AD Horn étrier and stripline taskforce - WDP and planning preparation
description
Transcript of AD Horn étrier and stripline taskforce - WDP and planning preparation
![Page 1: AD Horn étrier and stripline taskforce - WDP and planning preparation](https://reader033.fdocuments.in/reader033/viewer/2022051700/56815ee8550346895dcd9938/html5/thumbnails/1.jpg)
AD Horn étrier and stripline taskforce - WDP and planning
preparationMC
Taskforce brainstorming meeting #220th February 2014
![Page 2: AD Horn étrier and stripline taskforce - WDP and planning preparation](https://reader033.fdocuments.in/reader033/viewer/2022051700/56815ee8550346895dcd9938/html5/thumbnails/2.jpg)
Updates
Visit in B195 w/ ABT to check feasibility of the test bench Contacts with MEF to integrate the test bench Contacts with CV for the compressed air cooling Do we have all pieces for the test bench?
Removed the horn + stripline from the 2nd spare chariot (ok) Realized that the chariot and the horn have a “different”
design with respect to what in the target area Alignment of horn chariot with SU performed
Potentiometer calibrated for the alignment in the target area HE performed several (successful) handling tests in B232
(thanks JLG, YS, PB) Spare chariot is now on concrete blocks for inspection
Thermocouples + étrier
![Page 3: AD Horn étrier and stripline taskforce - WDP and planning preparation](https://reader033.fdocuments.in/reader033/viewer/2022051700/56815ee8550346895dcd9938/html5/thumbnails/3.jpg)
Points to be discussed WDP preparation in order to assess the DIMR level
Further discussions tomorrow with HE and RP RP feedback
Robert/Gerald? First draft of the planning for the intervention to be
presented tomorrow at LSC (see later) Etrier kinematics studies
To be studied tomorrow/next week with Ray Can we measure the pressure when étrier is closed?
Spare parts availability in view of the test bench in B195 and associated preparation (MME) Planning/possibilities/drawings availability? Can we start by producing a new junction box and stripline?
![Page 4: AD Horn étrier and stripline taskforce - WDP and planning preparation](https://reader033.fdocuments.in/reader033/viewer/2022051700/56815ee8550346895dcd9938/html5/thumbnails/4.jpg)
MEF contacted for integration of the test bench
Budget (do we need specific items?) HE, ABT, MME (spares + timeline?), MEF for
integration The AD-target consolidation presently available for
2014 was not foreseeing a specific budget for this event…
Points to be discussed
![Page 5: AD Horn étrier and stripline taskforce - WDP and planning preparation](https://reader033.fdocuments.in/reader033/viewer/2022051700/56815ee8550346895dcd9938/html5/thumbnails/5.jpg)
Draft list of actions
See INDICO page, w/ tentative group association
![Page 6: AD Horn étrier and stripline taskforce - WDP and planning preparation](https://reader033.fdocuments.in/reader033/viewer/2022051700/56815ee8550346895dcd9938/html5/thumbnails/6.jpg)
?M
issing… but searches ongoing
![Page 7: AD Horn étrier and stripline taskforce - WDP and planning preparation](https://reader033.fdocuments.in/reader033/viewer/2022051700/56815ee8550346895dcd9938/html5/thumbnails/7.jpg)
Connection box drawings
![Page 8: AD Horn étrier and stripline taskforce - WDP and planning preparation](https://reader033.fdocuments.in/reader033/viewer/2022051700/56815ee8550346895dcd9938/html5/thumbnails/8.jpg)
Preliminary planning
19th
Feb
ruar
y
28th
July
No
acce
ss, P
SS te
sts
It assumes the spare junction box is found The planning assumes that the “spare” horn can be qualified for operation Production time to be assessed in detail (just a guess here)?
?
18 days
![Page 9: AD Horn étrier and stripline taskforce - WDP and planning preparation](https://reader033.fdocuments.in/reader033/viewer/2022051700/56815ee8550346895dcd9938/html5/thumbnails/9.jpg)
Preliminary planning
Details to be established
![Page 10: AD Horn étrier and stripline taskforce - WDP and planning preparation](https://reader033.fdocuments.in/reader033/viewer/2022051700/56815ee8550346895dcd9938/html5/thumbnails/10.jpg)
Spare horn on the concrete blocks ready for inspection
![Page 11: AD Horn étrier and stripline taskforce - WDP and planning preparation](https://reader033.fdocuments.in/reader033/viewer/2022051700/56815ee8550346895dcd9938/html5/thumbnails/11.jpg)
“Butee mecanique” and spring for potentiometer activation
![Page 12: AD Horn étrier and stripline taskforce - WDP and planning preparation](https://reader033.fdocuments.in/reader033/viewer/2022051700/56815ee8550346895dcd9938/html5/thumbnails/12.jpg)
Horn & stripline movement
Air cooling pipes
![Page 13: AD Horn étrier and stripline taskforce - WDP and planning preparation](https://reader033.fdocuments.in/reader033/viewer/2022051700/56815ee8550346895dcd9938/html5/thumbnails/13.jpg)
![Page 14: AD Horn étrier and stripline taskforce - WDP and planning preparation](https://reader033.fdocuments.in/reader033/viewer/2022051700/56815ee8550346895dcd9938/html5/thumbnails/14.jpg)