Adam Lans

11
ADAM LANS Resume and Work Samples

description

Resume and Samples

Transcript of Adam Lans

  • ADAM LANSResume and Work Samples

  • CARNEGIE MELLON UNIVERSITY Bachelor of Architecture, Honors 2009-2014

    AALTO UNIVERSITY WOOD STUDIES Studied in Espoo, Finland for a semester. Wood coursework Winter-Spring 2013. Studied wood product properties and performance, wood industrial design, wood manufacturing, wood architecture construction, and plywood manufacturing.

    FORTY EIGHTY ARCHITECTURE Intern Summer of 2012. Finished construction documents, RCPs, and plans for Bobs sub shop. 3d and physically crafted wood Pittsburgh Uptown site model. Helped design signage for Pittsburgh VA hospital.

    BIOLOGIC DESIGN GROUP Intern Summer 2013Helped prototype phase change material units for environmental center.

    CARNEGIE MELLON ARCHITECTURE WOOD SHOP Monitor year round 2010 to 2014. Responsible for shop safety and maintainance.

    CARNEGIE MELLON MATERIALS AND ASSEMBLY COURSE Teaching Assistant. Guided a second year 11 student architecture studio in building a 1:1 plywood structure.

    NATIONAL WOODWORK Consulting. 3d modelling assistance with Summer home. Summer 2013

    MECHANICAL AND MATERIAL RESEARCH Experience experimenting with phenomena to inform architectural design. Experimented with concrete, silicone, air pressure, water flow tests, cable oscillation, and reverberation chambers.

    PSYCHOLOGY AND PSYCHOTHERAPY Independently study psychotherapy and psychology. Self-publishing a book designed to provide guided personal narrative and exercizes to those who experience unmanagable stress called Self Made Therapy. I also help run the low latent Inhibition organization www.lowlatentinhibition.org, a resource center for people who have Low Latent Inhibition.

    FABRICATION Competent with Wood craft, familiar with welding, and experience with machines. Have created machining jigs, furniture, structures, architectural models, small joinery projects, and worked with clients to build sign installations for a storefront.

    Skilled with tablesaw, bandsaw, Router, Drill press, Mill, Hollow Chisel Mortiser, Slot Mortiser, Lathe, Lumber Prep Machines, Sanding machines, power tools, hand and carving tools. Familiar with MIG, TIG, Arc, and Oxy Accetylene Welding, the english wheel, and most metal shop cutting and bending machines.

    SOFTWARE AND ELECTRONICS Rhino, Audocad, Sketch-up, Illustrator, Photoshop, InDesign, Vray, some Grasshopper.

    Experience with designing and using Arduino/Microcontrollers.

    CARNEGIE MELLON UNIVERSITY Awards

    School of Architecture Design Commendation. For excellence in Design. Fall 2010, Spring 2012

    School of Architecture Design Awards Commendation. For excellence in Design. Spring 2013

    Graduated with School of Architecture Honors.

    NEW ROCHELLE HIGH SCHOOL Awards

    Architecture Award. Awarded to the student who best exemplifies skills in architecture. 2009

    Performance and Visual art Education Award. Awarded to the student who best exemplifies skills in visual art. 2009

    Architecture Technology Club. Founder and President 2008

    Captains Award. Awarded to the hockey player who exhibits on and off ice qualities of determination, teamwork, and leadership. 2006

    EDUCATION

    WORK EXPERIENCE

    INDEPENDENT EXPERIENCE

    SKILLS

    RECOGNITION

    ADAM LANS914 960 3554

    [email protected] 14th Ave. WestSeattle, WA 98119

    OBJECTIVE I am seeking an employment opportunity that will make use of my craft skills, and will allow me to develop my construction experience. In addition to my Architectectural focus on sustainability, I am interested in industrial design, design build, and fabrication.

  • BUILT

    CHAIR

    CLASSROOM DESKS AND STRUCTURE

    SPECULTATIVE

    VISITOR CENTER

    SCHOOL OF URBAN AGRICULTURE

    TABLE OF CONTENTS

  • Made From Ash, with a hint of walnut for upright sitting. The process of designing this chair depended on the geometry of a 9 layer bent lamination with a 45 degree fillet. After bandsawing the lamination

    using a jig, the edges were spoke shaved until smooth. The mortise and tenon legs were notched around this arch, and the rest of the chair follows this element. The back and seats each have a slit which excentuate the grain running along the spine of the chair.

    CHAIR

    Made in 2014

    CLASSROOM DESIGN BUILDMade in 2012 with Matt Ho, Angela Mitchell, Kim Schuessler, Ting Wang

    STRUCTUREMade in 2011 with Phillip Denny, Emerson Stoldt, Sandra Kalanyan, Kim Schuessler, Matt Ho, Anna Beiberdorf, Emily Puhnaty, Monica Tong, and Angela Mitchell

  • Made From Ash, with a hint of walnut for upright sitting. The process of designing this chair depended on the geometry of a 9 layer bent lamination with a 45 degree fillet. After bandsawing the lamination

    using a jig, the edges were spoke shaved until smooth. The mortise and tenon legs were notched around this arch, and the rest of the chair follows this element. The back and seats each have a slit which excentuate the grain running along the spine of the chair.

    CHAIR

    Made in 2014

    CLASSROOM DESIGN BUILDMade in 2012 with Matt Ho, Angela Mitchell, Kim Schuessler, Ting Wang

    STRUCTUREMade in 2011 with Phillip Denny, Emerson Stoldt, Sandra Kalanyan, Kim Schuessler, Matt Ho, Anna Beiberdorf, Emily Puhnaty, Monica Tong, and Angela Mitchell

  • Made From Ash, with a hint of walnut for upright sitting. The process of designing this chair depended on the geometry of a 9 layer bent lamination with a 45 degree fillet. After bandsawing the lamination

    using a jig, the edges were spoke shaved until smooth. The mortise and tenon legs were notched around this arch, and the rest of the chair follows this element. The back and seats each have a slit which excentuate the grain running along the spine of the chair.

    CHAIR

    Made in 2014

    CLASSROOM DESIGN BUILDMade in 2012 with Matt Ho, Angela Mitchell, Kim Schuessler, Ting Wang

    STRUCTUREMade in 2011 with Phillip Denny, Emerson Stoldt, Sandra Kalanyan, Kim Schuessler, Matt Ho, Anna Beiberdorf, Emily Puhnaty, Monica Tong, and Angela Mitchell

  • Made From Ash, with a hint of walnut for upright sitting. The process of designing this chair depended on the geometry of a 9 layer bent lamination with a 45 degree fillet. After bandsawing the lamination

    using a jig, the edges were spoke shaved until smooth. The mortise and tenon legs were notched around this arch, and the rest of the chair follows this element. The back and seats each have a slit which excentuate the grain running along the spine of the chair.

    CHAIR

    Made in 2014

    CLASSROOM DESIGN BUILDMade in 2012 with Matt Ho, Angela Mitchell, Kim Schuessler, Ting Wang

    STRUCTUREMade in 2011 with Phillip Denny, Emerson Stoldt, Sandra Kalanyan, Kim Schuessler, Matt Ho, Anna Beiberdorf, Emily Puhnaty, Monica Tong, and Angela Mitchell

  • Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Bus Parking

    Boat gets full veiw of Church, and enters Visitor

    Winter/Alternitive entry

    Exit to Church

    Boat Take-off

    N

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Flashing with Holes

    6 mm Glass, Mesh, Resin

    .08 mm Veneer 4 mm Resin, Mesh, Glass

    40 mm Kerto x2

    Walnut Dovetail

    Flashing

    3 cm x 3 cm mullion

    Insulation

    9 mm Plywood

    Epic Metal Roofing

    Spruce

    12 mm Plywood

    Cherry

    Extended Mesh to filter roof water

    Walnut Dovetail

    ELEVATION

    SECTION aa

    SECTIONbb

    SECTION cc

    SECTION dd

    SECTION ee

    GROUND FLOORPLAN UPPER FLOORPLAN

    SITE PLAN

    Roof

    Kerto

    Siding

    Post and Mullion

    Walls

    Floors

    Plinth

    Door Frame

    Assembled

    NORTH ELEVATION

    SOUTH ELEVATIONWEST ELEVATION

    EAST ELEVATION

    ROOF TO FACADE DETAIL

    Petajavesi Church Visitor Center by the lake

    Adam Lans

    ASSEMBLY

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Bus Parking

    Boat gets full veiw of Church, and enters Visitor

    Winter/Alternitive entry

    Exit to Church

    Boat Take-off

    N

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Flashing with Holes

    6 mm Glass, Mesh, Resin

    .08 mm Veneer 4 mm Resin, Mesh, Glass

    40 mm Kerto x2

    Walnut Dovetail

    Flashing

    3 cm x 3 cm mullion

    Insulation

    9 mm Plywood

    Epic Metal Roofing

    Spruce

    12 mm Plywood

    Cherry

    Extended Mesh to filter roof water

    Walnut Dovetail

    ELEVATION

    SECTION aa

    SECTIONbb

    SECTION cc

    SECTION dd

    SECTION ee

    GROUND FLOORPLAN UPPER FLOORPLAN

    SITE PLAN

    Roof

    Kerto

    Siding

    Post and Mullion

    Walls

    Floors

    Plinth

    Door Frame

    Assembled

    NORTH ELEVATION

    SOUTH ELEVATIONWEST ELEVATION

    EAST ELEVATION

    ROOF TO FACADE DETAIL

    Petajavesi Church Visitor Center by the lake

    Adam Lans

    ASSEMBLY

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Bus Parking

    Boat gets full veiw of Church, and enters Visitor

    Winter/Alternitive entry

    Exit to Church

    Boat Take-off

    N

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Flashing with Holes

    6 mm Glass, Mesh, Resin

    .08 mm Veneer 4 mm Resin, Mesh, Glass

    40 mm Kerto x2

    Walnut Dovetail

    Flashing

    3 cm x 3 cm mullion

    Insulation

    9 mm Plywood

    Epic Metal Roofing

    Spruce

    12 mm Plywood

    Cherry

    Extended Mesh to filter roof water

    Walnut Dovetail

    ELEVATION

    SECTION aa

    SECTIONbb

    SECTION cc

    SECTION dd

    SECTION ee

    GROUND FLOORPLAN UPPER FLOORPLAN

    SITE PLAN

    Roof

    Kerto

    Siding

    Post and Mullion

    Walls

    Floors

    Plinth

    Door Frame

    Assembled

    NORTH ELEVATION

    SOUTH ELEVATIONWEST ELEVATION

    EAST ELEVATION

    ROOF TO FACADE DETAIL

    Petajavesi Church Visitor Center by the lake

    Adam Lans

    ASSEMBLY

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Bus Parking

    Boat gets full veiw of Church, and enters Visitor

    Winter/Alternitive entry

    Exit to Church

    Boat Take-off

    N

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Flashing with Holes

    6 mm Glass, Mesh, Resin

    .08 mm Veneer 4 mm Resin, Mesh, Glass

    40 mm Kerto x2

    Walnut Dovetail

    Flashing

    3 cm x 3 cm mullion

    Insulation

    9 mm Plywood

    Epic Metal Roofing

    Spruce

    12 mm Plywood

    Cherry

    Extended Mesh to filter roof water

    Walnut Dovetail

    ELEVATION

    SECTION aa

    SECTIONbb

    SECTION cc

    SECTION dd

    SECTION ee

    GROUND FLOORPLAN UPPER FLOORPLAN

    SITE PLAN

    Roof

    Kerto

    Siding

    Post and Mullion

    Walls

    Floors

    Plinth

    Door Frame

    Assembled

    NORTH ELEVATION

    SOUTH ELEVATIONWEST ELEVATION

    EAST ELEVATION

    ROOF TO FACADE DETAIL

    Petajavesi Church Visitor Center by the lake

    Adam Lans

    ASSEMBLY

    The Old Church of Petjvesi is situated right off of a freeway, which creates a parking problem for visitors. Rather than attempt to excavate the existing landscape for parking lot space, a boat house is created to serve as the visitor center. A parking lot can then be located accoss the lake from the church. After parking, visitors are boated across the lake and enjoy panoramic views of the church in context as they approach the church.

    2012-2013 at Aalto University in Espoo, Finland.Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Bus Parking

    Boat gets full veiw of Church, and enters Visitor

    Winter/Alternitive entry

    Exit to Church

    Boat Take-off

    N

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Flashing with Holes

    6 mm Glass, Mesh, Resin

    .08 mm Veneer 4 mm Resin, Mesh, Glass

    40 mm Kerto x2

    Walnut Dovetail

    Flashing

    3 cm x 3 cm mullion

    Insulation

    9 mm Plywood

    Epic Metal Roofing

    Spruce

    12 mm Plywood

    Cherry

    Extended Mesh to filter roof water

    Walnut Dovetail

    ELEVATION

    SECTION aa

    SECTIONbb

    SECTION cc

    SECTION dd

    SECTION ee

    GROUND FLOORPLAN UPPER FLOORPLAN

    SITE PLAN

    Roof

    Kerto

    Siding

    Post and Mullion

    Walls

    Floors

    Plinth

    Door Frame

    Assembled

    NORTH ELEVATION

    SOUTH ELEVATIONWEST ELEVATION

    EAST ELEVATION

    ROOF TO FACADE DETAIL

    Petajavesi Church Visitor Center by the lake

    Adam Lans

    ASSEMBLY

    SITE PLAN

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Bus Parking

    Boat gets full veiw of Church, and enters Visitor

    Winter/Alternitive entry

    Exit to Church

    Boat Take-off

    N

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Flashing with Holes

    6 mm Glass, Mesh, Resin

    .08 mm Veneer 4 mm Resin, Mesh, Glass

    40 mm Kerto x2

    Walnut Dovetail

    Flashing

    3 cm x 3 cm mullion

    Insulation

    9 mm Plywood

    Epic Metal Roofing

    Spruce

    12 mm Plywood

    Cherry

    Extended Mesh to filter roof water

    Walnut Dovetail

    ELEVATION

    SECTION aa

    SECTIONbb

    SECTION cc

    SECTION dd

    SECTION ee

    GROUND FLOORPLAN UPPER FLOORPLAN

    SITE PLAN

    Roof

    Kerto

    Siding

    Post and Mullion

    Walls

    Floors

    Plinth

    Door Frame

    Assembled

    NORTH ELEVATION

    SOUTH ELEVATIONWEST ELEVATION

    EAST ELEVATION

    ROOF TO FACADE DETAIL

    Petajavesi Church Visitor Center by the lake

    Adam Lans

    ASSEMBLY

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Bus Parking

    Boat gets full veiw of Church, and enters Visitor

    Winter/Alternitive entry

    Exit to Church

    Boat Take-off

    N

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Flashing with Holes

    6 mm Glass, Mesh, Resin

    .08 mm Veneer 4 mm Resin, Mesh, Glass

    40 mm Kerto x2

    Walnut Dovetail

    Flashing

    3 cm x 3 cm mullion

    Insulation

    9 mm Plywood

    Epic Metal Roofing

    Spruce

    12 mm Plywood

    Cherry

    Extended Mesh to filter roof water

    Walnut Dovetail

    ELEVATION

    SECTION aa

    SECTIONbb

    SECTION cc

    SECTION dd

    SECTION ee

    GROUND FLOORPLAN UPPER FLOORPLAN

    SITE PLAN

    Roof

    Kerto

    Siding

    Post and Mullion

    Walls

    Floors

    Plinth

    Door Frame

    Assembled

    NORTH ELEVATION

    SOUTH ELEVATIONWEST ELEVATION

    EAST ELEVATION

    ROOF TO FACADE DETAIL

    Petajavesi Church Visitor Center by the lake

    Adam Lans

    ASSEMBLY

    SITE ELEVATION

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Bus Parking

    Boat gets full veiw of Church, and enters Visitor

    Winter/Alternitive entry

    Exit to Church

    Boat Take-off

    N

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Flashing with Holes

    6 mm Glass, Mesh, Resin

    .08 mm Veneer 4 mm Resin, Mesh, Glass

    40 mm Kerto x2

    Walnut Dovetail

    Flashing

    3 cm x 3 cm mullion

    Insulation

    9 mm Plywood

    Epic Metal Roofing

    Spruce

    12 mm Plywood

    Cherry

    Extended Mesh to filter roof water

    Walnut Dovetail

    ELEVATION

    SECTION aa

    SECTIONbb

    SECTION cc

    SECTION dd

    SECTION ee

    GROUND FLOORPLAN UPPER FLOORPLAN

    SITE PLAN

    Roof

    Kerto

    Siding

    Post and Mullion

    Walls

    Floors

    Plinth

    Door Frame

    Assembled

    NORTH ELEVATION

    SOUTH ELEVATIONWEST ELEVATION

    EAST ELEVATION

    ROOF TO FACADE DETAIL

    Petajavesi Church Visitor Center by the lake

    Adam Lans

    ASSEMBLY

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Bus Parking

    Boat gets full veiw of Church, and enters Visitor

    Winter/Alternitive entry

    Exit to Church

    Boat Take-off

    N

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Flashing with Holes

    6 mm Glass, Mesh, Resin

    .08 mm Veneer 4 mm Resin, Mesh, Glass

    40 mm Kerto x2

    Walnut Dovetail

    Flashing

    3 cm x 3 cm mullion

    Insulation

    9 mm Plywood

    Epic Metal Roofing

    Spruce

    12 mm Plywood

    Cherry

    Extended Mesh to filter roof water

    Walnut Dovetail

    ELEVATION

    SECTION aa

    SECTIONbb

    SECTION cc

    SECTION dd

    SECTION ee

    GROUND FLOORPLAN UPPER FLOORPLAN

    SITE PLAN

    Roof

    Kerto

    Siding

    Post and Mullion

    Walls

    Floors

    Plinth

    Door Frame

    Assembled

    NORTH ELEVATION

    SOUTH ELEVATIONWEST ELEVATION

    EAST ELEVATION

    ROOF TO FACADE DETAIL

    Petajavesi Church Visitor Center by the lake

    Adam Lans

    ASSEMBLY

    A gap is created between the Southern facade and interior (Section AA) which lets in the water from the lake. The Facade is made of a glass, mesh, and wood veener laminate, which permits ambient light into the main space. The water channel also has ambient lighting so as to create caustic water effects in the interior space. This informs occupants when on-coming boats are arriving.

    3

    0 2 4 8 16 32 64Section Axon

    tion between the public and the school. The support

    core is concentrated in the rear, against the alley. The

    greenhouse pops up around the walkway so the public

    can look in and view the plants.

    The school is broken into four main zones. The

    public walkway, learning spaces, greenhouse, and

    support spaces. The walkway intersects the learning

    spaces like interlocking ngers to enhance the connec-

    tion between the public and the school. The support

    core is concentrated in the rear, against the alley. The

    greenhouse pops up around the walkway so the public

    can look in and view the plants.

    WorkShop

    ClassRoom

    Water DrainageEvaporation

    Reverberation from Train

    Public Walkway connecting Whole Foods to Farmers Market

    3

    0 2 4 8 16 32 64Section Axon

    tion between the public and the school. The support

    core is concentrated in the rear, against the alley. The

    greenhouse pops up around the walkway so the public

    can look in and view the plants.

    The school is broken into four main zones. The

    public walkway, learning spaces, greenhouse, and

    support spaces. The walkway intersects the learning

    spaces like interlocking ngers to enhance the connec-

    tion between the public and the school. The support

    core is concentrated in the rear, against the alley. The

    greenhouse pops up around the walkway so the public

    can look in and view the plants.

    8 9

    4

    Adam Lans3YEAR

    School for Urban AgricultureCarnegie Mellon School of Architecture

    48-305 Third-Year Studio, Spring 2012

    Instructor: Kelle Brooks

    Collaborator: Adam Lans

    Statement The school is located in East Liberty, between

    Whole Foods Market and the proposed Market Hall.

    The sites surroundings are highly unusual. The school

    faces an unkept alley on the southern portion of the

    site. This created a new public front for the school, and

    connected shoppers from Whole Foods to the new

    Market Hall. The walkway allows the public to appreci-

    ate the students work via public gardens and views

    into private workshops and garden spaces. This new

    elevated walkway and garden will breathe new life into

    this underdeveloped and under-utilized area.

    In addition to the public walkway, there is a

    public cafe on the corner of South Highland Ave. The

    public can get their food and take it up to the walkway

    level and enjoy the views out towards Shadyside or the

    East Liberty Church. The walkway level intersects the

    existing pedestrian bridge to connect to the East Bus-

    way.

    The cafeteria, classrooms, and greenhouse, and

    auditorium exist on the lower level. The greenhouse

    connects to large outdoor growing area for when the

    weather allows for outdoor growing.

    Alex F ischer3YEAR

    Up

    Up

    Dn

    Dn

    Up

    Up

    Up

    Up

    Dn

    Dn

    0 4 8 16 32 64 128Lower Floor

    MARKET HALL

    Penn C

    ir S

    Pen

    n Cir

    E

    Penn C

    ir S

    Penn Ave

    Broad St

    Penn Ave

    Antler Way She

    ridan

    Sq

    She

    ridan

    Ave

    Stevens

    on Pl

    Ellsworth

    Ave

    Ellsworth Ave

    E Busway

    E Buswa

    y

    E Buswa

    y

    Busw

    ay

    Busw

    ay

    Busway

    Shad

    y Ave

    Sha

    dy

    Ave

    Sw

    ope

    St

    Yard

    ley

    Way

    Em

    erso

    n St

    Cars

    on

    St

    S H

    ighland

    Ave

    S H

    ighland

    Ave

    S H

    ighland

    Ave

    S W

    hitfield

    St

    Baum Blvd

    Trade St

    S B

    eatty St

    S B

    eatty

    St

    Tamello

    Way

    Mignotte St

    Baum B

    lvd

    E Comm

    erce Wa

    y

    Gre

    enbinar W

    ay

    Lam

    ont

    Pl

    Lehigh

    Ave

    Spahr

    St

    0 25 50 100 200 400 800Site Plan

    Dn

    Dn

    Dn

    Dn

    Dn

    Dn

    Dn Up

    Dn

    Dn

    Dn

    Dn

    Dn

    Dn

    PUBLIC GARDEN

    OUTDOOR GARDEN WORKSHOP

    HYDROPONICS WORKSHOP

    LOBBY

    INDOOR GARDEN WORKSOP

    COOKING WORKSOP

    0 4 8 16 32 64 128Upper Floor

    School for Urban AgricultureCarnegie Mellon School of Architecture

    48-305 Third-Year Studio, Spring 2012

    Instructor: Kelle Brooks

    Collaborator: Adam Lans

    Statement Watering systems and appropriate planting are

    fundamental for the success of any urban garden. As

    such, the school treats these as essential elements in the

    spacial organization of the school. Water is collected,

    used, and recycled, all within view of the students and

    public users in the main wall of the school. Overall, the

    goal is to enhance the students and publics under-

    standing and engagement with agriculture in an urban

    context.

    Being a school, security is a prime concern. As

    such, there is one entrance into the school. The public

    can engage with the walkway, the cafe, the mezzanine

    level of the lecture hall, and a public garden where

    public workshops can be held.

    The school is broken into four main zones. The

    public walkway, learning spaces, greenhouse, and

    support spaces. The walkway intersects the learning

    spaces like interlocking fingers to enhance the connec-

    tion between the public and the school. The support

    core is concentrated in the rear, against the alley. The

    greenhouse pops up around the walkway so the public

    can look in and view the plants.

    Alex F ischer 3YEAR

    0 8 16 32 64 128Axon

    Frame:Planter INDOOR GARDEN WORKSOP

    LECTURE HALLCAFE KITCHEN

    WOMENS ROOM

    PUBLIC WALKWAY

    STUDENT LOUNGE

    CAFETERIA SERVICE CAFETERIA

    GREENHOUSE

    PUBLIC WALKWAY

    0 4 8 16 32 64 128Section through lecture

    0 4 8 16 32 64 128Section through greenhouse

    0 8 16 32 64 128Axon

    Mass:Water

    0 8 16 32 64 128Axon

    Spacial Systems:Circulation

    The Vocational High School for Urban agriculture is locat-ed in East Liberty, pittsburgh, between whole foods market and the proposed farmer's market hall. The school fac-es an unkempt alley on the southern portion of the site. This creates a new public front for the school, and con-nects shoppers from whole foods to the new farmer's market hall. The walkway al-lows the public to appreci-ate the student's work via public gardens and views into private workshops and garden spaces. This new el-evated walkway and garden will breathe new life into this underdeveloped and unde-rutilized area. In addition to the public walkway, there is a public cafe on the corner of south highland ave. The public can get their food and take it up to the walkway level and enjoy the views out towards shadyside or the east liberty church. The walkway level intersects the existing pedestrian bridge to connect to the east busway.

    SCHOOL FOR URBAN

    AGRICULTURE

    The School of Urban Agriculture creates a public walkway from Whole foods to the Farmers market, creating a new identity to an underdeveloped area. The school makes use of natural watering systems which are integrated into the buildings performance, and experience, both privately for the school, and publically for users who utilize the walkway.

    Collaborated in 2012 with partner Alex Fisher

    SCHOOL OF URBAN AGRICULTURE

  • Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Bus Parking

    Boat gets full veiw of Church, and enters Visitor

    Winter/Alternitive entry

    Exit to Church

    Boat Take-off

    N

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Flashing with Holes

    6 mm Glass, Mesh, Resin

    .08 mm Veneer 4 mm Resin, Mesh, Glass

    40 mm Kerto x2

    Walnut Dovetail

    Flashing

    3 cm x 3 cm mullion

    Insulation

    9 mm Plywood

    Epic Metal Roofing

    Spruce

    12 mm Plywood

    Cherry

    Extended Mesh to filter roof water

    Walnut Dovetail

    ELEVATION

    SECTION aa

    SECTIONbb

    SECTION cc

    SECTION dd

    SECTION ee

    GROUND FLOORPLAN UPPER FLOORPLAN

    SITE PLAN

    Roof

    Kerto

    Siding

    Post and Mullion

    Walls

    Floors

    Plinth

    Door Frame

    Assembled

    NORTH ELEVATION

    SOUTH ELEVATIONWEST ELEVATION

    EAST ELEVATION

    ROOF TO FACADE DETAIL

    Petajavesi Church Visitor Center by the lake

    Adam Lans

    ASSEMBLY

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Bus Parking

    Boat gets full veiw of Church, and enters Visitor

    Winter/Alternitive entry

    Exit to Church

    Boat Take-off

    N

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Flashing with Holes

    6 mm Glass, Mesh, Resin

    .08 mm Veneer 4 mm Resin, Mesh, Glass

    40 mm Kerto x2

    Walnut Dovetail

    Flashing

    3 cm x 3 cm mullion

    Insulation

    9 mm Plywood

    Epic Metal Roofing

    Spruce

    12 mm Plywood

    Cherry

    Extended Mesh to filter roof water

    Walnut Dovetail

    ELEVATION

    SECTION aa

    SECTIONbb

    SECTION cc

    SECTION dd

    SECTION ee

    GROUND FLOORPLAN UPPER FLOORPLAN

    SITE PLAN

    Roof

    Kerto

    Siding

    Post and Mullion

    Walls

    Floors

    Plinth

    Door Frame

    Assembled

    NORTH ELEVATION

    SOUTH ELEVATIONWEST ELEVATION

    EAST ELEVATION

    ROOF TO FACADE DETAIL

    Petajavesi Church Visitor Center by the lake

    Adam Lans

    ASSEMBLY

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Bus Parking

    Boat gets full veiw of Church, and enters Visitor

    Winter/Alternitive entry

    Exit to Church

    Boat Take-off

    N

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Flashing with Holes

    6 mm Glass, Mesh, Resin

    .08 mm Veneer 4 mm Resin, Mesh, Glass

    40 mm Kerto x2

    Walnut Dovetail

    Flashing

    3 cm x 3 cm mullion

    Insulation

    9 mm Plywood

    Epic Metal Roofing

    Spruce

    12 mm Plywood

    Cherry

    Extended Mesh to filter roof water

    Walnut Dovetail

    ELEVATION

    SECTION aa

    SECTIONbb

    SECTION cc

    SECTION dd

    SECTION ee

    GROUND FLOORPLAN UPPER FLOORPLAN

    SITE PLAN

    Roof

    Kerto

    Siding

    Post and Mullion

    Walls

    Floors

    Plinth

    Door Frame

    Assembled

    NORTH ELEVATION

    SOUTH ELEVATIONWEST ELEVATION

    EAST ELEVATION

    ROOF TO FACADE DETAIL

    Petajavesi Church Visitor Center by the lake

    Adam Lans

    ASSEMBLY

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Bus Parking

    Boat gets full veiw of Church, and enters Visitor

    Winter/Alternitive entry

    Exit to Church

    Boat Take-off

    N

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Flashing with Holes

    6 mm Glass, Mesh, Resin

    .08 mm Veneer 4 mm Resin, Mesh, Glass

    40 mm Kerto x2

    Walnut Dovetail

    Flashing

    3 cm x 3 cm mullion

    Insulation

    9 mm Plywood

    Epic Metal Roofing

    Spruce

    12 mm Plywood

    Cherry

    Extended Mesh to filter roof water

    Walnut Dovetail

    ELEVATION

    SECTION aa

    SECTIONbb

    SECTION cc

    SECTION dd

    SECTION ee

    GROUND FLOORPLAN UPPER FLOORPLAN

    SITE PLAN

    Roof

    Kerto

    Siding

    Post and Mullion

    Walls

    Floors

    Plinth

    Door Frame

    Assembled

    NORTH ELEVATION

    SOUTH ELEVATIONWEST ELEVATION

    EAST ELEVATION

    ROOF TO FACADE DETAIL

    Petajavesi Church Visitor Center by the lake

    Adam Lans

    ASSEMBLY

    The Old Church of Petjvesi is situated right off of a freeway, which creates a parking problem for visitors. Rather than attempt to excavate the existing landscape for parking lot space, a boat house is created to serve as the visitor center. A parking lot can then be located accoss the lake from the church. After parking, visitors are boated across the lake and enjoy panoramic views of the church in context as they approach the church.

    2012-2013 at Aalto University in Espoo, Finland.Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Bus Parking

    Boat gets full veiw of Church, and enters Visitor

    Winter/Alternitive entry

    Exit to Church

    Boat Take-off

    N

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Flashing with Holes

    6 mm Glass, Mesh, Resin

    .08 mm Veneer 4 mm Resin, Mesh, Glass

    40 mm Kerto x2

    Walnut Dovetail

    Flashing

    3 cm x 3 cm mullion

    Insulation

    9 mm Plywood

    Epic Metal Roofing

    Spruce

    12 mm Plywood

    Cherry

    Extended Mesh to filter roof water

    Walnut Dovetail

    ELEVATION

    SECTION aa

    SECTIONbb

    SECTION cc

    SECTION dd

    SECTION ee

    GROUND FLOORPLAN UPPER FLOORPLAN

    SITE PLAN

    Roof

    Kerto

    Siding

    Post and Mullion

    Walls

    Floors

    Plinth

    Door Frame

    Assembled

    NORTH ELEVATION

    SOUTH ELEVATIONWEST ELEVATION

    EAST ELEVATION

    ROOF TO FACADE DETAIL

    Petajavesi Church Visitor Center by the lake

    Adam Lans

    ASSEMBLY

    SITE PLAN

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Bus Parking

    Boat gets full veiw of Church, and enters Visitor

    Winter/Alternitive entry

    Exit to Church

    Boat Take-off

    N

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Flashing with Holes

    6 mm Glass, Mesh, Resin

    .08 mm Veneer 4 mm Resin, Mesh, Glass

    40 mm Kerto x2

    Walnut Dovetail

    Flashing

    3 cm x 3 cm mullion

    Insulation

    9 mm Plywood

    Epic Metal Roofing

    Spruce

    12 mm Plywood

    Cherry

    Extended Mesh to filter roof water

    Walnut Dovetail

    ELEVATION

    SECTION aa

    SECTIONbb

    SECTION cc

    SECTION dd

    SECTION ee

    GROUND FLOORPLAN UPPER FLOORPLAN

    SITE PLAN

    Roof

    Kerto

    Siding

    Post and Mullion

    Walls

    Floors

    Plinth

    Door Frame

    Assembled

    NORTH ELEVATION

    SOUTH ELEVATIONWEST ELEVATION

    EAST ELEVATION

    ROOF TO FACADE DETAIL

    Petajavesi Church Visitor Center by the lake

    Adam Lans

    ASSEMBLY

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Bus Parking

    Boat gets full veiw of Church, and enters Visitor

    Winter/Alternitive entry

    Exit to Church

    Boat Take-off

    N

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Flashing with Holes

    6 mm Glass, Mesh, Resin

    .08 mm Veneer 4 mm Resin, Mesh, Glass

    40 mm Kerto x2

    Walnut Dovetail

    Flashing

    3 cm x 3 cm mullion

    Insulation

    9 mm Plywood

    Epic Metal Roofing

    Spruce

    12 mm Plywood

    Cherry

    Extended Mesh to filter roof water

    Walnut Dovetail

    ELEVATION

    SECTION aa

    SECTIONbb

    SECTION cc

    SECTION dd

    SECTION ee

    GROUND FLOORPLAN UPPER FLOORPLAN

    SITE PLAN

    Roof

    Kerto

    Siding

    Post and Mullion

    Walls

    Floors

    Plinth

    Door Frame

    Assembled

    NORTH ELEVATION

    SOUTH ELEVATIONWEST ELEVATION

    EAST ELEVATION

    ROOF TO FACADE DETAIL

    Petajavesi Church Visitor Center by the lake

    Adam Lans

    ASSEMBLY

    SITE ELEVATION

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Bus Parking

    Boat gets full veiw of Church, and enters Visitor

    Winter/Alternitive entry

    Exit to Church

    Boat Take-off

    N

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Flashing with Holes

    6 mm Glass, Mesh, Resin

    .08 mm Veneer 4 mm Resin, Mesh, Glass

    40 mm Kerto x2

    Walnut Dovetail

    Flashing

    3 cm x 3 cm mullion

    Insulation

    9 mm Plywood

    Epic Metal Roofing

    Spruce

    12 mm Plywood

    Cherry

    Extended Mesh to filter roof water

    Walnut Dovetail

    ELEVATION

    SECTION aa

    SECTIONbb

    SECTION cc

    SECTION dd

    SECTION ee

    GROUND FLOORPLAN UPPER FLOORPLAN

    SITE PLAN

    Roof

    Kerto

    Siding

    Post and Mullion

    Walls

    Floors

    Plinth

    Door Frame

    Assembled

    NORTH ELEVATION

    SOUTH ELEVATIONWEST ELEVATION

    EAST ELEVATION

    ROOF TO FACADE DETAIL

    Petajavesi Church Visitor Center by the lake

    Adam Lans

    ASSEMBLY

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Bus Parking

    Boat gets full veiw of Church, and enters Visitor

    Winter/Alternitive entry

    Exit to Church

    Boat Take-off

    N

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Flashing with Holes

    6 mm Glass, Mesh, Resin

    .08 mm Veneer 4 mm Resin, Mesh, Glass

    40 mm Kerto x2

    Walnut Dovetail

    Flashing

    3 cm x 3 cm mullion

    Insulation

    9 mm Plywood

    Epic Metal Roofing

    Spruce

    12 mm Plywood

    Cherry

    Extended Mesh to filter roof water

    Walnut Dovetail

    ELEVATION

    SECTION aa

    SECTIONbb

    SECTION cc

    SECTION dd

    SECTION ee

    GROUND FLOORPLAN UPPER FLOORPLAN

    SITE PLAN

    Roof

    Kerto

    Siding

    Post and Mullion

    Walls

    Floors

    Plinth

    Door Frame

    Assembled

    NORTH ELEVATION

    SOUTH ELEVATIONWEST ELEVATION

    EAST ELEVATION

    ROOF TO FACADE DETAIL

    Petajavesi Church Visitor Center by the lake

    Adam Lans

    ASSEMBLY

    A gap is created between the Southern facade and interior (Section AA) which lets in the water from the lake. The Facade is made of a glass, mesh, and wood veener laminate, which permits ambient light into the main space. The water channel also has ambient lighting so as to create caustic water effects in the interior space. This informs occupants when on-coming boats are arriving.

    3

    0 2 4 8 16 32 64Section Axon

    tion between the public and the school. The support

    core is concentrated in the rear, against the alley. The

    greenhouse pops up around the walkway so the public

    can look in and view the plants.

    The school is broken into four main zones. The

    public walkway, learning spaces, greenhouse, and

    support spaces. The walkway intersects the learning

    spaces like interlocking ngers to enhance the connec-

    tion between the public and the school. The support

    core is concentrated in the rear, against the alley. The

    greenhouse pops up around the walkway so the public

    can look in and view the plants.

    WorkShop

    ClassRoom

    Water DrainageEvaporation

    Reverberation from Train

    Public Walkway connecting Whole Foods to Farmers Market

    3

    0 2 4 8 16 32 64Section Axon

    tion between the public and the school. The support

    core is concentrated in the rear, against the alley. The

    greenhouse pops up around the walkway so the public

    can look in and view the plants.

    The school is broken into four main zones. The

    public walkway, learning spaces, greenhouse, and

    support spaces. The walkway intersects the learning

    spaces like interlocking ngers to enhance the connec-

    tion between the public and the school. The support

    core is concentrated in the rear, against the alley. The

    greenhouse pops up around the walkway so the public

    can look in and view the plants.

    8 9

    4

    Adam Lans3YEAR

    School for Urban AgricultureCarnegie Mellon School of Architecture

    48-305 Third-Year Studio, Spring 2012

    Instructor: Kelle Brooks

    Collaborator: Adam Lans

    Statement The school is located in East Liberty, between

    Whole Foods Market and the proposed Market Hall.

    The sites surroundings are highly unusual. The school

    faces an unkept alley on the southern portion of the

    site. This created a new public front for the school, and

    connected shoppers from Whole Foods to the new

    Market Hall. The walkway allows the public to appreci-

    ate the students work via public gardens and views

    into private workshops and garden spaces. This new

    elevated walkway and garden will breathe new life into

    this underdeveloped and under-utilized area.

    In addition to the public walkway, there is a

    public cafe on the corner of South Highland Ave. The

    public can get their food and take it up to the walkway

    level and enjoy the views out towards Shadyside or the

    East Liberty Church. The walkway level intersects the

    existing pedestrian bridge to connect to the East Bus-

    way.

    The cafeteria, classrooms, and greenhouse, and

    auditorium exist on the lower level. The greenhouse

    connects to large outdoor growing area for when the

    weather allows for outdoor growing.

    Alex F ischer3YEAR

    Up

    Up

    Dn

    Dn

    Up

    Up

    Up

    Up

    Dn

    Dn

    0 4 8 16 32 64 128Lower Floor

    MARKET HALL

    Penn C

    ir S

    Pen

    n Cir

    E

    Penn C

    ir S

    Penn Ave

    Broad St

    Penn Ave

    Antler Way She

    ridan

    Sq

    She

    ridan

    Ave

    Stevens

    on Pl

    Ellsworth

    Ave

    Ellsworth Ave

    E Busway

    E Buswa

    y

    E Buswa

    y

    Busw

    ay

    Busw

    ay

    Busway

    Shad

    y Ave

    Sha

    dy

    Ave

    Sw

    ope

    St

    Yard

    ley

    Way

    Em

    erso

    n St

    Cars

    on

    St

    S H

    ighland

    Ave

    S H

    ighland

    Ave

    S H

    ighland

    Ave

    S W

    hitfield

    St

    Baum Blvd

    Trade St

    S B

    eatty St

    S B

    eatty

    St

    Tamello

    Way

    Mignotte St

    Baum B

    lvd

    E Comm

    erce Wa

    y

    Gre

    enbinar W

    ay

    Lam

    ont

    Pl

    Lehigh

    Ave

    Spahr

    St

    0 25 50 100 200 400 800Site Plan

    Dn

    Dn

    Dn

    Dn

    Dn

    Dn

    Dn Up

    Dn

    Dn

    Dn

    Dn

    Dn

    Dn

    PUBLIC GARDEN

    OUTDOOR GARDEN WORKSHOP

    HYDROPONICS WORKSHOP

    LOBBY

    INDOOR GARDEN WORKSOP

    COOKING WORKSOP

    0 4 8 16 32 64 128Upper Floor

    School for Urban AgricultureCarnegie Mellon School of Architecture

    48-305 Third-Year Studio, Spring 2012

    Instructor: Kelle Brooks

    Collaborator: Adam Lans

    Statement Watering systems and appropriate planting are

    fundamental for the success of any urban garden. As

    such, the school treats these as essential elements in the

    spacial organization of the school. Water is collected,

    used, and recycled, all within view of the students and

    public users in the main wall of the school. Overall, the

    goal is to enhance the students and publics under-

    standing and engagement with agriculture in an urban

    context.

    Being a school, security is a prime concern. As

    such, there is one entrance into the school. The public

    can engage with the walkway, the cafe, the mezzanine

    level of the lecture hall, and a public garden where

    public workshops can be held.

    The school is broken into four main zones. The

    public walkway, learning spaces, greenhouse, and

    support spaces. The walkway intersects the learning

    spaces like interlocking fingers to enhance the connec-

    tion between the public and the school. The support

    core is concentrated in the rear, against the alley. The

    greenhouse pops up around the walkway so the public

    can look in and view the plants.

    Alex F ischer 3YEAR

    0 8 16 32 64 128Axon

    Frame:Planter INDOOR GARDEN WORKSOP

    LECTURE HALLCAFE KITCHEN

    WOMENS ROOM

    PUBLIC WALKWAY

    STUDENT LOUNGE

    CAFETERIA SERVICE CAFETERIA

    GREENHOUSE

    PUBLIC WALKWAY

    0 4 8 16 32 64 128Section through lecture

    0 4 8 16 32 64 128Section through greenhouse

    0 8 16 32 64 128Axon

    Mass:Water

    0 8 16 32 64 128Axon

    Spacial Systems:Circulation

    The Vocational High School for Urban agriculture is locat-ed in East Liberty, pittsburgh, between whole foods market and the proposed farmer's market hall. The school fac-es an unkempt alley on the southern portion of the site. This creates a new public front for the school, and con-nects shoppers from whole foods to the new farmer's market hall. The walkway al-lows the public to appreci-ate the student's work via public gardens and views into private workshops and garden spaces. This new el-evated walkway and garden will breathe new life into this underdeveloped and unde-rutilized area. In addition to the public walkway, there is a public cafe on the corner of south highland ave. The public can get their food and take it up to the walkway level and enjoy the views out towards shadyside or the east liberty church. The walkway level intersects the existing pedestrian bridge to connect to the east busway.

    SCHOOL FOR URBAN

    AGRICULTURE

    The School of Urban Agriculture creates a public walkway from Whole foods to the Farmers market, creating a new identity to an underdeveloped area. The school makes use of natural watering systems which are integrated into the buildings performance, and experience, both privately for the school, and publically for users who utilize the walkway.

    Collaborated in 2012 with partner Alex Fisher

    SCHOOL OF URBAN AGRICULTURE

  • Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Bus Parking

    Boat gets full veiw of Church, and enters Visitor

    Winter/Alternitive entry

    Exit to Church

    Boat Take-off

    N

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Flashing with Holes

    6 mm Glass, Mesh, Resin

    .08 mm Veneer 4 mm Resin, Mesh, Glass

    40 mm Kerto x2

    Walnut Dovetail

    Flashing

    3 cm x 3 cm mullion

    Insulation

    9 mm Plywood

    Epic Metal Roofing

    Spruce

    12 mm Plywood

    Cherry

    Extended Mesh to filter roof water

    Walnut Dovetail

    ELEVATION

    SECTION aa

    SECTIONbb

    SECTION cc

    SECTION dd

    SECTION ee

    GROUND FLOORPLAN UPPER FLOORPLAN

    SITE PLAN

    Roof

    Kerto

    Siding

    Post and Mullion

    Walls

    Floors

    Plinth

    Door Frame

    Assembled

    NORTH ELEVATION

    SOUTH ELEVATIONWEST ELEVATION

    EAST ELEVATION

    ROOF TO FACADE DETAIL

    Petajavesi Church Visitor Center by the lake

    Adam Lans

    ASSEMBLY

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Bus Parking

    Boat gets full veiw of Church, and enters Visitor

    Winter/Alternitive entry

    Exit to Church

    Boat Take-off

    N

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Flashing with Holes

    6 mm Glass, Mesh, Resin

    .08 mm Veneer 4 mm Resin, Mesh, Glass

    40 mm Kerto x2

    Walnut Dovetail

    Flashing

    3 cm x 3 cm mullion

    Insulation

    9 mm Plywood

    Epic Metal Roofing

    Spruce

    12 mm Plywood

    Cherry

    Extended Mesh to filter roof water

    Walnut Dovetail

    ELEVATION

    SECTION aa

    SECTIONbb

    SECTION cc

    SECTION dd

    SECTION ee

    GROUND FLOORPLAN UPPER FLOORPLAN

    SITE PLAN

    Roof

    Kerto

    Siding

    Post and Mullion

    Walls

    Floors

    Plinth

    Door Frame

    Assembled

    NORTH ELEVATION

    SOUTH ELEVATIONWEST ELEVATION

    EAST ELEVATION

    ROOF TO FACADE DETAIL

    Petajavesi Church Visitor Center by the lake

    Adam Lans

    ASSEMBLY

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Bus Parking

    Boat gets full veiw of Church, and enters Visitor

    Winter/Alternitive entry

    Exit to Church

    Boat Take-off

    N

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Flashing with Holes

    6 mm Glass, Mesh, Resin

    .08 mm Veneer 4 mm Resin, Mesh, Glass

    40 mm Kerto x2

    Walnut Dovetail

    Flashing

    3 cm x 3 cm mullion

    Insulation

    9 mm Plywood

    Epic Metal Roofing

    Spruce

    12 mm Plywood

    Cherry

    Extended Mesh to filter roof water

    Walnut Dovetail

    ELEVATION

    SECTION aa

    SECTIONbb

    SECTION cc

    SECTION dd

    SECTION ee

    GROUND FLOORPLAN UPPER FLOORPLAN

    SITE PLAN

    Roof

    Kerto

    Siding

    Post and Mullion

    Walls

    Floors

    Plinth

    Door Frame

    Assembled

    NORTH ELEVATION

    SOUTH ELEVATIONWEST ELEVATION

    EAST ELEVATION

    ROOF TO FACADE DETAIL

    Petajavesi Church Visitor Center by the lake

    Adam Lans

    ASSEMBLY

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Bus Parking

    Boat gets full veiw of Church, and enters Visitor

    Winter/Alternitive entry

    Exit to Church

    Boat Take-off

    N

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Flashing with Holes

    6 mm Glass, Mesh, Resin

    .08 mm Veneer 4 mm Resin, Mesh, Glass

    40 mm Kerto x2

    Walnut Dovetail

    Flashing

    3 cm x 3 cm mullion

    Insulation

    9 mm Plywood

    Epic Metal Roofing

    Spruce

    12 mm Plywood

    Cherry

    Extended Mesh to filter roof water

    Walnut Dovetail

    ELEVATION

    SECTION aa

    SECTIONbb

    SECTION cc

    SECTION dd

    SECTION ee

    GROUND FLOORPLAN UPPER FLOORPLAN

    SITE PLAN

    Roof

    Kerto

    Siding

    Post and Mullion

    Walls

    Floors

    Plinth

    Door Frame

    Assembled

    NORTH ELEVATION

    SOUTH ELEVATIONWEST ELEVATION

    EAST ELEVATION

    ROOF TO FACADE DETAIL

    Petajavesi Church Visitor Center by the lake

    Adam Lans

    ASSEMBLY

    The Old Church of Petjvesi is situated right off of a freeway, which creates a parking problem for visitors. Rather than attempt to excavate the existing landscape for parking lot space, a boat house is created to serve as the visitor center. A parking lot can then be located accoss the lake from the church. After parking, visitors are boated across the lake and enjoy panoramic views of the church in context as they approach the church.

    2012-2013 at Aalto University in Espoo, Finland.Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Bus Parking

    Boat gets full veiw of Church, and enters Visitor

    Winter/Alternitive entry

    Exit to Church

    Boat Take-off

    N

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Flashing with Holes

    6 mm Glass, Mesh, Resin

    .08 mm Veneer 4 mm Resin, Mesh, Glass

    40 mm Kerto x2

    Walnut Dovetail

    Flashing

    3 cm x 3 cm mullion

    Insulation

    9 mm Plywood

    Epic Metal Roofing

    Spruce

    12 mm Plywood

    Cherry

    Extended Mesh to filter roof water

    Walnut Dovetail

    ELEVATION

    SECTION aa

    SECTIONbb

    SECTION cc

    SECTION dd

    SECTION ee

    GROUND FLOORPLAN UPPER FLOORPLAN

    SITE PLAN

    Roof

    Kerto

    Siding

    Post and Mullion

    Walls

    Floors

    Plinth

    Door Frame

    Assembled

    NORTH ELEVATION

    SOUTH ELEVATIONWEST ELEVATION

    EAST ELEVATION

    ROOF TO FACADE DETAIL

    Petajavesi Church Visitor Center by the lake

    Adam Lans

    ASSEMBLY

    SITE PLAN

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Bus Parking

    Boat gets full veiw of Church, and enters Visitor

    Winter/Alternitive entry

    Exit to Church

    Boat Take-off

    N

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Flashing with Holes

    6 mm Glass, Mesh, Resin

    .08 mm Veneer 4 mm Resin, Mesh, Glass

    40 mm Kerto x2

    Walnut Dovetail

    Flashing

    3 cm x 3 cm mullion

    Insulation

    9 mm Plywood

    Epic Metal Roofing

    Spruce

    12 mm Plywood

    Cherry

    Extended Mesh to filter roof water

    Walnut Dovetail

    ELEVATION

    SECTION aa

    SECTIONbb

    SECTION cc

    SECTION dd

    SECTION ee

    GROUND FLOORPLAN UPPER FLOORPLAN

    SITE PLAN

    Roof

    Kerto

    Siding

    Post and Mullion

    Walls

    Floors

    Plinth

    Door Frame

    Assembled

    NORTH ELEVATION

    SOUTH ELEVATIONWEST ELEVATION

    EAST ELEVATION

    ROOF TO FACADE DETAIL

    Petajavesi Church Visitor Center by the lake

    Adam Lans

    ASSEMBLY

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Bus Parking

    Boat gets full veiw of Church, and enters Visitor

    Winter/Alternitive entry

    Exit to Church

    Boat Take-off

    N

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Flashing with Holes

    6 mm Glass, Mesh, Resin

    .08 mm Veneer 4 mm Resin, Mesh, Glass

    40 mm Kerto x2

    Walnut Dovetail

    Flashing

    3 cm x 3 cm mullion

    Insulation

    9 mm Plywood

    Epic Metal Roofing

    Spruce

    12 mm Plywood

    Cherry

    Extended Mesh to filter roof water

    Walnut Dovetail

    ELEVATION

    SECTION aa

    SECTIONbb

    SECTION cc

    SECTION dd

    SECTION ee

    GROUND FLOORPLAN UPPER FLOORPLAN

    SITE PLAN

    Roof

    Kerto

    Siding

    Post and Mullion

    Walls

    Floors

    Plinth

    Door Frame

    Assembled

    NORTH ELEVATION

    SOUTH ELEVATIONWEST ELEVATION

    EAST ELEVATION

    ROOF TO FACADE DETAIL

    Petajavesi Church Visitor Center by the lake

    Adam Lans

    ASSEMBLY

    SITE ELEVATION

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Bus Parking

    Boat gets full veiw of Church, and enters Visitor

    Winter/Alternitive entry

    Exit to Church

    Boat Take-off

    N

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Flashing with Holes

    6 mm Glass, Mesh, Resin

    .08 mm Veneer 4 mm Resin, Mesh, Glass

    40 mm Kerto x2

    Walnut Dovetail

    Flashing

    3 cm x 3 cm mullion

    Insulation

    9 mm Plywood

    Epic Metal Roofing

    Spruce

    12 mm Plywood

    Cherry

    Extended Mesh to filter roof water

    Walnut Dovetail

    ELEVATION

    SECTION aa

    SECTIONbb

    SECTION cc

    SECTION dd

    SECTION ee

    GROUND FLOORPLAN UPPER FLOORPLAN

    SITE PLAN

    Roof

    Kerto

    Siding

    Post and Mullion

    Walls

    Floors

    Plinth

    Door Frame

    Assembled

    NORTH ELEVATION

    SOUTH ELEVATIONWEST ELEVATION

    EAST ELEVATION

    ROOF TO FACADE DETAIL

    Petajavesi Church Visitor Center by the lake

    Adam Lans

    ASSEMBLY

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Bus Parking

    Boat gets full veiw of Church, and enters Visitor

    Winter/Alternitive entry

    Exit to Church

    Boat Take-off

    N

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Flashing with Holes

    6 mm Glass, Mesh, Resin

    .08 mm Veneer 4 mm Resin, Mesh, Glass

    40 mm Kerto x2

    Walnut Dovetail

    Flashing

    3 cm x 3 cm mullion

    Insulation

    9 mm Plywood

    Epic Metal Roofing

    Spruce

    12 mm Plywood

    Cherry

    Extended Mesh to filter roof water

    Walnut Dovetail

    ELEVATION

    SECTION aa

    SECTIONbb

    SECTION cc

    SECTION dd

    SECTION ee

    GROUND FLOORPLAN UPPER FLOORPLAN

    SITE PLAN

    Roof

    Kerto

    Siding

    Post and Mullion

    Walls

    Floors

    Plinth

    Door Frame

    Assembled

    NORTH ELEVATION

    SOUTH ELEVATIONWEST ELEVATION

    EAST ELEVATION

    ROOF TO FACADE DETAIL

    Petajavesi Church Visitor Center by the lake

    Adam Lans

    ASSEMBLY

    A gap is created between the Southern facade and interior (Section AA) which lets in the water from the lake. The Facade is made of a glass, mesh, and wood veener laminate, which permits ambient light into the main space. The water channel also has ambient lighting so as to create caustic water effects in the interior space. This informs occupants when on-coming boats are arriving.

    3

    0 2 4 8 16 32 64Section Axon

    tion between the public and the school. The support

    core is concentrated in the rear, against the alley. The

    greenhouse pops up around the walkway so the public

    can look in and view the plants.

    The school is broken into four main zones. The

    public walkway, learning spaces, greenhouse, and

    support spaces. The walkway intersects the learning

    spaces like interlocking ngers to enhance the connec-

    tion between the public and the school. The support

    core is concentrated in the rear, against the alley. The

    greenhouse pops up around the walkway so the public

    can look in and view the plants.

    WorkShop

    ClassRoom

    Water DrainageEvaporation

    Reverberation from Train

    Public Walkway connecting Whole Foods to Farmers Market

    3

    0 2 4 8 16 32 64Section Axon

    tion between the public and the school. The support

    core is concentrated in the rear, against the alley. The

    greenhouse pops up around the walkway so the public

    can look in and view the plants.

    The school is broken into four main zones. The

    public walkway, learning spaces, greenhouse, and

    support spaces. The walkway intersects the learning

    spaces like interlocking ngers to enhance the connec-

    tion between the public and the school. The support

    core is concentrated in the rear, against the alley. The

    greenhouse pops up around the walkway so the public

    can look in and view the plants.

    8 9

    4

    Adam Lans3YEAR

    School for Urban AgricultureCarnegie Mellon School of Architecture

    48-305 Third-Year Studio, Spring 2012

    Instructor: Kelle Brooks

    Collaborator: Adam Lans

    Statement The school is located in East Liberty, between

    Whole Foods Market and the proposed Market Hall.

    The sites surroundings are highly unusual. The school

    faces an unkept alley on the southern portion of the

    site. This created a new public front for the school, and

    connected shoppers from Whole Foods to the new

    Market Hall. The walkway allows the public to appreci-

    ate the students work via public gardens and views

    into private workshops and garden spaces. This new

    elevated walkway and garden will breathe new life into

    this underdeveloped and under-utilized area.

    In addition to the public walkway, there is a

    public cafe on the corner of South Highland Ave. The

    public can get their food and take it up to the walkway

    level and enjoy the views out towards Shadyside or the

    East Liberty Church. The walkway level intersects the

    existing pedestrian bridge to connect to the East Bus-

    way.

    The cafeteria, classrooms, and greenhouse, and

    auditorium exist on the lower level. The greenhouse

    connects to large outdoor growing area for when the

    weather allows for outdoor growing.

    Alex F ischer3YEAR

    Up

    Up

    Dn

    Dn

    Up

    Up

    Up

    Up

    Dn

    Dn

    0 4 8 16 32 64 128Lower Floor

    MARKET HALL

    Penn C

    ir S

    Pen

    n Cir

    E

    Penn C

    ir S

    Penn Ave

    Broad St

    Penn Ave

    Antler Way She

    ridan

    Sq

    She

    ridan

    Ave

    Stevens

    on Pl

    Ellsworth

    Ave

    Ellsworth Ave

    E Busway

    E Buswa

    y

    E Buswa

    y

    Busw

    ay

    Busw

    ay

    Busway

    Shad

    y Ave

    Sha

    dy

    Ave

    Sw

    ope

    St

    Yard

    ley

    Way

    Em

    erso

    n St

    Cars

    on

    St

    S H

    ighland

    Ave

    S H

    ighland

    Ave

    S H

    ighland

    Ave

    S W

    hitfield

    St

    Baum Blvd

    Trade St

    S B

    eatty St

    S B

    eatty

    St

    Tamello

    Way

    Mignotte St

    Baum B

    lvd

    E Comm

    erce Wa

    y

    Gre

    enbinar W

    ay

    Lam

    ont

    Pl

    Lehigh

    Ave

    Spahr

    St

    0 25 50 100 200 400 800Site Plan

    Dn

    Dn

    Dn

    Dn

    Dn

    Dn

    Dn Up

    Dn

    Dn

    Dn

    Dn

    Dn

    Dn

    PUBLIC GARDEN

    OUTDOOR GARDEN WORKSHOP

    HYDROPONICS WORKSHOP

    LOBBY

    INDOOR GARDEN WORKSOP

    COOKING WORKSOP

    0 4 8 16 32 64 128Upper Floor

    School for Urban AgricultureCarnegie Mellon School of Architecture

    48-305 Third-Year Studio, Spring 2012

    Instructor: Kelle Brooks

    Collaborator: Adam Lans

    Statement Watering systems and appropriate planting are

    fundamental for the success of any urban garden. As

    such, the school treats these as essential elements in the

    spacial organization of the school. Water is collected,

    used, and recycled, all within view of the students and

    public users in the main wall of the school. Overall, the

    goal is to enhance the students and publics under-

    standing and engagement with agriculture in an urban

    context.

    Being a school, security is a prime concern. As

    such, there is one entrance into the school. The public

    can engage with the walkway, the cafe, the mezzanine

    level of the lecture hall, and a public garden where

    public workshops can be held.

    The school is broken into four main zones. The

    public walkway, learning spaces, greenhouse, and

    support spaces. The walkway intersects the learning

    spaces like interlocking fingers to enhance the connec-

    tion between the public and the school. The support

    core is concentrated in the rear, against the alley. The

    greenhouse pops up around the walkway so the public

    can look in and view the plants.

    Alex F ischer 3YEAR

    0 8 16 32 64 128Axon

    Frame:Planter INDOOR GARDEN WORKSOP

    LECTURE HALLCAFE KITCHEN

    WOMENS ROOM

    PUBLIC WALKWAY

    STUDENT LOUNGE

    CAFETERIA SERVICE CAFETERIA

    GREENHOUSE

    PUBLIC WALKWAY

    0 4 8 16 32 64 128Section through lecture

    0 4 8 16 32 64 128Section through greenhouse

    0 8 16 32 64 128Axon

    Mass:Water

    0 8 16 32 64 128Axon

    Spacial Systems:Circulation

    The Vocational High School for Urban agriculture is locat-ed in East Liberty, pittsburgh, between whole foods market and the proposed farmer's market hall. The school fac-es an unkempt alley on the southern portion of the site. This creates a new public front for the school, and con-nects shoppers from whole foods to the new farmer's market hall. The walkway al-lows the public to appreci-ate the student's work via public gardens and views into private workshops and garden spaces. This new el-evated walkway and garden will breathe new life into this underdeveloped and unde-rutilized area. In addition to the public walkway, there is a public cafe on the corner of south highland ave. The public can get their food and take it up to the walkway level and enjoy the views out towards shadyside or the east liberty church. The walkway level intersects the existing pedestrian bridge to connect to the east busway.

    SCHOOL FOR URBAN

    AGRICULTURE

    The School of Urban Agriculture creates a public walkway from Whole foods to the Farmers market, creating a new identity to an underdeveloped area. The school makes use of natural watering systems which are integrated into the buildings performance, and experience, both privately for the school, and publically for users who utilize the walkway.

    Collaborated in 2012 with partner Alex Fisher

    SCHOOL OF URBAN AGRICULTURE

  • Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Bus Parking

    Boat gets full veiw of Church, and enters Visitor

    Winter/Alternitive entry

    Exit to Church

    Boat Take-off

    N

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Flashing with Holes

    6 mm Glass, Mesh, Resin

    .08 mm Veneer 4 mm Resin, Mesh, Glass

    40 mm Kerto x2

    Walnut Dovetail

    Flashing

    3 cm x 3 cm mullion

    Insulation

    9 mm Plywood

    Epic Metal Roofing

    Spruce

    12 mm Plywood

    Cherry

    Extended Mesh to filter roof water

    Walnut Dovetail

    ELEVATION

    SECTION aa

    SECTIONbb

    SECTION cc

    SECTION dd

    SECTION ee

    GROUND FLOORPLAN UPPER FLOORPLAN

    SITE PLAN

    Roof

    Kerto

    Siding

    Post and Mullion

    Walls

    Floors

    Plinth

    Door Frame

    Assembled

    NORTH ELEVATION

    SOUTH ELEVATIONWEST ELEVATION

    EAST ELEVATION

    ROOF TO FACADE DETAIL

    Petajavesi Church Visitor Center by the lake

    Adam Lans

    ASSEMBLY

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Bus Parking

    Boat gets full veiw of Church, and enters Visitor

    Winter/Alternitive entry

    Exit to Church

    Boat Take-off

    N

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Flashing with Holes

    6 mm Glass, Mesh, Resin

    .08 mm Veneer 4 mm Resin, Mesh, Glass

    40 mm Kerto x2

    Walnut Dovetail

    Flashing

    3 cm x 3 cm mullion

    Insulation

    9 mm Plywood

    Epic Metal Roofing

    Spruce

    12 mm Plywood

    Cherry

    Extended Mesh to filter roof water

    Walnut Dovetail

    ELEVATION

    SECTION aa

    SECTIONbb

    SECTION cc

    SECTION dd

    SECTION ee

    GROUND FLOORPLAN UPPER FLOORPLAN

    SITE PLAN

    Roof

    Kerto

    Siding

    Post and Mullion

    Walls

    Floors

    Plinth

    Door Frame

    Assembled

    NORTH ELEVATION

    SOUTH ELEVATIONWEST ELEVATION

    EAST ELEVATION

    ROOF TO FACADE DETAIL

    Petajavesi Church Visitor Center by the lake

    Adam Lans

    ASSEMBLY

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Bus Parking

    Boat gets full veiw of Church, and enters Visitor

    Winter/Alternitive entry

    Exit to Church

    Boat Take-off

    N

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Flashing with Holes

    6 mm Glass, Mesh, Resin

    .08 mm Veneer 4 mm Resin, Mesh, Glass

    40 mm Kerto x2

    Walnut Dovetail

    Flashing

    3 cm x 3 cm mullion

    Insulation

    9 mm Plywood

    Epic Metal Roofing

    Spruce

    12 mm Plywood

    Cherry

    Extended Mesh to filter roof water

    Walnut Dovetail

    ELEVATION

    SECTION aa

    SECTIONbb

    SECTION cc

    SECTION dd

    SECTION ee

    GROUND FLOORPLAN UPPER FLOORPLAN

    SITE PLAN

    Roof

    Kerto

    Siding

    Post and Mullion

    Walls

    Floors

    Plinth

    Door Frame

    Assembled

    NORTH ELEVATION

    SOUTH ELEVATIONWEST ELEVATION

    EAST ELEVATION

    ROOF TO FACADE DETAIL

    Petajavesi Church Visitor Center by the lake

    Adam Lans

    ASSEMBLY

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Bus Parking

    Boat gets full veiw of Church, and enters Visitor

    Winter/Alternitive entry

    Exit to Church

    Boat Take-off

    N

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Flashing with Holes

    6 mm Glass, Mesh, Resin

    .08 mm Veneer 4 mm Resin, Mesh, Glass

    40 mm Kerto x2

    Walnut Dovetail

    Flashing

    3 cm x 3 cm mullion

    Insulation

    9 mm Plywood

    Epic Metal Roofing

    Spruce

    12 mm Plywood

    Cherry

    Extended Mesh to filter roof water

    Walnut Dovetail

    ELEVATION

    SECTION aa

    SECTIONbb

    SECTION cc

    SECTION dd

    SECTION ee

    GROUND FLOORPLAN UPPER FLOORPLAN

    SITE PLAN

    Roof

    Kerto

    Siding

    Post and Mullion

    Walls

    Floors

    Plinth

    Door Frame

    Assembled

    NORTH ELEVATION

    SOUTH ELEVATIONWEST ELEVATION

    EAST ELEVATION

    ROOF TO FACADE DETAIL

    Petajavesi Church Visitor Center by the lake

    Adam Lans

    ASSEMBLY

    The Old Church of Petjvesi is situated right off of a freeway, which creates a parking problem for visitors. Rather than attempt to excavate the existing landscape for parking lot space, a boat house is created to serve as the visitor center. A parking lot can then be located accoss the lake from the church. After parking, visitors are boated across the lake and enjoy panoramic views of the church in context as they approach the church.

    2012-2013 at Aalto University in Espoo, Finland.Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Bus Parking

    Boat gets full veiw of Church, and enters Visitor

    Winter/Alternitive entry

    Exit to Church

    Boat Take-off

    N

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Flashing with Holes

    6 mm Glass, Mesh, Resin

    .08 mm Veneer 4 mm Resin, Mesh, Glass

    40 mm Kerto x2

    Walnut Dovetail

    Flashing

    3 cm x 3 cm mullion

    Insulation

    9 mm Plywood

    Epic Metal Roofing

    Spruce

    12 mm Plywood

    Cherry

    Extended Mesh to filter roof water

    Walnut Dovetail

    ELEVATION

    SECTION aa

    SECTIONbb

    SECTION cc

    SECTION dd

    SECTION ee

    GROUND FLOORPLAN UPPER FLOORPLAN

    SITE PLAN

    Roof

    Kerto

    Siding

    Post and Mullion

    Walls

    Floors

    Plinth

    Door Frame

    Assembled

    NORTH ELEVATION

    SOUTH ELEVATIONWEST ELEVATION

    EAST ELEVATION

    ROOF TO FACADE DETAIL

    Petajavesi Church Visitor Center by the lake

    Adam Lans

    ASSEMBLY

    SITE PLAN

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Bus Parking

    Boat gets full veiw of Church, and enters Visitor

    Winter/Alternitive entry

    Exit to Church

    Boat Take-off

    N

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Flashing with Holes

    6 mm Glass, Mesh, Resin

    .08 mm Veneer 4 mm Resin, Mesh, Glass

    40 mm Kerto x2

    Walnut Dovetail

    Flashing

    3 cm x 3 cm mullion

    Insulation

    9 mm Plywood

    Epic Metal Roofing

    Spruce

    12 mm Plywood

    Cherry

    Extended Mesh to filter roof water

    Walnut Dovetail

    ELEVATION

    SECTION aa

    SECTIONbb

    SECTION cc

    SECTION dd

    SECTION ee

    GROUND FLOORPLAN UPPER FLOORPLAN

    SITE PLAN

    Roof

    Kerto

    Siding

    Post and Mullion

    Walls

    Floors

    Plinth

    Door Frame

    Assembled

    NORTH ELEVATION

    SOUTH ELEVATIONWEST ELEVATION

    EAST ELEVATION

    ROOF TO FACADE DETAIL

    Petajavesi Church Visitor Center by the lake

    Adam Lans

    ASSEMBLY

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Bus Parking

    Boat gets full veiw of Church, and enters Visitor

    Winter/Alternitive entry

    Exit to Church

    Boat Take-off

    N

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Flashing with Holes

    6 mm Glass, Mesh, Resin

    .08 mm Veneer 4 mm Resin, Mesh, Glass

    40 mm Kerto x2

    Walnut Dovetail

    Flashing

    3 cm x 3 cm mullion

    Insulation

    9 mm Plywood

    Epic Metal Roofing

    Spruce

    12 mm Plywood

    Cherry

    Extended Mesh to filter roof water

    Walnut Dovetail

    ELEVATION

    SECTION aa

    SECTIONbb

    SECTION cc

    SECTION dd

    SECTION ee

    GROUND FLOORPLAN UPPER FLOORPLAN

    SITE PLAN

    Roof

    Kerto

    Siding

    Post and Mullion

    Walls

    Floors

    Plinth

    Door Frame

    Assembled

    NORTH ELEVATION

    SOUTH ELEVATIONWEST ELEVATION

    EAST ELEVATION

    ROOF TO FACADE DETAIL

    Petajavesi Church Visitor Center by the lake

    Adam Lans

    ASSEMBLY

    SITE ELEVATION

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Bus Parking

    Boat gets full veiw of Church, and enters Visitor

    Winter/Alternitive entry

    Exit to Church

    Boat Take-off

    N

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Flashing with Holes

    6 mm Glass, Mesh, Resin

    .08 mm Veneer 4 mm Resin, Mesh, Glass

    40 mm Kerto x2

    Walnut Dovetail

    Flashing

    3 cm x 3 cm mullion

    Insulation

    9 mm Plywood

    Epic Metal Roofing

    Spruce

    12 mm Plywood

    Cherry

    Extended Mesh to filter roof water

    Walnut Dovetail

    ELEVATION

    SECTION aa

    SECTIONbb

    SECTION cc

    SECTION dd

    SECTION ee

    GROUND FLOORPLAN UPPER FLOORPLAN

    SITE PLAN

    Roof

    Kerto

    Siding

    Post and Mullion

    Walls

    Floors

    Plinth

    Door Frame

    Assembled

    NORTH ELEVATION

    SOUTH ELEVATIONWEST ELEVATION

    EAST ELEVATION

    ROOF TO FACADE DETAIL

    Petajavesi Church Visitor Center by the lake

    Adam Lans

    ASSEMBLY

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Bus Parking

    Boat gets full veiw of Church, and enters Visitor

    Winter/Alternitive entry

    Exit to Church

    Boat Take-off

    N

    Water Tanks Relocation

    Storage

    Dock

    Kitchen

    Front Desk

    Flexible Event Space

    Deck

    aaaa

    bb

    bbccddee

    ccddee

    aaaa

    bb

    bbccddee

    ccddee

    Flashing with Holes

    6 mm Glass, Mesh, Resin

    .08 mm Veneer 4 mm Resin, Mesh, Glass

    40 mm Kerto x2

    Walnut Dovetail

    Flashing

    3 cm x 3 cm mullion

    Insulation

    9 mm Plywood

    Epic Metal Roofing

    Spruce

    12 mm Plywood

    Cherry

    Extended Mesh to filter roof water

    Walnut Dovetail

    ELEVATION

    SECTION aa

    SECTIONbb

    SECTION cc

    SECTION dd

    SECTION ee

    GROUND FLOORPLAN UPPER FLOORPLAN

    SITE PLAN

    Roof

    Kerto

    Siding

    Post and Mullion

    Walls

    Floors

    Plinth

    Door Frame

    Assembled

    NORTH ELEVATION

    SOUTH ELEVATIONWEST ELEVATION

    EAST ELEVATION

    ROOF TO FACADE DETAIL

    Petajavesi Church Visitor Center by the lake

    Adam Lans

    ASSEMBLY

    A gap is created between the Southern facade and interior (Section AA) which lets in the water from the lake. The Facade is made of a glass, mesh, and wood veener laminate, which permits ambient light into the main space. The water channel also has ambient lighting so as to create caustic water effects in the interior space. This informs occupants when on-coming boats are arriving.

    3

    0 2 4 8 16 32 64Section Axon

    tion between the public and the school. The support

    core is concentrated in the rear, against the alley. The

    greenhouse pops up around the walkway so the public

    can look in and view the plants.

    The school is broken into four main zones. The

    public walkway, learning spaces, greenhouse, and

    support spaces. The walkway intersects the learning

    spaces like interlocking ngers to enhance the connec-

    tion between the public and the school. The support

    core is concentrated in the rear, against the alley. The

    greenhouse pops up around the walkway so the public

    can look in and view the plants.

    WorkShop

    ClassRoom

    Water DrainageEvaporation

    Reverberation from Train

    Public Walkway connecting Whole Foods to Farmers Market

    3

    0 2 4 8 16 32 64Section Axon

    tion between the public and the school. The support

    core is concentrated in the rear, against the alley. The

    greenhouse pops up around the walkway so the public

    can look in and view the plants.

    The school is broken into four main zones. The

    public walkway, learning spaces, greenhouse, and

    support spaces. The walkway intersects the learning

    spaces like interlocking ngers to enhance the connec-

    tion between the public and the school. The support

    core is concentrated in the rear, against the alley. The

    greenhouse pops up around the walkway so the public

    can look in and view the plants.

    8 9

    4

    Adam Lans3YEAR

    School for Urban AgricultureCarnegie Mellon School of Architecture

    48-305 Third-Year Studio, Spring 2012

    Instructor: Kelle Brooks

    Collaborator: Adam Lans

    Statement The school is located in East Liberty, between

    Whole Foods Market and the proposed Market Hall.

    The sites surroundings are highly unusual. The school

    faces an unkept alley on the southern portion of the

    site. This created a new public front for the school, and

    connected shoppers from Whole Foods to the new

    Market Hall. The walkway allows the public to appreci-

    ate the students work via public gardens and views

    into private workshops and garden spaces. This new

    elevated walkway and garden will breathe new life into

    this underdeveloped and under-utilized area.

    In addition to the public walkway, there is a

    public cafe on the corner of South Highland Ave. The

    public can get their food and take it up to the walkway

    level and enjoy the views out towards Shadyside or the

    East Liberty Church. The walkway level intersects the

    existing pedestrian bridge to connect to the East Bus-

    way.

    The cafeteria, classrooms, and greenhouse, and

    auditorium exist on the lower level. The greenhouse

    connects to large outdoor growing area for when the

    weather allows for outdoor growing.

    Alex F ischer3YEAR

    Up

    Up

    Dn

    Dn

    Up

    Up

    Up

    Up

    Dn

    Dn

    0 4 8 16 32 64 128Lower Floor

    MARKET HALL

    Penn C

    ir S

    Pen

    n Cir

    E

    Penn C

    ir S

    Penn Ave

    Broad St

    Penn Ave

    Antler Way She

    ridan

    Sq

    She

    ridan

    Ave

    Stevens

    on Pl

    Ellsworth

    Ave

    Ellsworth Ave

    E Busway

    E Buswa

    y

    E Buswa

    y

    Busw

    ay

    Busw

    ay

    Busway

    Shad

    y Ave

    Sha

    dy

    Ave

    Sw

    ope

    St

    Yard

    ley

    Way

    Em

    erso

    n St

    Cars

    on

    St

    S H

    ighland

    Ave

    S H

    ighland

    Ave

    S H

    ighland

    Ave

    S W

    hitfield

    St

    Baum Blvd

    Trade St

    S B

    eatty St

    S B

    eatty

    St

    Tamello

    Way

    Mignotte St

    Baum B

    lvd

    E Comm

    erce Wa

    y

    Gre

    enbinar W

    ay

    Lam

    ont

    Pl

    Lehigh

    Ave

    Spahr

    St

    0 25 50 100 200 400 800Site Plan

    Dn

    Dn

    Dn

    Dn

    Dn

    Dn

    Dn