Activities for the CIPM MRA Korea Research Institute of Standards and Science 1. Participation in KC (as of Feb 2013) CC CIPM BIPM APMP Total Participation KC SC KC SC KC SC AUV 13(9) 1(1) 0(0) 0(0) 7(5) 2(2) 23(17) 73.91% EM 51(21) 2(2) 9(6) 0(0) 18(12) 14(10) 94(51) 54.26% L 9(5) 4(4) 2(2) 0(0) 12(9) 5(2) 32(22) 68.75% M 97(40) 0(0) 0(0) 0(0) 36(22) 12(4) 145(66) 45.52% PR 18(8) 3(1) 0(0) 0(0) 6(3) 10(6) 37(18) 48.65% QM 144(86) 0(0) 0(1) 0(0) 9(7) 5(4) 158(98) 62.03% RI 49(19) 13(3) 79(12) 1(0) 15(10) 6(5) 163(49) 30.06% T 20(6) 3(0) 0(0) 0(0) 13(8) 10(8) 46(22) 47.83% TF 1(1) 0(0) 0(0) 0(0) 0(0) 0(0) 1(1) 100.00% Total 402(195) 26(11) 90(21) 1(0) 116(76) 64(41) 699(344) 49.21% 2. CMCs listed in the KCDB (as of Feb 2013) (1) DSME - BP, USA (2002) DSME : Daewoo Shipbuilding & Marine Engineering AUV EM L M PR QM RI T TF Total 41 141 28 49 41 473 214 59 24 1070 Offshore plant order by BP, USA Calibration traceability to NIST required Additional cost for recalibration in USA : 1 million US dollars Possible penalty due to a 2-month delay: 10 million US dollars Claim Solution Benefit DSME, accredited by KOLAS, which is a member of APLAC and ILAC MRA DSME, keeping its standards traceable to KRISS NIST confirmed that “traceability to KRISS is equivalent to traceability to NIST” via the CIPM MRA, to which NIST and KRISS are signatories BP accepted accreditation by KOLAS and calibration certificates issued by KRISS 11million US dollars saved Invested 30,000 US dollars for calibration Had it not been for the CIPM MRA, ILAC MRA... DSME offshore plant KRISS has demonstrated its technical capability by achieving outstanding results in a number of fields.

Transcript of Activities for the CIPM MRA - KRISS · ILAC MRA •POSCO, keeping its standards traceable to KRISS,...

Page 1: Activities for the CIPM MRA - KRISS · ILAC MRA •POSCO, keeping its standards traceable to KRISS, which is a signatory to the CIPM MRA •POSCO’s steel accepted without restriction

Activities for the CIPM MRAKorea Research Institute of Standards and Science

1. Participation in KC (as of Feb 2013)

Note 1 : ( ) : participation by KRISS

CCCIPM BIPM APMP

Total ParticipationRatioKC SC KC SC KC SC

AUV 13(9) 1(1) 0(0) 0(0) 7(5) 2(2) 23(17) 73.91%

EM 51(21) 2(2) 9(6) 0(0) 18(12) 14(10) 94(51) 54.26%

L 9(5) 4(4) 2(2) 0(0) 12(9) 5(2) 32(22) 68.75%

M 97(40) 0(0) 0(0) 0(0) 36(22) 12(4) 145(66) 45.52%

PR 18(8) 3(1) 0(0) 0(0) 6(3) 10(6) 37(18) 48.65%

QM 144(86) 0(0) 0(1) 0(0) 9(7) 5(4) 158(98) 62.03%

RI 49(19) 13(3) 79(12) 1(0) 15(10) 6(5) 163(49) 30.06%

T 20(6) 3(0) 0(0) 0(0) 13(8) 10(8) 46(22) 47.83%

TF 1(1) 0(0) 0(0) 0(0) 0(0) 0(0) 1(1) 100.00%

Total 402(195) 26(11) 90(21) 1(0) 116(76) 64(41) 699(344) 49.21%

2. CMCs listed in the KCDB (as of Feb 2013)

(1) DSME - BP, USA (2002)

•DSME : Daewoo Shipbuilding & Marine Engineering

3. Success Stories of CIPM MRA in Korea

AUV EM L M PR QM RI T TF Total

41 141 28 49 41 473 214 59 24 1070

•Offshore plant order by BP, USA •Calibration traceability to NIST required

•Additional cost for recalibration in USA: 1 million US dollars•Possible penalty due to a 2-month delay: 10 million US dollars

Claim

Solution

Benefit

•DSME, accredited by KOLAS, which is a member of APLAC and ILACMRA •DSME, keeping its standards traceable to KRISS•NIST confirmed that “traceability to KRISS is equivalent to traceability

to NIST” via the CIPM MRA, to which NIST and KRISS are signatories•BP accepted accreditation by KOLAS and calibration certificates

issued by KRISS

•11million US dollars saved•Invested 30,000 US dollars for calibration

Had it not been for the CIPM MRA,

ILAC MRA...➜

DSME offshore plant

KRISS has demonstrated its technical capability by achieving outstanding results in a number of fields.

Page 2: Activities for the CIPM MRA - KRISS · ILAC MRA •POSCO, keeping its standards traceable to KRISS, which is a signatory to the CIPM MRA •POSCO’s steel accepted without restriction

(2) SHI - SEIC, Russia (2003)

•SHI : Samsung Heavy Industry •SEIC : Sakhalin Energy Investment Company

•SHI constructed an offshore platform ordered by SEIC, Russia •All the measuring instruments attached to the platform required

traceability to NMS of Russia

•Additional cost for recalibration in Russia ;•Possible penalty due to delay of delivery : 16 million US dollars

•KRISS and VNIMS are signatories to the CIPM MRA•KRISS and VNIIMS concluded a protocol recognizing the equivalency

of NMS in both countries •SEIC approved all of the KRISS-traceable SHI measuring instruments

as traceable to VNIIMS

•16 million US dollars saved•Invested 150,000 US dollars for calibration

Had it not been for the CIPM MRA... ➜

The dimensions of theplatform is approximately 95 m x 130 m x 120 m

(3) POSCO - India, Mexico (2004)

•POSCO : Pohang Steel and Iron Company

•A Mexican manufacturer of automobile parts demanded proof ofreliability of POSCO steel •An Indian buyer of POSCO steel required certification from BIS

(Bureau of India Standard)

•Additional cost for retesting in Mexico and India;•Possible penalty due to delay in delivery: 5 million US dollars

•POSCO, accredited by KOLAS, which is a member of APLAC andILAC MRA•POSCO, keeping its standards traceable to KRISS, which is a signatory

to the CIPM MRA•POSCO’s steel accepted without restriction in India and Mexico

•5 million US dollars saved•Invested 70,000 US dollars for calibration

Had it not been for the CIPM MRA,

ILAC MRA...➜

POSCO offshore plant

267 Gajeong-ro, Yuseong-gu, Daejeon 305-340, KoreaTel: +82-42-868-5441~5443 Fax: +82-42-868-5444 E-mail: [email protected] Website: http://english.kriss.re.kr

(4) Korean Air - US FAA (2008)

•US FAA required KA to secure calibration certificates traceable toNIST according the US Repair Station Act

•Suspending services for 3 months during calibration at NIST; •Additional cost to substitute instruments and to establish a new system

with traceability to NIST: 9 million US dollars

•KRISS and NIST are signatories to the CIPM MRA•The FAA accepted all KRISS-traceable KA measuring instruments as

traceable to NIST

•9.4 million US dollars saved•Invested 40,000 US dollars for calibration