![Page 1: Adaptation of old polycondensation plants to produce high ...suschem.org/files/library/SII_1-SusChemBrokerage2018...franco.cavadini@synesis-consortium.eu Title Presentazione standard](https://reader033.fdocuments.in/reader033/viewer/2022052016/602f5d73af3dd4130239fb62/html5/thumbnails/1.jpg)
Adaptation of old polycondensation plants to produce high-quality plastics from post-consumer waste
streamsFranco A. Cavadini, CTO
![Page 2: Adaptation of old polycondensation plants to produce high ...suschem.org/files/library/SII_1-SusChemBrokerage2018...franco.cavadini@synesis-consortium.eu Title Presentazione standard](https://reader033.fdocuments.in/reader033/viewer/2022052016/602f5d73af3dd4130239fb62/html5/thumbnails/2.jpg)
Wh
o w
e a
re
2011
• gr3n idea tested in
LAB
• Batch process
• Patent
2012-14
• Microwave reactor
• Continuous process
• Patent extension
2015-18
• Testing full scale line
• Horizon 2020 project
• 2M€ granted
2017-20
• Testing full scale plant
• Horizon 2020 project
• 10M€ project (8M€granted)
LAB PRE-PILOT REACTOR PILOT PLANT INDUSTRIAL PLANT
Swiss Incubator 2nd Italian place European finalist
Enrolled in KTI program Awarded KTI label
Horizon 2020 project
Horizon 2020 project
![Page 3: Adaptation of old polycondensation plants to produce high ...suschem.org/files/library/SII_1-SusChemBrokerage2018...franco.cavadini@synesis-consortium.eu Title Presentazione standard](https://reader033.fdocuments.in/reader033/viewer/2022052016/602f5d73af3dd4130239fb62/html5/thumbnails/3.jpg)
Ou
r st
rate
gic
ob
ject
ive
Virgin PET production
Polyester fibers
PET packagin
g
72Mt
48Mt
24Mt
Avg life = 5yrsσ = 1.5yrs
Avg life = 0.5yrsσ = 0.1yrs
Textile waste
Packaging waste
33Mt
23Mt
Recycled textile
Recycled packaging
<0.1Mt
~9Mt(1)
Text…
Packagin…+6Mt
+3Mt
53Mt(2)
37Mt
16Mt
(1) 1.8Mt loss in the recyclingprocess(2) Including secondary production
Landfill and dispersed
Incinerated
![Page 4: Adaptation of old polycondensation plants to produce high ...suschem.org/files/library/SII_1-SusChemBrokerage2018...franco.cavadini@synesis-consortium.eu Title Presentazione standard](https://reader033.fdocuments.in/reader033/viewer/2022052016/602f5d73af3dd4130239fb62/html5/thumbnails/4.jpg)
Ou
r st
rate
gic
ob
ject
ive
Petrochemicalco
PET produce
r
PTAMEG
Polyester fiber
PET Resin
Food & Beverage or PET user
Apparel
Consumer
Municipalities
Packaging
Garment
Waste
Mechanical recycler
Equipment producer
PET bottles
Equipment
Plant
EPC
![Page 5: Adaptation of old polycondensation plants to produce high ...suschem.org/files/library/SII_1-SusChemBrokerage2018...franco.cavadini@synesis-consortium.eu Title Presentazione standard](https://reader033.fdocuments.in/reader033/viewer/2022052016/602f5d73af3dd4130239fb62/html5/thumbnails/5.jpg)
Ou
r st
rate
gic
ob
ject
ive
Petrochemicalco
PET produce
r
Food & Beverage or PET user
Apparel
Consumer
MunicipalitiesMechanical
recycler
Equipment producer
EPC
TextileDifficult to
Recycle PET Packaging
PET monomers
CE-SPIRE05-2019Project “Re-START”
![Page 6: Adaptation of old polycondensation plants to produce high ...suschem.org/files/library/SII_1-SusChemBrokerage2018...franco.cavadini@synesis-consortium.eu Title Presentazione standard](https://reader033.fdocuments.in/reader033/viewer/2022052016/602f5d73af3dd4130239fb62/html5/thumbnails/6.jpg)
Pla
n o
f A
ctio
n
Reactive Unit Industrial prototype for multiple types of de-polymerization
Engineering adaptation of the polycondensation
process
Deployment of a full on-line
optimization platform
Monitoring, control and
LCA
Retrofittingof industrial
plants
TECHNICAL OBJECTIVE: build a SW/HW platform for the retrofitting of poly-condensation plants for PET, to allow them using post-consumer waste as main raw material. STRATEGIC OBJECTIVE: Create a network of smaller-scale European producer of fully circular PET by linking to the PET/polyester value chain.
Re-START’s SCOPETesting, optimization and
demonstration with highly varied input waste materials
PROJECT TASKS
• Target call: CE-SPIRE-05-2019• Deadline for submission: 21 February 2019 17:00:00• Looking for partners:
• PET producers;• Polycondensation engineering experts;
![Page 7: Adaptation of old polycondensation plants to produce high ...suschem.org/files/library/SII_1-SusChemBrokerage2018...franco.cavadini@synesis-consortium.eu Title Presentazione standard](https://reader033.fdocuments.in/reader033/viewer/2022052016/602f5d73af3dd4130239fb62/html5/thumbnails/7.jpg)
7
Qu
est
ion
s
Questions
Thank you for your attention
Any question?
Franco A. Cavadini, [email protected]