Action taken by BWSSB in preventing pollution
of Lakes
Bangalore Valley System
Well defined valleys
– 4 Major valleys Koramangala Challaghatta Hebbal Vrishabhavathi
– Minor valleys Arkavathi, Kathriguppe and Kethamaranahalli
(Vrishabhavathi Valley) Taverekere (Koramangala valley)
BANGALORE’S CASCADING LAKES SERIES
Un planned growth of city Un sewered pockets such as slums and erstwhile CMC areas Damage of main sewers Blockages and overflows in the sewer system Direct letting out of raw wastewater into storm water
drainage system from un-sewered as well as sewered pockets Lack of adequate infrastructure facilities Dumping of solid waste within the drainage zones
Reasons for pollution of Lakes
Sewerage management in Bangalore
Facts Total sewage generated in Bangalore – 1000 MLD Sewerage connections – 8 Lakh Sewerage network
Laterals (< 300 mm dia) – 3367 KmsTrunk Sewers (>300 mm dia) – 302 Kms
Number of plants – 14 Sewage treatment capacity – 721 MLD Average Present treatment – 453 MLD
Measures for abating Lake Pollution
1) Replacement/ Rehabilitation/ Up gradation of old sewerage net work – Laterals and Trunk sewers in core city
2) Creation of New Sewerage Net Work Erstwhile CMC area – 2300 Kms 110 Villages – 2000 Kms
Total – 4300 Kms3) Creation of Additional Treatment capacity to
treat wastewater produced in the new areas
Environmental Action Plan – A Replacement and Rehabilitation of existing sewers Total length – 33 Kms Cost – Rs. 47 Crores under NRCP Work is completed
On going projects
On going projects
Environmental Action Plan – B
Replacement and Rehabilitation of existing
sewers Total length – 70 Kms Taken up under 8 packages Cost – Rs. 176 Crores under JnNURM & JICA Project period 2010-2013
On going projects
Zero Flow in Hebbal drainage zone Length – 19 Kms Taken up under 3 packages Cost – Rs. 35 Crores under BWSSB funds
& Mega city funds Project period 2010-2013
On going projects
Providing UGD Facilities to 8 ULBs in BBMP area
• Estimated Cost : Rs. 1098.15 Crore
• Amount put to bid : Rs. 966.21 Crore
• Awarded Cost : Rs. 1191.79 Crore
• Funding : JnNURM - World Bank
• Project Period : 4 Years
• Length of pipeline to be laid : 2300 Kms
• Number of packages : 24
On going projects - progressSl
No. ULB’s Total Pipe
laying Qty to be
achieved in Kms
Progress achieved in
Kms
Percentage Completion Date
1 Yelahanka CMC 60.28 57.82 95.92% Feb-132 Byatarayanapura CMC 468.81 269.46 57.47% Feb-143 Mahadevapura CMC 357.11 155.81 43.63% Sep-154 Krishnarajapuram CMC 314.85 246.91 78.42% Feb-145 Bommanahalli CMC 466.91 260.84 55.86% Feb-146 Rajarajeshwarinagar CMC 117.22 78.37 66.85% Feb-147 Kengeri TMC 57.62 14.1 24.47% Sep-148 Dasarahalli CMC 470.92 374.61 79.54% Feb-14
TOTAL 2313.72 1457.91 63.01% Sep-15
Construction of new treatment plants 11 Numbers under JICA assistance 339 MLD Capacity with nutrient removal treatment process 300 MLD plant at V Valley at a cost of Rs. 396 Crore
Environmental Action Plan – C Cost – Rs. 360 Crores Length – 109 Kms
Water supply and Sanitation to 110 Villages Awaiting clearance from Central Government
Future projects
Treatment plants proposed under CWSS Stage IV Phase II
Name Capacity in MLD Process (Including BNR)
Raja Canal 40 Extended Aeration (EA)
Horamavu Agara 20 Sequential Batch Reactor (SBR)
Nagasandra 20 SBR
Chikkabanavara 5 SBR
Kadugodi 6 SBR
Kachohalli 3 Membrane Bio – Reactor
Kengeri 60 Activated Sludge Process (ASP)
K & C Valley 60 ASP
Bellandur Amanikere 90 ASP
Doddabele 20 SBR
Yellemallappa Chetty Kere 15 SBR
Total 339
MonthAverage daily inflow in ML
2006 2007 2008 2009 2010 2011 2012January 198.89 246.07 210.01 307.00 303.28 271.98 259.98February 233.55 247.32 216.15 316.33 318.15 251.02 277.56March 236.92 234.59 264.28 313.87 330.55 261.97 275.28April 269.88 264.22 305.91 277.75 276.15 274.92 270.90May 310.17 276.99 294.20 251.55 323.67 251.50 249.71June 224.34 299.24 304.44 244.93 307.66 279.12 285.55July 245.12 289.05 278.76 236.87 308.70 304.51 356.58August 253.33 327.73 301.85 275.66 306.78 285.22 354.27September 295.74 268.33 257.06 292.62 285.64 252.68 356.13October 301.31 247.88 261.78 271.95 297.04 304.74 383.27November 288.76 238.10 264.39 265.12 301.92 309.28 379.74December 245.59 217.67 303.05 269.91 275.20 249.00 384.29Average 258.72 263.18 272.75 276.72 302.88 274.81 320.50
Quantity of used water treated in the existing treatment plants
Monthly Average inflow to treatment plants in MLD
Treatment Plant and capacity January-13 February-13 March-13V Valley 180 MLD 68.17 67.18 74.45Mailasandra 75 MLD 47.14 48.99 52.58Nagasandra 20 MLD 7.24 5.68 7.34Hebbal 60 MLD STP 18.25 34.16 34.16Yelahanka 10 MLD STP 4.28 5.21 5.51Jakkur 10 MLD STP 4.44 4.70 4.91Raja Canal 40 MLD STP 19.00 28.04 39.35K R Purum 20 MLD STP 9.89 12.38 12.18Kadabeesanahalli 50 MLD 27.44 36.43 36.12K & C Valley 218 MLD 144.85 148.09 149.64K & C Valley 30 MLD 28.89 28.81 30.27Lal Bagh 1.50 MLD 1.20 1.08 1.08Cubbon Park 1.50 MLD 1.06 1.25 0.85Madivala 4 MLD 3.79 3.79 3.79Kempambudhi 1 MLD 1.00 1.00 1.00Total - 721 MLD 386.64 426.76 453.22
Benefits after the completion of UGD works under KMRP
Erstwhile ULB Name of the Lake No. of lakes
Yelahanka Attur, Puttenahalli, Yelahanka, Allalasandra, Jakkur, Shivanahalli
6
Bytarayanpura Chikkabanavara, Singapura, Abbegeri, Vidrayanapura, Doddabommasandra, Tindlu, Hebbal, Nagavara, Jakkur, Rachenahalli, Amruthahalli, Hennur, Byrathikhane, Kalkere, Rampura
15
Erstwhile ULB
Name of the Lake No. of lakes
Mahadeva pura & K R Purum
Munekollal, Sadaramangala, Bhattrahalli, Vengeankere, Ramamurthy Nagar, Basavapura, Yellemallappa Chetty, Kaggadasapura, Vibhuthipura, Varthur, Mahadevapura, Ganghadhar, Doddakundenahalli, Kundenahalli, Rajupallya, Benniganahalli, Sigehalli, Siddapura
18
Benefits after the completion of UGD works under KMRP
Erstwhile ULB
Name of the Lake No. of lakes
Bommana halli
Jaraganahalli, Chunchanaghatta, Puttenahalli, Kothunur, Arekere, Hulimavu, Madivala, Agaram, Varthur, Begur, Chikkabegur, Singasandra, Kadagi Singasandra, Somasundra palya, Garvibhavpalya, Hosapalya
16
R R Nagar & Kengeri
Mallathahalli, Hosakere, Kengeri, Dubasapalya, Halgevadrahalli
5
Benefits after the completion of UGD works under KMRP
Erstwhile ULB
Name of the Lake No. of lakes
Dasarahalli Dasarahalli, Doddabidrakallu, Herohalli, Laggere, Shivapura, Pillappakatte, Bagalkunte, Mallasandra, Chikkabanavara, Nelegadaranahalli
10
Total 70
Benefits after the completion of UGD works under KMRP