Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA

62
Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA “A Sober Assessment of Opportunities and Realities” http://www.w2agz.com/ BD_3TUW09.htm

description

Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA. “A Sober Assessment of Opportunities and Realities”. http://www.w2agz.com/BD_3TUW09.htm. New Holland & The Hudson Valley. Barents Baltus (1659) > Baltus Barents van Kleeck (?)(1702) > Poughkeepsie. - PowerPoint PPT Presentation

Transcript of Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA

Page 1: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA

Activities and Plans in the USPaul M. Grant

W2AGZ TechnologiesSan Jose, CA USA

“A Sober Assessment of Opportunities and Realities”

http://www.w2agz.com/BD_3TUW09.htm

Page 2: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA

New Holland & The Hudson Valley

Barents Baltus (1659) > Baltus Barents van Kleeck (?)(1702) > Poughkeepsie

Page 3: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA

USElectric Power 101

Page 4: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA

~$2 trillion total asset value

$344 billion annual revenues

142 million customers

3273 utilities

Without electric power the $14.3 trillion

U.S. economy would come to a halt

- Electricity Today - The Crown Jewel of the US Economy

Page 5: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA

NYC circa 1890s

Page 6: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA

Fathers of American Electric Power

Page 7: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA

The US Electrical System

Page 8: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA

US Electricity Generation Sources

Page 9: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA

US Electricity Flow - 20071 Quad = 0.29 TkWh

US Generation Capacity = 1.1 TWGross Generation = 4.33 GkWh(T&D Losses)/(End Use) = 10%

Page 10: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA

The US Transmission Grid(s)• 300,000 km• 500 companies• 10% Losses

Page 11: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA

North American HVDC

Page 12: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA

Pacific Intertie• HVDC, +/- 500 kV, 3.1 kA, 3.1 GW• 1,362 km• ~50% of LA Power Consumption • Converter/Inverter Losses ~ 5%• Ohmic Losses ~ 10%

Celilo I/C Station“A Mountain of Silicon”

Page 13: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA

NERC Interconnects

Source: DOE 2006 National Electric Transmission Study

Page 14: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA

The Grid:A Journey Though the Heart of Our Electrified World

By Phillip F. ScheweJoseph Henry Press, 2007 (Buy It!)

Reviewed by Paul M. Grant:

Plugged into the matrixThe rise and potential fall of the US electricity grid

Nature 447, 145 (2007)http://www.w2agz.com/Publications/Book%20Reviews/06%20%282007%29%20Plugged%20Into%20the%20Matrix.pdf

Page 15: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA

Where Can We Use Superconductivity?

Potentially Everywhere …maybe

Page 16: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA

Superconductivity Act of 1988

DOE Program: ~ 20 Years @ ~ $50 M/yr = $1 B

Page 17: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA

HTSC Utility Market

10 More Years!

Page 18: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA
Page 19: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA
Page 20: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA
Page 21: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA
Page 22: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA
Page 23: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA
Page 24: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA
Page 25: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA
Page 26: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA
Page 27: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA

2010 DOE OED&ER Budget Request

?

WOW !

Page 28: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA

Wiring the World with Copper Oxides

Page 29: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA

HTSC Power Technology is Here

• …and it works!– …perhaps still a little pricey, though

• …so where’s the demand?• …what needs to be fixed?• …why isn’t is being used?

– …would it help if the wire/tape were free?

Page 30: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA

Projected 2008 Congested Paths in the Eastern Interconnection

Source: DOE 2006 National Electric Transmission Study

Page 31: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA

Western Interconnection

Source: DOE 2006 National Electric Transmission Study

Page 32: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA

Real-Life Power Flows

Can we defeat (macroscopically) Kirchhoff's Laws?

Page 33: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA

Chaos on the Grid

Business as usual

Business when a crowbar is thrown

across the lines

Page 34: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA

How many 9’s?

• Average rms Voltage = 116.25 volts • Deviation = +/- 3.0 volts• Percentage = ~ 3.5%• Not Exactly “Five 9’s”

“Easily accommodated by most PC power supplies…no problem.”

07/25/04 3:30-6:00 PM, Sunday, SJ, CA 95120--W2AGZ Server Voltage

Page 35: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA

San Francisco ‘00

Chicago ‘99

New Orleans ‘99

Atlanta ‘99

Delaware ‘99

New York ‘99Detroit ‘00

West Coast ’96

1818

17

San Francisco ‘00

Chicago ‘99

New Orleans ‘99

Atlanta ‘99

New York ‘99Detroit ‘00

West Coast ’96Northern California ‘01

Delaware ‘99

Texas ‘03

Blackouts

Northeast ‘03

Page 36: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA

Northeast 8/14/03

Page 37: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA

As Night Falls…

Page 38: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA

The Party Begins…

Page 39: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA

…and Continues…

Page 40: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA

It Gets Better…

Page 41: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA

and Better…

Page 42: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA

The Morning After

Page 43: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA

Viva New York!

Page 44: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA

Can “New” Transmission Technology Help?

• Yes, but probably not superconductivity in a big way, at least for a while.

• More likely, “smart” grid stuff will come first– HVDC cables and lines– FACTS to increase present corridor capacity by

30%– IT and communications plus an “OS/360” to more

effectively and efficiently management power flows

P. M. Grant, DOE Presentation, 2004

Page 45: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA

Financials

$750 M ($400 M “VC”, $350 M “Futures”)

• Loan Payment (4%, 40 yrs, 750 M$) = 35 M$/yr• Labor, Overhead, Maintenance = 5 M$/yr• Tariff = 0.5 ¢/kWh• Profit (NOI) @ 50% Capacity = 4 M$/yr• Profit (NOI) @ Full Capacity = 48 M$/yr

Specifications

2-1000 MW HVDC Bipolar Circuits

• Circuit 1: 130 miles, Greene County → Bronx County• Circuit 2: 140 miles, Albany County → New York

County• Each Circuit: +/- 500 kV, 1000 A Bipolar (2 cables

ea.)

Why didn’t it go forward?Wire C/P = 100 $/kA×mHTSC Cost = $87 M

Page 46: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA

Sayerville, NJ → Levittown LI, NY

- 600 MW (+/- 250 kV, 1200 A)- 65 miles (105 km)- $400 M- 2007

Pirelli (Prysmian)Energy Cables

$190 M

T 77 K

C/P$/

kA×m

Cost ($M)

Cu 7 1.8

HTSC 100 25.1

Financials40 yrs @ 4%: $ 20MLOM: 1 MNOI (100%): 5 M

Page 47: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA

So Where’s the “Gold Rush” to Superconductivity?

• What’s the analogy to the Erie Canal, Railroads, REA, TVA, Interstate Highways that opened the country to economic development?– Capacity? Possibly– Reliability? Maybe– Power Quality? Nah

Page 48: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA
Page 49: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA
Page 50: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA
Page 51: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA
Page 52: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA
Page 53: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA
Page 54: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA
Page 55: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA
Page 56: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA

1250 Miles

4 GW

460 Miles

500 kV

Page 57: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA
Page 58: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA

“Superconduct-ress”

Page 59: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA

Mr. Electric Utility Good Ol’ Boy

Page 60: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA

Miss Same Old Technology

Page 61: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA

Together Forever?

Page 62: Activities and Plans in the US Paul M. Grant W2AGZ Technologies San Jose, CA USA