Department of Aviation Airport Office Building 8500 Peňa Boulevard Denver, Colorado (303) 342-2200 www.flydenver.com November 21, 2014 Runway 17L-35R Complex Pavement and Lighting Rehabilitation CONTRACT NO. 201417577 ADDENDUM NUMBER FIVE This Addendum Number Five supersedes and/or supplements all portions of the Contract Documents with which it conflicts. Bidders must acknowledge receipt of this addendum on page 34 of the Bid Forms. __________________________________ Dave LaPorte, Deputy Manager of Aviation Airport Infrastructure Management (AIM)

Transcript of ADDENDUM NUMBER FIVE - Denver International …business.flydenver.com/bizpdf/DIAAD_884.pdf ·...

Page 1: ADDENDUM NUMBER FIVE - Denver International …business.flydenver.com/bizpdf/DIAAD_884.pdf · Volume No. 2 Sheet EL507 – ELECTRICAL DETAILS Replace Sheet EL507 dated October 20,

Department of Aviation Airport Office Building

8500 Peňa Boulevard Denver, Colorado

(303) 342-2200 www.flydenver.com

November 21, 2014

Runway 17L-35R Complex Pavement and Lighting Rehabilitation

CONTRACT NO. 201417577

ADDENDUM NUMBER FIVE This Addendum Number Five supersedes and/or supplements all portions of the Contract Documents with which it conflicts. Bidders must acknowledge receipt of this addendum on page 34 of the Bid Forms. __________________________________ Dave LaPorte, Deputy Manager of Aviation Airport Infrastructure Management (AIM)

Page 2: ADDENDUM NUMBER FIVE - Denver International …business.flydenver.com/bizpdf/DIAAD_884.pdf · Volume No. 2 Sheet EL507 – ELECTRICAL DETAILS Replace Sheet EL507 dated October 20,

CITY AND COUNTY OF DENVER CONTRACT NO. CE201417577

RUNWAY 17L-35R COMPLEX PAVEMENT AND LIGHTING REHABILITATION

DENVER INTERNATIONAL AIRPORT

ADDENDUM NUMBER FIVE

November 20, 2014

RUNWAY 17L/35R COMPLEX PAVEMENT AND LIGHTING REHABILITATION CONTRACT NO. CE201417577 ADDENDUM NUMBER FIVE

1

Scope of this Addendum

Addendum Number Five includes modifications to the following Contract Documents issued October 20, 2014. These modifications are deemed necessary by the City and County of Denver.

PART I – PROJECT REQUIREMENTS

BID PROPOSAL 1. Replace the original bid proposal with the attached revised bid proposal noted

as Addendum #5 and dated November 20, 2014.

PART II – DIVISION II – TECHNICAL SPECIFICATIONS

VOLUME NO. 1 – CIVIL 1. Appendix A, 015525 TRAFFIC CONTROL

Add the following work description and measurement and payment requirements for Temporary Detour Pavement Construction and Removal: “015525e - Construction and removal of the temporary pavement section for detour roads will be paid for once per each detour location required. This will include placement of 3 inches of hot-mixed asphalt in accordance with Item P-401C on top of 8 inches of compacted asphalt millings. Compaction of asphalt millings shall be tested and accepted via proof roll in the presence of the DIA project manager. Compaction of the hot-mixed asphalt surface shall be to a 90 percent level as monitored by the QA testing firm, but all remaining testing requirements under the P-401C specification will not be required for this temporary pavement construction. This item shall include any excavation and preparation of subgrade necessary to complete the item. The subgrade shall also require proof rolling for acceptance by the DIA project manager. This work shall also include the removal of temporary detour roads and remediation of areas on which temporary detour roads are placed, which shall include revegitation of disturbed areas as required under the T-901 specification. Payment for temporary pavement construction and removal for each detour location will be at the contract unit price per each detour location. This price will shall be full compensation for placement of 3 inches of hot-mixed asphalt in accordance with Item P-401C on top of 8 inches of compacted asphalt millings. This item shall include any excavation and preparation of subgrade and the removal of temporary detour roads and remediation of areas on which temporary detour roads are placed,

Page 3: ADDENDUM NUMBER FIVE - Denver International …business.flydenver.com/bizpdf/DIAAD_884.pdf · Volume No. 2 Sheet EL507 – ELECTRICAL DETAILS Replace Sheet EL507 dated October 20,

CITY AND COUNTY OF DENVER CONTRACT NO. CE201417577

RUNWAY 17L-35R COMPLEX PAVEMENT AND LIGHTING REHABILITATION

DENVER INTERNATIONAL AIRPORT

ADDENDUM NUMBER FIVE

November 20, 2014

RUNWAY 17L/35R COMPLEX PAVEMENT AND LIGHTING REHABILITATION CONTRACT NO. CE201417577 ADDENDUM NUMBER FIVE

2

as well as revegitation. This item shall also include all labor, equipment, tools and incidentals necessary to complete the item for each detour location.” Add the following pay item for Temporary Detour Pavement Construction and Removal: “015525e TEMPORARY DETOUR PAVEMENT CONSTRUCTION AND REMOVAL-PER EACH” The quantity will be 2 Each.

VOLUME NO. 2 – ELECTRICAL 1. L-125 – AIRPORT LIGHTING SYSTEMS

Section 2.02, section D, change “… five thousand volt, nineteen strand.” to read “… five thousand volt, seven or nineteen strand.”

2. L-125 – AIRPORT LIGHTING SYSTEMS Section 2.03, second paragraph, first sentence, change “The contractor shall remove and reinstall the existing quartz fixture.” to read “The contractor shall remove and reinstall the existing quartz or LED fixture, as shown in the plans.”

PART III – CONTRACT DRAWINGS VOLUME NO. 1 – CIVIL PLANS 1. Volume No. 1 Sheet C0003 – SUMMARY OF APPROXIMATE QUANTITIES

Add the following bid item “015525e TEMPORARY DETOUR PAVEMENT CONSTRUCTION AND REMOVAL-PER EACH” The quantity will be 2 Each.

2. Volume No. 1 Sheet C0004 – GENERAL NOTES AND LEGEND Note 17 is hereby revised from “100-Foot separation from the AOA fence.” to “10-Foot separation from the AOA fence”. Note 19 is hereby revised from “15-Feet above existing grades.” to “30-Feet above existing grades.”

3. Volume No. 1 Sheet C0100 – ARFF RESPONSE PHASING PLAN Emergency Vehicle Access Notes, Note 1 is hereby revised from “shall be delineated with reflective cones” to “shall be delineated with construction delineators”. This is in accordance with Detail 4 on Sheet C0150. The maximum spacing is increased to 25-feet for the designated ARFF access route, which deviates from the normal spacing of 10-feet as shown on Detail 6, as noted for other construction areas.

Page 4: ADDENDUM NUMBER FIVE - Denver International …business.flydenver.com/bizpdf/DIAAD_884.pdf · Volume No. 2 Sheet EL507 – ELECTRICAL DETAILS Replace Sheet EL507 dated October 20,

CITY AND COUNTY OF DENVER CONTRACT NO. CE201417577

RUNWAY 17L-35R COMPLEX PAVEMENT AND LIGHTING REHABILITATION

DENVER INTERNATIONAL AIRPORT

ADDENDUM NUMBER FIVE

November 20, 2014

RUNWAY 17L/35R COMPLEX PAVEMENT AND LIGHTING REHABILITATION CONTRACT NO. CE201417577 ADDENDUM NUMBER FIVE

3

4. Volume No. 1 Sheet C0151 – CONSTRUCTION SAFETY PLAN

SAFETY NOTES: Note 10, is hereby revised to read as follows: “Contractor shall maintain and keep clear of the ARFF response access route between ARFF #3 and Great Rocks Road. The route from ARFF #3 to Taxiway EC, along Taxiway P to the north shoulder of Taxiway ED, and onto Great Rocks Road, shall be delineated as shown on Sheet C0100, in accordance with the Emergency Vehicle Access Notes thereon.” Note 13, is hereby revised to read as follows: “Contractor shall establish specific haul/traffic routes to, within, and from the construction areas. Construction delineators and signage shall only be required at entrance and exit locations to assure that construction vehicles understand the prescribed areas that are allowed for construction traffic. Contractor shall present their proposed plan to the DIA project manager for concurrence prior to construction. All areas that present opportunities for vehicles to potentially stray from the approved routes shall be appropriately barricaded and signed to prevent access to unapproved areas.”

5. Volume No. 1 Sheet C0450 – PAVING DETAILS Detail 4, Type E2 – Doweled Construction Joint, change call out from “Detail 2, Sheet C0451” to Detail 4, Sheet C0451.” See attached, revised Sheet C0450.

6. Volume No. 1 Sheet C0450 – PAVING DETAILS Detail 5, Type C1 – Doweled Contraction Joint, change call out from “Detail 4, Sheet C0451” to Detail 2, Sheet C0451.” See attached, revised Sheet C0450.

7. Volume No. 1 Sheet C0450 – PAVING DETAILS Detail 7, Type D1 – Dummy Contraction Joint, change call out from “Detail 4, Sheet C0451” to Detail 2, Sheet C0451.” See attached, revised Sheet C0450.

8. Volume No. 1 Sheet C0452 – PAVING DETAILS Detail 3 and Detail 4 have minor changes to clarify the reinforcement and detail titles. See attached, revised Sheet C0452.

9. Volume No. 1 Sheet C0455 – SPALL REPAIR DETAILS Detail 7, spacer ring callouts, change “New epoxy coated flange ring …” to read “New galvanized steel flange ring …” and change “New epoxy coated spacer ring” to read “New galvanized steel spacer ring”.

Page 5: ADDENDUM NUMBER FIVE - Denver International …business.flydenver.com/bizpdf/DIAAD_884.pdf · Volume No. 2 Sheet EL507 – ELECTRICAL DETAILS Replace Sheet EL507 dated October 20,

CITY AND COUNTY OF DENVER CONTRACT NO. CE201417577

RUNWAY 17L-35R COMPLEX PAVEMENT AND LIGHTING REHABILITATION

DENVER INTERNATIONAL AIRPORT

ADDENDUM NUMBER FIVE

November 20, 2014

RUNWAY 17L/35R COMPLEX PAVEMENT AND LIGHTING REHABILITATION CONTRACT NO. CE201417577 ADDENDUM NUMBER FIVE

4

10. Volume No. 1 Sheet C0601 – PAVEMENT MARKING PLAN AREA 1 Note 4, Change to read, “The Contractor shall cover elevated and in-pavement light fixtures before removal of curing compound. Covering elevated and in-pavement light fixtures before pavement marking operations is not the responsibility of the Contractor. The exception to this would be where lights would need to be covered by the Contractor while placing and removing temporary pavement markings at the designated detour locations.”

11. Volume No. 1 Sheet C0702 – DETOUR ROADS Add Note 4, “Temporary paint shall be Waterborne and meet the requirements of Federal Specification TT-P-1952E, Type II. Temporary paint shall be applied at a rate of 230ft2 /gal, maximum. There will be no additional payment for the placement or removal of temporary pavement markings, as these items will be incidental to Item 015525d – TRAFFIC CONTROL. Match the markings that are present along the centerline and pavement edges.” .

VOLUME NO. 2 – ELECTRICAL PLANS

12. Volume No. 2 Sheet GI003 – SUMMARY OF APPROXIMATE QUANTITIES

Schedule A, Bid Item L-125p, quantity change “925” to read “944”.

13. Volume No. 2 Sheet EL001 – ELECTRICAL NOTES Note 7, second sentence, change “… stainless steel” to read “… galvanized steel”.

14. Volume No. 2 Sheet EL002 – ELECTRICAL LEGEND Middle column, fifth symbol from the top, change description from “externally lighted” to read “internally lighted”.

15. Volume No. 2 Sheet EL504 – ELECTRICAL DETAILS Replace Sheet EL504 dated October 20, 2014 with revised attached sheet EL504 dated November 20, 2014.

16. Volume No. 2 Sheet EL506 – ELECTRICAL DETAILS Replace Sheet EL506 dated October 20, 2014 with revised attached sheet EL506 dated November 20, 2014.

17. Volume No. 2 Sheet EL507 – ELECTRICAL DETAILS Replace Sheet EL507 dated October 20, 2014 with revised attached sheet EL507 dated November 20, 2014.

END OF ADDENDUM FIVE

Page 6: ADDENDUM NUMBER FIVE - Denver International …business.flydenver.com/bizpdf/DIAAD_884.pdf · Volume No. 2 Sheet EL507 – ELECTRICAL DETAILS Replace Sheet EL507 dated October 20,

Item No. Description and Price Quantity Unit Unit Price Extension

015050a Mobilization at the lump sum of

____________________________________________________dollars

and _________________________________________________cents.

($___________________________________________) per lump sum.

1 LS __________ ____________________

013530a Maintain Lighted X's at the lump sum of

____________________________________________________dollars

and _________________________________________________cents.

($___________________________________________) per lump sum.

1 LS __________ ____________________

015525a Haul Route Monitor at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($___________________________________________) per hour.

6,500 HR __________ ____________________

015525b Gate Guard at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($__________________________________________) per hour.

2,800 HR __________ ____________________

015525c Gate Guard Shack (Temporary) at the lump sum of

____________________________________________________dollars

and _________________________________________________cents.

($____________________________________ ______) per lump sum.

1 LS __________ ____________________

015525d Traffic Control at the lump sum of

____________________________________________________dollars

and _________________________________________________cents.

($__________________________________________) per lump sum.

1 LS __________ ____________________

015525e Temporary Detour Pavement Construction and Removal at the unit price

of

____________________________________________________dollars

and _________________________________________________cents.

($__________________________________________) per each.

2 EA __________ ____________________

P-150a Remove Concrete Pavement - 17" Reinforced at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($___________________________________________) per square yard.

2,523 SY __________ ____________________

P-150b Remove Concrete Pavement - 17" Non-Reinforced at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($________________________________________________) per square

yard.

94,618 SY __________ ____________________

P-150c Remove Bituminous Shoulder Pavement Full Depth at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($_________________________________________________) per

square yard.

2,547 SY __________ ____________________

SCHEDULE I: RUNWAY 17L-35R PAVEMENT REHABILITATION (INCLUDING CONNECTOR TAXIWAYS UP TO HOLD LINES) (FEDERAL)

DENVER INTERNATIONAL AIRPORT

RUNWAY 17L-35R COMPLEX PAVEMENT AND LIGHTING REHABILITATION

CONTRACT NO. 201417577

Part 1 - Schedule of Prices and Quantities

RUNWAY 17L-35R COMPLEX PAVEMENT AND LIGHTING REHABILITATION

CONTRACT NO. CE 201417577

ADDENDUM NUMBER FIVE

MoncadaJJ
Polygon
Page 7: ADDENDUM NUMBER FIVE - Denver International …business.flydenver.com/bizpdf/DIAAD_884.pdf · Volume No. 2 Sheet EL507 – ELECTRICAL DETAILS Replace Sheet EL507 dated October 20,

Item No. Description and Price Quantity Unit Unit Price Extension

P-150d Remove Bituminous Shoulder Pavement 3-Inch Depth By Cold Milling at

the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($___________________________________________) per square yard.

746 SY __________ ____________________

P-150e Demolish L-868 Base Can at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($__________________________________________) per each.

529 EA __________ ____________________

P-150f Demolish Base Can In Shoulder, Remove Light Fixture at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($_______________________________________________) per each.10 EA __________ ____________________

P-150g Remove Concrete Curing Compound at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($_______________________________________________) per square

foot.

87,480 SF __________ ____________________

P-161a Bondbreaker Fabric at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($________________________________________________) per square

yard.

97,141 SY __________ ____________________

P-161b Geotextile Fabric at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($________________________________________________) per square

yard.

2,547 SY __________ ____________________

P-161c Stress-Absorbing Fabric at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($___________________________________________) per square yard.

746 SY __________ ____________________

P-401a Bituminous Surface Course (3-Inch) at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($___________________________________________) per ton.

556 TON __________ ____________________

P-401b Bituminous Base Course (7-Inch) at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($__________________________________ ________) per ton.

1,003 TON __________ ____________________

P-403a Asphalt Treated Permeable Base (5-7 Inches) at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($________________________________________________) per square

yard.

2,547 SY __________ ____________________

SCHEDULE I: RUNWAY 17L-35R PAVEMENT REHABILITATION (INCLUDING CONNECTOR TAXIWAYS UP TO HOLD LINES) (FEDERAL)

RUNWAY 17L-35R COMPLEX PAVEMENT AND LIGHTING REHABILITATION

CONTRACT NO. CE 201417577

ADDENDUM NUMBER FIVE

Page 8: ADDENDUM NUMBER FIVE - Denver International …business.flydenver.com/bizpdf/DIAAD_884.pdf · Volume No. 2 Sheet EL507 – ELECTRICAL DETAILS Replace Sheet EL507 dated October 20,

Item No. Description and Price Quantity Unit Unit Price Extension

P-501a Portland Cement Concrete Pavement - 17" Non-Reinforced - High

Production at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($_______________________________________________) per square

yard.

82,104 SY __________ ____________________

P-501b Portland Cement Concrete Pavement - 17" Non-Reinforced - Low

Production at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($___________________________________________) per square yard.

12,514 SY __________ ____________________

P-501c Portland Cement Concrete Pavement - 17" Reinforced at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($_______________________________________________) per square

yard.

2,523 SY __________ ____________________

P-501d Concrete Grooving at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($_______________________________________________) per square

yard.

90,320 SY __________ ____________________

P-501e Concrete Block Out at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($___________________________________________) per each.

1 EA __________ ____________________

P-610a Cement Treated Base Repair at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($___________________________________________) per square yard.

2,920 SY __________ ____________________

L-125r Remove and Reinstall Light Fixture, Install Temporary Plywood Cover at

the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($_______________________________________________) per each.

238 EA __________ ____________________

L-125s Procure and Install New 22" Deep L-868B Light Base (Complete) at the

unit price of

____________________________________________________dollars

and _________________________________________________cents.

($_______________________________________________) per each.

492 EA __________ ____________________

L-125t Procure and Install New 26" Deep L-868B Light Base (Complete) at the

unit price of

____________________________________________________dollars

and _________________________________________________cents.

($_______________________________________________) per each.

37 EA __________ ____________________

L-125u Procure and Install New L-867B Base Can In Shoulder Pavement,

Reinstall Light Fixture (Complete) at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($_______________________________________________) per each.

10 EA __________ ____________________

Schedule I Total:

SCHEDULE I: RUNWAY 17L-35R PAVEMENT REHABILITATION (INCLUDING CONNECTOR TAXIWAYS UP TO HOLD LINES) (FEDERAL)

RUNWAY 17L-35R COMPLEX PAVEMENT AND LIGHTING REHABILITATION

CONTRACT NO. CE 201417577

ADDENDUM NUMBER FIVE

MoncadaJJ
Polygon
Page 9: ADDENDUM NUMBER FIVE - Denver International …business.flydenver.com/bizpdf/DIAAD_884.pdf · Volume No. 2 Sheet EL507 – ELECTRICAL DETAILS Replace Sheet EL507 dated October 20,

Item No. Description and Price Quantity Unit Unit Price Extension

015050a Mobilization at the lump sum of

____________________________________________________dollars

and _________________________________________________cents.

($___________________________________________) per lump sum.

1 LS __________ ____________________

P-150a Remove Concrete Pavement - 17" Reinforced at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($___________________________________________) per square yard.

2,638 SY __________ ____________________

P-150b Remove Concrete Pavement - 17" Non-Reinforced at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($________________________________________________) per square

yard.

39,960 SY __________ ____________________

P-150c Remove Bituminous Shoulder Pavement Full Depth at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($_________________________________________________) per

square yard.

4,910 SY __________ ____________________

P-150e Demolish L-868 Base Can at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($__________________________________________) per each.

146 EA __________ ____________________

P-150f Demolish Base Can In Shoulder, Remove Light Fixture at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($_______________________________________________) per each.2 EA __________ ____________________

P-150g Remove Concrete Curing Compound at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($_______________________________________________) per square

foot.

28,350 SF __________ ____________________

P-161a Bondbreaker Fabric at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($________________________________________________) per square

yard.

42,598 SY __________ ____________________

P-161b Geotextile Fabric at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($________________________________________________) per square

yard.

4,910 SY __________ ____________________

P-401a Bituminous Surface Course (3-Inch) at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($___________________________________________) per ton.

829 TON __________ ____________________

Part 1 - Schedule of Prices and Quantities

SCHEDULE II: TAXIWAY "ED" PAVEMENT REHABILITATION (FEDERAL)

DENVER INTERNATIONAL AIRPORT

RUNWAY 17L-35R COMPLEX PAVEMENT AND LIGHTING REHABILITATION

CONTRACT NO. 201417577

RUNWAY 17L-35R COMPLEX PAVEMENT AND LIGHTING REHABILITATION

CONTRACT NO. CE 201417577

ADDENDUM NUMBER FIVE

Page 10: ADDENDUM NUMBER FIVE - Denver International …business.flydenver.com/bizpdf/DIAAD_884.pdf · Volume No. 2 Sheet EL507 – ELECTRICAL DETAILS Replace Sheet EL507 dated October 20,

Item No. Description and Price Quantity Unit Unit Price Extension

P-401b Bituminous Base Course (7-Inch) at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($__________________________________ ________) per ton.

1,933 TON __________ ____________________

P-403a Asphalt Treated Permeable Base (5-7 Inches) at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($________________________________________________) per square

yard.

4,910 SY __________ ____________________

P-501a Portland Cement Concrete Pavement - 17" Non-Reinforced - High

Production at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($_______________________________________________) per square

yard.

39,960 SY __________ ____________________

P-501c Portland Cement Concrete Pavement - 17" Reinforced at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($_______________________________________________) per square

yard.

2,638 SY __________ ____________________

P-501d Concrete Grooving at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($_______________________________________________) per square

yard.

4,500 SY __________ ____________________

P-610a Cement Treated Base Repair at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($___________________________________________) per square yard.

1,280 SY __________ ____________________

L-125r Remove and Reinstall Light Fixture, Install Temporary Plywood Cover at

the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($_______________________________________________) per each.

1 EA __________ ____________________

L-125s Procure and Install New 22" Deep L-868B Light Base (Complete) at the

unit price of

____________________________________________________dollars

and _________________________________________________cents.

($_______________________________________________) per each.

123 EA __________ ____________________

L-125t Procure and Install New 26" Deep L-868B Light Base (Complete) at the

unit price of

____________________________________________________dollars

and _________________________________________________cents.

($_______________________________________________) per each.

23 EA __________ ____________________

L-125u Procure and Install New L-867B Base Can In Shoulder Pavement,

Reinstall Light Fixture (Complete) at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($_______________________________________________) per each.

2 EA __________ ____________________

Schedule II Total:

SCHEDULE II: TAXIWAY "ED" PAVEMENT REHABILITATION (FEDERAL)

RUNWAY 17L-35R COMPLEX PAVEMENT AND LIGHTING REHABILITATION

CONTRACT NO. CE 201417577

ADDENDUM NUMBER FIVE

MoncadaJJ
Polygon
Page 11: ADDENDUM NUMBER FIVE - Denver International …business.flydenver.com/bizpdf/DIAAD_884.pdf · Volume No. 2 Sheet EL507 – ELECTRICAL DETAILS Replace Sheet EL507 dated October 20,

Item No. Description and Price Quantity Unit Unit Price Extension

015050a Mobilization at the lump sum of

____________________________________________________dollars

and _________________________________________________cents.

($___________________________________________) per lump sum.

1 LS __________ ____________________

P-150a Remove Concrete Pavement - 17" Reinforced at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($___________________________________________) per square yard.

623 SY __________ ____________________

P-150b Remove Concrete Pavement - 17" Non-Reinforced at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($________________________________________________) per square

yard.

4,374 SY __________ ____________________

P-150c Remove Bituminous Shoulder Pavement Full Depth at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($_________________________________________________) per

square yard.

50 SY __________ ____________________

P-150d Remove Bituminous Shoulder Pavement 3-Inch Depth By Cold Milling at

the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($___________________________________________) per square yard.

73 SY __________ ____________________

P-150e Demolish L-868 Base Can at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($__________________________________________) per each.

39 EA __________ ____________________

P-150g Remove Concrete Curing Compound at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($_______________________________________________) per square

foot.

3,690 SF __________ ____________________

P-161a Bondbreaker Fabric at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($________________________________________________) per square

yard.

4,997 SY __________ ____________________

P-161b Geotextile Fabric at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($________________________________________________) per square

yard.

50 SY __________ ____________________

P-161c Stress-Absorbing Fabric at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($___________________________________________) per square yard.

73 SY __________ ____________________

SCHEDULE III: TAXIWAYS "P, P6, P7" PAVEMENT REHABILITATION (FEDERAL)

DENVER INTERNATIONAL AIRPORT

RUNWAY 17L-35R COMPLEX PAVEMENT AND LIGHTING REHABILITATION

CONTRACT NO. 201417577

Part 1 - Schedule of Prices and Quantities

RUNWAY 17L-35R COMPLEX PAVEMENT AND LIGHTING REHABILITATION

CONTRACT NO. CE 201417577

ADDENDUM NUMBER FIVE

Page 12: ADDENDUM NUMBER FIVE - Denver International …business.flydenver.com/bizpdf/DIAAD_884.pdf · Volume No. 2 Sheet EL507 – ELECTRICAL DETAILS Replace Sheet EL507 dated October 20,

Item No. Description and Price Quantity Unit Unit Price Extension

P-401a Bituminous Surface Course (3-Inch) at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($___________________________________________) per ton.

21 TON __________ ____________________

P-401b Bituminous Base Course (7-Inch) at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($__________________________________ ________) per ton.

20 TON __________ ____________________

P-403a Asphalt Treated Permeable Base (5-7 Inches) at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($________________________________________________) per square

yard.

50 SY __________ ____________________

P-501b Portland Cement Concrete Pavement - 17" Non-Reinforced - Low

Production at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($___________________________________________) per square yard.

4,374 SY __________ ____________________

P-501c Portland Cement Concrete Pavement - 17" Reinforced at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($_______________________________________________) per square

yard.

623 SY __________ ____________________

P-610a Cement Treated Base Repair at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($___________________________________________) per square yard.

150 SY __________ ____________________

L-125r Remove and Reinstall Light Fixture, Install Temporary Plywood Cover at

the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($_______________________________________________) per each.

40 EA __________ ____________________

L-125s Procure and Install New 22" Deep L-868B Light Base (Complete) at the

unit price of

____________________________________________________dollars

and _________________________________________________cents.

($_______________________________________________) per each.

36 EA __________ ____________________

L-125t Procure and Install New 26" Deep L-868B Light Base (Complete) at the

unit price of

____________________________________________________dollars

and _________________________________________________cents.

($_______________________________________________) per each.

3 EA __________ ____________________

Schedule III Total:

SCHEDULE III: TAXIWAYS "P, P6, P7" PAVEMENT REHABILITATION (FEDERAL)

RUNWAY 17L-35R COMPLEX PAVEMENT AND LIGHTING REHABILITATION

CONTRACT NO. CE 201417577

ADDENDUM NUMBER FIVE

MoncadaJJ
Polygon
Page 13: ADDENDUM NUMBER FIVE - Denver International …business.flydenver.com/bizpdf/DIAAD_884.pdf · Volume No. 2 Sheet EL507 – ELECTRICAL DETAILS Replace Sheet EL507 dated October 20,

Item No. Description and Price Quantity Unit Unit Price Extension

015050a Mobilization at the lump sum of

____________________________________________________dollars

and _________________________________________________cents.

($___________________________________________) per lump sum.

1 LS __________ ____________________

P-150a Remove Concrete Pavement - 17" Reinforced at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($___________________________________________) per square yard.

1,025 SY __________ ____________________

P-150b Remove Concrete Pavement - 17" Non-Reinforced at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($________________________________________________) per square

yard.

5,475 SY __________ ____________________

P-150c Remove Bituminous Shoulder Pavement Full Depth at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($_________________________________________________) per

square yard.

186 SY __________ ____________________

P-150d Remove Bituminous Shoulder Pavement 3-Inch Depth By Cold Milling at

the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($___________________________________________) per square yard.

261 SY __________ ____________________

P-150e Demolish L-868 Base Can at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($__________________________________________) per each.

43 EA __________ ____________________

P-150g Remove Concrete Curing Compound at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($_______________________________________________) per square

foot.

2,340 SF __________ ____________________

P-161a Bondbreaker Fabric at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($________________________________________________) per square

yard.

6,500 SY __________ ____________________

P-161b Geotextile Fabric at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($________________________________________________) per square

yard.

186 SY __________ ____________________

P-161c Stress-Absorbing Fabric at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($___________________________________________) per square yard.

261 SY __________ ____________________

SCHEDULE IV: TAXIWAYS "P, P2, P3, P4, P9" PAVEMENT REHABILITATION (FEDERAL)

DENVER INTERNATIONAL AIRPORT

RUNWAY 17L-35R COMPLEX PAVEMENT AND LIGHTING REHABILITATION

CONTRACT NO. 201417577

Part 1 - Schedule of Prices and Quantities

RUNWAY 17L-35R COMPLEX PAVEMENT AND LIGHTING REHABILITATION

CONTRACT NO. CE 201417577

ADDENDUM NUMBER FIVE

Page 14: ADDENDUM NUMBER FIVE - Denver International …business.flydenver.com/bizpdf/DIAAD_884.pdf · Volume No. 2 Sheet EL507 – ELECTRICAL DETAILS Replace Sheet EL507 dated October 20,

Item No. Description and Price Quantity Unit Unit Price Extension

P-401a Bituminous Surface Course (3-Inch) at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($___________________________________________) per ton.

76 TON __________ ____________________

P-401b Bituminous Base Course (7-Inch) at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($__________________________________ ________) per ton.

73 TON __________ ____________________

P-403a Asphalt Treated Permeable Base (5-7 Inches) at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($________________________________________________) per square

yard.

186 SY __________ ____________________

P-501b Portland Cement Concrete Pavement - 17" Non-Reinforced - Low

Production at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($___________________________________________) per square yard.

5,475 SY __________ ____________________

P-501c Portland Cement Concrete Pavement - 17" Reinforced at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($_______________________________________________) per square

yard.

1,025 SY __________ ____________________

P-610a Cement Treated Base Repair at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($___________________________________________) per square yard.

200 SY __________ ____________________

L-125r Remove and Reinstall Light Fixture, Install Temporary Plywood Cover at

the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($_______________________________________________) per each.

49 EA __________ ____________________

L-125s Procure and Install New 22" Deep L-868B Light Base (Complete) at the

unit price of

____________________________________________________dollars

and _________________________________________________cents.

($_______________________________________________) per each.

25 EA __________ ____________________

L-125t Procure and Install New 26" Deep L-868B Light Base (Complete) at the

unit price of

____________________________________________________dollars

and _________________________________________________cents.

($_______________________________________________) per each.

18 EA __________ ____________________

Schedule IV Total:

SCHEDULE IV: TAXIWAYS "P, P2, P3, P4, P9" PAVEMENT REHABILITATION (FEDERAL)

RUNWAY 17L-35R COMPLEX PAVEMENT AND LIGHTING REHABILITATION

CONTRACT NO. CE 201417577

ADDENDUM NUMBER FIVE

MoncadaJJ
Polygon
Page 15: ADDENDUM NUMBER FIVE - Denver International …business.flydenver.com/bizpdf/DIAAD_884.pdf · Volume No. 2 Sheet EL507 – ELECTRICAL DETAILS Replace Sheet EL507 dated October 20,

Item No. Description and Price Quantity Unit Unit Price Extension

015050a Mobilization at the lump sum of

____________________________________________________dollars

and _________________________________________________cents.

($___________________________________________) per lump sum.

1 LS __________ ____________________

P-152a Subgrade Preparation at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($___________________________________________) per square yard.290 SY __________ ____________________

P-401c Bituminous Access Road (4-Inch) at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($________________________________________________) per ton.

60 TON __________ ____________________

P-501f Spall Repair at the unit price of

____________________________________________________dollars

and _________________________________________________cents.

($___________________________________________) per square foot.

7,180 SF __________ ____________________

Schedule V Total:

Total for Schedules I through V:

SCHEDULE V: SPALL REPAIR AND ACCESS ROADS (NON-FEDERAL)

DENVER INTERNATIONAL AIRPORT

RUNWAY 17L-35R COMPLEX PAVEMENT AND LIGHTING REHABILITATION

CONTRACT NO. 201417577

Part 1 - Schedule of Prices and Quantities

RUNWAY 17L-35R COMPLEX PAVEMENT AND LIGHTING REHABILITATION

CONTRACT NO. CE 201417577

ADDENDUM NUMBER FIVE

MoncadaJJ
Polygon
Page 16: ADDENDUM NUMBER FIVE - Denver International …business.flydenver.com/bizpdf/DIAAD_884.pdf · Volume No. 2 Sheet EL507 – ELECTRICAL DETAILS Replace Sheet EL507 dated October 20,

Item No. Description and Price Quantity Unit Unit Price Extension

01505a Mobilization at the lump sum of 1 LS

_____________________________________________________________________dollars

and___________________________________________________________________cents.

($_____________________________________________________________) per lump sum.

01575a Cover Elevated Edge Lights at the unit price of 8 EA

_____________________________________________________________________dollars

and___________________________________________________________________cents.

($_________________________________________________________________) per each.

01575b Cover Panel on Guidance Sign at the unit price of 4 EA

_____________________________________________________________________dollars

and___________________________________________________________________cents.

($_________________________________________________________________) per each.

01575c Install Tie Back at the unit price of 2 EA

_____________________________________________________________________dollars

and___________________________________________________________________cents.

($_________________________________________________________________) per each.

L-108a Install Cable, 1/C #8, 7 Strand, 5000V, L-824, Type C at the unit price of 106,000 LF

_____________________________________________________________________dollars

and___________________________________________________________________cents.

($_____________________________________________________________) per linear foot.

L-110a Install Conduit 1-Way, 2-Inch PVC (CLSM) at the unit price of 70 LF

_____________________________________________________________________dollars

and___________________________________________________________________cents.

($_____________________________________________________________) per linear foot.

L-110b Install Conduit 1-Way, 2-Inch PVC (CE) at the unit price of 120 LF

_____________________________________________________________________dollars

and___________________________________________________________________cents.

($_____________________________________________________________) per linear foot.

L-125a Procure L-850A(L) Runway Centerline Light at the unit price of 239 EA

_____________________________________________________________________dollars

and___________________________________________________________________cents.

($_________________________________________________________________) per each.

L-125b Procure L-850B(L) Runway Touchdown Zone Light at the unit price of 180 EA

_____________________________________________________________________dollars

and___________________________________________________________________cents.

($_________________________________________________________________) per each.

L-125c Procure L-850C Runway Edge Light at the unit price of 5 EA

_____________________________________________________________________dollars

and___________________________________________________________________cents.

($_________________________________________________________________) per each.

L-125d Remove and Install L-850A(L) Runway Centerline Light at the unit price of 239 EA

_____________________________________________________________________dollars

and___________________________________________________________________cents.

($_________________________________________________________________) per each.

L-125e Remove and Install L-850B(L) Runway Touchdown Zone Light at the unit price of 180 EA

_____________________________________________________________________dollars

and___________________________________________________________________cents.

($_________________________________________________________________) per each.

DENVER INTERNATIONAL AIRPORT

RUNWAY 17L-35R COMPLEX PAVEMENT AND LIGHTING REHABILITATION

CONTRACT NO. 201417577

Part 2 - Schedule of Prices and Quantities

SCHEDULE A: REPLACE RUNWAY 17L-35R LIGHTING, REPLACE PARALLEL TAXIWAY "P" AND CONNECTOR TAXIWAY CENTERLINE LIGHTING (FEDERAL)

RUNWAY 17L-35R COMPLEX PAVEMENT AND LIGHTING REHABILITATION

CONTRACT NO. CE 201417577

ADDENDUM NUMBER FIVE

Page 17: ADDENDUM NUMBER FIVE - Denver International …business.flydenver.com/bizpdf/DIAAD_884.pdf · Volume No. 2 Sheet EL507 – ELECTRICAL DETAILS Replace Sheet EL507 dated October 20,

Item No. Description and Price Quantity Unit Unit Price Extension

L-125f Remove and Install L-850C Runway Edge Light at the unit price of 5 EA

_____________________________________________________________________dollars

and___________________________________________________________________cents.

($_________________________________________________________________) per each.

L-125g Remove and Reinstall L-852C Unidirectional Taxiway Centerline Light at the unit price of 5 EA

_____________________________________________________________________dollars

and___________________________________________________________________cents.

($_________________________________________________________________) per each.

L-125h Remove and Reinstall L-852C Bidirectional Taxiway Centerline Light at the unit price of 137 EA

_____________________________________________________________________dollars

and___________________________________________________________________cents.

($_________________________________________________________________) per each.

L-125i Remove and Reinstall L-852D Unidirectional Taxiway Centerline Light at the unit price of 181 EA

_____________________________________________________________________dollars

and___________________________________________________________________cents.

($_________________________________________________________________) per each.

L-125j Remove and Reinstall L-852D Bidirectional Taxiway Centerline Light at the unit price of 71 EA

_____________________________________________________________________dollars

and___________________________________________________________________cents.

($_________________________________________________________________) per each.

L-125k Remove and Reinstall L-852GS 2-Circuit Runway Stop Bar/Guard Light at the unit price of 21 EA

_____________________________________________________________________dollars

and___________________________________________________________________cents.

($_________________________________________________________________) per each.

L-125l Remove and Reinstall L-862 Runway Edge Light at the unit price of 2 EA

_____________________________________________________________________dollars

and___________________________________________________________________cents.

($_________________________________________________________________) per each.

L-125m Remove and Reinstall L-861T Taxiway Edge Light at the unit price of 2 EA

_____________________________________________________________________dollars

and___________________________________________________________________cents.

($_________________________________________________________________) per each.

L-125n Remove and Reinstall Coverplate at the unit price of 86 EA

_____________________________________________________________________dollars

and___________________________________________________________________cents.

($_________________________________________________________________) per each.

L-125o Procure and Install L-868, Size A, Base Can at the unit price of 15 EA

_____________________________________________________________________dollars

and___________________________________________________________________cents.

($_________________________________________________________________) per each.

L-125p Install Fixture ID Marker at the unit price of 944 EA

_____________________________________________________________________dollars

and___________________________________________________________________cents.

($_________________________________________________________________) per each.

L-125q Drill Out Existing Bolt and Rethread Existing Bolt Hole at the unit price of 117 EA

_____________________________________________________________________dollars

and___________________________________________________________________cents.

($_________________________________________________________________) per each.

L-127a

Remove and Install Internally Lighted L-806(L) Supplemental Wind Cone and Foundation at the unit

price of 2 EA

_____________________________________________________________________dollars

and___________________________________________________________________cents.

($_________________________________________________________________) per each.

SCHEDULE A: REPLACE RUNWAY 17L-35R LIGHTING, REPLACE PARALLEL TAXIWAY "P" AND CONNECTOR TAXIWAY CENTERLINE LIGHTING (FEDERAL)

RUNWAY 17L-35R COMPLEX PAVEMENT AND LIGHTING REHABILITATION

CONTRACT NO. CE 201417577

ADDENDUM NUMBER FIVE

MoncadaJJ
Polygon
Page 18: ADDENDUM NUMBER FIVE - Denver International …business.flydenver.com/bizpdf/DIAAD_884.pdf · Volume No. 2 Sheet EL507 – ELECTRICAL DETAILS Replace Sheet EL507 dated October 20,

Item No. Description and Price Quantity Unit Unit Price Extension

L-131a Remove and Install Pavement Sensor at the unit price of 5 EA

_____________________________________________________________________dollars

and___________________________________________________________________cents.

($_________________________________________________________________) per each.

L-140a Photometric Testing for Runway 17L-35R Complex Light Fixtures at the lump sum of 1 LS

_____________________________________________________________________dollars

and___________________________________________________________________cents.

($_____________________________________________________________) per lump sum.

13410Ca Remove and Reinstall Brite III Remote Unit, Dual Channel at the unit price of 21 EA

_____________________________________________________________________dollars

and___________________________________________________________________cents.

($_________________________________________________________________) per each.

Schedule A Total:

Item No. Description and Price Quantity Unit Unit Price Extension

L-108a Install Cable, 1/C #8, 7 Strand, 5000V, L-824, Type C at the unit price of 345,000 LF

_____________________________________________________________________dollars

and___________________________________________________________________cents.

($_____________________________________________________________) per linear foot.

L-108b Install Cable, 1/C #8 Green Insulated Ground at the unit price of 21,000 LF

_____________________________________________________________________dollars

and___________________________________________________________________cents.

($_____________________________________________________________) per linear foot.

Schedule B Total:

Item No. Description and Price Quantity Unit Unit Price Extension

01505a Mobilization at the lump sum of 1 LS

_____________________________________________________________________dollars

and___________________________________________________________________cents.

($_____________________________________________________________) per lump sum.

L-127b Remove and Install L-806(L) ARFF #3 Wind Cone and Foundation at the lump sum of 1 LS

_____________________________________________________________________dollars

and___________________________________________________________________cents.

($_____________________________________________________________) per lump sum.

L-132a Install Active Pavement Sensor System at the lump sum of 1 LS

_____________________________________________________________________dollars

and___________________________________________________________________cents.

($_____________________________________________________________) per lump sum.

Schedule C Total:

Total for Schedules A through C:

SCHEDULE A: REPLACE RUNWAY 17L-35R LIGHTING, REPLACE PARALLEL TAXIWAY "P" AND CONNECTOR TAXIWAY CENTERLINE LIGHTING (FEDERAL)

SCHEDULE C: PROCURE AND INSTALL ACTIVE PAVEMENT SENSOR EQUIPMENT AND INFRASTRUCTURE (NON-FEDERAL)

SCHEDULE B: REPLACE HOMERUN CABLE (FEDERAL)

RUNWAY 17L-35R COMPLEX PAVEMENT AND LIGHTING REHABILITATION

CONTRACT NO. CE 201417577

ADDENDUM NUMBER FIVE

MoncadaJJ
Polygon
MoncadaJJ
Polygon
MoncadaJJ
Polygon
Page 19: ADDENDUM NUMBER FIVE - Denver International …business.flydenver.com/bizpdf/DIAAD_884.pdf · Volume No. 2 Sheet EL507 – ELECTRICAL DETAILS Replace Sheet EL507 dated October 20,

DENVER

INTERNATIONAL

AIRPORT

CITY & COUNTY

of DENVER

ISSUE RECORD

NO. BY PURPOSE DATE CKD

SCALE

DATE

DRAWN BY:

CHECKED BY:

FAA AIP NO:

WORK BREAKDOWN NO.

DESIGN CONTRACT NO.

CONST. CONTRACT NO.

VOLUME NO.

SHEET TITLE

SHEET NO.

CADD FILE NO.

OF

DENVER

INTERNATIONAL

AIRPORT

CITY & COUNTY

of DENVER

ISSUE RECORD

NO. BY PURPOSE DATE CKD

SCALE

DATE

DRAWN BY:

CHECKED BY:

FAA AIP NO:

WORK BREAKDOWN NO.

DESIGN CONTRACT NO.

CONST. CONTRACT NO.

VOLUME NO.

SHEET TITLE

SHEET NO.

CADD FILE NO.

OF

J:\_A

viation S

ervices\D

EN

_C

AD

\D

IA

\W

VX

W1636 - R

W 17L-35R

\C

E64028_R

EH

AB

17L-35R

\C

0450_C

E64028-E

1C

DE

T-502.dw

g N

ov 20, 2014 - 1:28pm

C0450_CE64028-E1CDET-502

RU

NW

AY

1

7L

-3

5R

PA

VE

ME

NT

RE

HA

BIL

IT

AT

IO

N

10/28/14

-

201417577

CE64028

-

1

126

PLANS FOR BID

C0450

102

PAVING

DETAILS

NTS

1. DRILLING METHOD FOR DOWELS SHALL BE CAPABLE OF MAINTAINING DRILL HOLES

PARALLEL TO THE CONCRETE SURFACE AND NORMAL TO THE JOINT LINE WITHIN

1/4" AT THE END OF THE DOWEL BAR. DRILL HOLES SHALL BE ACCURATELY LAID

OUT SO THAT THE MAXIMUM DEVIATION DOES NOT EXCEED 1". DRILL HOLE

DIAMETER BE OF SUFFICIENT SIZE ACCEPT THE TYPE AND SIZE DOWEL

REQUIRED, INCLUDING BONDING MATERIAL.

2. AFTER THE DRILLING IS COMPLETE AND PRIOR TO THE INSTALLATION OF THE

DOWELS, THE HOLES SHALL BE THOROUGHLY CLEANED REMOVE DRILLING DUST,

CONCRETE CHIPS AND ANY MATERIAL DETRIMENTAL TO DEVELOPING BOND

BETWEEN THE DRILLED SURFACE AND DOWEL.

3. BONDING MATERIAL SHALL BE APPLIED UNIFORMLY TO THE ENTIRE

CIRCUMFERENCE OF THE DOWEL HOLE SURFACE, AND SUFFICIENT MATERIAL

PLACED IN THE HOLE SO THAT A SLIGHT AMOUNT WILL BE FORCED FROM AROUND

THE ENTIRE CIRCUMFERENCE WHEN THE DOWEL IS INSERTED AND TAPPED TO

THE CORRECT POSITION. SECURE DOWELS UNTIL EPOXY HAS FULLY SET. SMALL

WEDGES MAY BE USED TO SUPPORT THE DOWEL IN CORRECT ALIGNMENT AND

ELEVATION UNTIL THE MATERIAL HARDENS. WEDGES WILL BE REMOVED PRIOR

TO PAVING ADJACENT PANELS.

CONCRETE PAVEMENT THICKNESS TABLE

T/2

17"

T

4.25"8.5"

T/4

NOTES:

1 1/2" x 20" SMOOTH

DOWEL ON 18" CENTERS

EPOXY ENTIRE DOWEL AND

OIL ONE END OF DOWEL

T/2

T

JOINT SHALL BE SAWED

T

FULL STRENGTH

PCC PAVEMENT

TYPE

NOTE:

1. ANY PORTION OF THE BASKET IN CONTACT WITH THE SUBGRADE,

INCLUDING CTB OR BOND BREAKER, SHALL BE PLASTIC OR EPOXY

COATED.

T/2

T

1 1/2" x 20" SMOOTH

DOWEL ON 18" CENTERS

EPOXY ENTIRE DOWEL AND

OIL EXPOSED END OF DOWEL

T/2

T

1 1/2" x 20" SMOOTH

DOWEL ON 18" CENTERS

EPOXY ENTIRE DOWEL AND

OIL ONE END OF DOWEL

JOINT SHALL BE SAWED

JOINT SHALL BE SAWED

T

T

1 1

/8

"

PCC PAVEMENT

SURFACE

P-605 SEALANT

1/2"±

1/16"

AC

P

AV

EM

EN

T

ASPHALT TREATED

PERMEABLE BASE

T/2

T

1 1/2" x 20" SMOOTH

DOWEL ON 18" CENTERS

EPOXY ENTIRE DOWEL AND

OIL ONE END OF DOWEL

JOINT SHALL BE SAWED

APPROVED WELDED

WIRE BASKET

NOTE:

1. ANY PORTION OF THE BASKET IN CONTACT WITH THE SUBGRADE,

INCLUDING CTB OR BOND BREAKER, SHALL BE PLASTIC OR EPOXY COATED.

T/3

5.667"

NOTES:

1. ASPHALT ELEVATION AT PCC JOINT SHALL BE 1/16" BELOW

PCC EDGE ELEVATION. HOWEVER, THE P-401 GRADE

TOLERANCES SHALL STILL APPLY.

2. P-605 SEALANT SHALL BE FLUSH WITH TOP OF THE ASPHALT.

APPROVED WELDED

WIRE BASKET

NOT TO SCALE

1C0401-C0440

C0450BETWEEN PCC AND ACC

TYPE L - CONSTRUCTION JOINT

NOT TO SCALE

2C0401-C0440

C0450EXPANSION JOINT

TYPE A - THICKENED EDGE

NOT TO SCALE

3C0401-C0440

C0450CONSTRUCTION JOINT

5.25"

T/4+1

3.4"

T/5

21.25"

Te

CLOSED CELL POLYETHLENE

EXPANSION JOINT FILLER

T

NEAREAST JOINT

BUT NOT LESS THAN 10'

Te

3

C0451

TYPE E1 - DOWELED

NOT TO SCALE

4C0401-C0440

C0450CONSTRUCTION JOINT

TYPE E2 - DOWELED

NOT TO SCALE

5C0401-C0440

C0450CONTRACTION JOINT

TYPE C1 - DOWELED

1

C0451

4

C0451

2

C0451

NOT TO SCALE

6C0401-C0440

C0450CONTRACTION JOINT

TYPE C2 - DOWELED

5

C0451

NOT TO SCALE

7C0401-C0440

C0450TYPE D1 - DUMMY CONTRACTION JOINT

NOT TO SCALE

8C0401-

C440

C0450TYPE D2 - DUMMY CONTRACTION JOINT

2

C0451

5

C0451

DENVER

INTERNATIONAL

AIRPORT

CITY & COUNTY

of DENVER

ISSUE RECORD

NO. BY PURPOSE DATE CKD

SCALE

DATE

DRAWN BY:

CHECKED BY:

FAA AIP NO:

WORK BREAKDOWN NO.

DESIGN CONTRACT NO.

CONST. CONTRACT NO.

VOLUME NO.

SHEET TITLE

SHEET NO.

CADD FILE NO.

OF

DENVER

INTERNATIONAL

AIRPORT

CITY & COUNTY

of DENVER

ISSUE RECORD

NO. BY PURPOSE DATE CKD

SCALE

DATE

DRAWN BY:

CHECKED BY:

FAA AIP NO:

WORK BREAKDOWN NO.

DESIGN CONTRACT NO.

CONST. CONTRACT NO.

VOLUME NO.

SHEET TITLE

SHEET NO.

CADD FILE NO.

OF

J:\_A

viation S

ervices\D

EN

_C

AD

\D

IA

\W

VX

W1636 - R

W 17L-35R

\C

E64028_R

EH

AB

17L-35R

\C

0450_C

E64028-E

1C

DE

T-502.dw

g N

ov 20, 2014 - 1:28pm

C0450_CE64028-E1CDET-502

RU

NW

AY

1

7L

-3

5R

PA

VE

ME

NT

RE

HA

BIL

IT

AT

IO

N

10/28/14

-

201417577

CE64028

-

1

126

PLANS FOR BID

C0450

104

PAVING

DETAILS

NTS

JG

JH

5

C0452

5

C0452

NEW P-501 PCC PAVEMENT

Page 20: ADDENDUM NUMBER FIVE - Denver International …business.flydenver.com/bizpdf/DIAAD_884.pdf · Volume No. 2 Sheet EL507 – ELECTRICAL DETAILS Replace Sheet EL507 dated October 20,

DENVER

INTERNATIONAL

AIRPORT

CITY & COUNTY

of DENVER

ISSUE RECORD

NO. BY PURPOSE DATE CKD

SCALE

DATE

DRAWN BY:

CHECKED BY:

FAA AIP NO:

WORK BREAKDOWN NO.

DESIGN CONTRACT NO.

CONST. CONTRACT NO.

VOLUME NO.

SHEET TITLE

SHEET NO.

CADD FILE NO.

OF

DENVER

INTERNATIONAL

AIRPORT

CITY & COUNTY

of DENVER

ISSUE RECORD

NO. BY PURPOSE DATE CKD

SCALE

DATE

DRAWN BY:

CHECKED BY:

FAA AIP NO:

WORK BREAKDOWN NO.

DESIGN CONTRACT NO.

CONST. CONTRACT NO.

VOLUME NO.

SHEET TITLE

SHEET NO.

CADD FILE NO.

OF

C:\U

sers\Y

arneal\appdata\local\tem

p\A

cP

ublish_4284\C

0450_C

E64028-E

1C

DE

T-502.dw

g N

ov 20, 2014 - 1:29pm

C0450_CE64028-E1CDET-502

RU

NW

AY

1

7L

-3

5R

PA

VE

ME

NT

RE

HA

BIL

IT

AT

IO

N

10/28/14

-

201417577

CE64028

-

1

126

PLANS FOR BID

C0452

104

PAVING

DETAILS

NTS

3"

T

T/4+1"

FULL STRENGTH CONCRETE

PAVEMENT

3"

3"

#4 DEFORMED BARS, 12" O.C.

BOTH WAYS OR D10 X D10 WELDED

WIRE FABRIC 6" O.C. BOTH WAYS.

18" LAP

9

0

°

NOT TO SCALE

1C0452 C0452

CONCRETE WIDENING AT PC'SNOT TO SCALE

2C0452 C0452

TYPICAL JOINT AT CURVENOT TO SCALE

3C0452 C0452

REINFORCED PAVEMENT SECTION

NOT TO SCALE

4C0452 C0452

PAVEMENT REINFORCEMENT DETAILNOT TO SCALE

5C0452 C0452

CONSTRUCTION JOINT DOWEL BASKETNOT TO SCALE

6C0452 C0452

TYPICAL JOINT DOGLEG DETAIL

DENVER

INTERNATIONAL

AIRPORT

CITY & COUNTY

of DENVER

ISSUE RECORD

NO. BY PURPOSE DATE CKD

SCALE

DATE

DRAWN BY:

CHECKED BY:

FAA AIP NO:

WORK BREAKDOWN NO.

DESIGN CONTRACT NO.

CONST. CONTRACT NO.

VOLUME NO.

SHEET TITLE

SHEET NO.

CADD FILE NO.

OF

DENVER

INTERNATIONAL

AIRPORT

CITY & COUNTY

of DENVER

ISSUE RECORD

NO. BY PURPOSE DATE CKD

SCALE

DATE

DRAWN BY:

CHECKED BY:

FAA AIP NO:

WORK BREAKDOWN NO.

DESIGN CONTRACT NO.

CONST. CONTRACT NO.

VOLUME NO.

SHEET TITLE

SHEET NO.

CADD FILE NO.

OF

C:\U

sers\Y

arneal\appdata\local\tem

p\A

cP

ublish_4284\C

0450_C

E64028-E

1C

DE

T-502.dw

g N

ov 20, 2014 - 1:29pm

C0450_CE64028-E1CDET-502

RU

NW

AY

1

7L

-3

5R

PA

VE

ME

NT

RE

HA

BIL

IT

AT

IO

N

10/28/14

-

201417577

CE64028

-

1

126

PLANS FOR BID

C0452

106

PAVING

DETAILS

NTS

JG

JH

3

C0452

4

C0452

Page 21: ADDENDUM NUMBER FIVE - Denver International …business.flydenver.com/bizpdf/DIAAD_884.pdf · Volume No. 2 Sheet EL507 – ELECTRICAL DETAILS Replace Sheet EL507 dated October 20,
Page 22: ADDENDUM NUMBER FIVE - Denver International …business.flydenver.com/bizpdf/DIAAD_884.pdf · Volume No. 2 Sheet EL507 – ELECTRICAL DETAILS Replace Sheet EL507 dated October 20,
Page 23: ADDENDUM NUMBER FIVE - Denver International …business.flydenver.com/bizpdf/DIAAD_884.pdf · Volume No. 2 Sheet EL507 – ELECTRICAL DETAILS Replace Sheet EL507 dated October 20,