Addendum No. 1 Invitation to Tender ES-19-11 Shoreline ... · Addendum No. 1 Invitation to Tender...

5
Main Office: 155 George Street, Prince George, BC V2L 1P8 Telephone: 250-960-4400 / Fax: 250-562-8676 Toll Free: 1-800-667-1959 / http://www.rdffg.bc.ca Addendum No. 1 Invitation to Tender ES-19-11 Shoreline Stabilization & Drainage Works Harold Mann Regional Park The addendum is being issued prior to the closing of the Invitation to Tender to provide further information, make changes to, or to clarify the Contract Documents and is to be read, interpreted and coordinated with all other parts of the Contract Documents. In case of a conflict with the balance of the documents, this Addendum shall govern. Tenderers shall attach a signed copy of this addendum to their tender. This addendum shall form part of the Contract Documents. Replace Appendix A and Appendix B with corrected Appendix A: Site Layout and Appendix B: Design Drawings. June 20, 2019 Addendum No. 1 Received. Signature of Tenderer Name of Tenderer Inquiries relating to this ITT may be directed to: Technical Inquiries: Bryan Boyes Utilities Leader Regional District of Fraser-Fort George 155 George Street Prince George BC V2L 1P8 Telephone: 250-960-4400 Fax: 250-562- 8676 Email: [email protected] General Inquiries: Petra Wildauer General Manager of Environmental Services Regional District of Fraser-Fort George 155 George Street Prince George, BC V2L 1P8 Phone: 250-960-4400 / Fax: 250-526-8676 Email: [email protected]

Transcript of Addendum No. 1 Invitation to Tender ES-19-11 Shoreline ... · Addendum No. 1 Invitation to Tender...

Page 1: Addendum No. 1 Invitation to Tender ES-19-11 Shoreline ... · Addendum No. 1 Invitation to Tender ES-19-11 Shoreline Stabilization & Drainage Works Harold Mann Regional Park The addendum

Main Office: 155 George Street, Prince George, BC V2L 1P8

Telephone: 250-960-4400 / Fax: 250-562-8676

Toll Free: 1-800-667-1959 / http://www.rdffg.bc.ca

Addendum No. 1

Invitation to Tender ES-19-11

Shoreline Stabilization & Drainage Works Harold Mann Regional Park

The addendum is being issued prior to the closing of the Invitation to Tender to provide further information, make changes to, or to clarify the Contract Documents and is to be read, interpreted and coordinated with all other parts of the Contract Documents. In case of a conflict with the balance of the documents, this Addendum shall govern. Tenderers shall attach a signed copy of this addendum to their tender. This addendum shall form part of the Contract Documents.

Replace Appendix A and Appendix B with corrected Appendix A: Site Layout and Appendix B: Design Drawings.

June 20, 2019

Addendum No. 1 Received.

Signature of Tenderer Name of Tenderer

Inquiries relating to this ITT may be directed to:

Technical Inquiries:

Bryan Boyes Utilities Leader

Regional District of Fraser-Fort George 155 George Street

Prince George BC V2L 1P8 Telephone: 250-960-4400 Fax: 250-562-

8676 Email: [email protected]

General Inquiries:

Petra Wildauer General Manager of Environmental Services

Regional District of Fraser-Fort George 155 George Street

Prince George, BC V2L 1P8 Phone: 250-960-4400 / Fax: 250-526-8676

Email: [email protected]

Page 2: Addendum No. 1 Invitation to Tender ES-19-11 Shoreline ... · Addendum No. 1 Invitation to Tender ES-19-11 Shoreline Stabilization & Drainage Works Harold Mann Regional Park The addendum

Shoreline Stabilization & Drainage Works Harold Mann Regional Park

Invitation to Tender ES-19-11 October 1, 2019 – October 31, 2019

Page 29 of 32

APPENDIX A - SITE LAYOUT

Page 3: Addendum No. 1 Invitation to Tender ES-19-11 Shoreline ... · Addendum No. 1 Invitation to Tender ES-19-11 Shoreline Stabilization & Drainage Works Harold Mann Regional Park The addendum

77C434

SPK6 FOCUS

SPK1 FOCUS

1200Ø

HAROLD MANN REG. PARK

NO CAMPING

ATTENTION ALL VISITORS

NO LIFEGUARD

EAGLET LAKE FISHERIES MGMT.

1212

SPK

1476

SPK

LOT 1

LOT 2

REM DL7946

DL7945

P

L

A

N

2

5

0

3

3

P

L

A

N

A

-

2

7

8

7

R

O

A

D

P

L

A

N

E

P

P

4

3

0

7

4

6

0

0

6

0

5

6

0

0

16-1

16-2

SURVEY CONTROL TABLE

POINT

NAME

77C434

1212

1456

1476

NORTHING

5994787.247

5994787.465

5994858.675

5994665.748

EASTING

543897.558

543891.678

544069.101

543724.991

ELEVATION

603.998

604.130

609.411

599.753

DESCRIPTION

FMON

SPK

SPK

SPK

DA

TE

: 2

01

6-1

0-1

9, 1

4:4

1 F

IL

E: H

:\P

RO

J\2

34

1\2

20

0-2

29

9\2

21

4 - R

DF

FG

H

aro

ld

M

an

n R

eg

io

na

l P

ark S

ho

re

lin

e\1

0.0

D

ra

win

gs\1

0.3

M

od

els\V

-M

OD

L.d

wg

Drawn DesignDescriptionRev Date App'd ORIGINAL DWG SIZE: ANSI D (22" x 34")

Rev.

Drawing No.

DE

ST

RO

Y A

LL

P

RIN

TS

B

EA

RIN

G P

RE

VIO

US

R

EV

IS

IO

N

Approved Sealed

Project Number

THIS DRAWING AND DESIGN IS THE PROPERTY OF McELHANNEY CONSULTING SERVICES LTD. (McELHANNEY)

AND SHALL NOT BE USED, REUSED OR REPRODUCED WITHOUT THE CONSENT OF McELHANNEY. McELHANNEY

WILL NOT BE HELD RESPONSIBLE FOR THE IMPROPER OR UNAUTHORIZED USE OF THIS DRAWING AND DESIGN.

THIS DRAWING AND DESIGN HAS BEEN PREPARED FOR THE CLIENT IDENTIFIED, TO MEET THE STANDARDS AND

REQUIREMENTS OF THE APPLICABLE PUBLIC AGENCIES AT THE TIME OF PREPARATION. McELHANNEY, ITS

EMPLOYEES, SUBCONSULTANTS AND AGENTS WILL NOT BE LIABLE FOR ANY LOSSES OR OTHER

CONSEQUENCES RESULTING FROM THE USE OR RELIANCE UPON, OR ANY CHANGES MADE TO, THIS DRAWING,

BY ANY THIRD PARTY, INCLUDING CONTRACTORS, SUPPLIERS, CONSULTANTS AND STAKEHOLDERS, OR THEIR

EMPLOYEES OR AGENTS, WITHOUT McELHANNEY'S PRIOR WRITTEN CONSENT.

INFORMATION ON EXISTING UNDERGROUND FACILITIES MAY NOT BE COMPLETE OR ACCURATE. McELHANNEY,

ITS EMPLOYEES AND DIRECTORS ARE NOT RESPONSIBLE NOR LIABLE FOR THE LOCATION OF ANY

UNDERGROUND CONDUITS, PIPES, CABLES OR OTHER FACILITIES WHETHER SHOWN OR OMITTED FROM THIS

PLAN. PRIOR TO CONSTRUCTION CONTRACTOR SHALL EXPOSE LOCATIONS OF ALL EXISTING FACILITIES BY

HAND DIGGING OR HYDROVAC AND ADVISE THE ENGINEER OF POTENTIAL CONFLICTS.

McE

lh

an

ne

y A

NS

I D

- 1

5-0

5-2

2

Suite 12556 North Nechako RoadPrince George BCCanada V2K 1A1Tel 250 561 2229

REGIONAL DISTRICT OF FRASER - FORT GEORGE

155 GEORGE STREET, PRINCE GEORGE, BC, V2L 1P8

HAROLD MANN REGIONAL PARK

SITE SURVEY

PLAN - EXISTING CONDITION

101

2341-02214-00 0

0 16-10-19 ISSUED TO CLIENT SAB - DK

0 1:500 25

EAGLET LAKE

U

P

P

E

R

F

R

A

S

E

R

R

O

A

D

GRAVEL PARKING

PIT TOILETS

GATE

SERVICE BOX

RECYCLE BIN

L

O

G

R

A

I

L

F

E

N

C

E

WOOD STEPS

STONE STEPS

MEMORIAL STONE

BUILDING

BUILDINGS

GARBAGE BIN

GARBAGE BIN

CULVERT INLET NOT LOCATED

T

O

G

I

S

C

O

M

E

FOUND SET

IRON POST

SURVEY CONTROL

MONUMENT

SURVEY

CONIFEROUS TREE

POST MOUNTED SIGN

SIGN ON TWO POSTS

TEST PIT

SITE FEATURES

EXISTING

LEGEND

BOTTOM OF BANK

UNPAVED ROAD

PAVED ROAD

TOP OF BANK

WOOD FENCE

NOTES

· SURVEYED BY McELHANNEY CONSULTING SERVICES Ltd. (J. GAYOWSKI & M. BOWE) September 14, 2016

· COORDINATES ARE GRID, BASED ON UTM ZONE 10, NAD83 (CSRS) 2002.0 PROCESSED USING NATURAL

RESOURCES CANADA'S PRECISE POINT POSITIONING SERVICE. COMBINED SCALE FACTOR AT POINT

1476 IS 0.99953147

· ELEVATIONS ARE RELATIVE TO CGVD28 (HT 2.0)

· THE PROPERTY BOUNDARIES SHOWN ARE COMPILED FROM LEGAL PLANS AND A SUFFICIENT NUMBER

OF FIELD TIES TO IRON POSTS. THEY SHOULD BE USED ACCORDINGLY.

· NO UNDERGROUND UTILITIES WERE LOCATED FOR THIS SURVEY.

· CONTOUR INTERVAL IS 1m

Page 4: Addendum No. 1 Invitation to Tender ES-19-11 Shoreline ... · Addendum No. 1 Invitation to Tender ES-19-11 Shoreline Stabilization & Drainage Works Harold Mann Regional Park The addendum

Shoreline Stabilization & Drainage Works Harold Mann Regional Park

Invitation to Tender ES-19-11 October 1, 2019 – October 31, 2019

Page 31 of 32

APPENDIX B - DESIGN DRAWINGS

Page 5: Addendum No. 1 Invitation to Tender ES-19-11 Shoreline ... · Addendum No. 1 Invitation to Tender ES-19-11 Shoreline Stabilization & Drainage Works Harold Mann Regional Park The addendum

DA

TE

: 2017-03-03

, 09:20

F

ILE

: H

:\P

RO

J\2341\2200-2299\2214 - R

DF

FG

H

arold M

ann R

egional P

ark S

horeline\10.0 D

raw

ings\10.3 M

odels\20170303 V

-M

OD

L1.dw

g

ORIGINAL DWG SIZE: ANSI D (22" x 34")

Rev.

Drawing No.

Approved Sealed

Project Number

McE

lhanney A

NS

I D

- 15-05-22

Suite 12556 North Nechako RoadPrince George BCCanada V2K 1A1Tel 250 561 2229

155 GEORGE STREET, PRINCE GEORGE, BC, V2L 1P8

HAROLD MANN REGIONAL PARK

MULTI-FLOW DRAIN CONCEPT

A

EAGLET LAKE

U

P

P

E

R

F

R

A

S

E

R

R

O

A

D

GRAVEL PARKING

PIT TOILETS

GATE

SERVICE BOX

RECYCLE BIN

L

O

G

R

A

I

L

F

E

N

C

E

WOOD STEPS

STONE STEPS

MEMORIAL STONE

BUILDING

BUILDINGS

GARBAGE BIN

GARBAGE BIN

CULVERT INLET NOT LOCATED

T

O

G

I

S

C

O

M

E

FOUND SET

IRON POST

SURVEY CONTROL

MONUMENT

SURVEY

CONIFEROUS TREE

POST MOUNTED SIGN

SIGN ON TWO POSTS

TEST PIT

SITE FEATURES

EXISTING

LEGEND

BOTTOM OF BANK

UNPAVED ROAD

PAVED ROAD

TOP OF BANK

WOOD FENCE

MULTI-FLOW UNDER

PATH OR LANDSCAPING

MULTI-FLOW UNDER

PICNIC TABLE PAD

PICNIC TABLE

EXISTING

WETLAND

TYPICAL MULTI-FLOW DRAIN

PERMEABLE GRANULAR MATERIAL

MULTI-FLOW PANEL

EXISTING GROUND SURFACE LANDSCAPING OR PERMEABLE WALKWAY

NOT TO SCALE

DISCHARGE

TO LAKE

DISCHARGE

TO LAKE

0 1:500 25

H:\P

RO

J\2

34

1\2

20

0-2

29

9\2

21

4 - R

DF

FG

H

aro

ld

M

an

n R

eg

io

na

l P

ark S

ho

re

lin

e\1

0.0

D

ra

win

gs\1

0.3

M

od

els\2

01

70

30

3 V

-M

OD

L1

.d

wg

, D

RA

IN

C

ON

CE

PT

, 3

/3

/2

01

7 9

:2

0:2

8 A

M