ADAPTIVE REUSE: LAKEVIEW CULTURAL CENTRE FOR THE...

7
ADAPTIVE REUSE: LAKEVIEW CULTURAL CENTRE FOR THE ARTS DESIGNED BY: BRIANNE WALLACE MICHAEL FIK GAETANO SCHEMBRI LOCATION: CANADIAN ARSENAL LTD. SMALL ARMS BUILDING 1352 LAKESHORE ROAD EAST, LAKEVIEW, MISSISSAUGA, ONTARIO CANADA THESE DRAWINGS MUST NOT BE SCALED. THE CONTRACTOR SHALL CHECK ALL DIMENSIONS AGAINST ALL OTHER CONSULTANTS AND MANUFACTURES DRAWINGS AND MUST REPORT ANY DISCREPANCIES TO THE CONSULTANT BEFORE PROCEEDING WITH THE WORK. TABLE OF CONTENTS: DRAWN BY: DRAWING TITLE: SCALE: PAGE #: G.S TITLE PAGE N/A A-0.0 M.F EXISTING BUILDING: GROUND FLOOR PLANS (1:100) A-1.1 M.F EXISTING BUILDING: SECOND FLOOR PLANS (1:100) A-1.2 M.F DEMOLITION PLANS: GROUND FLOOR PLANS (1:100) A-1.3 M.F DEMOLITION PLANS: SECOND FLOOR PLANS (1:100) A-1.4 G.S SITE PLAN (1:250) A-1.5 M.F PROPOSED BUILDING: GROUND FLOOR PLANS (1:100) A-1.6 M.F PROPOSED BUILDING: SECOND FLOOR PLANS (1:100) A-1.7 G.S ROOF PLAN (1:100) A-1.8 B.W NORTH, EAST, & SOUTH ELEVATIONS (1:100) A-2.1 B.W WEST ELEVATION & WEST LOBBY ELEVATION (1:100/1:50) A-2.2 B.W INTERIOR CORRIDOR ELEVATION & WIN SCHD. (1:50/1:100) A-2.2 G.S ELEVATOR AND RAMP DETAIL PLANS (1:20) A-2.2 B.W BUILDING SECTION (1:100) A-3.1 B.W NEW/EXISTING WALL @ WINDOW & @ ROOF (1:100/1:10) A-3.1 M.F WALL SECTION @ CANTILEVER ADDITION (1:50) A-4.1 M.F UPGRADED ROOF @ UPGRADED EXISTING WALL (1:20) A-4.1 M.F GREEN ROOF @ LIVING WALL (1:20) A-4.1 G.S OUTDOOR PATIO SECTION (1:20) A-4.2 G.S STAIR SECTION, & 1ST & 2ND FLOOR PLANS (1:20) A-5.1 G.S ENLARGED CAFE PLANS (1:20) A-6.1 DATE: AUGUST - 19 - 2011

Transcript of ADAPTIVE REUSE: LAKEVIEW CULTURAL CENTRE FOR THE...

Page 1: ADAPTIVE REUSE: LAKEVIEW CULTURAL CENTRE FOR THE ARTStrantor.sheridanc.on.ca/student/schembrg/portfolio... · mississauga, ontario canada site plan gaetano schembri ken snell august

ADAPTIVE REUSE: LAKEVIEW CULTURAL CENTRE FOR THE ARTS

DESIGNED BY:

BRIANNE WALLACEMICHAEL FIKGAETANO SCHEMBRI

LOCATION:

CANADIAN ARSENAL LTD. SMALL ARMS BUILDING

1352 LAKESHORE ROAD EAST,LAKEVIEW, MISSISSAUGA, ONTARIOCANADA

THESE DRAWINGS MUST NOT BE SCALED. THE CONTRACTORSHALL CHECK ALL DIMENSIONS AGAINST ALL OTHERCONSULTANTS AND MANUFACTURES DRAWINGS AND MUSTREPORT ANY DISCREPANCIES TO THE CONSULTANT BEFOREPROCEEDING WITH THE WORK.

TABLE OF CONTENTS:

DRAWN BY: DRAWING TITLE: SCALE: PAGE #:

G.S TITLE PAGE N/A A-0.0M.F EXISTING BUILDING: GROUND FLOOR PLANS (1:100) A-1.1M.F EXISTING BUILDING: SECOND FLOOR PLANS (1:100) A-1.2M.F DEMOLITION PLANS: GROUND FLOOR PLANS (1:100) A-1.3M.F DEMOLITION PLANS: SECOND FLOOR PLANS (1:100) A-1.4G.S SITE PLAN (1:250) A-1.5M.F PROPOSED BUILDING: GROUND FLOOR PLANS (1:100) A-1.6M.F PROPOSED BUILDING: SECOND FLOOR PLANS (1:100) A-1.7G.S ROOF PLAN (1:100) A-1.8B.W NORTH, EAST, & SOUTH ELEVATIONS (1:100) A-2.1B.W WEST ELEVATION & WEST LOBBY ELEVATION (1:100/1:50) A-2.2B.W INTERIOR CORRIDOR ELEVATION & WIN SCHD. (1:50/1:100) A-2.2G.S ELEVATOR AND RAMP DETAIL PLANS (1:20) A-2.2B.W BUILDING SECTION (1:100) A-3.1B.W NEW/EXISTING WALL @ WINDOW & @ ROOF (1:100/1:10) A-3.1M.F WALL SECTION @ CANTILEVER ADDITION (1:50) A-4.1M.F UPGRADED ROOF @ UPGRADED EXISTING WALL (1:20) A-4.1M.F GREEN ROOF @ LIVING WALL (1:20) A-4.1G.S OUTDOOR PATIO SECTION (1:20) A-4.2G.S STAIR SECTION, & 1ST & 2ND FLOOR PLANS (1:20) A-5.1G.S ENLARGED CAFE PLANS (1:20) A-6.1

DATE: AUGUST - 19 - 2011

Page 2: ADAPTIVE REUSE: LAKEVIEW CULTURAL CENTRE FOR THE ARTStrantor.sheridanc.on.ca/student/schembrg/portfolio... · mississauga, ontario canada site plan gaetano schembri ken snell august

120900 [396'-7 3/4"]

13

83

50

[45

3'-1

0 3

/4"]

138700[455'-0 3/4"]

139490

[457'-7

3/4

"]

LAKESHORE RD. EAST

41 PARKING SPACES

SIDEENTRANCE

FIRE

RO

UTE

8900

H.D.

16 PARKING SPACESH.D.

LAKEVIEW CULTURAL CENTERFOR THE ARTS

LOADING BAY

DN

UP

UP

OUTDOORPERFORMACE

STAGEOUTDOOR

PATIO

UP

LANDSCAPED BED LANDSCAPED BED

LANDSCAPED BED

DN

NEW EXTENSION

EXISTING BUILDING

H.D.

NO

RTH

16 PARKING SPACES

16 PARKING SPACES

16 PARKING SPACES

16 PARKING SPACES

SIAMESE CONNECTIONS

GARBAGE BIN

DOORS

12 PARKING SPACES7 PARKING SPACES

BIKE RACK

OUTDOOR PICNIC TABLES

OUTDOOR PICNIC TABLES

FLAG POLE

EXISTING BUILDING TO BE REMOVED

EXISTING OIL TANK TO BE REMOVEDALL CONTAMINATING FILL TO BEREMOVED

LOADING BAY 10mX6m1:12 SLOPE

200mm CURB

BUS STOP

H.D.

H.D.

GUARD RAIL1070mm HIGH

LAWN

LAWN

LAWN

LAWN

LAWN

LAWN

LAWN

R700

0

[R22

'-11

1/2"

]

R7000

[R22'-1

1 1/2"]

R6200

[R20'-4"]

SITE PLAN1

A-1.5 1:250SHEET No.:

SCALE:

DATE:

CHECKED BY:

DRAWN BY:

DRAWING NAME:

PROJECT ADDRESS:

ISSUES / REVISIONS

No. DATE DESCRIPTION BY

Sheridan

TEAM 12:

MICHAEL FIK

GAETANO SCHEMBRI

BRIANNE WALLACE

THESE DRAWINGS MUST NOT BE SCALED. THE

CONTRACTOR SHALL CHECK ALL DIMENSIONS

AGAINST ALL OTHER CONSULTANTS AND

MANUFACTURERS DRAWINGS AND MUST REPORT

ANY DISCREPANCIES TO THE CONSULTANT

BEFORE PROCEEDING WITH THE WORK.

A

B

A - DRAWING NUMBER

B - SHEET NUMBER WHERE CALLED

PROJECT NAME:

ADAPTIVE REUSE:LAKEVIEW CULTURAL CENTRE FOR THE ARTS

1352 LAKESHORE RD. EASTMISSISSAUGA, ONTARIOCANADA

SITE PLAN

GAETANO SCHEMBRI

KEN SNELL

AUGUST - 19 - 2011

1:250

A-1.5

Page 3: ADAPTIVE REUSE: LAKEVIEW CULTURAL CENTRE FOR THE ARTStrantor.sheridanc.on.ca/student/schembrg/portfolio... · mississauga, ontario canada site plan gaetano schembri ken snell august

RD

RD. SLOPED@2%

RD

RD. SLOPED@2%

RD. SLOPED@2%

RD. SLOPED@2%

RD. SLOPED@2%

RD. SLOPED@2%

RD. SLOPED@2%

RD

NEW SKYLIGHT

MODIFIED EXISTING ROOF

RD. SLOPED@2%

NEW GREEN ROOFSMALL TREES AND SHRUBS TO BE PLANTED

NEW 2-PLY MOD BITROOFING MEMBRANE

NEW 2-PLY MOD BITROOFING MEMBRANE

WOOD DECKING

11

B

10987654321

6000

6000

6000

6000

6000

9000

6850 6000 6000 6000 6000 6000 6000 6000 6000 6000

C

D

E

F

A

G

7510

9810

11245

4680

8410

RD. SLOPED@2%

RD. SLOPED@2%

STEEL ROOF KaWa R670CRIMPED AND CURVED

OUTDOOR PERFORMANCESTAGE

EAVESTROUGH

8294

10868

8294

ACCESS DOOR TO ROOF

METAL FENCE

LADDER UPLADDER UP

LADDER UP

HVAC UNIT

EAVESTROUGH

METAL FENCE

HVAC UNIT

METAL FENCE

HVAC UNIT

SHEET No.:

SCALE:

DATE:

CHECKED BY:

DRAWN BY:

DRAWING NAME:

PROJECT ADDRESS:

ISSUES / REVISIONS

No. DATE DESCRIPTION BY

Sheridan

TEAM 12:

MICHAEL FIK

GAETANO SCHEMBRI

BRIANNE WALLACE

THESE DRAWINGS MUST NOT BE SCALED. THE

CONTRACTOR SHALL CHECK ALL DIMENSIONS

AGAINST ALL OTHER CONSULTANTS AND

MANUFACTURERS DRAWINGS AND MUST REPORT

ANY DISCREPANCIES TO THE CONSULTANT

BEFORE PROCEEDING WITH THE WORK.

A

B

A - DRAWING NUMBER

B - SHEET NUMBER WHERE CALLED

PROJECT NAME:

ADAPTIVE REUSE:LAKEVIEW CULTURAL CENTRE FOR THE ARTS

1352 LAKESHORE RD. EASTMISSISSAUGA, ONTARIOCANADA

ROOF PLAN

GAETANO SCHEMBRI

KEN SNELL

AUGUST - 19 - 2011

1:100

A-1.8

ROOF PLAN1

A1.5 1:100

Page 4: ADAPTIVE REUSE: LAKEVIEW CULTURAL CENTRE FOR THE ARTStrantor.sheridanc.on.ca/student/schembrg/portfolio... · mississauga, ontario canada site plan gaetano schembri ken snell august

YX

900T/O GROUND FLOOR

LEVEL 2

4680T/O SECOND FLOOR

LEVEL 4

7510U/S OF ROOF DECK

LEVEL 5

8410U/S OF ROOF DECK

LEVEL 6

9810U/S OF ROOF DECK

LEVEL 7

10810U/S OF ROOF DECK

LEVEL 8

50

1100

10

70

18

80

18

0

18

0 T

YP. 25

62

METAL C CHANNELS

38mm METAL DECKING

CONTINUOUS METAL HAND RAIL

456

10 RISERS

10 RISERS

100mm SCREENING

UNILOCK PAVING STONES

TYPICAL STAIR PARAPET

100mm METAL C- CHANNELS SPACED 600mm O.C38mm CORRUGATED STEEL DECKING2-50mm EXTRUDED POLYSTYRENE INSULATIONWATERPROOF MEMBRANEDRAINAGE MAT150mm GRANULAR "A" GRAVEL

PRE-FINISHED ALUMINUM FLASHINGWATERPROOFING MEMBRANEPROTECTION MAT50mm EXTRUDED POLYSTYRENE INSULATIONCONTINUOUS 6 mil. POLYETHYLENE VAPOUR BARRIER16mm EXTERIOR PLYWOOD SHEATHING200mm POURED CONCRETE SHEAR WALL16mm EXTERIOR PLYWOOD SHEATHING8mm WATERPROOF MEMBRANEW/ VERTICAL C-CHANNELS @ 300mm O.C.25mm AIRSPACE90mm GREEN WALL PANEL

W4 - TYPICAL STAIR WALL

90mm GREEN WALL PANEL25mm AIRSPACE

8mm WATERPROOF MEMBRANEW/ VERTICAL C-CHANNELS @ 300mm O.C.

8mm WATERPROOF MEMBRANE19mm EXTERIOR PLYWOOD SHEATHING

200mm POURED CONCRETE/W PARGING ON INTERIOR SURFACE

300mm C-CHANNEL

300

NETTED WIRE MESH

UP

DN

3X

3Y

3X

3Y

YX

YX

10

20

40

11

00

300

1100

20

0

3060

10

20

1100

25

00

5000

300

W1 - TYPICAL EXISTING BRICK UPGRADE

EXISTING 100mm BRICK TO REMAINEXISTING 25mm AIRSPACE TO REMAINEXISTING 2-100mm CLAY BLOCK TO

REMAIN/W PARGING ON INTERIOR SURFACE102mm STEEL STUDS @ 400mm O.C.C/W R12 BATT INSULATIONCONTINUOUS 6mil. POLYETHYLENE

VAPOUR BARRIER16mm TYPE X GYPSUM WALL BOARD

W1

44

3

865

965

SHEET No.:

SCALE:

DATE:

CHECKED BY:

DRAWN BY:

DRAWING NAME:

PROJECT ADDRESS:

ISSUES / REVISIONS

No. DATE DESCRIPTION BY

Sheridan

TEAM 12:

MICHAEL FIK

GAETANO SCHEMBRI

BRIANNE WALLACE

THESE DRAWINGS MUST NOT BE SCALED. THE

CONTRACTOR SHALL CHECK ALL DIMENSIONS

AGAINST ALL OTHER CONSULTANTS AND

MANUFACTURERS DRAWINGS AND MUST REPORT

ANY DISCREPANCIES TO THE CONSULTANT

BEFORE PROCEEDING WITH THE WORK.

A

B

A - DRAWING NUMBER

B - SHEET NUMBER WHERE CALLED

PROJECT NAME:

ADAPTIVE REUSE:LAKEVIEW CULTURAL CENTRE FOR THE ARTS

1352 LAKESHORE RD. EASTMISSISSAUGA, ONTARIOCANADA

STAIR SECTION

STAIR PLAN

GAETANO SCHEMBRI

KEN SNELL

AUGUST - 19 - 2011

1:120

A-5.1STAIR SECTION1

A-5.1 1:2O

EAST FIRST FLOOR STAIR PLAN2

A-5.1 1:2O

EAST SECOND FLOOR STAIR PLAN3

A-5.1 1:2O

Page 5: ADAPTIVE REUSE: LAKEVIEW CULTURAL CENTRE FOR THE ARTStrantor.sheridanc.on.ca/student/schembrg/portfolio... · mississauga, ontario canada site plan gaetano schembri ken snell august

30

0

450

100

300

20

0 225

7800

50

00

32

49

1700

1451 200 1451

200

1451

200

1451

200

295 856 856 295

STAGE LIGHTINGFROM SIDE

STAGE LIGHTINGFROM SIDE

STAGE SPEAKERSFROM TOP

STAGE LIGHTINGFROM TOP

STAGE SPEAKERSFROM SIDE

STAGE SPEAKERSFROM SIDE

0000TOP OF OUTSIDE EXTERIOR

1200T/O OF STAGE

4450T/O REAR OVER WALL

LEVEL 1

7697T/O STEEL COLUMN

8294U/S OF OWSJ

LEVEL 1

10868T/O METAL ROOF

-1200TOP OF FNDT. FOOTING

12.5mm X 200mmANCHOR BOLTS

EXPANSION JOIN

OUTDOORPATIO STAGE

5000T/O FRONT COVER WALL

SQUARE PLASTIC SHEATHING MATS1000mmX1OOOmm

CONCRETE SCREWS W/T PRE FINISHED CAPS

SPEAKER CHAINS

77

5

775mm CRAWL SPACE INTENDED TO RUNELECTRICAL WIRES AND VENTING

LARGE EAVESTROUGH SLOPED TO REAR ANDCOLLECTED TO DOWNSPOUT

METAL L-ANGLE

W-310 X 39 METAL BEAM

CURVED METAL ROOF SHEATHING

1000mm CURVED OWSJ

12

5

OUTDOOR PATIO SECTION1

A-4.2 1:2OSHEET No.:

SCALE:

DATE:

CHECKED BY:

DRAWN BY:

DRAWING NAME:

PROJECT ADDRESS:

ISSUES / REVISIONS

No. DATE DESCRIPTION BY

Sheridan

TEAM 12:

MICHAEL FIK

GAETANO SCHEMBRI

BRIANNE WALLACE

THESE DRAWINGS MUST NOT BE SCALED. THE

CONTRACTOR SHALL CHECK ALL DIMENSIONS

AGAINST ALL OTHER CONSULTANTS AND

MANUFACTURERS DRAWINGS AND MUST REPORT

ANY DISCREPANCIES TO THE CONSULTANT

BEFORE PROCEEDING WITH THE WORK.

A

B

A - DRAWING NUMBER

B - SHEET NUMBER WHERE CALLED

PROJECT NAME:

ADAPTIVE REUSE:LAKEVIEW CULTURAL CENTRE FOR THE ARTS

1352 LAKESHORE RD. EASTMISSISSAUGA, ONTARIOCANADA

OUTDOOR PATIOSECTION

GAETANO SCHEMBRI

KEN SNELL

AUGUST - 19 - 2011

1:20

A-4.2

Page 6: ADAPTIVE REUSE: LAKEVIEW CULTURAL CENTRE FOR THE ARTStrantor.sheridanc.on.ca/student/schembrg/portfolio... · mississauga, ontario canada site plan gaetano schembri ken snell august

SER

VIC

E C

OUNTE

R

DUMB-WAITER

DISH-WASHINGSTATION

STORAGE

UP

WALK-INFRIDGE

WALK-INFREEZER

UP

0000

09003

98

01

60

0

1:10 SLOPED RAMP

2510 1600

2510

WALL DOOR

CONTINUOUS RAILING300mm BEYOND RAMP

1:10 SLOPED RAMP

1:10 SLOPED RAMP

HALL BUTTON

LADDER AND LIGHT SWITCHIN PIT

0251

0641

1600

16

00

13

65

13

65

1365

40

40

40

40

57

63

20

31

94

CONTINUOUS RAILING

CAB DOOR

COMPUTER OPERATING PANEL

PLUNGER

CAR RAILS INSERTS

15

04

22

37

12

88

17

27

1869

ELEVATOR

WALK-INFRIDGE

WALK-INFREEZER

ISLAND SEATING

SHEET No.:

SCALE:

DATE:

CHECKED BY:

DRAWN BY:

DRAWING NAME:

PROJECT ADDRESS:

ISSUES / REVISIONS

No. DATE DESCRIPTION BY

Sheridan

TEAM 12:

MICHAEL FIK

GAETANO SCHEMBRI

BRIANNE WALLACE

THESE DRAWINGS MUST NOT BE SCALED. THE

CONTRACTOR SHALL CHECK ALL DIMENSIONS

AGAINST ALL OTHER CONSULTANTS AND

MANUFACTURERS DRAWINGS AND MUST REPORT

ANY DISCREPANCIES TO THE CONSULTANT

BEFORE PROCEEDING WITH THE WORK.

A

B

A - DRAWING NUMBER

B - SHEET NUMBER WHERE CALLED

PROJECT NAME:

ADAPTIVE REUSE:LAKEVIEW CULTURAL CENTRE FOR THE ARTS

1352 LAKESHORE RD. EASTMISSISSAUGA, ONTARIOCANADA

ELEVATOR AND RAMP DETAIL

GAETANO SCHEMBRI

KEN SNELL

AUGUST - 19 - 2011

1:120

A-N/A

ELEVATOR AND RAMP DETAIL1

A0X 1:2O

Page 7: ADAPTIVE REUSE: LAKEVIEW CULTURAL CENTRE FOR THE ARTStrantor.sheridanc.on.ca/student/schembrg/portfolio... · mississauga, ontario canada site plan gaetano schembri ken snell august

OPEN TO ABOVE

UP

KITCHEN

FOOD PREPARATION STATION

SER

VIC

E C

OUNTE

R

21 RISERS @ 180mm

76 OCCUPANTS

DISH-WASHINGSTATION

STORAGE

CAFE TERRA FUNK

ADMINISTRATOR'SOFFICE

CO

RRID

OR

WALK-INFRIDGE

WALK-INFREEZER

KITCHEN ISLAND

KITCHEN

OUTD

OO

R PA

TIO

BOOTH SEATINGSEATS 6-8 PEOPLE

12 TABLESSEATS 54 PEOPLE

BOOTH SEATINGSEATS 6-8 PEOPLE

BOOTH SEATINGSEATS 6-8 PEOPLE

ISLAND SEATING

SHEET No.:

SCALE:

DATE:

CHECKED BY:

DRAWN BY:

DRAWING NAME:

PROJECT ADDRESS:

ISSUES / REVISIONS

No. DATE DESCRIPTION BY

Sheridan

TEAM 12:

MICHAEL FIK

GAETANO SCHEMBRI

BRIANNE WALLACE

THESE DRAWINGS MUST NOT BE SCALED. THE

CONTRACTOR SHALL CHECK ALL DIMENSIONS

AGAINST ALL OTHER CONSULTANTS AND

MANUFACTURERS DRAWINGS AND MUST REPORT

ANY DISCREPANCIES TO THE CONSULTANT

BEFORE PROCEEDING WITH THE WORK.

A

B

A - DRAWING NUMBER

B - SHEET NUMBER WHERE CALLED

PROJECT NAME:

ADAPTIVE REUSE:LAKEVIEW CULTURAL CENTRE FOR THE ARTS

1352 LAKESHORE RD. EASTMISSISSAUGA, ONTARIOCANADA

CAFE PLAN

GAETANO SCHEMBRI

KEN SNELL

AUGUST - 19 - 2011

1:30

A-6.1ENLARGED CAFE PLANS1

A-6.1 1:30