Adel Fawzy CV Update 2015
-
Upload
adel-mohamed -
Category
Documents
-
view
246 -
download
1
Transcript of Adel Fawzy CV Update 2015
![Page 1: Adel Fawzy CV Update 2015](https://reader035.fdocuments.in/reader035/viewer/2022081812/58ab020f1a28abd35e8b5eff/html5/thumbnails/1.jpg)
Adel Muhamed Fawzy Ibrahim Tahon Egypt
Elmena-Safour, Diarb-Negm, El-Sharkia
Cell Number (+2) 01228137837
Home Number (+2) 055-3830792
PERSONAL DETAILS
Date of Birth: 30 September1989.
Nationality: Egyptian.
Marital Status: Single.
Military status: Completed.
PROFILE
Competent electrical engineer with two years' experience in Oil and Gas industry which is providing me with a comprehensive
knowledge of designing, developing and maintaining electrical systems and components to required specifications, focusing on
economy, safety, reliability, quality and sustainability.
CAREER OBJECTIVE
Seeking for a job in the field of Electrical power & Industrial Automation Maintenance and engineering through which I can gain
more experience and enhance my technical as well as interpersonal skills.
Related work experience
Electrical Engineer
Quality Control Company for Khalda Petroleum Company (EGPC /Apache joint
venture).
Razzak oil field, Western desert, Egypt.
April 2013 – Present (2 years)
Brief description RZK field is an oil production field with ±30,000 BOPD which depends on artificial lift using ESP or sucker
rod systems.
Duties
Maintenance duties
Creating and following up periodic (daily, weekly and monthly) check list of electrical equipment.
Creating and upgrading maintenance schedule program of electrical facilities and equipment
including:
Transformer type: multi taps transformers
Generator type: SR4B and SR5 Caterpillar alternator which is driven by CAT3400
& 3500 Series diesel engines.
Switchgears: Schneider Blokset , ABB MNS 3.0
UPS systems (E.T.N and Schneider APC)
L.V cables: Elsewedy cables with 600V insulation voltages for different current
ampacities.
![Page 2: Adel Fawzy CV Update 2015](https://reader035.fdocuments.in/reader035/viewer/2022081812/58ab020f1a28abd35e8b5eff/html5/thumbnails/2.jpg)
Following up maintenance schedule (monthly, Semi-annual &annual) via oracle software (or excel)
and make sure that they are correctly carried out.
Involved in allocating work orders and work permits and supervising the actual execution of work on
site.
Excellent knowledge of using testing equipment to perform PMs on several electrical equipment.
Troubleshooting duties .
Carryout the proper procedure in checking the fault with the aid of electrical diagram and manuals
and raising upset report of electrical equipment failures to my superiors to investigate root cause to
avoid constant repetition.
Using Caterpillar Electronic technician (ET) in troubleshooting testing calibrating and adjusting
caterpillar generators.
Engineering duties
Studying existing load and making load forecasting study to upgrade power source to central turbine
power plant and overhead transmission lines.
Raise & Review MOC (Management of Change) for existing installations in KPC Razzak Field
Prepared data sheet and material requisition package for Electrical Transformers, camp and mess
electrical equipment, cables, Electrical Power Distribution Center containing Switchgears, MCC
(motors controllers and protection, soft starters and VSDs), Distribution Panels, UPS, motors and
Generators.
Design Earthing Protection Systems (Designing, supplying, Installation & Testing).
Performing of Electrical Sizing Calculations & Adequacy Checks for Generators, Switchgears,
Transformers & Power Cables.
Adjusting, installing and programming with Power management system [DSE 5510, DSE8610,
Comap IC-MINT, Woodward LSM, Woodward 2301A & Woodward EPG] for controlling speed,
load shedding and load sharing between generators according to presetting sequence and protection.
Prepared One Line diagram, block diagram and schematic diagram in Autocad electrical.
Attending factory acceptance test (FAT) for various electrical installations.
Performed Load Flow, Short circuit, voltage drop calculation for AC system, harmonic and Device
coordination study in ETAP & Easy power software.
Prepare cable schedule, calculate voltage drop for AC system and perform cable sizing, bill of
materials, requisition.
Assist in preparation of electrical scope of work, cost estimates for proposal work Ensured that HSE
policies and procedures are strictly implemented
Electrical Engineer
Engineering Projects CO. (EPCO)
Nasr City, Cairo, Egypt.
August 2011 – February 2012 (6months)
Duties
Installing. Maintenance and troubleshooting for burners and boilers control and protection system.
EDUCATION HISTORY
Zagazig university: B.Sc. of electrical Power Engineering (2011) with total GPA[71.63%].
Project Description: Designing of electrical installation for a resort [grade: excellent].
Summer training:
Gulf Of Suez Petroleum Company GUPCO (2009).
Petrojet (2010).
Summer courses:
Programmable logic controllers at High Technology Center (HTC) at Cairo university.
Classic Control (at ITC 10th of Ramadan).
![Page 3: Adel Fawzy CV Update 2015](https://reader035.fdocuments.in/reader035/viewer/2022081812/58ab020f1a28abd35e8b5eff/html5/thumbnails/3.jpg)
International computer driving license (ICDL) .
Autocad (2-d) Hi-Q Academy.
Languages
Arabic (Mother Tongue).
English (Fluent).
KEY SKILLS
Strong decision-making skills and the ability to prioritize and plan effectively.
Methodical approach to all tasks. Excellent, flexibility and creativity skills.
Able to assist or instruct electricians.
Above Average Ability to work under pressure and limited resources.
Ability to build positive business relationships, Superior communication skills, interpersonal, proactive attitude and
excellent team player.
Excellent engineering, analytical, troubleshooting and team leadership skills.
Capable of performing technical studies and writing technical report.
COMPUTER SKILLS
Good knowledge in software programming and network system.
Expertise in MS Office suite and document control software.
ENGINEERING SKILLS
Excellent knowledge in electrical calculation and design of control and protection systems for generators, switchgears,
MCC, motors, drives, UPS and substation for oil and gas industries.
Excellent knowledge in preparing electrical specification, data sheet and material requisition.
Good knowledge in modeling and studying (short circuit, load flow, device coordination, harmonic analysis and system
stability) of electrical systems using electrical engineering software (ETAP and Easy Power)
Excellent knowledge of electrical standards: NEC, ANSI, NFPA, IEEE, IEC, and NEMA.
Good knowledge in PLC.
Good working knowledge of upstream and downstream oil production and processing system including understanding
ESP and Sucker rod oil production operations and surface facilities for oil processing.
Excellent knowledge of using Autocad 2-D and Autocad electrical for creating electrical drawing (one line, schematic,
equipment plan, area classification etc.).
Hobbies and interests
Running, Classic music & Internet Surfing.
Active contributor to online global electrical engineering forum.
REFEREES
Mr. Ron McNeil Deputy Maintenance Manager
Apache/Khalda Joint Venture
Abu Gharadig Facility Egypt
Canadian Number 00-1-403-885-4138
Egyptian Number +201220427236
E-Mail: [email protected]
Eng. Mohamed Ahmed Saleh
Khalda Petroleum Company
Operation-Engineering Dept. [Surface
Facilities]
TEL: (+2) 02- 27022257 - Internal: 1672
MOBILE: (+2) 0122- 041 13 08
E-Mail: [email protected]