ADDENDUM NO. 1 January 14, 2016 PROJECT: CITY OF BRONTE,...

5
ADDENDUM NO. 1 January 14, 2016 PROJECT: CITY OF BRONTE, TEXAS Water Supply Improvements BID DATE: January 26, 2016 The following changes and/or additions shall be made to the Plans, Specifications and Contract Documents for the above referenced project. Bidder shall acknowledge receipt of this Addendum by signing below and returning this Addendum with the Bid. 1. A new wage rate decision TX160119 has been issued as attached, and it shall replace decision TX20150119. Prepared by: JACOB & MARTIN, LTD. Consulting Engineers 3465 Curry Lane Abilene, Texas 79606 _______________________________ Bidder’s Acknowledgment

Transcript of ADDENDUM NO. 1 January 14, 2016 PROJECT: CITY OF BRONTE,...

Page 1: ADDENDUM NO. 1 January 14, 2016 PROJECT: CITY OF BRONTE, …jacobmartin.com/wp-content/uploads/2016/01/Addendum-1.pdf · 2016-01-14 · classification, which in this example would

ADDENDUM NO. 1

January 14, 2016

PROJECT: CITY OF BRONTE, TEXAS

Water Supply Improvements

BID DATE: January 26, 2016

The following changes and/or additions shall be made to the Plans, Specifications and Contract

Documents for the above referenced project. Bidder shall acknowledge receipt of this Addendum

by signing below and returning this Addendum with the Bid.

1. A new wage rate decision TX160119 has been issued as attached, and it shall replace

decision TX20150119.

Prepared by:

JACOB & MARTIN, LTD.

Consulting Engineers

3465 Curry Lane

Abilene, Texas 79606

_______________________________

Bidder’s Acknowledgment

Page 2: ADDENDUM NO. 1 January 14, 2016 PROJECT: CITY OF BRONTE, …jacobmartin.com/wp-content/uploads/2016/01/Addendum-1.pdf · 2016-01-14 · classification, which in this example would
Page 3: ADDENDUM NO. 1 January 14, 2016 PROJECT: CITY OF BRONTE, …jacobmartin.com/wp-content/uploads/2016/01/Addendum-1.pdf · 2016-01-14 · classification, which in this example would
Page 4: ADDENDUM NO. 1 January 14, 2016 PROJECT: CITY OF BRONTE, …jacobmartin.com/wp-content/uploads/2016/01/Addendum-1.pdf · 2016-01-14 · classification, which in this example would
Page 5: ADDENDUM NO. 1 January 14, 2016 PROJECT: CITY OF BRONTE, …jacobmartin.com/wp-content/uploads/2016/01/Addendum-1.pdf · 2016-01-14 · classification, which in this example would