 520-623-3112 Fax No.: 520-623-3130

E-Mail Address: [email protected]

Signature of Requester (required): Date: 12/17/2019

As the community official responsible for floodplain management, I hereby acknowledge that we have received and reviewed this Letter of Map Revision (LOMR) or conditional LOMR request. Based upon the community's review, we find the completed or proposed project meets or is designed to meet all of the community floodplain management requirements, including the requirements for when fill is placed in the regulatory floodway, and that all necessary Federal, State, and local permits have been, or in the case of a conditional LOMR, will be obtained. For Conditional LOMR requests, the applicant has documented Endangered Species Act (ESA) compliance to FEMA prior to FEMA’s review of the Conditional LOMR application. For LOMR requests, I acknowledge that compliance with Sections 9 and 10 of the ESA has been achieved independently of FEMA’s process. For actions authorized, funded, or being carried out by Federal or State agencies, documentation from the agency showing its compliance with Section 7(a)(2) of the ESA will be submitted. In addition, we have determined that the land and any existing or proposed structures to be removed from the SFHA are or will be reasonably safe from flooding as defined in 44CFR 65.2(c), and that we have available upon request by FEMA, all analyses and documentation used to make this determination.

Community Official’s Name and Title: Anthony Smith, Chairman of the Pinal County Flood Control District Board of Directors

Community Name: Pinal County

Mailing Address:

PO Box 827

Florence 85132

Daytime Telephone No.: 520-509-3555 Fax No.: 520-866-6511

E-Mail Address: [email protected]

Community Official’s Signature (required): Date:

CERTIFICATION BY REGISTERED PROFESSIONAL ENGINEER AND/OR LAND SURVEYOR

This certification is to be signed and sealed by a licensed land surveyor, registered professional engineer, or architect authorized by law to certify elevation information data, hydrologic and hydraulic analysis, and any other supporting information as per NFIP regulations paragraph 65.2(b) and as described in the MT-2 Forms Instructions. All documents submitted in support of this request are correct to the best of my knowledge. I understand that any false statement may be punishable by fine or imprisonment under Title 18 of the United States Code, Section 1001.

Certifier’s Name: John Wallace License No.: AZ Civil Eng 22922 Expiration Date: 12-31-2019

Company Name: JE Fuller/Hydrology & Gemorphology Telephone No.: 520-623-3112 Fax No.: 520-623-3130

Signature: Date: 12/17/2019

E-Mail Address: [email protected]

Improved data

Page 22

Page 23: ADJOURNMENT (SUPPORTING DOCUMENTS ARE AVAILABLE AT …

FEMA Form 086-0-27, (2/2011) Previously FEMA Form 81-89 MT-2 Form 1 Page 3 of 3

Ensure the forms that are appropriate to your revision request are included in your submittal.

Form Name and (Number) Required if …

Riverine Hydrology and Hydraulics Form (Form 2) New or revised discharges or water-surface elevations

Riverine Structures Form (Form 3) Channel is modified, addition/revision of bridge/culverts, addition/revision of levee/floodwall, addition/revision of dam

Coastal Analysis Form (Form 4) New or revised coastal elevations

Coastal Structures Form (Form 5) Addition/revision of coastal structure

Alluvial Fan Flooding Form (Form 6) Flood control measures on alluvial fans

Seal (Optional)

Page 23

Page 24: ADJOURNMENT (SUPPORTING DOCUMENTS ARE AVAILABLE AT …

Technical Support Data Notebook Section 1: Introduction

LOMR – Queen Creek, Pinal County, AZ

Page 1-2

Figure 1.1 - Location Map of Study AreaStudy Location Map, Town of Superior, Pinal County, AZ

Page 24

Page 25: ADJOURNMENT (SUPPORTING DOCUMENTS ARE AVAILABLE AT …

Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community

Queen Creek & Mine Wash LOMR Annotated FIRM - Superior, AZ

LegendQueen Creek Revised Floodway

Queen Creek Revised 100-yr Floodplain

Queen Creek Revised 500-yr Floodplain

Mine Wash Removed Floodplain

. 1 inch = 500 feet

BACKROUND BLUE SHADING IS EXISTING FIS NFHL LAYER

All elevations are North American Vertical Datum of 1988 (NAVD 88).

May 5th, 2020

Page 25

Page 26: ADJOURNMENT (SUPPORTING DOCUMENTS ARE AVAILABLE AT …

AGENDA ITEM

May 27, 2020 ADMINISTRATION BUILDING AFLORENCE, ARIZONA

REQUESTED BY: Funds #: 68

Dept. #: 311

Dept. Name: Public Works

Director: Scott Bender

BRIEF DESCRIPTION OF AGENDA ITEM AND REQUESTED BOARD ACTION:Discussion/approval/disapproval of authorization of the Pinal County Flood Control District to make a payment to theLower Santa Cruz River Alliance for continued membership and support, for an amount not to exceed $5,000. (FL19-010) (Christopher Wanamaker/Scott Bender)

BRIEF DESCRIPTION OF THE FISCAL CONSIDERATIONS AND/OR EXPECTED FISCAL IMPACT OF THIS AGENDAITEM:There will be a $5,000 cost to be paid by the Pinal County Flood Control District.

BRIEF DESCRIPTION OF THE EXPECTED PERFORMANCE IMPACT OF THIS AGENDA ITEM:Utilizing the Lower Santa Cruz River Alliance is a cost effective way to increase partnerships and improve with Federalagencies for the goal of mitigating flooding in the Lower Santa Cruz Region.

MOTION:Approve as presented.

History Time Who Approval 5/13/2020 4:01 PM Public Works Yes

5/13/2020 4:04 PM County Attorney Yes

5/13/2020 4:20 PM County Manager Yes

5/13/2020 4:25 PM Clerk of the Board Yes

ATTACHMENTS:Click to download

Back up

Page 26

Page 27: ADJOURNMENT (SUPPORTING DOCUMENTS ARE AVAILABLE AT …

InvoiceDate

5/15/2020

Invoice #

226

Bill To

Pinal CountyChris Wanamaker

Lower Santa Cruz River Alliance, Inc.

2999 N 44th StreetSuite 130Phoenix, AZ 85018

P.O. No. Terms Project

Please be advised that your annual membershipcontribution is not tax-deductible for income taxpurposes

Total

DescriptionQuantity Rate Amount

Member dues for year beginning 7/1/20 5,000.00 5,000.00

$5,000.00

Page 27