Cook Islands Activity ManagementTe Tarai Vaka
Activity Planning Document: Activity Name
ContentsContents……....................................................................1Executive Summary.........................................................2Analysis and Strategic Context.........................................2Activity Description.........................................................3Implementation Arrangements.........................................4Appendix A: Results Framework.......................................7Results Diagram..............................................................7Results Measurement Table...........................................10Monitoring and Evaluation Work Plan.............................11Appendix B: Risk Matrix.................................................11Appendix C: Detailed Outputs-Based Budget / Cost Estimates 14Appendix D: Description of Program or Activities............15Appendix E: Management and Implementation Arrangements 15Appendix F: Relevant Analyses.......................................15
Cook Islands Activity Management – Activity Planning Document Template || 1
Cook Islands Activity ManagementTe Tarai Vaka
Executive SummaryMaximum 4 pages – (fewer for smaller scale activity). Please provide a succinct summary of the design in a form that can be treated as a stand-alone document. It should:
describe the development challenge and proposed response include a results diagram (planned outputs, and intended short, medium and/or
long-term outcomes which contribute to the goal) summarise tasks/activities outline key risks and mitigation recommend the delivery modality outline the expected whole of life costs and the contribution from development
partner/s if ODA funded, noting explicitly any contingency that has been included in the total estimate.
[???]
Analysis and Strategic Context Sections 2-4: Maximum 20 pages in total. Less detail is needed if the activity is low cost and low risk. Not all of the suggested headings are required for lower risk activities.Section 2 (this section) should provide a strategic analysis of the situation related to this development activity. This includes providing relevant background information and sufficient information so that someone not familiar with the context can understand the issues.[???]
Sector IssuesConcisely set out the relevant sector context/challenges. [???]
Stakeholder AnalysisProvide a summary stakeholder analysis (additional detail can be annexed).[???]
Problem AnalysisExplain the specific problem being addressed include consideration of relevant environmental and social safeguards (e.g. climate change, gender). The text should allow readers to understand what success would look like for this activity.[???]
Lessons LearnedHighlight any existing or previous similar activities undertaken by the Cook Islands Government and/or partners, including private sector, NGOs and donors if relevant. Also include principal lessons learned through these and other similar activities. [???]
Cook Islands Activity Management – Activity Planning Document Template || 2
Cook Islands Activity ManagementTe Tarai Vaka
Consistency with Existing Policy/StrategyClearly state how the activity links to the Cook Islands National Sustainable Development Plan, relevant national, or sector policies and strategies, and the budget policy statement. It should outline links to and any implications for existing government plans, programs, and departmental business plans. If ODA funded, also state how the activity fulfills development partner engagement criteria.[???]
Rationale for the ActivityProvide a clear summarized statement on why this activity is being proposed and what key objectives (economic growth, service delivery improvement, etc.) will be achieved.[???]
Activity Description This section answers the question “what will this activity do, with what resources and over what timeframe?” It should include a results diagram. It should explain and justify the forms of funding proposed, detail the individual activity components, provide budget estimates and information on the suggested timing of the activity.[???]
Results DiagramThis section includes a results diagram (refer to Appendix A) which describes the Activity’s goal and identifies the desired change to occur over time, by logically linking the Activity’s outputs, desired short, medium and/or long-term outcomes. Explanatory notes are to be included. [???]
Activity and InputsDescribe the tasks and inputs required to achieve the outputs.[???]
Form(s) of Funding and Development Modalities ProposedBriefly outline the forms and sources of funding considered, describe and justify the forms of funding and development modalities proposed (if relevant). [???]
Estimated Programme Budget and TimingSet out the activity budget, provide a breakdown of expenditure between components over time and list the procurement arrangements that will apply. A detailed budget should be provided in an Annex.[???]
Cook Islands Activity Management – Activity Planning Document Template || 3
Cook Islands Activity ManagementTe Tarai Vaka
Implementation ArrangementsThis section sets out the main issues and factors affecting how the proposed activity will be delivered on the ground.
Management and Governance Arrangements and StructureExplain how the activity will be governed and managed. Detail the envisaged relationship between the Cook Islands government, partners and contractors (if relevant). The roles and responsibilities of the partners in the activity should be outlined. [???]
Implementation PlanOutline an implementation plan and timeline and/or provide Gantt chart showing critical milestones in the Annex. [???]
Results Measurement and Monitoring and EvaluationProvide a brief overview of the results framework and how results will be reported. A Results Measurement Table and a Monitoring and Evaluation Work Plan are to be appended to the activity planning document.[???]
Sustainability IssuesAt the end of the activity, outline if the Cook Islands government/department will exit or transition to a new, follow-up activity. If transition, include a brief description of what is intended for the new, follow-up activity, anticipated approach or modality and partner(s) if known.Outline the issues that affect the sustainability of outcomes beyond the activity (e.g. absence of support, ongoing requirements for TA, budget issues, asset management, institutional arrangements, political instability, etc.). Describe steps you will undertake to address these issues.[???]
Procurement ArrangementsDescribe in detail how the implementing agency will ensure the use of Cook Islands procurement processes and responsibilities and how this will be monitored. Outline findings of any procurement and/or financial management capacity assessment relevant to the design.Procurement must comply with the Procurement Policy and the Cook Islands Government Financial Policies and Procedures Manual . [???]
Cook Islands Activity Management – Activity Planning Document Template || 4
Cook Islands Activity ManagementTe Tarai Vaka
Overarching Policy Issues including Gender, Human Rights, Climate Change and Disasters, Environmental and Social Safeguards Explain concisely how overarching policy issues such as gender, human rights, climate change and disasters, environment and social safeguards have been addressed through the design. The text should provide an explanation of the approach adopted in each case. This should not substitute for consideration and discussion of these issues in Sections A & B of the Planning Document if the issues are central to the design (gender in particular should be a central consideration in any activity). [???]
Critical Risks and Risk Management StrategiesOutline the most critical risks and explain how these risks will be addressed and managed. A risk matrix should be annexed.[???]
Environmental and Social SafeguardsWhere the activity has previously been assigned a provisional category A or B, note:
The agreed category assigned to the activity, the scope of any impact assessment and impact management plan and whether a reassignment from a provisional category assigned at the concept stage is being recommended
A summary of any adverse impacts or risks, and measures designed to avoid or mitigate these
Confirmation of the complaints and conflict resolution procedure Any major risks posed by climate variability, climate change and natural hazards,
and measures to address these and improve resilience The degree of compliance with relevant environmental and social laws and
regulations, and measures to strengthen capacity for their implementation.
AppendicesThe following appendices are required.
This section includes the following appendices: Appendix A: Results Framework (Results Diagram, Results Measurement Table,
Monitoring and Evaluation Work Plan) Appendix B: Risk Matrix Appendix C: Detailed Outputs-Based Budget/Cost Estimates (including costing
methodology) Appendix D: Detailed Description of Programme activities (if appropriate) Appendix E: Management & Implementation Arrangements – Organization Chart
and other details as appropriate including Roles/Responsibilities of Parties/Stakeholders
Appendix F: Relevant analyses (Social, Economic, Environment, Gender, Poverty, Stakeholder, institutional/fiduciary capacity, etc.).
Cook Islands Activity Management – Activity Planning Document Template || 5
Cook Islands Activity ManagementTe Tarai Vaka
The following appendices are optional and should be included if relevant. Delete reference to those not required:
Implementation Schedule Procurement Plan Position Descriptions/Terms of Reference (if activity includes TA) Scope of Services and Basis of Payment (mandatory if being tendered) Transition or Exit Planning Other relevant reports and assessments as appropriate.
Cook Islands Activity Management – Activity Planning Document Template || 6
Appendix A: Results FrameworkThe results framework below includes a results diagram, results measurement table and a monitoring and evaluation Work Plan. Depending on the activity, there may only be two outcome levels (outputs->outcomes), or up to four levels.
Results DiagramModify or replace this layout and text to create your results diagram.
NSDP Goal:
Cook Islands Activity Management – Activity Planning Document Template || 7
Outputs
Short-term Outcomes
Medium-term Outcomes
Long-term Outcome(s)
Medium-term Outcome
Short-term Outcome
OutputOutput
Short-term Outcome
Medium-term Outcome
Long-term Outcome
Output
Short-term OutcomeShort-term OutcomeShort-term Outcome
Medium-term OutcomeMedium-term OutcomeMedium-term Outcome
OutputOutput
Long-term Outcome Long-term Outcome
Output OutputOutput
Long- Term Outcome
Short- Term Outcome
Medium- TermOutcome
Long- TermOutcome
Short- TermOutcome
NSDP Goal :
Sample LayoutRefer to the Activity Planning Guideline for the format to use and the standards that apply when developing a results diagram.
Cook Islands Activity Management – Activity Planning Document Template || 8
Outputs/Inputs TableRefer to the Activity Planning Guideline for the format to use and the standards that apply. Add additional rows to the table as required.
Outputs from the Results Diagram
Activities to Delivery Outputs Inputs to Resource Activities
Output 1
Output 2
Cook Islands Activity Management – Activity Planning Document Template || 9
Results Measurement TableRefer to the Activity Planning Guideline, for the format to use and the standards that apply. Add or delete rows as needed.
Results Indicator(s) Baseline Information and Targets Methodology/Data SourcesLong-Term Outcomes
Medium Term Outcomes
Short-Term Outcomes
Outputs
Cook Islands Activity Management – Activity Planning Document Template || 10
Monitoring and Evaluation Work PlanRefer to the Activity Planning Guideline for the format to use and the standards that apply.Note when completing the table below:Approach: Includes the methods and processes we will use in undertaking monitoring and evaluation activitiesReporting & Deliverables: What and how the information will be reported, to whom and by when, how the findings will be shared and used.
Monitoring & Evaluation Tasks
Approach Timeline Roles and Responsibilities
Deliverables and Reporting Indicative Costs
Monitoring
Evaluation
Total Indicative Costs $Overall Monitoring and Evaluation Budget
Funding source $Funding source $Total Budgeted $
Appendix B: Risk Matrix[Insert your Risk Matrix here]
Refer to the example below for a layout of a risk matrix. Additional rows can be added to the table as needed.Risk Category and
DescriptionPotential Impact Likelihoo
dConsequen
ceRisk
ProfileProposed Risk Management
Responsibility
Cook Islands Activity Management – Activity Planning Document Template || 11
Key to Risks1. Risk Category and Description
Risk categories include: External
e.g. Economic, Political, Natural Event, Security Organisational
e.g. Personnel, Capacity, Policies Financial
e.g. financial management weaknesses, corruption, fraud, cost/exchange rate escalation, lack of funding.
2. Potential ImpactDescribe the impact
3. LikelihoodIdentify the likelihood of the risk occurring:Likelihood DescriptionAlmost certain Expected to occur in most
circumstancesLikely Will probably occur in most
circumstancesPossible 50/50 that it might occur at some
timeUnlikely Could occur at some timeRare May occur only in exceptional
circumstances
4. ConsequenceIdentify the level of consequence if the risk occurs:
Descriptor Description (Indicative Examples)Severe Causes serious harm to Activity beneficiaries, (individual; community,
organisation, or country).Serious reputational damage to contributing partners.
Major Some harm to Activity beneficiaries, (individual; community, organisation, or country).Achievement of Activity objectives significantly compromised.Reputational damage to contributing partners.Significant financial loss to contributing partners, organisations, communities, individuals.
Moderate Achievement of Activity objectives compromised.Costs escalate more than 30%.Significant implementation delays.
Cook Islands Activity Management – Activity Planning Document Template || 12
Cook Islands Activity Management – Activity Planning Document Template || 13
5. Risk ProfileDetermine the risk profile from the level of likelihood and consequence.
Likelihood
Almost certain Extreme risk
Likely
Possible
Unlikely
Rare Low risk
Consequence Moderate Major Severe
Colour Risk level Measures required
Green Low Normal control and monitoring measures will be sufficient.
Yellow Medium This requires measures to manage the likelihood or consequence of a risk and active monitoring.
Red High
Extreme risks are likely to occur and would prevent achievement of outcomes, cause unacceptable cost overruns and/or schedule slippage. Significant reputational damage will occur.
Appendix C: Detailed Outputs-Based Budget / Cost EstimatesAttach the sequenced costed Work Plan template (Excel file) that is appropriate for the activity, either the:
Summary by Output Work Plan Detailed by Output Work Plan Detailed by Input Work Plan.
The Work Plan is to cover the period of activity implementation.
[???]
Cook Islands Activity Management – Activity Planning Document Template || 14
Appendix D: Description of Program or Activities(Include if appropriate)This appendix provides a detailed description of program or Activities[???]
Appendix E: Management and Implementation ArrangementsInclude organization chart and other details as appropriate including roles and responsibilities of parties/stakeholders.[???]
Appendix F: Relevant Analyses(Include relevant analyses: Social, economic, environment, gender, poverty, institutional/fiduciary capacity, etc.)[???]