ADDENDUM SUMMARY www.corgan.com CANYON INDEPENDENT SCHOOL DISTRICT PROJECT NAME: CANYON INTERMEDIATE SCHOOL RENOVATIONS PROJECT NUMBER: 18378.0000 Date: 03/04/2019 Addendum # 2 This addendum contains changes to the requirements of the contract drawings and/or project manual. Such changes shall be incorporated into the contract documents and shall apply to the work with the same meaning and force as if they had been included in the original documents. Wherever this addendum modifies a portion of the paragraph of project manual or any portion of the drawing, the remainder of the paragraph of drawing affected shall remain in force. The conditions of the basic project manual shall govern all work described in this addendum. Wherever the conditions of work and the quality of quantity of materials or workmanship are not fully described in this Addendum, the conditions of work, etc. included in the basic project manual for similar items of work shall apply to the work described in this addendum. The “Conditions of the Contract” apply to all work described in this Addendum. The following changes shall be and are hereby made: DRAWING REVISIONS: ARCHITECTURAL ITEM NO. 1.01 SHEET COVER COVER SHEET Refer to attached sheet for revised sheet index. ITEM NO. 1.02 SHEET A08-41 DOOR SCHEDULE, DOOR AND FRAME DETAILS Refer to attached sheet for revisions to hardware for doors DRAWING REVISIONS: ELECTRICAL ITEM NO. 1.03 Sheet E01-03C, SPECIAL SYSTEMS FLOOR PLAN SEGMENT C Add additional access control door rough-in and power supply connection as indicated on the attached revised sheet. SUBMITTED PROPOSER QUESTIONS NOT OTHERWISE ADDRESSED HEREIN ITEM NO. 1.04 There is an existing tack strip on the p-lam wall panels. Do we need to add a tack strip to the areas we are salvaging or installing new P-lam panels?

Transcript of ADDENDUM SUMMARY - swgc.net › uploads › 18378-intermediate-add02.pdf · end of addendum summary...

Page 1: ADDENDUM SUMMARY - swgc.net › uploads › 18378-intermediate-add02.pdf · end of addendum summary . date job sheet issues revisions for architect m e p construction manager project

ADDENDUM SUMMARY

www.corgan.com

CANYON INDEPENDENT SCHOOL DISTRICT

PROJECT NAME: CANYON INTERMEDIATE SCHOOL RENOVATIONS

PROJECT NUMBER: 18378.0000

Date: 03/04/2019

Addendum # 2

This addendum contains changes to the requirements of the contract drawings and/or project manual. Such changes

shall be incorporated into the contract documents and shall apply to the work with the same meaning and force as if

they had been included in the original documents. Wherever this addendum modifies a portion of the paragraph of

project manual or any portion of the drawing, the remainder of the paragraph of drawing affected shall remain in

force.

The conditions of the basic project manual shall govern all work described in this addendum. Wherever the conditions

of work and the quality of quantity of materials or workmanship are not fully described in this Addendum, the

conditions of work, etc. included in the basic project manual for similar items of work shall apply to the work described

in this addendum.

The “Conditions of the Contract” apply to all work described in this Addendum.

The following changes shall be and are hereby made:

DRAWING REVISIONS: ARCHITECTURAL

ITEM NO. 1.01 SHEET COVER – COVER SHEET

Refer to attached sheet for revised sheet index.

ITEM NO. 1.02 SHEET A08-41 – DOOR SCHEDULE, DOOR AND FRAME DETAILS

Refer to attached sheet for revisions to hardware for doors

DRAWING REVISIONS: ELECTRICAL

ITEM NO. 1.03 Sheet E01-03C, SPECIAL SYSTEMS FLOOR PLAN – SEGMENT C

Add additional access control door rough-in and power supply connection as indicated on the attached revised

sheet.

SUBMITTED PROPOSER QUESTIONS NOT OTHERWISE ADDRESSED HEREIN

ITEM NO. 1.04 There is an existing tack strip on the p-lam wall panels. Do we need to add a tack strip to the areas

we are salvaging or installing new P-lam panels?

Page 2: ADDENDUM SUMMARY - swgc.net › uploads › 18378-intermediate-add02.pdf · end of addendum summary . date job sheet issues revisions for architect m e p construction manager project

Page 2 of 2

Yes, existing tack strips to be salvaged and reused in new p-lam wall panels. If quantity of existing tack strips is

not adequate for the quantity of p-lam panels, provide new tack strips as necessary.

ITEM NO. 1.05 Was the control wiring for the HVAC units to be by the CISD. I seem to recall this conversation at

Sundown with Jeff & Seth, but I do not recall for sure.

Refer to keynotes on M01-01 series drawings.

ITEM NO. 1.06 Please add sheets G01-01, A03-01, A00-03, E01-03A through E01-03E, & sheet E02-05 to the table

of contents on the cover sheet.

Refer to revised Cover Sheet.

ITEM NO. 1.07 Sheets A10-00 A10-01 & A10-01c are called out to be in the plan set but are not included. Please

remove from the table of contents or add them to the plan set.

Refer to revised Cover Sheet.

ITEM NO. 1.08 What species of wood do you all prefer for the wood doors at all campuses, Oak? There is no clear

call out of the species in the documents.

Please see revised specification 08 14 16 – Wood Faced Veneer Doors for clarification.

ITEM NO. 1.09 The hardware for the storefront is called out to be bronze. But the existing storefront at the IS is

clear. Please clarify.

Storefront hardware at the Intermediate School is to be satin nickel finish. Refer to revised specification 08 71 00

Door Hardware.

ITEM NO. 1.10 I am not seeing any projection screens on the plans, and neither are the subcontractors. But there is

a spec for it. Are there projection screens on any of the campuses that the GC is to provide? If not, please

remove the spec.

Projection screens are not provided on this project. The general note on A03-01 series sheets indicating

projection screens has been deleted. The projection screen specification has been deleted.

ITEM NO. 1.11 A liquid vapor barrier spec was released in Addendum One, but we are not building any exterior

walls. There is some window infill at the IS, are these 4 window infills what spec section 07 27 26 is referring to?

The liquid vapor barrier is not applicable at the Intermediate School.

Attachments:

Drawings –

COVER – COVER SHEET

A08-01 – DOOR SCHEDULE, DOORS, WINDOWS & FRAMES SCHEDULE & DETAILS

E01-03C – SPECIAL SYSTEMS FLOOR PLAN – SEGMENT C

End of Addendum Summary

Page 3: ADDENDUM SUMMARY - swgc.net › uploads › 18378-intermediate-add02.pdf · end of addendum summary . date job sheet issues revisions for architect m e p construction manager project

DATE

JOB

SHEET

ISSUES

REVISIONS

for

ARCHITECT M E P CONSTRUCTION MANAGER

PROJECT TEAM

SHEET LIST CODE INFORMATION

KEYPLAN

STRUCTURAL

3/4

/2019

12:1

7:2

1 P

M

COVER

COVER SHEET

CA

NY

ON

IN

TE

RM

ED

IAT

E

02/15/2019

18378.0000

LANCE MELTON

02/15/2019

CA

NY

ON

IS

D

CANYON ISDCANYON INTERMEDIATE

03.04.2019 - ADDENDUM 02

CORGANBROWN CONSULTING

ENGINEERST: 214-977-3404www.corgan.com

3301 N. 23rd St. Canyon, TX 79015T: 806.677.2600

3505 Olsen Blvd #110, Amarillo, TXT: 806.354.0141

SOUTHWEST GENERALCONTRACTORS

223 SW 4th Ave, Amarillo, TXT: 806.374.1050

2

1 02/15/2019 ISSUE FOR CONSTRUCTION

3

4

5

6

7

8

9

10

CO

VE

R

CO

VE

R S

HE

ET

CORGAN401 N Houston St, Dallas, TX 75202T: 214-977-3404 F: 214.653.8281

PHARIS STRUCTURALENGINEERING

7120 I-40 #135, Amarillo, TX 79106806.463.7799

PROJECT DATA

PROJECT NAME:

PROJECT ADDRESS:

APPLICABLE CODES NOTE:INCLUDED IN SPECIFICATION SECTION 014100 REGULATORY REQUIREMENTS

LIFE SAFETY INFORMATION REFERENCE

USE OR OCCUPANCY CLASSIFICATION

OCCUPANCY:

PLUMBING FIXTURE REQUIREMENTS

FEMALE

FIXTURE # REQUIRED

OWNER:

BUILDING CODE:

ACCESSIBILITY CODE:

ELECTRICAL CODE:

ENERGY CODE:

FIRE CODE:

MECHANICAL CODE:

PLUMBING CODE:

REGIONAL OR MUNICIPAL CODE:

# PROVIDED

MALE

# REQUIRED # PROVIDED

SINGLE USER

# REQUIRED # PROVIDED

SERVICE

# REQUIRED # PROVIDED

WATER CLOSETS

URINALS

LAVATORIES

SHOWERS

SERVICE SINKS

DRINKING FOUNTAINS

TOTAL OCCUPANTS:

2015 INTERNATIONAL BUILDING CODE

2012 TEXAS ACCESSIBILITY STANDARDS

2014 NATIONAL ELECTRICAL CODE

2015 INTERNATIONAL ENERGY CONSERVATION CODE

2015 INTERNATIONAL FIRE CODE

2015 INTERNATIONAL MECHANICAL CODE

CITY OF CANYON ADDENDUMS

2015 INTERNATIONAL PLUMBING CODE

EDUCATION

-

506 8TH STREETCANYON, TX 79015

CANYON ISD

CANYON INTERMEDIATE

14

14

-

18

18

-

#

#

-

11

18

-

18

0

0

-

2

2

-

1 1

10 11

#

PROJECT DATA AND CODE INFORMATION

SHEET INDEX

SHEETNO. SHEET NAME 0

2.1

5.2

019

- IS

SU

E F

OR

CO

NS

TR

UC

TIO

N

02.2

7.2

019 -

AD

DE

ND

UM

01

03.0

4.2

019 -

AD

DE

ND

UM

02

A09-01F FINISH FLOOR PLAN - LEVEL ONE - SEGMENT F ■ ■

STRUCTURAL

S01-01 STRUCTURAL SECTIONS AND DETAILS ■

PLUMBING

P00-01B PLUMBING DEMOLITION FLOOR PLAN - SEGMENT B ■

P00-01D PLUMBING DEMOLITION FLOOR PLAN - SEGMENT D ■ ■

P01-01B WASTE AND VENT FLOOR PLAN - SEGMENT B ■

P01-01D PLUMBING FLOOR PLAN - SEGMENT D ■ ■

P02-01B PLUMBING ROOF PLAN - SEGMENT B ■

P02-01E PLUMBING ROOF PLAN - SEGMENT E ■

P03-01 PLUMBING SCHEDULES AND DETAILS ■ ■

MECHANICAL

M00-01B MECHANICAL DEMOLITION FLOOR PLAN - SEGMENT B ■

M00-01C MECHANICAL DEMOLITION FLOOR PLAN - SEGMENT C ■

M00-01D MECHANICAL DEMOLITION FLOOR PLAN - SEGMENT D ■

M00-01E MECHANICAL DEMOLITION FLOOR PLAN - SEGMENT E ■

M01-01B MECHANICAL FLOOR PLAN - SEGMENT B ■

M01-01C MECHANICAL FLOOR PLAN - SEGMENT C ■

M01-01D MECHANICAL FLOOR PLAN - SEGMENT D ■

M01-01E MECHANICAL FLOOR PLAN - SEGMENT E ■

M02-01 MECHANICAL DETAILS AND SCHEDULES ■

ELECTRICAL

E00-01A LIGHTING DEMOLITION FLOOR PLAN - SEGMENT A ■

E00-01B LIGHTING DEMOLITION FLOOR PLAN - SEGMENT B ■

E00-01C LIGHTING DEMOLITION FLOOR PLAN - SEGMENT C ■

E00-01D LIGHTING DEMOLITION FLOOR PLAN - SEGMENT D ■

E00-01E LIGHTING DEMOLITION FLOOR PLAN - SEGMENT E ■

E00-02A POWER DEMOLITION FLOOR PLAN - SEGMENT A ■

E00-02B POWER DEMOLITION FLOOR PLAN - SEGMENT B ■

E00-02C POWER DEMOLITION FLOOR PLAN - SEGMENT C ■

E00-02D POWER DEMOLITION FLOOR PLAN - SEGMENT D ■

E00-02E POWER DEMOLITION FLOOR PLAN - SEGMENT E ■

E00-03A SPECIAL SYSTEMS DEMOLITION FLOOR PLAN - SEGMENT A ■

E00-03B SPECIAL SYSTEMS DEMOLITION FLOOR PLAN - SEGMENT B ■

E00-03C SPECIAL SYSTEMS DEMOLITION FLOOR PLAN - SEGMENT C ■

E00-03D SPECIAL SYSTEMS DEMOLITION FLOOR PLAN - SEGMENT D ■

E00-03E SPECIAL SYSTEMS DEMOLITION FLOOR PLAN - SEGMENT E ■

E01-01A LIGHTING FLOOR PLAN - SEGMENT A ■

E01-01B LIGHTING FLOOR PLAN - SEGMENT B ■

E01-01C LIGHTING FLOOR PLAN - SEGMENT C ■

E01-01D LIGHTING FLOOR PLAN - SEGMENT D ■

E01-01E LIGHTING FLOOR PLAN - SEGMENT E ■ ■

E01-02A POWER FLOOR PLAN - SEGMENT A ■

E01-02B POWER FLOOR PLAN - SEGMENT B ■

E01-02C POWER FLOOR PLAN - SEGMENT C ■

E01-02D POWER FLOOR PLAN - SEGMENT D ■

E01-02E POWER FLOOR PLAN - SEGMENT E ■

E01-03A SPECIAL SYSTEMS FLOOR PLAN - SEGMENT A ■

E01-03B SPECIAL SYSTEMS FLOOR PLAN - SEGMENT B ■

E01-03C SPECIAL SYSTEMS FLOOR PLAN - SEGMENT C ■ ■

E01-03D SPECIAL SYSTEMS FLOOR PLAN - SEGMENT D ■

E01-03E SPECIAL SYSTEMS FLOOR PLAN - SEGMENT E ■

E02-01 LIGHT FIXTURE SCHEDULE/ LEGEND/ ELECTRICAL DETAILS ■

E02-02 LIGHTING DETAILS ■

E02-03 LIGHTING DETAILS ■

E02-04 LIGHTING DETAILS ■

E02-05 ELECTRICAL DETAILS ■

SHEET INDEX

SHEETNO. SHEET NAME 0

2.1

5.2

019

- IS

SU

E F

OR

CO

NS

TR

UC

TIO

N

02.2

7.2

019 -

AD

DE

ND

UM

01

03.0

4.2

019 -

AD

DE

ND

UM

02

GENERAL

COVER COVER SHEET ■ ■

G00-01 STANDARDS AND SYMBOLS ■

G01-00 CODE PLAN & INFORMATION ■ ■

G01-01 LIFE SAFETY PLAN - LEVEL ONE - OVERALL ■

ARCHITECTURE

A00-01 DEMO FLOOR PLAN - LEVEL ONE - OVERALL ■

A00-01A DEMO FLOOR PLAN - LEVEL ONE - SEGMENT A ■ ■

A00-01B DEMO FLOOR PLAN - LEVEL ONE - SEGMENT B ■

A00-01C DEMO FLOOR PLAN - LEVEL ONE - SEGMENT C ■ ■

A00-01D DEMO FLOOR PLAN - LEVEL ONE - SEGMENT D ■ ■

A00-01E DEMO FLOOR PLAN - LEVEL ONE - SEGMENT E ■ ■

A00-01F DEMO FLOOR PLAN - LEVEL ONE - SEGMENT F ■ ■

A00-03 DEMO REFLECTED CEILING PLAN - LEVEL ONE - OVERALL ■

A00-03A DEMO REFLECTED CEILING PLAN - LEVEL ONE - SEGMENT A ■ ■

A00-03B DEMO REFLECTED CEILING PLAN - LEVEL ONE - SEGMENT B ■

A00-03C DEMO REFLECTED CEILING PLAN - LEVEL ONE - SEGMENT C ■ ■

A00-03D DEMO REFLECTED CEILING PLAN - LEVEL ONE - SEGMENT D ■ ■

A00-03E DEMO REFLECTED CEILING PLAN - LEVEL ONE - SEGMENT E ■

A00-03F DEMO REFLECTED CEILING PLAN - LEVEL ONE - SEGMENT F ■ ■

A02-00 WALL & PARTITION TYPES ■ ■

A02-00A TYPICAL UL HEAD DETAILS ■

A02-01A FLOOR PLAN - LEVEL ONE - SEGMENT A ■ ■

A02-01B FLOOR PLAN - LEVEL ONE - SEGMENT B ■

A02-01C FLOOR PLAN - LEVEL ONE - SEGMENT C ■ ■

A02-01D FLOOR PLAN - LEVEL ONE - SEGMENT D ■

A02-01E FLOOR PLAN - LEVEL ONE - SEGMENT E ■

A02-01F FLOOR PLAN - LEVEL ONE - SEGMENT F ■

A03-01 REFLECTED CEILING PLAN - LEVEL ONE - OVERALL ■

A03-01A REFLECTED CEILING PLAN - LEVEL ONE - SEGMENT A ■

A03-01B REFLECTED CEILING PLAN - LEVEL ONE - SEGMENT B ■

A03-01C REFLECTED CEILING PLAN - LEVEL ONE - SEGMENT C ■ ■

A03-01D REFLECTED CEILING PLAN - LEVEL ONE - SEGMENT D ■ ■

A03-01E REFLECTED CEILING PLAN - LEVEL ONE - SEGMENT E ■

A03-01F REFLECTED CEILING PLAN - LEVEL ONE - SEGMENT F ■

A04-01 ENLARGED PLANS ■ ■

A07-01 INTERIOR ELEVATIONS ■ ■

A07-41 MILLWORK DETAILS ■

A08-01 DOOR SCHEDULE, DOOR AND FRAME DETAILS ■ ■ ■

A08-41 WINDOW AND FRAME DETAILS ■ ■

A09-01 FINISH FLOOR PLAN - LEVEL ONE - OVERALL ■

A09-01A FINISH FLOOR PLAN - LEVEL ONE - SEGMENT A ■ ■

A09-01B FINISH FLOOR PLAN - LEVEL ONE - SEGMENT B ■

A09-01C FINISH FLOOR PLAN - LEVEL ONE - SEGMENT C ■

A09-01D FINISH FLOOR PLAN - LEVEL ONE - SEGMENT D ■ ■

A09-01E FINISH FLOOR PLAN - LEVEL ONE - SEGMENT E ■

AB

CD

FE

1 02/27/2019

ADDENDUM 1

2 03/04/2019

ADDENDUM 02

996 INCLUDING ELECTIVE SPACES

2

Page 4: ADDENDUM SUMMARY - swgc.net › uploads › 18378-intermediate-add02.pdf · end of addendum summary . date job sheet issues revisions for architect m e p construction manager project

0' - 2 1/2"

0' - 1 1/2"

0' - 0 1/2"

RE

F S

CH

ED

0' -

2"

0' - 0 1/2"

0' - 4"0' - 2 1/2"

0' - 0 1/2"

0' -

4"

0' -

2"

0' - 2"

0' - 0 1/2"

REF SCHED.

0' - 2" HEAD

REF SCHED.

0' - 4" HEAD

0' - 0 1/2"

0' - 0 1/2"

0' - 2"

0' - 0 1/2" 0' - 0 1/2"

0' - 2"

0' - 0 1/2" REF SCHED.

0' - 2" HEAD

0' - 0 1/2"

0' -

0 1

/2"

0' -

1"

0' -

0 1

/2" REF SCHED.

0' - 4" HEAD0' - 0 1/2"

0' - 0 1/2"

0' - 2"

0' - 0 1/2" 0' - 2" 0' - 0 1/2"

0' -

0 1

/2"

0' -

0 1

/2"

0' -

0 1

/2"

0' -

0 1

/2"

0' -

0 1

/2"

0' -

0 1

/2"

0' -

0 1

/2"

0' -

0 1

/2"

0' - 0 1/2"

RE

F. D

ET

AIL

RE

F. D

ET

AIL

RE

F. D

ET

AIL

RE

F. D

ET

AIL

RE

F. D

ET

AIL

RE

F. D

ET

AIL

RE

F. D

ET

AIL

RE

F. D

ET

AIL

RE

F. D

ET

AIL

RE

F. D

ET

AIL

RE

F. D

ET

AIL

1 2 3 4 5 6

7 8 9 10 11

A B

FLUSH DOOR

E

FLUSH DOOR WITH

LITE

SPLIT GLASS DOOR

AA BB

DOUBLE FLUSH DOOR

EE

DOUBLE FLUSH DOOR

WITH LITE

DOUBLE WIDE STILE

DOOR

RE

F. S

CH

ED

.

REF. SCHED.

RE

F. S

CH

ED

.

REF. SCHED.

RE

F. S

CH

ED

.

REF. SCHED.

RE

F. S

CH

ED

.

REF. SCHED.

RE

F. S

CH

ED

.

REF. SCHED. REF. SCHED.

RE

F. S

CH

ED

.

3' -

5 3

/4"

0' -

6"

0' -

10

"0

' -

8"

0' -

6"

0' - 5 1/2" 0' - 5 1/2"

1 7

1

1

4

8

5 1

5

7

1

RE

F. S

CH

ED

.

REF. SCHED.

3' -

4"

RE

F. S

CH

ED

.

REF. SCHED.

3' -

4"

REF. SCHED.

RE

F. D

ET

AIL

RE

F. D

ET

AIL

0' - 1 1/2"R

EF

. D

ET

AIL

1 8

0' - 1 1/2"

RE

F. D

ET

AIL

3

0' - 1 1/2"

RE

F. D

ET

AIL

4

0' - 1 1/2"0' - 1 1/2"

5 7

0' - 1 1/2"

RE

F. D

ET

AIL

DATE

JOB

SHEET

ISSUES

3/4

/2019

12:1

7:2

0 P

M

A08-01

DOOR SCHEDULE,

DOOR AND FRAME

DETAILS

CA

NY

ON

INT

ER

ME

DIA

TE

02/15/2019

18378.0000

02/15/2019

A08-0

1D

OO

R S

CH

ED

ULE

, D

OO

R A

ND

FR

AM

E D

ET

AIL

S

Lance Melton

506

8T

H S

TR

EE

T

CA

NY

ON

, T

X 7

90

15

CORGAN

401 N Houston St, Dallas, TX 75202

T: 214-977-3404 F: 214.653.8281

2

1 02/15/2019 ISSUE FOR CONSTRUCTION

3

4

5

6

7

8

9

10

3" = 1'-0"01H. M. FRAME PROFILES

1/4" = 1'-0"

STANDARD PANEL TYPES

1/4" = 1'-0"

FRAME TYPES

3" = 1'-0"2AL. KNOCKDOWN FRAME PROFILE

DOOR SCHEDULE

DO

OR

NU

MB

ER

ROOM DOOR FRAME FRAME

HA

RD

WA

RE

SE

T

FIR

E R

AT

ING

ST

C R

AT

ING

CO

MM

EN

TS

FROM ROOM TO ROOM WID

TH

HE

IGH

T

PA

NE

L T

YP

E

MA

TE

RIA

L

FIN

ISH

TH

ICK

NE

SS

FR

AM

E T

YP

E

MA

TE

RIA

L

FIN

ISH

SID

EL

IGH

T 1

WID

TH

SID

EL

IGH

T 2

WID

TH

LEVEL 1

100.1 CORRIDOR CLASSROOM 3' - 0" 7' - 0" B WD STAIN 0' - 1 3/4" 1 HM PAINT 0' - 1" 0' - 1" 10.0

100.2 CORRIDOR CLASSROOM 3' - 0" 7' - 0" B WD STAIN 0' - 1 3/4" 1 HM PAINT 0' - 1" 0' - 1" 10.0

101 RECEPTION VESTIBULE 3' - 6" 7' - 0" E AL DARK BRONZE 0' - 1 3/4" 7 DARK BRONZE 3' - 0" 0' - 1" 3.0 1

101.1 COMMONS RECEPTION 3' - 0" 7' - 0" A AL DARK BRONZE 0' - 1" DARK BRONZE 3.0

102 RECEPTION PRINCPAL 3' - 0" 7' - 0" A WD STAIN 0' - 1 3/4" 1 HM PAINT 0' - 1" 0' - 1" 7.0

102.1 CORRIDOR CLASSROOM 3' - 0" 7' - 0" B WD STAIN 0' - 1 3/4" 1 HM PAINT 0' - 1" 0' - 1" 10.0

102.2 CORRIDOR CLASSROOM 3' - 0" 7' - 0" B WD STAIN 0' - 1 3/4" 1 HM PAINT 0' - 1" 0' - 1" 10.0

103 RECEPTION ASSISTANT PRINCIPAL 3' - 0" 7' - 0" A WD STAIN 0' - 1 3/4" 1 HM PAINT 0' - 1" 0' - 1" 7.0

103A INTERCOM ASSISTANT PRINCIPAL 3' - 6" 7' - 0" A WD STAIN 0' - 1 3/4" 1 HM PAINT 0' - 1" 0' - 1" 10.0

104.1 CORRIDOR CLASSROOM 3' - 0" 7' - 0" B WD STAIN 0' - 1 3/4" 1 HM PAINT 0' - 1" 0' - 1" 10.0

104.2 CORRIDOR CLASSROOM 3' - 0" 7' - 0" B WD STAIN 0' - 1 3/4" 1 HM PAINT 0' - 1" 0' - 1" 10.0

106.1 CORRIDOR SCIENCE 3' - 0" 7' - 0" B WD STAIN 0' - 1 3/4" 1 HM PAINT 0' - 1" 0' - 1" 10.0

106.2 CORRIDOR SCIENCE 3' - 0" 7' - 0" B WD STAIN 0' - 1 3/4" 1 HM PAINT 0' - 1" 0' - 1" 10.0

108 CORRIDOR CLASSROOM 3' - 0" 7' - 0" B WD STAIN 0' - 1 3/4" 1 HM PAINT 0' - 1" 0' - 1" 10.0

110 CORRIDOR SCIENCE 3' - 0" 7' - 0" B WD STAIN 0' - 1 3/4" 1 HM PAINT 0' - 1" 0' - 1" 10.0

111 LIBRARY GREEN ROOM 3' - 0" 7' - 0" E AL AL 0' - 1" AL 4.0

112 WORK ROOM CORRIDOR 3' - 0" 7' - 0" A WD STAIN 0' - 1 3/4" 1 HM PAINT 0' - 1" 0' - 1" 8.0

117 EXIST. STORAGE CLASSROOM 3' - 0" 7' - 0" A WD STAIN 0' - 1 3/4" 1 HM PAINT 0' - 1" 0' - 1" 9.0

119 EXIST. STORAGE CLASSROOM 3' - 0" 7' - 0" A WD STAIN 0' - 1 3/4" 1 HM PAINT 0' - 1" 0' - 1" 9.0

124 CORRIDOR CLASSROOM 3' - 0" 7' - 0" B WD STAIN 0' - 1 3/4" 1 HM PAINT 0' - 1" 0' - 1" 10.0

128 CORRIDOR CLASSROOM 3' - 0" 7' - 0" B WD STAIN 0' - 1 3/4" 1 HM PAINT 0' - 1" 0' - 1" 10.0

130 CORRIDOR SCIENCE 3' - 0" 7' - 0" B WD STAIN 0' - 1 3/4" 1 HM PAINT 0' - 1" 0' - 1" 10.0

150.1 COMMONS LIBRARY 6' - 2" 7' - 0" EE AL DARK BRONZE 0' - 1" DARK BRONZE 2.0

150.2 LIBRARY CORRIDOR 6' - 0" 7' - 0" EE AL AL 0' - 1" AL 2.0

180 CORRIDOR BOOK STORAGE 5' - 0" 7' - 0" AA WD STAIN 0' - 1 3/4" 1 HM PAINT 0' - 1" 0' - 1" 5.0

182 CORRIDOR OFFICE 3' - 0" 7' - 0" B WD STAIN 0' - 1 3/4" 1 HM PAINT 0' - 1" 0' - 1" 7.0

184 CORRIDOR OFFICE 3' - 0" 7' - 0" B WD STAIN 0' - 1 3/4" 1 HM PAINT 0' - 1" 0' - 1" 7.0

186 CORRIDOR OFFICE 3' - 0" 7' - 0" B WD STAIN 0' - 1 3/4" 1 HM PAINT 0' - 1" 0' - 1" 7.0

204 CLASSROOM CORRIDOR 3' - 0" 7' - 0" B WD STAIN 0' - 1 3/4" 1 HM PAINT 0' - 1" 0' - 1" 10.0

205 CLASSROOM CORRIDOR 3' - 0" 7' - 0" B WD STAIN 0' - 1 3/4" 1 HM PAINT 0' - 1" 0' - 1" 10.0

206 CLASSROOM CORRIDOR 3' - 0" 7' - 0" B WD STAIN 0' - 1 3/4" 1 HM PAINT 0' - 1" 0' - 1" 10.0

222 CLASSROOM PREP 3' - 0" 7' - 0" A WD STAIN 0' - 1 3/4" 1 HM PAINT 0' - 1" 0' - 1" 9.0

224 CLASSROOM PREP 3' - 0" 7' - 0" A WD STAIN 0' - 1 3/4" 1 HM PAINT 0' - 1" 0' - 1" 9.0

401 CLASSROOM CORRIDOR 3' - 0" 7' - 0" B WD STAIN 0' - 1 3/4" 1 HM PAINT 0' - 1" 0' - 1" 10.0

REVISIONS1 02/27/2019 ADDENDUM 1

2 03/04/2019 ADDENDUM 02

1. CARD READER IN, REMOTE RELEASE.

DOOR COMMENTS

2

Page 5: ADDENDUM SUMMARY - swgc.net › uploads › 18378-intermediate-add02.pdf · end of addendum summary . date job sheet issues revisions for architect m e p construction manager project

SPECIALSYSTEMSFLOOR PLAN -SEGMENT C

CA

NY

ON

INTE

RM

ED

IATE

506

8TH

STR

EE

TC

AN

YO

N, T

X 7

9015

CORGAN401 N Houston St, Dallas, TX 75202T: 214-977-3404 F: 214.653.8281

ISSUES

KEYPLAN

2

1

3

4

5

6

7

8

9

10

REVISIONS

DATEJOB

SHEET02/15/201918378.0000

02/15/2019 ISSUE FOR CONSTRUCTION

C

E01-03CSPECIAL SYSTEMS FLOOR PLAN - SEGMENT C 1/8" = 1'-0"1

4' 8' 16'1'0

NORTH

MA

TC

HLI

NE

MATCHLINE

MA

TC

HLI

NE

MATCHLINE

REINSTALL EXISTING PROJECTOR/PROJECTOR MOUNT AND RECONNECTTO EXISTING PROJECTOR CONNECTION MODULE IN ROOM. REVISEEXISTING WIRING AND CONDUIT AS NECESSARY.

REINSTALL EXISTING WIRELESS ACCESS POINT AND RECONNECT TOEXISTING DATA CABLING. REVISE EXISTING WIRING AND CONDUIT ASNECESSARY.

EXISTING WALL MOUNTED DATA RACK.

EXISTING DATA AND/OR TELEPHONE OUTLET.

EXISTING JUNCTION BOX.

EXISTING PROJECTOR CONNECTION MODULE.

EXISTING WIRELESS ACCESS POINT.

EXISTING CLOCK.

EXISTING BELL.

EXISTING FIRE ALARM HORN/STROBE.

EXISTING FIRE ALARM MANUAL PULL STATION.

INSTALL A NEW PA SYSTEM SPEAKER EQUAL TO A BOGEN S86T725PG8WIN EXISTING SPEAKER LOCATION AND CONNECT TO REPLACED PASYSTEM. REVISE EXISTING WIRING AND CONDUIT AS NECESSARY.

INSTALL A NEW FIRE ALARM SMOKE DETECTOR IN EXISTING LOCATIONAND CONNECT TO EXISTING FIRE ALARM SYSTEM. REVISE EXISTINGWIRING AND CONDUIT AS NECESSARY.

INSTALL 4 DATA JACKS IN ARCHITECTURAL COLUMN. REFER TO POWERFLOOR PLAN FOR DETAILS.

INSTALL NEW PA SYSTEM FRONT END EQUIPMENT ON WALL IN LOCATIONAS SHOWN. CONNECT ALL EXISTING AND NEW PA SYSTEM DEVICES TONEW PA SYSTEM FRONT END EQUIPMENT. REVISE EXISTING WIRING ANDCONDUIT AS NECESSARY. CONTRACTOR TO VERIFY.

REINSTALL EXISTING SECURITY SYSTEM EQUIPMENT IN LOCATION ASSHOWN. REVISE ANY EXISTING WIRING AND CONDUIT AS NECESSARY TOMAINTAIN CONNECTION TO SECURITY SYSTEM. CONTRACTOR TOVERIFY.

REINSTALL EXISTING FIRE ALARM CONTROL PANEL IN LOCATION ASSHOWN. REVISE ANY EXISTING WIRING AND CONDUIT AS NECESSARY TOMAINTAIN CONNECTION TO FIRE ALARM SYSTEM. CONTRACTOR TOVERIFY.

EXISTING TELEPHONE EQUIPMENT.

EXISTING MASTER CLOCK.

EXISTING FIRE ALARM SPLICE CABINET.

ACCESS CONTROLLED DOOR. REFER TO ACCESS CONTROL SINGLEDOOR ROUGH-IN DIAGRAM FOR DETAILS.

PROVIDE PA SYSTEM ADMINISTRATIVE PHONE AND CONNECT TOREPLACED PA SYSTEM FRONT END EQUIPMENT.

CONNECT TO ACCESS CONTROL SYSTEM ELECTRIC STRIKE POWERSUPPLY LOCATED ABOVE ACCESSIBLE CEILING. HOMERUN 2-12, 1-12G,1/2"C. TO EXISTING 120VAC CIRCUIT IN ADMIN. AREA PANELBOARD.CONTRACTOR TO VERIFY. REVISE PANEL DIRECTORY CARD ASNECESSARY.

1

1. NO WORK TO BE PERFORMED IN HATCHED AREAS.

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

1 2-27-2019 ADDENDUM #1

2 3-4-2019 ADDENDUM #2

232

S

S

S

S

S

S

S

JP

J

J

B

P

S

JWAC

PCM

S

S

WAC

13

13

13

13

13

13

13

13

13

1

7

2

3

4

4

4

5

5

5

6

8

9

5

10

10

10

11

11

SP12

S

SSS

SP

SP

SP

SP

2J

FUT

JFUT

2

14

14

4

4

2BC

2BC

H

16

15

17

19

20

18

21

22

22

22

2

21

2

J

J 23

23

2