AD/ELENA (B193) Hall Extension F. Butin. Status The need of a new building for AD was already...

18
AD/ELENA (B193) Hall Extension F. Butin

Transcript of AD/ELENA (B193) Hall Extension F. Butin. Status The need of a new building for AD was already...

Page 1: AD/ELENA (B193) Hall Extension F. Butin. Status The need of a new building for AD was already discussed in 2010, First pre-study shown to GTPE 1st Sept.

AD/ELENA (B193) Hall Extension

 

 F. Butin

Page 2: AD/ELENA (B193) Hall Extension F. Butin. Status The need of a new building for AD was already discussed in 2010, First pre-study shown to GTPE 1st Sept.

Status The need of a new building for AD was

already discussed in 2010, First pre-study shown to GTPE 1st Sept 2010

Designed building v1 with CE in Dec 11 Specific presentation to GTPE on 12/01/2012 Shown in Site Committe by P. Collier on

23/02/12 Recommended to proceed with MS/CfT in

SPSC on 23/02/12 Specification document with all services

integration is ready on EDMS (https://edms.cern.ch/document/1207244/1 )

Decision from directorate still expectedF. Butin

Page 3: AD/ELENA (B193) Hall Extension F. Butin. Status The need of a new building for AD was already discussed in 2010, First pre-study shown to GTPE 1st Sept.

Reasons for an extension of AD hall

F. Butin

Four main goals for an extension of AD hall:

1. Accommodate for ELENA ring and experimental areas

2. Relocate the existing workshop3. Provide short term storage space for

experiments4. Host the magnetic horns test bench

Page 4: AD/ELENA (B193) Hall Extension F. Butin. Status The need of a new building for AD was already discussed in 2010, First pre-study shown to GTPE 1st Sept.

New building details

Surface needed: Storage: 180 m2 Kickers: 200 m2 Workshop: 50 m2 Horn test bench: 70 m2 CV installation: 10 m2 Circulation: 60 m2 Total: 570 m2

F. Butin / S. MauryIEFC 24th of February 2012

Page 5: AD/ELENA (B193) Hall Extension F. Butin. Status The need of a new building for AD was already discussed in 2010, First pre-study shown to GTPE 1st Sept.

Extension building proposal

F. Butin / S. MauryIEFC 24th of February 2012

570 m2 AD hall extension

Sketch: A. Kosmicki

Page 6: AD/ELENA (B193) Hall Extension F. Butin. Status The need of a new building for AD was already discussed in 2010, First pre-study shown to GTPE 1st Sept.

TT2

TTL2

TT7

Booster

193

Extension

181

Sketch: A. KosmickiF. Butin

Page 7: AD/ELENA (B193) Hall Extension F. Butin. Status The need of a new building for AD was already discussed in 2010, First pre-study shown to GTPE 1st Sept.

F. Butin

Accès

193

ExtensionBlocs à évacuer

Butte à excaver

Sketch: A. Kosmicki

Page 8: AD/ELENA (B193) Hall Extension F. Butin. Status The need of a new building for AD was already discussed in 2010, First pre-study shown to GTPE 1st Sept.

New building details

F. Butin

Complete CE project by A. Kosmicki and L. Lopez on EDMS# 1176220

Sketch: A. Kosmicki

Page 9: AD/ELENA (B193) Hall Extension F. Butin. Status The need of a new building for AD was already discussed in 2010, First pre-study shown to GTPE 1st Sept.

F. Butin

Magnetic horns test

bench (10 x 7 m2)

Workshop (5 x 10

m2)Offloading area(8x2.3 m2)

Storage (5 x 9 m2)

Storage (7x4 m2)

Storage (7x4 m2)

Sto

rag

e (1

4x2

m2

)

Sto

rag

e (7

x2

m2

)

Kickers 12.7 x 14.7 m2

Test bench

7 x 10 m2

Page 10: AD/ELENA (B193) Hall Extension F. Butin. Status The need of a new building for AD was already discussed in 2010, First pre-study shown to GTPE 1st Sept.

Magnetic horns test bench

F. Butin

Page 11: AD/ELENA (B193) Hall Extension F. Butin. Status The need of a new building for AD was already discussed in 2010, First pre-study shown to GTPE 1st Sept.

Workshop layout

F. Butin

Workshop (5 x 10 m2)

Drill DrillMachine

tool

Sin

k

Page 12: AD/ELENA (B193) Hall Extension F. Butin. Status The need of a new building for AD was already discussed in 2010, First pre-study shown to GTPE 1st Sept.

EL integration

F. Butin

Cable trays

Main cabinet

Page 13: AD/ELENA (B193) Hall Extension F. Butin. Status The need of a new building for AD was already discussed in 2010, First pre-study shown to GTPE 1st Sept.

EL integration Distribution cabinet on NE wall Kickers: 380 V – 200A Crane (10t, 6m below hook): 380 V –

15 kW HVAC: 380 V – 80 A plus 380 V – 25

A Power sockets blocks (3 x 16 A + 1

x 32 A) every 7 m, plus additional in workshop

3x 63 A sockets, 1 for test bench Lighting on the ceiling

F. Butin

Page 14: AD/ELENA (B193) Hall Extension F. Butin. Status The need of a new building for AD was already discussed in 2010, First pre-study shown to GTPE 1st Sept.

EL integration

F. Butin

Cables trayshave to go

Page 15: AD/ELENA (B193) Hall Extension F. Butin. Status The need of a new building for AD was already discussed in 2010, First pre-study shown to GTPE 1st Sept.

CV integration HVAC system for 20 kW internal

heat load Demineralized water for detector

cooling tests (100 l/s) Tap water, sink Compressed air (6 outlets) Smoke extraction

F. Butin

Page 16: AD/ELENA (B193) Hall Extension F. Butin. Status The need of a new building for AD was already discussed in 2010, First pre-study shown to GTPE 1st Sept.

CV integration, HVAC system

F. Butin

Y. Body, EN/CV

Page 17: AD/ELENA (B193) Hall Extension F. Butin. Status The need of a new building for AD was already discussed in 2010, First pre-study shown to GTPE 1st Sept.

Misc IT network: Wifi + internet sockets Access control: on all doors, same

access rights as AD hall Radiation classification: Supervised

area Radiation monitoring: Interlock with

TT2 operation. 80 cm thick slab above void surrounding AD

F. Butin

Page 18: AD/ELENA (B193) Hall Extension F. Butin. Status The need of a new building for AD was already discussed in 2010, First pre-study shown to GTPE 1st Sept.

Conclusion A new multipurpose building is urgently

needed for : - AD/ELENA kickers generators

- Short term storage for delicate physics detectors, for existing and future experiments

- Workshop for the experiments - Magnetic horn test bench

It is absolutely mandatory if Gbar exp is approved

This will give vital space for ELENA machine, approved experiment (Gbar) and new antiproton experiments in the future.

We are in the starting blocks !F. Butin / S. MauryIEFC 24th of February 2012