Page 1 of 2 ADDENDUM No. 1 ADDENDUM No. 1 for Runway Incursion Mitigation (RIM) Project to Reconfigure Taxiways ‘P’ & ‘U’ Bid # FY18-805-55 at the Manchester – Boston Regional Airport Due to be opened 1:00 p.m., on April 25, 2018 Date: April 17, 2018 The attention of firms submitting proposals for the work named above is called to the following modifications to the documents as were issued. The items set forth herein, whether of clarification, omission, addition and/or substitution, shall be included and form a part of the Proposer’s submitted materials and the corresponding contract when issued. No claim for additional compensation, due to lack of knowledge of the contents of this Addendum will be considered. All Proposer’s are advised that receipt of this notice and all attached material must be duly acknowledged in the space provided on the signature page of the proposal documents, and by the insertion of this sheet, signed, and submitted with your Proposal package. This form must be signed and attached to the original copy of your submission. The attached sheets contain information or clarifications requested or discussed. Receipt of Addendum No. 1 to the REQUEST FOR PROPOSALS for Runway Incursion Mitigation (RIM) Project to Reconfigure Taxiways ‘P’ & ‘U’ at the MANCHESTER-BOSTON REGIONAL AIRPORT is hereby acknowledged. COMPANY NAME: SIGNED BY: NAME AND TITLE PRINTED: TELEPHONE: FAX:

Transcript of ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance...

Page 1: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4

Page 1 of 2 ADDENDUM No. 1

ADDENDUM No. 1

for

Runway Incursion Mitigation (RIM) Project to Reconfigure Taxiways ‘P’ & ‘U’Bid # FY18-805-55

at the Manchester – Boston Regional Airport

Due to be opened 1:00 p.m., on April 25, 2018

Date: April 17, 2018

The attention of firms submitting proposals for the work named above is called to the following modifications to thedocuments as were issued.

The items set forth herein, whether of clarification, omission, addition and/or substitution, shall be included and forma part of the Proposer’s submitted materials and the corresponding contract when issued. No claim for additionalcompensation, due to lack of knowledge of the contents of this Addendum will be considered.

All Proposer’s are advised that receipt of this notice and all attached material must be duly acknowledged in the spaceprovided on the signature page of the proposal documents, and by the insertion of this sheet, signed, and submittedwith your Proposal package.

This form must be signed and attached to the original copy of your submission.

The attached sheets contain information or clarifications requested or discussed.

Receipt of Addendum No. 1 to the REQUEST FOR PROPOSALS for Runway Incursion Mitigation (RIM)Project to Reconfigure Taxiways ‘P’ & ‘U’ at the MANCHESTER-BOSTON REGIONAL AIRPORT is hereby

acknowledged.

COMPANY NAME:

SIGNED BY:

NAME AND TITLE PRINTED:

TELEPHONE: FAX:

Page 2: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4

ADDENDUM No. 1

CLARIFICATIONSAddendum Item No.1 -SUBMITTED QUESTION:There is a conflict with excess materials. Please clarify whether excess material is to be disposed of by theContractor or remain Airport Property.

CLARIFICATION:Unless otherwise stated, surplus materials are to become property of the Contractor and be legally disposed of offsite.The Owner wishes to retain any surplus topsoil, taxiway light fixtures and taxiway sign fixtures. Refer to revised noteon attached Drawing No. G1.0 General Notes and Sheet Index

Addendum Item No.2 -SUBMITTED QUESTION: Are Builder’s Risk Insurance or Owner Contractor’s Protective (OCP) Coveragerequired for this project?

CLARIFICATION: Builders Risk Insurance is not required for this project. OCP is required for this project.

Addendum Item No.3 -SUBMITTED QUESTION: Will the Airport have started the Utility relocations prior to the start of the Contractwith costs processed through the $200,000 allowance item L-900-1? If this work will not be started until orderedby the Contractor, is there any estimate as to duration of the work by the utility?

CLARIFICATION: Utility Relocation is to be ordered and coordinated by the Contractor. Utility Owner has notprovided an estimated duration to complete their work.

Addendum Item No.4 -SUBMITTED QUESTION: How will the grooving pattern work with the shift in taxiway alignment? Groovingcannot overlap with compromising the paved surface.

CLARIFICATION: Grooves are to remain perpendicular to the taxiway centerline along the radius. The Contractorwill have to adjust the angle between passes which will result in a gap between passes on the outside edge of theradius.

Addendum Item No.5 -SUBMITTED QUESTION: Please indicate the class of RCP

CLARIFICATION: All RCP shall be Class V.

Addendum Item No.6 -SUBMITTED QUESTION: The Info for Bidders indicates 105 days for completion and the Proposal indicates 180days, please confirm which is correct.

CLARIFICATION: Project duration has been increased to 196 calendar days by this addendum.

Addendum Item No.7 -SUBMITTED QUESTION: Will the final coat of paint be required after grooving is completed? If so will thisresult in 3 coats of paint?

CLARIFICATION: It is anticipated the final coat of paint will not be completed until after grooving is complete. Athird coat of paint is not anticipated.

Page 3: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4

ADDENDUM No. 1

Addendum Item No.8 -SUBMITTED QUESTION: Will the Contractor be responsible to verify the perc rate at subgrade for theinfiltration system?

CLARIFICATION: No the Contractor is not responsible to verify infiltration rates. The Owner may elect to do soand will pay for the cost associated with the testing.

Addendum Item No.9 -SUBMITTED QUESTION: The silt fence detail on Drawing ES2.1 shows an optional wire mesh that is not in thespecification. Is this option needed? If so, this should be a separate item.

CLARIFICATION: The wire mesh called out on the silt fence detail as optional is not required for use on thisproject. The use of wire mesh would be at the sole discretion of the Contractor and his/her Erosion and SedimentControl Plan Preparer.

SPECIFICATIONSAddendum Item No.10 -Remove the 6th paragraph of page 1 of the Advertisement for Bids and Replace it with the following:

Bids will be publicly opened and read aloud on April 25, 2018 at 1:00 pm at the Airport administrativeoffices boardroom located on the third floor of the Airport terminal at One Airport Road, Manchester, NH.The contract will be awarded to lowest responsive and responsible bidder. The Owner intends to issue anotice-to-proceed within 60 days of the bid opening contingent upon available funding, qualified bids,receipt of insurance certificates and receipt of bonds.

Addendum Item No.11 -Remove The first paragraph of Section 1.01 (Receipt and Opening of Bids) and Replace it with the following:

The City of Manchester, Department of Aviation, Manchester, New Hampshire (herein called the Owner),invites bids on the form attached hereto, all blanks of which must be appropriately filled in. Bids will bereceived by the Manchester-Boston Regional Airport Administration Office at One Airport RoadManchester, NH until 1:00 pm on April 25 and then at said office publicly opened and read aloud.

Addendum Item No.12 -Remove The first sentence of Section 1.08 (Time of Completion and Liquidated Damages) and Replace it with thefollowing:

The bidder must agree to commence work on a date to be specified in the written Notice to Proceed of theOwner and to fully complete the project within 196 calendar days.

Addendum Item No.13 -Remove pages 4-17 of the Bid Proposal Replace with the Attached pages 4 – 17 of the Bid Proposal.The following items have been modified or added:

P-156-1 Erosion and Sediment Control Plan and MonitoringD-705-4 6-Inch Underdrain Outlet Pipe (Solid)L-100-1 Modifications to ALCMS EquipmentL-108-1 No. 8 AWG, 5 kV, L-824 Type C CableL-108-2 No. 6 AWG, Solid, Bare Counterpoise WireL-109-2 Constant Current Regulator InstallationL-110-7 Concrete Encase Existing Duct BankL-900-2 Temporary GeneratorsL-858-1 New Lighted Guidance Sign, - 1 ModuleL-858-2 New Lighted Guidance Sign, - 2 Module

Page 4: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4

ADDENDUM No. 1

L-858-3 New Lighted Guidance Sign, - 3 ModuleL-858-4 Removal of Existing Guidance SignL-858-5 Remove and Replace Sign Panel, - 2 ModuleL-858-6 Remove and Replace Sign Panel, - 3 Module

Addendum Item No.14 -Add the attached Hillsborough County Wage Rates to the Davis-Bacon Wage Rates. Hillsborough County wagerates are to be used for the small portion of work located in Manchester NH. This includes replacing the sign panelsfor Taxiway ‘A3’ and wiring of guard lights at Taxiway ‘B’.

Addendum Item No.15 -Add the following pay item to paragraph 156-5.1 of Specification Section P-156 (Temporary Air and WaterPollution, Soil Erosion and Siltation Control):

P-156-2 Sediment Barrier per linear foot

Addendum Item No.16 -Remove first paragraph of Specification Section P-401-2.3 (HMA Pavement) and Replace it with the following:

401-2.3 Asphalt cement binder. Asphalt cement binder shall conform to AASHTO M320 PerformanceGrade (PG) 76-28. A certificate of compliance from the manufacturer shall be included with the mix designsubmittal. Asphalt Cement Binder shall have a minimum elastic recovery of 70% when tested inaccordance with ASTM D6084

Addendum Item No.17 -Remove Specification Section L-100 (Modifications to the ALCMS Equipment) and Replace it with the AttachedSection L-100.

Addendum Item No.18 -Remove Specification Section L-109 (Work in Lighting Vault) and Replace it with the Attached Section L-109.

Addendum Item No.19 -Add the following paragraph to Specification Section L-110 (Airport Underground Electrical Duct Banks andConduits)

110-3.10 Concrete Encasing of Existing Ductbanks. Where shown on the Contract Drawings, or asdirected by the Engineer, the Contractor shall fully encase existing ductbanks that are under new pavement.The existing ductbank was constructed with sand bedding and backfill material. The Contractor will takecare to not damage the existing ducts.

Addendum Item No.20 -Add the following pay item to paragraph 110-5.1 of Specification Section L-110 (Airport Underground ElectricalDuct Banks and Conduits):

Item L-110-7 Concrete Encase Existing Duct Bank - per linear foot

Addendum Item No.21 -Add the following paragraphs to Specification Section L-858 (Runway and Taxiway Guidance Signs):

858-4.3 Remove and Replace Sign Panel. The quantity of “Remove and Replace Sign Panel, xx Modules”to be installed under this item shall be the number of panels removed and replaced, as shown on the Drawings,

Page 5: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4

ADDENDUM No. 1

and accepted by the Engineer. Items shall include but are not limited to removal of the existing panels,furnishing new panels, and installation of new panels.

858-5.1 Payment shall be made at the Contract unit price per “Remove and Replace Sign Panel, xx Modules”furnished and installed in place and accepted by the Engineer. This price shall be full compensation forfurnishing all materials and for all preparation, assembly, and installation of these materials, restoration ofthe site around each sign as shown on the Plans and for all labor, equipment, tools and incidentals necessaryto complete this item.

Addendum Item No.22 -Remove last paragraph (list of pay items) of Specification Section L-858 (Runway and Taxiway Guidance Signs)and replace it with the following:

Item L-858-1 New Lighted Guidance Sign, - 1 Module Per Each

Item L-858-2 New Lighted Guidance Sign, - 2 Module Per Each

Item L-858-3 New Lighted Guidance Sign, - 3 Module Per Each

Item L-858-4 Removal of Existing Guidance Sign Per Each

Item L-858-5 Remove and Replace Sign Panel, - 2 Module Per Each

Item L-858-6 Remove and Replace Sign Panel, - 3 Module Per Each

Plans

Addendum Item No.23 -Remove and Replace the following list of drawings with the attached drawings. Changes are indicated by revisionclouds.

G1.0 GENERAL NOTES AND SHEET INDEXG2.0 OVERALL SAFETY AND PHASING PLANG2.2 SAFETY AND PHASING PLANSC2.1 – C2.3 GRADING PLANSC3.1 – C3.6 TAXIWAY AND ROADWAY PROFILESF1.2 FENCE DETAILSE1.1 – E1.3, E1.7 LIGHTING AND SIGNAGE PLANSE3.8, E.13 CIRCUIT PLANSE4.1-E4.2 ELECTRICAL DETAILSE5.1 – E5.3 LIGHT AND SIGN SCHEDULES

END OF ADDENDUM #1

Page 6: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4

PROPOSAL (BID) DOCUMENTS Page 4 of 19

PROPOSAL

for

RIM PROJECT TO RECONGIURE TAXIWAYS ‘P’ AND ‘U’at

Manchester-Boston Regional Airport

Proposal of * hereinafter called “Bidder”) a

corporation organized under the laws of the State of , a partnership, or an

individual** doing business as , to the City of Manchester,

New Hampshire, Department of Aviation (hereinafter called “Owner”).

The bidder in compliance with your invitation for bids for the construction of airport improvements havingexamined the plans and specifications with related documents and the site of the proposed work if required,and being familiar with all of the conditions surrounding the construction of the proposed project includingthe availability of materials, and labor, hereby proposes to furnish all plant, labor, materials, supplies,equipment, services, and to construct the work in accordance with the Contract Documents, within the timeset forth therein, and at the amount in U.S. dollars provided herein. This price is to cover all expensesincurred in performing the work required under the Contract Documents, of which this proposal is a part.

Time of Completion and Liquidated Damages

Bidder hereby agrees to commence work under this Contract on the date to be specified in written “Notice toProceed” of the Owner, and to fully complete the project within 196 calendar days.

Bidder further agrees to pay to the Owner, as liquidated damages, the sum of two thousand dollars($2,000.00) for each and every calendar day that the work remains incomplete beyond the time specified formilestone dates and completion as hereinafter provided in the Contract Documents.

In addition, Bidder must agree to pay the Owner as liquidated damages the sum of ten thousand dollars($10,000.00) for each and every calendar day the work in phases III and IIIA work areas remains incompletebeyond the specified times for each work area.

Bidder acknowledges receipt of the addenda shown on the attached form entitled, ACKNOWLEDGMENTOF ADDENDA.

Bidder agrees to perform all the work described in the specifications, shown on the plans or directed, forthe following unit prices:

*The name of the bidder must be exactly the same as the name under which the bidder was pre-qualified with the City of Manchester.

** Strike out inapplicable terms.

Page 7: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4

PROPOSAL (BID) DOCUMENTS Page 5 of 19

ACKNOWLEDGMENT OF ADDENDA

Addendum No. Date:

Addendum No. Date:

Addendum No. Date:

Addendum No. Date:

Addendum No. Date:

Addendum No. Date:

Addendum No. Date:

Addendum No. Date:

Addendum No. Date:

Page 8: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4

PROPOSAL (BID) DOCUMENTS Page 6 of 19

Manchester-Boston Regional AirportRIM PROJECT TO RECONGIURE TAXIWAYS ‘P’ AND ‘U’

BID FORM

ITEM NO.ESTIMATEDQUANTITY/

UNIT

DESCRIPTION AND UNIT PRICE(IN WORDS)

FIGURES

UNIT PRICE EXTENSION

Dollars Cents Dollars Cents

G-001-1 1 LS

Safety and Phasing

_____________________Dollars and

_____________________ Cents

G-001-2 1 LS

Contractor’s Safety Plan ComplianceDocument

_____________________Dollars and

_____________________ Cents

G-001-3 1 AL

Gate Guard

__Forty Thousand_______Dollars and

_____Zero____________ Cents

$40,000 .00 $40,000 .00

G-001-4 1 LS

Mobilization (5%)

_____________________Dollars and

_____________________ Cents

G-002-01 1 FLS

As- Built Plans

__Fifteen Thousand______Dollars and

______Zero____________ Cents

$15,000 .00 $15,000 .00

G-002-02 1 LS

GIS Conversion

_____________________Dollars and

_____________________ Cents

G-002-3 1 LS

Project Photographs_____________________Dollars and

_____________________ Cents

M-001-1 1 LS

Engineer’s Field Office

_____________________Dollars and

_____________________ Cents

M-002-1 1 AL

Runway Down Time

__Thirty Thousand______Dollars and

_____Zero____________ Cents

$30,000 .00 $30,000 .00

Page 9: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4

PROPOSAL (BID) DOCUMENTS Page 7 of 19

Manchester-Boston Regional AirportRIM PROJECT TO RECONGIURE TAXIWAYS ‘P’ AND ‘U’

BID FORM

ITEM NO.ESTIMATEDQUANTITY/

UNIT

DESCRIPTION AND UNIT PRICE(IN WORDS)

FIGURES

UNIT PRICE EXTENSION

Dollars Cents Dollars Cents

M-003-1 5,950 SY

Bit. Pavement Milling - 4” NominalDepth

_____________________Dollars and

_____________________ Cents

M-004-1 2,100 LF

Crack Sealing

_____________________Dollars and

_____________________ Cents

M-005-1 860 LF

Bituminous Curb

_____________________Dollars and

_____________________ Cents

M-006-1 14,000 SF

Mechanically Stabilized Earth Walls

_____________________Dollars and

_____________________ Cents

M-006-2 850 LF

Concrete Wall Coping

_____________________Dollars and

_____________________ Cents

M-006-3 1,200 CY

Removal and Replacement of UnsuitableWall Foundation Material

_____________________Dollars and

_____________________ Cents

M-007-1 250 CY

Stone Fill - Class C

_____________________Dollars and

_____________________ Cents

P-152-1 47,500 CY

Common Excavation

_____________________Dollars and

_____________________ Cents

P-152-2 2,000 CY

Rock Excavation_____________________Dollars and

_____________________ Cents

Page 10: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4

PROPOSAL (BID) DOCUMENTS Page 8 of 19

Manchester-Boston Regional AirportRIM PROJECT TO RECONGIURE TAXIWAYS ‘P’ AND ‘U’

BID FORM

ITEM NO.ESTIMATEDQUANTITY/

UNIT

DESCRIPTION AND UNIT PRICE(IN WORDS)

FIGURES

UNIT PRICE EXTENSION

Dollars Cents Dollars Cents

P-152-3 26,400 SY

Removal of Heavy Duty BituminousPavement_____________________Dollars and

_____________________ Cents

P-152-4 25,400 SY

Removal of Light Duty BituminousPavement

_____________________Dollars and

_____________________ Cents

P-152-5 13,500 LF

Removal of Pipes (≥6”)

_____________________Dollars and

_____________________ Cents

P-152-6 19 EA

Removal of Structures

_____________________Dollars and

_____________________ Cents

P-152-7 2 EA

Removal of Electrical Handholes

_____________________Dollars and

_____________________ Cents

P-152-8 9,100 LF

Removal of Cable

_____________________Dollars and

_____________________ Cents

P-152-9 5,400 LF

Removal of Duct Bank

_____________________Dollars and

_____________________ Cents

P-152-10 2,075 LF

Removal of Security Fencing

_____________________Dollars and

_____________________ Cents

P-152-11 1 LS

Removal of Existing Retaining Wall

_____________________Dollars and

_____________________ Cents

Page 11: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4

PROPOSAL (BID) DOCUMENTS Page 9 of 19

Manchester-Boston Regional AirportRIM PROJECT TO RECONGIURE TAXIWAYS ‘P’ AND ‘U’

BID FORM

ITEM NO.ESTIMATEDQUANTITY/

UNIT

DESCRIPTION AND UNIT PRICE(IN WORDS)

FIGURES

UNIT PRICE EXTENSION

Dollars Cents Dollars Cents

P-152-12 30,600 CY

Embankment in Place

_____________________Dollars and

_____________________ Cents

P-153-1 25 CY

Controlled Low Strength Material

_____________________Dollars and

_____________________ Cents

P-154-1 33,600 CY

Subbase Course

_____________________Dollars and

_____________________ Cents

P-156-1 1 LS

Erosion and Sediment Control Plan andMonitoring

_____________________Dollars and

_____________________ Cents

P-156-2 4,100 LF

Sediment Barrier

_____________________Dollars and

_____________________ Cents

P-156-3 25 EA

Inlet Protection- Turf Areas

_____________________Dollars and

_____________________ Cents

P-156-4 10 EA

Inlet Protection-Paved Areas

_____________________Dollars and

_____________________ Cents

P-156-5 15 EA

Stone Check Dams

_____________________Dollars and

_____________________ Cents

P-156-6 6,050 SY

Erosion Control Blankets

_____________________Dollars and

_____________________ Cents

Page 12: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4

PROPOSAL (BID) DOCUMENTS Page 10 of 19

Manchester-Boston Regional AirportRIM PROJECT TO RECONGIURE TAXIWAYS ‘P’ AND ‘U’

BID FORM

ITEM NO.ESTIMATEDQUANTITY/

UNIT

DESCRIPTION AND UNIT PRICE(IN WORDS)

FIGURES

UNIT PRICE EXTENSION

Dollars Cents Dollars Cents

P-209-1 6,700 CY

Crushed Aggregate Base Course

_____________________Dollars and

_____________________ Cents

P-401-1 8,160 TON

Bituminous Surface Course

_____________________Dollars and

_____________________ Cents

P-403-1 15,900 TON

Bituminous Base Course

_____________________Dollars and

_____________________ Cents

P-603-1 10,900 Gal

Tack Coat

_____________________Dollars and

_____________________ Cents

P-605-1 8,100 LF

Saw and Seal Bituminous PavementJoints

_____________________Dollars and

_____________________ Cents

P-620-1 15,350 SF

Permanent Pavement Markings

_____________________Dollars and

_____________________ Cents

P-620-2 5,450 SF

Black Paint

_____________________Dollars and

_____________________ Cents

P-620-3 1,600 SF

Surface Painted Signs

_____________________Dollars and

_____________________ Cents

P-620-4 1,450 SF

Paint Marking Removal

_____________________Dollars and

_____________________ Cents

Page 13: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4

PROPOSAL (BID) DOCUMENTS Page 11 of 19

Manchester-Boston Regional AirportRIM PROJECT TO RECONGIURE TAXIWAYS ‘P’ AND ‘U’

BID FORM

ITEM NO.ESTIMATEDQUANTITY/

UNIT

DESCRIPTION AND UNIT PRICE(IN WORDS)

FIGURES

UNIT PRICE EXTENSION

Dollars Cents Dollars Cents

P-621-1 9,230 SY

Saw-Cut Grooving

_____________________Dollars and

_____________________ Cents

D-701-1 1,990 LF

12-Inch Reinforced Concrete Pipe

_____________________Dollars and

_____________________ Cents

D-701-2 1,050 LF

15-Inch Reinforced Concrete Pipe

_____________________Dollars and

_____________________ Cents

D-701-3 1,410 LF

24-Inch Reinforced Concrete Pipe

_____________________Dollars and

_____________________ Cents

D-701-4 75 LF

12-Inch Ductile Iron Pipe

_____________________Dollars and

_____________________ Cents

D-705-1 5,960 LF

6-Inch Underdrain Pipe

_____________________Dollars and

_____________________ Cents

D-705-2 15 EA

Underdrain Cleanout

_____________________Dollars and

_____________________ Cents

D-705-3 3 EA

Core and Connect to Existing Structure

_____________________Dollars and

_____________________ Cents

D-705-4 690 LF

6-Inch Underdrain Outlet Pipe (Solid)

_____________________Dollars and

_____________________ Cents

D-751-1 4 EA

48-Inch Diameter Manhole

_____________________Dollars and

_____________________ Cents

Page 14: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4

PROPOSAL (BID) DOCUMENTS Page 12 of 19

Manchester-Boston Regional AirportRIM PROJECT TO RECONGIURE TAXIWAYS ‘P’ AND ‘U’

BID FORM

ITEM NO.ESTIMATEDQUANTITY/

UNIT

DESCRIPTION AND UNIT PRICE(IN WORDS)

FIGURES

UNIT PRICE EXTENSION

Dollars Cents Dollars Cents

D-751-2 2 EA

72-Inch Diameter Manhole

_____________________Dollars and

_____________________ Cents

D-751-3 13 EA

48-Inch Diameter Catch Basin

_____________________Dollars and

_____________________ Cents

D-751-4 6 EA

72-Inch Diameter Catch Basin

_____________________Dollars and

_____________________ Cents

D-751-5 2 EA

12-Inch Concrete Flared End Section

_____________________Dollars and

_____________________ Cents

D-751-6 1 EA

15-Inch Concrete Flared End Section

_____________________Dollars and

_____________________ Cents

D-751-7 1 EA

24-Inch Concrete Flared End Section

_____________________Dollars and

_____________________ Cents

D-751-8 2 EA

12-Inch Concrete Headwall

_____________________Dollars and

_____________________ Cents

D-751-9 1 LS

Glycol Collection Structure and Valves

_____________________Dollars and

_____________________ Cents

D-751-10 1 EA

Outlet Control Structure

_____________________Dollars and

_____________________ Cents

D-751-11 1 EA

Diversion Structure

_____________________Dollars and

_____________________ Cents

Page 15: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4

PROPOSAL (BID) DOCUMENTS Page 13 of 19

Manchester-Boston Regional AirportRIM PROJECT TO RECONGIURE TAXIWAYS ‘P’ AND ‘U’

BID FORM

ITEM NO.ESTIMATEDQUANTITY/

UNIT

DESCRIPTION AND UNIT PRICE(IN WORDS)

FIGURES

UNIT PRICE EXTENSION

Dollars Cents Dollars Cents

D-751-12 10 EA

Adjust Frames and Covers

_____________________Dollars and

_____________________ Cents

D-751-13 2 EA

Modify Electrical Manhole

_____________________Dollars and

_____________________ Cents

D-751-14 1 EA

Modify FAA Manhole

_____________________Dollars and

_____________________ Cents

D-752-1 1 LS

Infiltration Chambers

_____________________Dollars and

_____________________ Cents

L-100-1 1 AL

Modifications to ALCMS Equipment

_Twenty thousand_______Dollars and

_______zero __________ Cents

20,000 .00 20,000 .00

L-107-1 1 LS

L-806 Type I-B Size 1 Wind Cone

_____________________Dollars and

_____________________ Cents

L-108-1 61,800 LF

No. 8 AWG, 5kV, L-824, Type C Cable

_____________________Dollars and

_____________________ Cents

L-108-2 12,900 LF

No. 6 AWG, Solid, Bare CounterpoiseWire

_____________________Dollars and

_____________________ Cents

L-108-3 2,600 LF

No. 2 AWG, 600V Wire

_____________________Dollars and

_____________________ Cents

Page 16: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4

PROPOSAL (BID) DOCUMENTS Page 14 of 19

Manchester-Boston Regional AirportRIM PROJECT TO RECONGIURE TAXIWAYS ‘P’ AND ‘U’

BID FORM

ITEM NO.ESTIMATEDQUANTITY/

UNIT

DESCRIPTION AND UNIT PRICE(IN WORDS)

FIGURES

UNIT PRICE EXTENSION

Dollars Cents Dollars Cents

L-108-4 5,500 LF

No. 6 AWG, 600V Wire

_____________________Dollars and

_____________________ Cents

L-108-5 1,600 LF

1 ¼” Innerduct

_____________________Dollars and

_____________________ Cents

L-109-1 1 LS

Installation of Airport Vault Equipment

_____________________Dollars and

_____________________ Cents

L-109-2 1 AL

Constant Current Regulator Installation

___Sixty Thousand______Dollars and

_______zero _________ Cents

60,000 .00 60,000 .00

L-110-1 320 LF

Concrete Encased Electrical Conduit, 6-way 2” Schedule 40 PVC

_____________________Dollars and

_____________________ Cents

L-110-2 470 LF

Reinforced Concrete Encased ElectricalDuct Bank, 6-way 2” Schedule 40 PVC

_____________________Dollars and

_____________________ Cents

L-110-3 12,425 LF

Concrete Encased Electrical Conduit, 1-way2” Schedule 40 PVC

_____________________Dollars and

_____________________ Cents

L-110-4 475 LF

Concrete Encased Electrical Conduit, 1-way 2” GRSC

_____________________Dollars and

_____________________ Cents

L-110-5 265 LF

Direct Buried Electrical Duct Bank, 2-way 6” Schedule 40 PVC

_____________________Dollars and

_____________________ Cents

Page 17: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4

PROPOSAL (BID) DOCUMENTS Page 15 of 19

Manchester-Boston Regional AirportRIM PROJECT TO RECONGIURE TAXIWAYS ‘P’ AND ‘U’

BID FORM

ITEM NO.ESTIMATEDQUANTITY/

UNIT

DESCRIPTION AND UNIT PRICE(IN WORDS)

FIGURES

UNIT PRICE EXTENSION

Dollars Cents Dollars Cents

L-110-6 1,590 LF

Direct Buried Electrical Duct Bank, 4-way 6” Schedule 40 PVC

_____________________Dollars and

_____________________ Cents

L-110-7 700 LF

Concrete Encase Existing Duct Bank

_____________________Dollars and

_____________________ Cents

L-115-1 2 EA

Electrical Handhole 4’x4’ Aircraft Rated

_____________________Dollars and

_____________________ Cents

L-115-2 4 EA

Eversource Manhole

_____________________Dollars and

_____________________ Cents

L-125-1 3 EA

Base Mounted L-862 Elevated RunwayEdge Light

_____________________Dollars and

_____________________ Cents

L-125-2 2 EA

Base Mounted L-850C Semi-FlushRunway Edge Light

_____________________Dollars and

_____________________ Cents

L-125-3 98 EA

Base Mounted L-861T Elevated TaxiwayEdge Light

_____________________Dollars and

_____________________ Cents

L-125-4 123 EA

Base Mounted L-852 Semi-FlushTaxiway Centerline Light

_____________________Dollars and

_____________________ Cents

Page 18: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4

PROPOSAL (BID) DOCUMENTS Page 16 of 19

Manchester-Boston Regional AirportRIM PROJECT TO RECONGIURE TAXIWAYS ‘P’ AND ‘U’

BID FORM

ITEM NO.ESTIMATEDQUANTITY/

UNIT

DESCRIPTION AND UNIT PRICE(IN WORDS)

FIGURES

UNIT PRICE EXTENSION

Dollars Cents Dollars Cents

L-125-5 4 EA

Base Mounted L-804 Elevated RunwayGuard Light

_____________________Dollars and

_____________________ Cents

L-125-6 20 EA

Base Mounted L-852G Semi-FlushRunway Guard Light

_____________________Dollars and

_____________________ Cents

L-125-7 3 EA

Base Mounted Field Lighting Arrestor

_____________________Dollars and

_____________________ Cents

L-125-8 105 EA

Removal of Existing Fixture

_____________________Dollars and

_____________________ Cents

L-125-9 1 LS

Temporary Lighting

_____________________Dollars and

_____________________ Cents

L-125-10 1 LS

Valve Actuator Power Rack

_____________________Dollars and

_____________________ Cents

L-858-1 1 EA

New Lighted Guidance Sign, -1 Module

_____________________Dollars and

_____________________ Cents

L-858-2 3 EA

New Lighted Guidance Sign, -2 Module

_____________________Dollars and

_____________________ Cents

L-858-3 3 EA

New Lighted Guidance Sign, -3 Module

_____________________Dollars and

_____________________ Cents

Page 19: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4

PROPOSAL (BID) DOCUMENTS Page 17 of 19

Manchester-Boston Regional AirportRIM PROJECT TO RECONGIURE TAXIWAYS ‘P’ AND ‘U’

BID FORM

ITEM NO.ESTIMATEDQUANTITY/

UNIT

DESCRIPTION AND UNIT PRICE(IN WORDS)

FIGURES

UNIT PRICE EXTENSION

Dollars Cents Dollars Cents

L-858-4 15 EA

Removal of Existing Guidance Sign

_____________________Dollars and

_____________________ Cents

L-858-5 2 EA

Remove and Replace Sign Panel – 2 Mod

_____________________Dollars and

_____________________ Cents

L-858-6 2EA

Remove and Replace Sign Panel – Mod

_____________________Dollars and

_____________________ Cents

L-900-1 1 AL

Utility Service Modification

_Two Hundred Thousand_Dollars and

_________Zero________ Cents

$200,000 .00 $200,000 .00

L-900-2 1 LS

Temporary Generators

_____________________Dollars and

_____________________ Cents

T-901-1 82,500 SY

Seeding

_____________________Dollars and

_____________________ Cents

T-905-1 82,500 SY

Topsoil

_____________________Dollars and

_____________________ Cents

F-162-1 1,430 LF

10’ Tall Chain Link Fence

_____________________Dollars and

_____________________ Cents

F-162-2 1 EA

Double Swing Vehicle Gate

_____________________Dollars and

_____________________ Cents

Page 20: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4
Page 21: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4
Page 22: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4
Page 23: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4
Page 24: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4
Page 25: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4

Item L-100 Modifications to ALCMS Equipment 1

Item L-100 Modifications To ALCMS Equipment

Description

100-1.1 This work shall include the modifications to the existing Airport Lighting Control and MonitoringSystem (ALCMS) and Touchscreen Panels located in the Air Traffic Control Tower, and AirfieldLighting Vault to incorporate the reconfigured taxiway graphics for Taxiways P and U as well asadditional control scheme for new taxiway centerline light and in-pavement RGL circuits. This includesmodifications to these circuits, all labor, programming, modifications to graphic screens, and all otherwork required to fully integrate the new airfield lighting circuits into the ALCMS.

All work done by the Contractor to assist the vendor with completion of this item shall be included forpayment under Item L-109 ‘Work in Lighting Vault’. Contractor shall assist in completing all work toupgrade the ALCMS system.

100-1.2 SHOP DRAWINGS

Contractor shall submit shop drawings for approval by the Engineer, prior to implementing any softwarechanges or installing any equipment. Proposed software changes shall be submitted to Airport Operationsand the ATCT supervisor for approval independent of the Engineer. Contractor shall put his shopdrawing check stamp on all shop drawings submitted for approval.

100-1.3 AS BUILT DRAWINGS

The Contractor shall, at all times, maintain a complete accurate and up to date set of as built drawings.These as built drawings shall be available to the Engineer at all times for his review. At the completion ofthe contract, the Contractor shall submit two (2) clean, legible and complete sets of as built drawings andO&M documentation to the Airport prior to his final request for payment.

100-1.4 CODES, PERMITS, FEES

a. The Contractor is presumed to be knowledgeable of national and local code requirements. If hebelieves any requirement of the drawings or specifications is not in conformance with code orother applicable requirements, he shall so notify the Engineer before the work is installed. Thedecision of the Engineer in interpreting the drawings and specifications and code requirementsrelating thereto for a specific application under this contract shall be considered final.

b. The Contractor shall give all necessary notices, obtain all permits, and pay all inspection andother fees required by governmental authorities having jurisdiction over the work under thiscontract. Receipt of all required approvals, clearances, and certificates by the Owner shall be aprerequisite to acceptance and final payment for the work.

100-1.5 MATERIALS AND WORKMANSHIP

Materials furnished shall be new, shall be undamaged when installed, and shall conform to allestablished and applicable standards and test requirements of Underwriters Laboratories (U.L.), NationalElectrical Manufacturers Association (NEMA), and American National Standards Institute (ANSI), andthe Institute of Electrical and Electronics Engineers (IEEE).

Page 26: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4

Item L-100 Modifications to ALCMS Equipment 2

100-1.6 PROJECT COORDINATION

The ALCMS Manufacturer shall provide an experienced and qualified Engineering, Sales and Service staff tosupport the contractor and airport throughout the installation and life of the system.

The project shall follow this basic cycle of events:

Milestone Description1. Submittal The ALCMS Manufacturer shall submit ALCMS

equipment specifications to the contractor.2. Submittal Review and

ApprovalSubmittal is reviewed by the contractor, airport, andengineer(s).

3. Production Release The ALCMS Manufacturer shall release approvedsystem to manufacturing.

4. Demo CD35% Software Completion

The ALCMS Manufacturer shall send to thecontractor, airport, and engineers a Demo CD of theplanned layout of the touchscreen that will be usedfor the control of the ALCMS system.

5. Production System is manufactured.

6. Production Testing System is tested by the ALCMS Manufacturer.

7. Factory Acceptance Testing System is available for Factory Acceptance Testing(FAT) witnessed by airport/owner.NOT APPLICABLE

8. Shipment of system Approved system is shipped to installation site.

9. Installation Contractor installs equipment and completesexternal wiring.

10. Commissioning The ALCMS Manufacturer shall arrive atinstallation site to complete commissioning ofsystem and verify contractor installation and wiring.

11. System Readiness Check The ALCMS Manufacturer shall perform a systemreadiness check to verify proper operation of allequipment prior to cut over.

12. System Cut-over The ALCMS Manufacturer and Contractor shall cutover the new system and bring it on-line andoperational.

13. System Acceptance Testing System is available for System Acceptance Testing(SAT) which shall be witnessed the byairport/owner and/or engineer.

14. Manuals / As-Built drawings The ALCMS Manufacturer shall issue operatormanuals, maintenance manuals and ATC manualsand final as-built drawings.

15. On-Site Training The ALCMS Manufacturer shall complete on-sitetraining of maintenance, Operations, and ATCpersonnel.

16. Final Owner Acceptance Upon completion of all contractual requirements,

Page 27: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4

Item L-100 Modifications to ALCMS Equipment 3

system is accepted in writing by the airport/owner.17. Warranty and Support The ALCMS Manufacturer shall provide warranty

and support per the contractual requirements.

100-1.07 CONTRACTOR INSTALLATION REQUIREMENTS

a. The installing contractor shall be responsible for the physical installation of all associated ALCMScomponents. At a minimum, this includes the Constant Current Regulators (CCRs), and DistributedControl and Monitoring Equipment (DCME).

(1) The Contractor shall furnish, install, relocate, connect and test all equipment, equipmentaccessories, conduit cables, wires, buses, grounds and support necessary to insure a complete andoperable electrical distribution facility for the airport lighting system as specified in the submittalpackage.

(2) The equipment installation and mounting shall comply with the requirements of the NationalElectrical Code and local code agency having jurisdiction.

100-1.08 WIRE AND CONNECTIONS

a. The Contractor shall make all necessary electrical connections at each location in accordance with theALCMS manufacturer’s wiring diagrams.

b. All wires called out in the drawings associated with equipment that is to be controlled or monitoredshould be pulled, terminated and dressed at the appropriate terminal blocks and at the associatedequipment.

c. The Contractor shall leave sufficient extra wire length on each control/monitoring lead to make futurechanges in connections at the terminal block.

100-1.09 MARKING AND LABELING

All equipment, control wires, terminal blocks, etc., shall be tagged, marked or labeled as specified below:a. Wire Identification: The Contractor shall furnish and install labels or identifying tags on all control

wires at the point where they connect to the control equipment or to the terminal blocks.b. Wire labels, if used, shall be of the self-sticking, pre-printed type and of the manufacturer’s

recommended size for the wire involved. Identification markings designated in the plans shall befollowed.

c. Tags, if used, shall be nonferrous metal or plastic. Each tag shall be securely tied to the proper wire bya nonmetallic cord or plastic wire tie.

100-1.10 INSTALLATION OF DATA CABLES

a. The Contractor shall install, terminate and test all data cables required for the project as shown on theContract Drawings. This includes all of the following components: Data cables, terminal cabinets andjumper cables.

b. All associated data cables shall be tested upon completion of the cable installation and termination ofconnectors.

c. Tests shall include verification of point-point continuity of each wire.d. All test data shall be recorded and included in a test report that shall be submitted to the airport / owner

for approval.e. Commissioning of the system shall not begin until all test reports are submitted and approved and a

copy provided to ALCMS Manufacturer.

Page 28: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4

Item L-100 Modifications to ALCMS Equipment 4

100-1.11 CONTRACTOR POWER-UP AND INITIAL TESTING

The Contractor shall perform the following power-up and commissioning tasks:a. Power up all assemblies.b. Verify communication is established between all assemblies.c. Initiate lighting commands from Tower Touchscreen and verify proper control operations are being

executed at the Vault assembly.d. Test monitoring feedback to verify proper wiring and operation.

Inform ALCMS manufacturer in writing all mentioned power up tests are complete.

100-1.12 ALCMS MANUFACTURER PLC COMMISSIONING

The ALCMS Manufacturer shall perform the following installation and commissioning tasks:

a. Verify Contractor connections including power, control and monitoring.b. Verify proper labeling of equipment.c. Verify communication connections.d. Perform system testing including control, monitoring and diagnostics.e. Training on ALCMS related equipment.f. Perform System Acceptance Testing (SAT).

100-1.13 SYSTEM ACCEPTANCE TEST (SAT)

Following the final installation and commissioning of the system, the ALCMS Manufacturer shall perform ademonstration of the system performance. This demonstration shall include the following:

a. Lighting control functionsb. Monitoring functionsc. Alarm functionsd. Print and Display functions

The ALCMS Manufacturer shall develop a SAT test plan in accordance with the specifications and issue this tothe contractor for approval from the airport engineer.

The SAT shall be witnessed by owner representatives, the contractor and the engineer.

100-1.14 AS-INSTALLED DRAWINGS

a. The ALCMS Manufacturer shall provide six (6) hard copies of As-Installed drawings after systemacceptance. The As-Installed drawings shall include the following information:(1) System Block Diagram (1-line drawings)(2) System External Wiring Diagrams(3) Assembly Drawings(4) Assembly Wiring Diagrams

b. The As-Installed drawings shall be 11” X 17” in size and shall be spiral bound or supplied in 3-ringbinders. The cover of each binder shall be labeled with all project-related information.

Page 29: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4

Item L-100 Modifications to ALCMS Equipment 5

100-1.15 ON-SITE TRAINING

a. The ALCMS manufacturer shall provide to the contractor a final training course syllabus and trainingschedule thirty (30) days before on-site training.

b. Any audio/video recordings of training classes described herein are the sole responsibility of the contractor.Coordination of the video recording must be organized by the Contractor and approved by the engineer.

c. All training sessions shall be held in a facility provided by the airport. This facility should have tables,chairs, projection screen and sufficient space to lay out manuals and drawings.

d. The ALCMS manufacturer shall provide all required visual aids and projectors.

100-1.16 AIR TRAFFIC CONTROLLER TRAINING

a. The ALCMS manufacturer shall provide two (2), 1 hour User Training Class for Air Traffic Control(ATC) personnel.

b. ATC Training coordinator should be present for both classes and shall be the responsible for trainingremaining personnel not able to attend these classes.

c. This training shall include discussion and review of the following:(1) PLC General System Overview(2) Touchscreen Operations(3) Using the Control System (GUI)(4) Command and Control Sequences

d. Training classes for ATC personnel should be limited to a maximum of 4-6 people per class.

e. Air Traffic Control should designate a training coordinator that shall be responsible for scheduling andorganizing on-site training for their personnel. In addition, this coordinator shall be responsible fortraining other personnel that were absent or unable to attend the training sessions.

f. Any additional training beyond contract requirements shall be the responsibility of the ATC trainingcoordinator to complete.

100-1.17 MAINTENANCE TRAININGa. The ALCMS manufacturer shall provide two (2), 1 hour training class for maintenance personnel. This

training shall include discussion and review of the following:(1) System Block Diagram(2) System Assemblies and Wiring Diagrams(3) Touchscreen Operation(4) Graphical User Interface (GUI) Screens(5) Implementing Airfield Lighting Changes

b. Training classes for maintenance personnel should be limited to a maximum of 4-6 people per class.

c. Maintenance should designate a training coordinator that shall be responsible for scheduling andorganizing on-site training for their personnel. In addition, this coordinator shall be responsible fortraining other personnel that were absent or unable to attend the training sessions.

Page 30: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4

Item L-100 Modifications to ALCMS Equipment 6

d. Any additional training beyond contract requirements shall be the responsibility of the trainingcoordinator to complete.

100-1.18 OWNER SYSTEM ACCEPTANCE AND WARRANTY START DATE

Upon successful completion of the SAT and on-site training the owner shall issue the ALCMS Manufacturer awritten notice of system acceptance within five (5) working days.

The date the final acceptance letter is received or five (5) days following successful completion of the SAT(whichever occurs first) represents the start of the warranty period. Please refer to the Warranty section formore information regarding the ALCMS warranty guarantee.

100-1.19 SYSTEM WARRANTY

All equipment shall be warranted against defects in workmanship, hardware and software for a period of one (1)year from initial operation of the system but not more than eighteen (18) months from the manufacturer’sshipment of the system.

During this time period the ALCMS manufacturer shall provide all parts, labor and technical support with thefollowing conditions:

a. The manufacturer shall correct by repair or replacement, at its option, equipment or parts which failbecause of mechanical, electrical or physical defects, provided that the goods have been properlyhandled and stored prior to installation, properly installed and properly operated after installation,provided further that Buyer gives manufacturer written notice of such defects after delivery of thegoods to Buyer.

b. The manufacturer may examine any goods upon which a claim is made in the same condition as whendefect therein is discovered, and may require the return of the goods to establish any claim.

c. The manufacturer's liability under no circumstances shall exceed the contract price of goods claimed tobe defective.

d. Any returns under this guarantee are to be on a transportation charge prepaid basis. For products notmanufactured by, but sold by the manufacturer, warranty is limited to that extended by the originalmanufacturer.

100-1.20 SYSTEM SERVICE AND SUPPORT

a. The ALCMS Manufacturer shall provide technical assistance and support during the warranty period.

Equipment and Materials

100-2.1 GENERAL

Contractor shall submit shop drawings for approval by the Engineer, prior to implementing any softwarechanges. Proposed software changes shall be submitted to Airport Operations and the ATCT supervisorfor approval independent of the Engineer. Contractor shall put his shop drawing check stamp on all shopdrawings submitted for approval.

Page 31: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4

Item L-100 Modifications to ALCMS Equipment 7

100-2.2 EXISTING AIRFIELD LIGHTING CONTROL AND MONITORING SYSTEM (ALCMS)

The existing ALCMS as manufactured by Liberty Airport Systems (Contact person: Galen Dixon 614-323-6242) shall be updated by the manufacturer to accurately reflect the new alignment of airportrunways and taxiways. Consideration shall be given to the control of the airfield lighting system duringthe transition and provisions shall be made to operate the system manually during this time if necessary.

Additional control points shall be added for new Constant Current Regulators installed under this project.New CCR circuits include:

1. Taxiway A South Centerline circuit

2. Runway 17-35 In-pavement Runway Guard Lights

100-2.3 CONSTANT CURRENT REGULATORS

Installation of new Constant Current Regulators is covered under Section L-109 ‘Work in LightingVault’.

Construction Methods

100-3.1 AIRFIELD LIGHTING TOUCHSCREEN MODIFICATIONSThe existing ALCMS system consists of a touchscreen in the Air Traffic Control Tower, AirfieldLighting Vault and Airfield Operations. The system is PLC based and software controlled. The systemwill be updated at all locations by the system manufacturer under this Contract.

All work required by the Contractor to obtain temporary work badges and escorting duties for LibertyAirport Systems technicians associated with this work item shall be considered as work necessary tocomplete the installation.

100-3.2 CONTRACTOR SUPPORTThe Contractor shall support the manufacturer with the system commissioning. Effort to includeescorting, installing equipment, terminations, badging, fees and any incidental required to complete thework. Payment for this work shall be made under Specification Section L-109 ‘Work in Lighting Vault’.

Method of Measurement

100-4.1 Airfield Lighting Control and Monitoring System Modifications furnished and installed asrequired by the drawings and these specifications shall be measured for payment as part of thisspecification.

Page 32: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4

Item L-100 Modifications to ALCMS Equipment 8

Measurement shall also include work by the Contractor to assist vendor with the system commissioning.Effort to include escorting, installing equipment, terminations, badging, fees and any incidental requiredto complete the work.

100-4.2 Work to install and commission new constant current regulators is not included formeasurement under this item but is covered under Specification Section L-109 ‘Work in Lighting Vault’.

100-4.3 Measurement shall not include work by the Contractor to assist vendor with the systemcommissioning. Effort to provide escorting, installing equipment, terminations, badging, fees and anyincidental required to complete the ALCMS upgrades will be paid for under Specification Section L-109‘Work in Lighting Vault’.

Basis of Payment

100-5.1 Payment shall be made at the Lump Sum from the Allowance price for the complete andaccepted ALCMS Modifications. This price shall be full compensation for all services and items includedin the designated allowance item, preparation, assembly, delivery, transportation, and installation ofmaterials and equipment, labor, equipment, tools, and incidentals necessary to complete this item.

Payment shall be made under:

Project Item L-100-1 Modifications to ALCMS Equipment ________ Per Allowance Lump Sum

END OF PROJECT ITEM

Page 33: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4

Item L-109 Work in Lighting Vault 1

Item L-109 Work in Lighting Vault

DESCRIPTION109-1.1 This item shall consist of furnishing all vault equipment, wiring, cable, conduit, and groundingsystems. This work shall also include the marking and labeling of equipment and the labeling or taggingof wires; the testing of the installation; and the furnishing of all incidentals necessary to place it inoperating condition as a completed unit to the satisfaction of the Engineer.

EQUIPMENT AND MATERIALS

109-2.1 General.

a. Airport lighting equipment and materials covered by Advisory Circulars (AC) shall be certified andlisted in AC 150/5345-53, Airport Lighting Equipment Certification Program.

b. All other equipment and materials covered by other referenced specifications shall be subject toacceptance through manufacturer’s certification of compliance with the applicable specification whenrequested by the Engineer.

c. Manufacturer’s certifications shall not relieve the Contractor of the responsibility to providematerials per these specifications. Materials supplied and/or installed that do not comply with thesespecifications shall be removed (when directed by the Engineer) and replaced with materials that complywith these specifications at the Contractor’s cost.

d. All materials and equipment used to construct this item shall be submitted to the Engineer forapproval prior to ordering the equipment. Submittals consisting of marked catalog sheets or shopdrawings shall be provided. Submittal data shall be presented in a clear, precise and thorough manner.Original catalog sheets are preferred. Photocopies are acceptable provided they are as good a quality asthe original. Clearly and boldly mark each copy to identify products or models applicable to this project.Indicate all optional equipment and delete any non-pertinent data. Submittals for components of electricalequipment and systems shall identify the equipment to which they apply on each submittal sheet.Markings shall be made bold and clear with arrows or circles (highlighting is not acceptable). TheContractor is solely responsible for delays in the project that may accrue directly or indirectly from latesubmissions or resubmissions of submittals.

e. The data submitted shall be sufficient, in the opinion of the Engineer, to determine compliance withthe plans and specifications. The Contractor’s submittals shall be neatly bound in a properly sized 3-ringbinder, tabbed by specification section. The Engineer reserves the right to reject any and all equipment,materials or procedures that do not meet the system design and the standards and codes, specified in thisdocument.

f. All equipment and materials furnished and installed under this section shall be guaranteed againstdefects in materials and workmanship for a period of at least twelve (12) months from final acceptance bythe Owner. The defective materials and/or equipment shall be repaired or replaced, at the Owner’sdiscretion, with no additional cost to the Owner.

109-2.2 Concrete. Not used.

109-2.3 Reinforcing steel. Not used.

Page 34: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4

Item L-109 Work in Lighting Vault 2

109-2.4 Brick. Not used.

109-2.5 Rigid steel conduit. Rigid steel conduit and fittings shall be per Underwriters LaboratoriesStandards 6 and 514B.

109-2.6 Plastic Conduit and fittings. Plastic Conduit and fittings shall conform to the requirements ofFederal Specification W-C-1094 and UL-651 and UL-654 schedule 40 polyvinyl chloride (PVC) suitablefor use above or below ground.

109-2.7 Lighting. Not used.

109-2.8 Outlets. Not used.

109-2.9 Switches. Not used.

109-2.10 Paint. Not used.

109-2.11 Ground bus. Not used.

109-2.12 Square duct. Duct shall be square similar to that manufactured by the Square D Company (orequivalent), or the Trumbull Electric Manufacturing Company (or equivalent). The entire front of the ducton each section shall consist of hinged or removable cover for ready access to the interior. The cross-section of the duct shall be not less than 4 ´ 4 inch (100 ´ 100 mm) except where otherwise shown in theplans.

109-2.13 Ground rods. Not used.

109-2.14 Potheads. Not used.

109-2.15 Vault prefabricated metal housing. Not used.

109-2.16 FAA-approved equipment. Certain items of airport lighting equipment installed in vaults arecovered by individual ACs listed below:

AC 150/5345-7 Specification for L-824 Underground Electrical Cable for Airport LightingCircuits

AC 150/5345-10 Specification for Constant Current Regulators and Regulator Monitors. SeeSection 109-2.20 of this Specification for details.

AC 150/5345-26D FAA Specification for L-823 Plug and Receptacle, Cable Connectors

AC 150/5345-56B Specification for L-890 Airport Lighting Control and Monitoring System(ALCMS). See Specification Item L-100 ‘Modifications to ALCMS Equipment’for details.

109-2.17 Other electrical equipment. Distribution transformers, oil switches, cutouts, relays, terminalblocks, transfer relays, circuit breakers, and all other regularly used commercial items of electricalequipment not covered by FAA equipment specifications and ACs shall conform to the applicable rulingsand standards of the Institute of Electrical and Electronic Engineers (IEEE) or the National ElectricalManufacturers Association (NEMA). When specified, test reports from a testing laboratory indicating thatthe equipment meets the specifications shall be supplied. In all cases, equipment shall be new and a first-grade product. This equipment shall be supplied in the quantities required for the specific project andshall incorporate the electrical and mechanical characteristics specified in the proposal and plans.Equipment selected and installed by the Contractor shall maintain the interrupting current rating of theexisting systems or specified rating whichever is greater.

109-2.18 Wire. Wire (in conduit) rated up to 5,000 volts shall be per AC 150/5345-7, Specification for L-824 Underground Electrical Cables for Airport Lighting Circuits. Cable color for individual circuits shallbe provided as shown on the Contract Drawings. For ratings up to 600 volts, moisture and heat resistant

Page 35: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4

Item L-109 Work in Lighting Vault 3

thermoplastic wire conforming to Commercial Item Description A-A-59544A Type THWN-2 shall beused. The wires shall be of the type, size, number of conductors, and voltage shown in the plans or in theproposal.

a. Control circuits. Unless otherwise indicated on the plans, wire shall be not less than No. 12American wire gauge (AWG) and shall be insulated for 600 volts. If telephone control cable is specified,No. 19 AWG telephone cable per ANSI/Insulated Cable Engineers Association (ICEA) S-85-625-2007specifications shall be used.

b. Power circuits.

(1) 600 volts maximum-Wire shall be sized as shown on the Contract Drawings.(2) 3,000 volts maximum-not used.(3) Over 3,000 volts-not used.

109-2.19 Short circuit / coordination / device evaluation / arc flash analysis. Not used.

CONSTRUCTION METHODS

109-3.1 General. Not used.

109-3.2 Foundation and walls. Not used.

109-3.3 Installation of Equipment in Vault. The Contractor shall furnish, install, and connect allequipment, equipment accessories, conduit, cables, wires, buses, grounds, and support necessary to ensurea complete and operable electrical distribution center for the airport lighting system as specified hereinand shown in the plans.

The equipment installation and mounting shall comply with the requirements of the National ElectricalCode and local code agency having jurisdiction.

109-3.4 Power supply equipment. Transformers, regulators, booster transformers, and other powersupply equipment items shall be furnished and installed at the location shown in the plans or as directedby the Engineer.

109-3.5 Switchgear and panels. Not used.

109-3.6 Duct and conduit. Conduit shall be used between square ducts and equipment or betweendifferent items of equipment when the equipment is designed for conduit connection. When theequipment is not designed for conduit connection, conductors shall enter the square-type control ductthrough insulating bushings in the duct or on the conduit risers.

109-3.7 Wiring and connections. The Contractor shall make all necessary electrical connections in thevault per the wiring diagrams furnished and as directed by the Engineer. In wiring to the terminal blocks,the Contractor shall leave sufficient extra length on each control lead to make future changes inconnections at the terminal block. This shall be accomplished by running each control lead the longestway around the box to the proper terminal. Leads shall be neatly laced in place.

109-3.8 Marking and labeling. All equipment, control wires, terminal blocks, etc., shall be tagged,marked, or labeled as specified below:

a. Wire identification. The Contractor shall furnish and install self-sticking wire labels or identifyingtags on all control wires at the point where they connect to the control equipment or to the terminalblocks. Wire labels, if used, shall be of the self-sticking preprinted type and of the manufacturer’srecommended size for the wire involved. Identification -markings designated in the plans shall befollowed. Tags, if used, shall be of fiber not less than 3/4 inch (19 mm) in diameter and not less than 1/32

Page 36: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4

Item L-109 Work in Lighting Vault 4

inch (1 mm) thick. Identification markings designated in the plans shall be stamped on tags by means ofsmall tool dies. Each tag shall be securely tied to the proper wire by a nonmetallic cord.

b. Labels.After finish painting is completed, the Contractor must provide white with black core laminatedphenolic nameplates with 1/4 inch minimum lettering etched through the outer covering.Inscription must be made with all upper case letters and must be the same inscriptions as shownon the Drawings or as directed by the Engineer.

(1) All major electrical equipment must be so identified, including switchgear, motor starters,disconnect switches, panels, switches, breakers, etc.

(2) Disconnect switches serving feeders and overcurrent protective devices mounted in aswitchboard must be so identified.

(3) Embossed self-adhering plastic tape labels will not be accepted.(4) Use stainless steel screws, except where contact-type permanent adhesive may be

required when screws cannot or should not penetrate substrate.(5) The Contractor must take care when attaching the identification so that the NEMA rating

of the equipment is not violated.

109-3.9 Constant Current Regulators. Contractor is responsible for enlisting the original manufacturerto outfit outfitting two empty cubicles in an existing Constant Current Regulator (CCR) switchgearlineup. Existing switchgear equipment is manufactured by ADB/Liberty Airport Systems (Contact personGalen Dixon 614.323.6242). New regulators shall be SCR or ferroresonant type as manufactured byLiberty Airport Systems and sized as shown on the Contract Drawings. Manufacturer Contractor isresponsible for furnishing and installing all components required to provide an operational CCR.Installation of CCR components shall be performed and certified by a manufacturer’s representative. Awritten acceptance checklist shall be completed by the manufacturer’s representative and shall besubmitted to the Resident Engineer for record.

Work by the contractor shall include extending the 600A, 2”x1/4” copper horizontal bus bars to energizethe additional cubicles and assisting the manufacturer with CCR installation.

Work shall also include furnishing and installing all control wiring between new CCR’s and existingALCMS system as shown on the Contract Drawings. Upgrades and modifications to ALCMS system areincluded in Specification Section L-100 ‘Modifications to ALCMS Equipment’.

109-3.10 Existing In-Pavement RGL Circuit Monitoring. Contractor is responsible for relocatingexisting monitoring equipment for Runway 17 In-Pavement RGL circuit. Equipment is currently locatedin empty CCR cubicle and shall be moved to existing monitoring enclosure as shown on the ContractDocuments. Contractor shall enlist Liberty Airport Systems to commission the new installation once allequipment has been moved and connected.

109-3.11 Contractor Support for ALCMS Installation.

The Contractor shall support the manufacturer with the ALCMS system commissioning as detailed inSection L-100 ‘Modifications to ALCMS Equipment’. Effort to include escorting, installing equipment,terminations, badging, fees and any incidental required to complete the work. Payment for this work shallbe made in this Specification Section.

Page 37: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4

Item L-109 Work in Lighting Vault 5

109-3.12 Contractor Support for Constant Current Regulator Installation.

The Contractor shall support the manufacturer with the Constant Current Regulator installation andcommissioning. Effort to include extending the 600A, 2”x1/4” copper horizontal bus bars to energize theadditional cubicles and assisting the manufacturer with CCR installation as well as escorting, installingequipment, terminations, badging, fees and any incidental required to complete the work.

Work shall also include furnishing and installing all control wiring between new CCR’s and existingALCMS system as shown on the Contract Drawings. Upgrades and modifications to ALCMS system areincluded in Specification Section L-100 ‘Modifications to ALCMS Equipment’.

Payment for this work shall be made in this Specification Section.

METHOD OF MEASUREMENT

109-4.1 The quantity of vault equipment to be paid for under ‘Installation of Airport Vault Equipment’this item shall consist of all equipment installed, connected, and accepted as a complete unit ready foroperation. Measurement shall include all equipment installed within the exterior walls of the LightingVault.

All work by Liberty Airport Systems to furnish, install, test, certify and commission the constant currentregulators and relocation of in-pavement RGL monitoring circuit shall be included for measurementunder this item. All work by the contractor to support Liberty Airport Systems such as shipping ofcomponents, storage, delivery, escorting, badging, supervision shall also be included in the lump sumprice for this item.

All work associated with ALCMS upgrades shall not be measured for measurement as part of the lightingvault lump sum but shall be paid under Section L-100 ‘Modifications to ALCMS Equipment’.

All work done by the Contractor to support the ALCMS upgrades shall be measured for measurement aspart of this Lump Sum.

All work done by the Contractor to support the Constant Current Regulator Installation shall be measuredfor measurement as part of this Lump Sum. All work by the contractor to support Liberty Airport Systemssuch as handling of components, storage, delivery, escorting, badging, extension of bus bars, installationof control cable and installation supervision shall also be included in the lump sum price for this item.

Relocation of In-pavement RGL monitoring equipment shall be included for measurement under thisitem.

All equipment installed outside the Lighting Vault will be measured for payment under other sections ofthis specification.

109-4.2 All work by Liberty Airport Systems to furnish, install, test, certify and commission the constantcurrent regulators shall be paid from the Contract Allowance for this item.

All work associated with ALCMS upgrades shall not be measured for measurement as part of thisallowance but shall be paid under Section L-100 ‘Modifications to ALCMS Equipment’.

All work by Liberty Airport Systems to commission the relocation of In-pavement RGL monitoringequipment shall be paid from the Contract Allowance for this item.

Page 38: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4

Item L-109 Work in Lighting Vault 6

BASIS OF PAYMENT

109-5.1 Payment will be made at the contract unit lump sum price for the vault equipment installation.This price shall be full compensation for furnishing all materials and for all preparation, assembly, andinstallation of these materials, and for all labor, equipment, tools, and incidentals necessary to completethe item.

109-5.2 Payment shall be made from the Allowance price for the complete and accepted ConstantCurrent Regulator Installation. This price shall be full compensation for all services and items included inthe designated allowance item, preparation, assembly, delivery, transportation, and installation ofmaterials and equipment, labor, equipment, tools, and incidentals necessary to complete this item.

Payment will be made under:

Item L-109-1 Installation of Airport Vault Equipment - per Lump Sum

Item L-109-2 Constant Current Regulator Installation- per Allowance

MATERIAL REQUIREMENTS

AC 150/5340-30 Design and Installation Details for Airport Visual Aids

AC 150/5345-7 Specification for L-824 Underground Electrical Cable for Airport LightingCircuits

AC 150/5345-10 Specification for Constant Current Regulators and Regulator Monitors

AC 150/5345-26D FAA Specification for L-823 Plug and Receptacle, Cable Connectors

AC 150/5345-56B Specification for L-890 Airport Lighting Control and Monitoring System(ALCMS)

AC 150/5345-53 Airport Lighting Equipment Certification Program

American National Standards Institute / Insulated Cable Engineers Association (ANSI/ICEA) S-85-625Standard for Telecommunications Cable Aircore, Polyolefin Insulated, CopperConductor Technical Requirements

Commercial Item Description (CID) A-A 59544Cable and Wire, Electrical (Power, Fixed Installation)

FED SPEC W-C-1094 Conduit and Conduit Fittings Plastic, Rigid

Underwriters Laboratories Standard 6Electrical Rigid Metal Conduit – Steel

NFPA-70 National Electrical Code (NEC)

NFPA-70E Standard for Electrical Safety in the Workplace

NFPA-780 Standard for the Installation of Lightning Protection Systems

END OF ITEM L-109

Page 39: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4

Jacob

s-

P:\2

017

\E2X

74

70

5-

MH

TTa

xiw

ays

P&

U\7

00

-C

AD

\Pla

ns\

02.0

-G

ene

ralN

ote

s&

Sh

ee

tIn

de

x.d

wg

[G1.0

]A

pril1

7,2018

-3:4

6p

m[s

tiney]

G1.0

········

Page 40: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4

X X X

X

X

X X X X

XX

XX

XXX

PetCem

etery

PetCem

etery

X

X X X X X

X

XXXXXXXXXXXXXXXXXX

XX

XX

XX

X

XX

XX

X

X

X XX

X

X

XX

XX

XX

XX

XX

XX

XX

X

XXXXXXXXXX

Jacob

s-

P:\2

017

\E2X

74

70

5-

MH

TTa

xiw

ays

P&

U\7

00

-C

AD

\Pla

ns\

03

-O

vera

llS

afe

tya

nd

Pha

sing

Pla

n.d

wg

[G2.0

]A

pril1

6,2018

-4:1

9p

m[s

tiney]

G2.0

Page 41: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4

XX

X X X X X X X X X X X

X

X

XXXXXXXXXXXXXXXXXXXXXXXXXXXXX

X

XXXXXXXXXXXXXXXXXXXXXX

XX

X X X X X X X X X X X

X

X

XXXXXXXXXXXXXXXXXXXXXXXXXXXXX

X

XXXXXXXXXXXXXXXXXXXXXX

XX

X X X X X X X X X X X

X

X

XXXXXXXXXXXXXXXXXXXXXXXXXXXXX

X

XXXXXXXXXXXXXXXXXXXXXX

XX

X X X X X X X X X X X

X

X

XXXXXXXXXXXXXXXXXXXXXXXXXXXXX

X

XXXXXXXXXXXXXXXXXXXXXX

XX

X X X X X X X X X X X

X

X

XXXXXXXXXXXXXXXXXXXXXXXXXXXXX

X

XXXXXXXXXXXXXXXXXXXXXX

XX

X X X X X X X X X X X

X

X

XXXXXXXXXXXXXXXXXXXXXXXXXXXXX

X

XXXXXXXXXXXXXXXXXXXXXX

Jacob

s-

P:\2

017

\E2X

74

70

5-

MH

TTa

xiw

ays

P&

U\7

00

-C

AD

\Pla

ns\

03.2

-S

afe

tya

nd

Pha

sing

Pla

ns.

dw

g[G

2.2

]A

pril1

6,2018

-6:0

9p

m[s

tiney]

G2.2

Page 42: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4

X

XX

X X X

X

XXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXX

X

Jacob

s-

P:\2

017

\E2X

74

70

5-

MH

TTa

xiw

ays

P&

U\7

00

-C

AD

\Pla

ns\

10

-G

rad

ing

Pla

ns.

dw

g[C

2.1

]A

pril1

7,

201

8-

11:2

0am

[stin

ey]

C2.1

Page 43: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4

Jacob

s-

P:\2

017

\E2X

74

70

5-

MH

TTa

xiw

ays

P&

U\7

00

-C

AD

\Pla

ns\

10

-G

rad

ing

Pla

ns.

dw

g[C

2.2

]A

pril1

7,

201

8-

11:2

0am

[stin

ey]

C2.2

Page 44: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4

X X X X X X X X X X X X X X X X X X XJacob

s-

P:\2

017

\E2X

74

70

5-

MH

TTa

xiw

ays

P&

U\7

00

-C

AD

\Pla

ns\

10

-G

rad

ing

Pla

ns.

dw

g[C

2.3

]A

pril1

7,

201

8-

11:2

1am

[stin

ey]

C2.3

Page 45: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4

Jacob

s-

P:\2

017

\E2X

74

70

5-

MH

TTa

xiw

ays

P&

U\7

00

-C

AD

\Pla

ns\

10.1

-Ta

xiw

ay

&S

erv

ice

Ro

ad

Pro

file

s.d

wg

[3.1

]A

pril1

7,2018

-4:2

6p

m[s

tiney]

C3.1

Page 46: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4

Jacob

s-

P:\2

017

\E2X

74

70

5-

MH

TTa

xiw

ays

P&

U\7

00

-C

AD

\Pla

ns\

10.1

-Ta

xiw

ay

&S

erv

ice

Ro

ad

Pro

file

s.d

wg

[3.2

]A

pril1

7,2018

-4:2

6p

m[s

tiney]

C3.2

Page 47: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4

Jacob

s-

P:\2

017

\E2X

74

70

5-

MH

TTa

xiw

ays

P&

U\7

00

-C

AD

\Pla

ns\

10.1

-Ta

xiw

ay

&S

erv

ice

Ro

ad

Pro

file

s.d

wg

[3.3

]A

pril1

7,2018

-4:2

7p

m[s

tiney]

C3.3

Page 48: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4

Jacob

s-

P:\2

017

\E2X

74

70

5-

MH

TTa

xiw

ays

P&

U\7

00

-C

AD

\Pla

ns\

10.1

-Ta

xiw

ay

&S

erv

ice

Ro

ad

Pro

file

s.d

wg

[3.4

]A

pril1

7,2018

-4:2

7p

m[s

tiney]

C3.4

Page 49: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4

Jacob

s-

P:\2

017

\E2X

74

70

5-

MH

TTa

xiw

ays

P&

U\7

00

-C

AD

\Pla

ns\

10.1

-Ta

xiw

ay

&S

erv

ice

Ro

ad

Pro

file

s.d

wg

[3.5

]A

pril1

7,2018

-4:2

7p

m[s

tiney]

C3.5

Page 50: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4

Jacob

s-

P:\2

017

\E2X

74

70

5-

MH

TTa

xiw

ays

P&

U\7

00

-C

AD

\Pla

ns\

10.1

-Ta

xiw

ay

&S

erv

ice

Ro

ad

Pro

file

s.d

wg

[3.6

]A

pril1

7,2018

-4:2

8p

m[s

tiney]

C3.6

Page 51: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4

Jacob

s-

P:\2

017

\E2X

74

70

5-

MH

TTa

xiw

ays

P&

U\7

00

-C

AD

\Pla

ns\

13

-Fe

nce

Pla

ns.

dw

g[F

1.2

]A

pril1

7,

201

8-

3:3

2p

m[s

tiney]

F1.2

Page 52: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4

X

XX

X X X

X

XXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXX

X

17-35

35 A1

A

Jacob

s-

\\mhtfil0

1\jo

b\2

017

\E2X

74

70

5-

MH

TTa

xiw

ays

P&

U\7

00

-C

AD

\Pla

ns\

15.1

.10

-L

ightin

gan

dS

ign

ag

eP

lan

s.d

wg

[E1.1

]A

pril1

7,2018

-4:2

2p

m[s

ag

ri]

E1.1

Page 53: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4

A1

A2

Jacob

s-

\\mhtfil0

1\jo

b\2

017

\E2X

74

70

5-

MH

TTa

xiw

ays

P&

U\7

00

-C

AD

\Pla

ns\

15.1

.10

-L

ightin

gan

dS

ign

ag

eP

lan

s.d

wg

[E1.2

]A

pril1

7,2018

-4:1

1p

m[s

ag

ri]

E1.2

Page 54: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4

X X X X X X X X X X X X X X X X X X X

Jacob

s-

\\mhtfil0

1\jo

b\2

017

\E2X

74

70

5-

MH

TTa

xiw

ays

P&

U\7

00

-C

AD

\Pla

ns\

15.1

.10

-L

ightin

gan

dS

ign

ag

eP

lan

s.d

wg

[E1.3

]A

pril1

7,2018

-4:1

2p

m[s

ag

ri]

E1.3

Page 55: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4

A3

17-35

Jacob

s-

\\mhtfil0

1\jo

b\2

017

\E2X

74

70

5-

MH

TTa

xiw

ays

P&

U\7

00

-C

AD

\Pla

ns\

15.1

.10

-L

ightin

gan

dS

ign

ag

eP

lan

s.d

wg

[E1.7

]A

pril1

7,2018

-4:1

3p

m[s

ag

ri]

E1.7

Page 56: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4

28-17-1

28-20-1A28-20-228-20-2-1

28-18-1

X X X X X X X X X X

XXXXX

X

XXXXXX

XXXXXXXXXXX

17-35

35 A1

A

A1 A2

Jacob

s-

\\mhtfil0

1\jo

b\2

017

\E2X

74

70

5-

MH

TTa

xiw

ays

P&

U\7

00

-C

AD

\Pla

ns\

15.3

.8-

Ne

wTW

As

Ed

ge

Circuit

Pla

ns.

dw

g[E

3.8

]A

pril1

7,2018

-4:2

4p

m[s

ag

ri]

E3.8

Page 57: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4

28-17-1

28-20-1A28-20-2

28-21-24

28-20-2-1

28-18-1

X X X X X X X X X X

X

XXXXXX

XXXXXXXXXXXX

17-35

35 A1

A

A1 A2

Jacob

s-

\\mhtfil0

1\jo

b\2

017

\E2X

74

70

5-

MH

TTa

xiw

ays

P&

U\7

00

-C

AD

\Pla

ns\

15.3

.13

-N

ew

RW

17

35

Ed

ge

Circuit

Pla

ns.

dw

g[E

3.1

3]A

pril1

7,2018

-4:2

1p

m[s

ag

ri]

E3.13

Page 58: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4

Jacob

s-

P:\2

017

\E2X

74

70

5-

MH

TTa

xiw

ays

P&

U\7

00

-C

AD

\Pla

ns\

15.4

.1-1

0E

lectr

ica

lde

tails

.dw

g[E

4.1

]A

pril1

7,

2018

-8:1

3p

m[s

tiney]

E4.1

T/W X

T/W X

T/W X

Page 59: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4

Jacob

s-

\\mhtfil0

1\jo

b\2

017

\E2X

74

70

5-

MH

TTa

xiw

ays

P&

U\7

00

-C

AD

\Pla

ns\

15.4

.1-1

0E

lectr

ica

lde

tails

.dw

g[E

4.2

]A

pril1

7,2018

-4:3

3p

m[s

ag

ri]

E4.2

T/WX

Page 60: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4

Jacob

s-

\\mhtfil0

1\jo

b\2

017

\E2X

74

70

5-

MH

TTa

xiw

ays

P&

U\7

00

-C

AD

\Pla

ns\

15.5

.1-

Lig

htS

che

du

le1

.dw

g[E

5.1

]A

pril1

7,2018

-4:3

1p

m[s

ag

ri]

E5.1

Page 61: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4

Jacob

s-

\\mhtfil0

1\jo

b\2

017

\E2X

74

70

5-

MH

TTa

xiw

ays

P&

U\7

00

-C

AD

\Pla

ns\

15.5

.2-

Lig

htS

che

du

le2

.dw

g[E

5.2

]A

pril1

7,2018

-4:3

0p

m[s

ag

ri]

E5.2

Page 62: ADDENDUM No. 1€¦ · L-858-1 New Lighted Guidance Sign, - 1 Module L-858-2 New Lighted Guidance Sign, - 2 Module. ADDENDUM No. 1 L-858-3 New Lighted Guidance Sign, - 3 Module L-858-4

A2

A

A1

A2

A3

A3

A3

A3

Jacob

s-

\\mhtfil0

1\jo

b\2

017

\E2X

74

70

5-

MH

TTa

xiw

ays

P&

U\7

00

-C

AD

\Pla

ns\

15.5

.3-

Lig

htS

che

du

le3

.dw

g[E

5.3

]A

pril1

7,2018

-4:2

7p

m[s

ag

ri]

E5.3