Action-SS June 14, 2016 Attachments BOARD OF EDUCATION OF CHARLES COUNTY AGENDA ITEM SUBJECT FY 2017 Educational Facilities Master Plan (EFMP) OVERVIEW The EFMP is the first step in the state's school construction program process that leads to the development and approval of a state supported Capital Improvements Program (CIP). Revisions to the EFMP are submitted annually to the Maryland Department of Planning by July 1. This plan is an “identification of needs document.” The CIP is developed later in the fall of each year and addresses these needs with careful consideration to project costs and affordability discussions with county government. BUDGET IMPLICATIONS The EFMP is used to develop and prioritize both the state and local CIP. Funding consideration by the Interagency Committee on School Construction will be given to a local board's CIP only if a current EFMP is on file. STAKEHOLDERS INVOLVED To ensure our system's facilities’ needs are objectively identified for the Board of Education’s (BOE) programming consideration, central office and local government staffs assisted in the development and refinement of the EFMP documents. DESCRIPTION A synopsis of the required elements of the EFMP is included with this plan (attachment). Careful consideration was given to the long standing dialogue between the County Commissioners and the BOE relating to the Adequate Public Facilities Ordinance, and the responsiveness of the CIP to the county’s growth within the state and local anticipated revenues. The focus of the EFMP is reflected in the proposed project schedule along with the systemic renovations plan. This year’s update follows our normal review of maintenance records, systems normal life expectancy records, and growth in the county; but also includes consideration of the new System Wide Capital Improvements Program (educational survey and assessment by GWWO Architects). RECOMMENDATION/FUTURE DIRECTION That the BOE accept and approve the EFMP for FY 2017, as a working document, which will be submitted to the state by July 1, 2016. G:\Planning_&_Construction\EFMP\FY 2017\ ACTION ITEM.doc

Transcript of Action-SS June 14, 2016 Attachments BOARD OF EDUCATION OF ...

Page 1: Action-SS June 14, 2016 Attachments BOARD OF EDUCATION OF ...

Action-SS June 14, 2016 Attachments

BOARD OF EDUCATION OF CHARLES COUNTY AGENDA ITEM

SUBJECT FY 2017 Educational Facilities Master Plan (EFMP) OVERVIEW The EFMP is the first step in the state's school construction program process that leads to the development and approval of a state supported Capital Improvements Program (CIP). Revisions to the EFMP are submitted annually to the Maryland Department of Planning by July 1. This plan is an “identification of needs document.” The CIP is developed later in the fall of each year and addresses these needs with careful consideration to project costs and affordability discussions with county government. BUDGET IMPLICATIONS The EFMP is used to develop and prioritize both the state and local CIP. Funding consideration by the Interagency Committee on School Construction will be given to a local board's CIP only if a current EFMP is on file. STAKEHOLDERS INVOLVED To ensure our system's facilities’ needs are objectively identified for the Board of Education’s (BOE) programming consideration, central office and local government staffs assisted in the development and refinement of the EFMP documents. DESCRIPTION A synopsis of the required elements of the EFMP is included with this plan (attachment). Careful consideration was given to the long standing dialogue between the County Commissioners and the BOE relating to the Adequate Public Facilities Ordinance, and the responsiveness of the CIP to the county’s growth within the state and local anticipated revenues. The focus of the EFMP is reflected in the proposed project schedule along with the systemic renovations plan. This year’s update follows our normal review of maintenance records, systems normal life expectancy records, and growth in the county; but also includes consideration of the new System Wide Capital Improvements Program (educational survey and assessment by GWWO Architects). RECOMMENDATION/FUTURE DIRECTION That the BOE accept and approve the EFMP for FY 2017, as a working document, which will be submitted to the state by July 1, 2016. G:\Planning_&_Construction\EFMP\FY 2017\ ACTION ITEM.doc

Page 2: Action-SS June 14, 2016 Attachments BOARD OF EDUCATION OF ...

FY 2017 EDUCATIONAL FACILITIES MASTER PLAN SYNOPSIS

The Educational Facilities Master Plan (EFMP) is the first of three phases in the state's public school construction program - the programming phase. With Interagency Committee on School Construction approval, the EFMP will serve as the basis for the state's capital improvements program. The preparation of this year's plan considers evolving planning data, identified through the ongoing collaboration by central office staff and county staff, ensuring careful consideration of the Board of Education (BOE) and the County Commissioners’ recommendations for future planning efforts. The plan excerpts listed below (elements of a more detailed document) outline the following changes as contrasted with last year's plan:

Goals, Standards and Guidelines Section - Updated to reflect changes that have occurred over the last year and updated with new information from the various departments.

New Enrollment Data - Includes new projected enrollment and redistricting data on

which all subsequent analysis has been based.

Facilities’ Needs Analysis - A major component focusing on future planning efforts in one composite document. This section includes: Project Schedule - Graphically displays the suggested planning and construction

programming for renovations and required new capacity. New capacity requirements are drawn from an analysis of area step charts by school level included with this report. The step charts on pages 16 – 18 depict projected enrollment as developed by our school system staff and approved by the Maryland Department of Planning in May 2016.

Systemic Renovations – The report includes a section that formalizes the tie with the

Comprehensive Maintenance Plan as it impacts systemic renovations, bringing planning and programming consideration before the BOE on a yearly basis.

Page 3: Action-SS June 14, 2016 Attachments BOARD OF EDUCATION OF ...

Educational Facilities

Master Plan

FY 2017

Westlake High School

Charles County Public Schools

La Plata, Maryland

June 2016

Page 4: Action-SS June 14, 2016 Attachments BOARD OF EDUCATION OF ...

i

Prepared

For

THE BOARD OF EDUCATION

OF CHARLES COUNTY

Virginia R. McGraw, Chairman

Michael Lukas, Vice Chairman

Jennifer S. Abell

Mark Crawford

Victoria T. Kelly

Margaret T. Marshall

Barbara S. Palko

Da’Juon Washington, Student Member

Kimberly A. Hill

Superintendent

Keith A. Hettel

Assistant Superintendent

for Supporting Services

David N. Clements

Supervisor of

Planning & Construction

June 2016

The Charles County public school system does not discriminate on the basis of race, color, religion, national origin, sex, sexual

orientation, age or disability in its programs, activities or employment practices. For inquiries, please contact Dr. Patricia Vaira, Title

IX Coordinator and Section 504 Coordinator (students), or Pamela Murphy, Section 504 Coordinator (employees/adults), at Charles

County Public Schools, Jesse L. Starkey Administration Building, P.O. Box 2770, La Plata, Maryland 20646; (301) 932-6610/870-3814.

For special accommodations call (301) 934-7230 or TDD 1-800-735-2258 two weeks prior to the event.

Page 5: Action-SS June 14, 2016 Attachments BOARD OF EDUCATION OF ...

GOALS, STANDARDS AND GUIDELINES

Each school district in the State of Maryland prepares an annual Educational Facilities Master

Plan (EFMP) in order to receive funds from the state’s public school construction program.

Funds for specific schools are approved annually through the Capital Improvements Program

(CIP). The EFMP presents school resources and identifies needs; the subsequent CIP responds

to the identified needs by funding specific capital projects.

The state requires that each EFMP include a section on goals, standards and guidelines and

identifies eight policy areas to be addressed. Information for Charles County Public Schools

follows below.

A. GRADE ORGANIZATION PATTERN

Public schools in Charles County are organized into three levels: elementary schools

are from pre-K through grade 5; middle schools are grades 6 through 8; and high schools

are grades 9 through 12. The Stethem Educational Center houses alternative programs

for students at the middle and high school levels. At the six Title I schools a three-year

old full day program is also offered. The F.B. Gwynn Center houses programs serving

students from infants and toddlers through middle school.

Adult Education Services is comprised of several programs at the Lifelong Learning

Center, including the National External Diploma Program®, and is currently located

at the Robert D. Stethem Educational Center in Pomfret, as well as schools in the

Waldorf area. The National External Diploma Program® at the Lifelong Learning

Center is an alternative to the GED® exam based on skills achieved through life

experiences. The Lifelong Learning Center has several programs for adults, including

adult basic education, family literacy, GED® preparation, English language civics

classes, and English as a second language classes. Off-site classes include GED®,

NEDP®, Adult Basic Education, and ESL at John Hanson Middle School; ESL at two

Judy Centers/Title I school, ESL and GED® preparation at the County Detention

Center, and a GED® to college transition class at the College of Southern Maryland.

Six elementary schools (six school-wide) house Title I programs for three-year olds (C.

Paul Barnhart, Mt. Hope/Nanjemoy, Indian Head, J. P. Ryon, Dr. Samuel Mudd, and

Eva Turner).

B. STUDENT STAFFING RATIOS

A low student-teacher ratio provides a more individualized instructional program.

Presently, Charles County Public Schools average 25 pupils or less for every one

1

Page 6: Action-SS June 14, 2016 Attachments BOARD OF EDUCATION OF ...

teacher. In addition to classroom teachers, other professionals staff the system’s pre-

school, library, guidance, reading, special education, and gifted education programs.

Itinerant staff is deployed on an as-needed basis including pupil personnel workers,

school psychologists, speech therapists, nursing personnel, and special education

specialists. Specific program needs may also impact student-teacher ratios such as

recent initiatives in reading, high school assessments, state testing, and the three-year

old program.

C. TRANSPORTATION POLICIES

The transportation department operates a safe, efficient and reliable bus service with a

policy to hold busing to a minimum in terms of time and distance. Every effort is made

to keep student travel times less than one hour, especially in the rural areas of the

county. As development occurs, bus routes may change in order to meet the growing

number of students in current subdivisions and from new developments.

D. ATTENDANCE ZONES AND REDISTRICTING POLICIES

Each school has a geographically-based attendance area or zone. Students living within

a zone attend the designated school with certain exceptions for children attending

special education programs or other designated exceptions. A transportation link on

the school system’s website (www.ccboe.com) identifies the appropriate attendance

zone upon entry of a street address.

Changing enrollment patterns and the opening of new schools cause redistricting.

School enrollment boundaries are adjusted in order to promote uniform and efficient

use of school facilities and resources. The redistricting policy, adopted in 1997 and

amended in 2012, requires staff to annually review enrollment data of individual

schools. When a boundary line adjustment becomes necessary, the Superintendent

establishes an advisory committee on redistricting. The factors reviewed during

redistricting include:

school capacity

impact on educational program quality

student enrollment trends

age or condition of buildings

transportation

impact on the community

limiting movement in elementary/middle schools to once in three years

limiting movement after enrollment in ninth grade.

2

Page 7: Action-SS June 14, 2016 Attachments BOARD OF EDUCATION OF ...

The redistricting committee develops two proposals and holds at least one public

hearing. From the committee’s report and initial public input, the Superintendent

presents a redistricting proposal to the Board of Education. The Board holds at least

one public hearing on the Superintendent's redistricting proposal. The final decision

is made by the Board with at least 90 days’ notice prior to implementation. There were

no school boundary changes during the 2015-2016 school year.

E. GIFTED EDUCATION SERVICES

Gifted education provides advanced academic experiences for students who perform or

show the potential to perform at high levels of accomplishment. A learning resource

teacher who works directly with the gifted education program is part of the

instructional leadership team at each elementary and middle school, sharing an office

with the instructional specialist/math resource teacher and reading resource teacher.

Students identified for gifted services in reading/language arts and mathematics work

with the learning resource teacher in the classroom and in small group settings. In

addition, the learning resource teacher collaborates with classroom teachers and

provides staff development for small and large groups.

F. SPECIAL EDUCATION

Special education is customized at each grade level through the Individualized

Education Program (IEP) process with the focus of keeping students in regular

classroom settings. Every school has an IEP room or office for testing, meetings, and

services, where confidential student files are centralized.

Special Education services for preschool age students are delivered in a variety of ways

and are determined by the needs of the students and their families. Many of our

students attend Preschool Special Education Programs that are located in most

elementary schools; these programs include a strong philosophy and a co-teaching

model.

Students with Autism Spectrum Disorder at the elementary school are served through

the Multiple Intensity Teaching (MIT) program. This is a regionalized program

designed to address the academic, social, and behavioral needs of students with severe

communication and behavior disorders. The program serves students beginning at age

three and ending at fourth grade. The classrooms operate using the principles of an

applied behavior analysis model. Students learn skills necessary to function

independently across academic, social, and behavior domains. Students in grades

kindergarten through fourth grade are provided with inclusion opportunities as

3

Page 8: Action-SS June 14, 2016 Attachments BOARD OF EDUCATION OF ...

specified in their IEP. Placement in MIT is determined by the student’s IEP team.

Students at the secondary level are currently provided academic, social, and behavioral

support through the use of autism resource teachers. The teachers provide professional

development for school-based staff in best practices regarding the instruction of

students with autism spectrum disorders.

The Emotional Adjustment Program (EAP) is a highly structured, self-contained

therapeutic program with mainstreaming opportunities for those students who have

difficulty accessing the academic curriculum in the general education setting due to

emotional/behavioral dysregulation. The program is regionalized with school sites at

the elementary, middle, and high school settings. The program provides students with

academic, behavior, and psychological services support for the acquisition of essential

self-regulatory, social, and academic skills. The program continues to support those

students who are able to maintain appropriate behavior as they return to the

mainstream setting. Ultimately, these therapeutic supports are intended to assist the

student in achieving emotional/behavioral stability and academic success without the

need for such extensive supports.

The Life Skills Program provides an alternate curriculum at each grade level for

students with moderate, severe, or profound disabilities. Functional academics,

communications, decision-making skills, and behavior modifications are addressed.

Instruction is community-based in that students work on their IEP goals in community

settings. Within the school setting, students are included with non-disabled peers in

both instructional and social activities.

Transition Academic Adaptive Skills Classes (TAASC) meet the needs of students ages

5-18 with moderate disabilities who require an instructional program designed to

develop skills essential to achieving the highest level of independent functioning in

academics, daily living, work, and community access. Each student’s IEP drives

instruction.

IEP goals and objectives are developed in the following areas:

Academics: the development of math, reading, and writing skills to develop

proficiency with grade level standards.

Personal Management: the development of skills in the areas of personal

hygiene, independent living, and time management.

Community Access: the development of skills in the areas of transportation,

utilization of stores and services, and appropriate integration into the

school/community.

Communication: the development of skills in the areas of receptive and

expressive communication, social interactions, and making choices.

4

Page 9: Action-SS June 14, 2016 Attachments BOARD OF EDUCATION OF ...

Socialization: the development of skills in the areas of interactions with peers

and adults in one-on-one, group, and community settings.

All classes are located in elementary, middle, and high schools within the county, thus

ensuring that students are educated within the least restricted environment. Each

student will be regularly included with their same age peers in daily activities and

instruction, as appropriate.

Some students in the TAASC program pursue a certificate of completion upon

graduation from high school; however, most students will pursue a high school

diploma. These students must fulfill all graduation requirements as determined by the

Maryland State Department of Education and Charles County Public Schools.

Formal transition planning from school to adult life begins when students are 14 years

old. These plans are refined as students get older and school and community based

vocational experiences are provided to students in high school classes, as appropriate.

During the 2015-2016 school year, TAASC programs were held in 14 elementary

schools, 4 middle schools, 2 high schools, and at the F.B. Gwynn Center.

G. CAREER AND TECHNOLOGY EDUCATION

Career and Technology Education (CTE) prepares students for a wide range of careers

through programs that promote both academic and technical achievement. Students

enrolled in CTE program courses can enter careers that require varying levels of

education: high school diplomas, post-secondary certificates, apprenticeships, military

service, or college degrees. Additionally, CTE Programs of Study provide opportunities

to earn industry-recognized credentials and college credit while still in high school.

Students learn skills and develop attitudes that support career employment, college

readiness, and life-long learning.

Business Education courses provide students with opportunities to acquire business

knowledge, skills, and attitudes needed to function effectively in many career

pathways. The foundation and advanced course sequence support continuing education

in business administration, management, finance and marketing. Learning experiences

are designed to support critical thinking skills and effective communication.

Computer Science courses prepare students for success in computer science and related

informational technology degrees, as well as related fields such as engineering. Courses

cover topics such as computer programming and computational thinking, web

development, network technologies, and PC troubleshooting and repair. Students use

5

Page 10: Action-SS June 14, 2016 Attachments BOARD OF EDUCATION OF ...

a variety of programming languages, including Java, virtual robots, animation software,

and professional web development applications such as Adobe CS 5.5.

Family and Consumer Sciences (FACS) courses offered at the high school level prepare

students to become capable individuals, family members, and citizens managing the

challenges of living and working in a diverse global society. FACS programs include

Architecture and Interior Design, Fashion Design, Fashion Merchandising and

Marketing, Food and Nutrition Science and Intercultural Foods, Retail Merchandising,

and Textiles and Apparels.

Financial Literacy courses prepare students with the knowledge and skills necessary to

meaningfully plan for their financial future, manage their money, and evaluate choices

to make informed decisions. The courses cover a wide variety of financial literacy

topics such as credit card usage, credit scores and reports, buying a car, preparing a

budget, checking and savings accounts, investing, and income considerations. All

freshmen entering high school in 2011 and beyond must earn one credit in financial

literacy.

Junior Reserve Officers Training Corps (JROTC) is a service specific student leadership

program that instills the values of citizenship, community service, personal

responsibility, character, and self-discipline. Air Force, Army or Navy (Sea Service-

Navy, Marine, and Coast Guard) programs are offered at each high school. The

programs are staffed with a minimum of one retired officer and one retired

noncommissioned officer.

Technology Education is a comprehensive experienced-based curriculum based on the

Maryland State Technology Education Standards. The Foundations of Technology

course, offered at all high schools is a graduation requirement. Advanced technology

education courses are also available for students interested in this subject matter.

Students are taught technological literacy by exploring the ways in which ingenuity,

processes, materials, devices, science, and mathematics are applied to solving practical

and perennial problems of a designed world. Laboratory activities include the safe use

of tools, machines, and materials.

Career Technology Education Completer Programs by Career Clusters

Career Technology Education Completer Programs provide high school students with

an opportunity to pursue sequential technical and academic programs of study leading

to a career. CTE Programs of Study prepare students for college and careers.

6

Page 11: Action-SS June 14, 2016 Attachments BOARD OF EDUCATION OF ...

The Career Research and Development (CRD) Program of Study prepares students with

academic, technical, and workplace skills necessary to seek further education and

employment in a career field of their interest. The program consists of a classroom

instructional component and a paid or unpaid workplace component.

Arts, Media and Communication Cluster

Graphic Communications – The PrintEd Program of Study is designed to give students

an overall understanding of the industry and its major operations while teaching

competencies that lead to PrintEd certification. Students can gain technical skills in

three areas: Introduction to Graphic Communication, Digital File Preparation, and

Press Operations. Students may also earn college credits through an articulation

agreement with the College of Southern Maryland.

The Interactive Media Production Program of Study includes a strong foundation in

arts and communication with particular emphasis on graphic and media

communications, interactive technologies, and project development. Students

complete courses in Arts, Media and Communication and Interactive Media Production

and Advanced Media Production.

Business Management and Finance Cluster

Business Education courses focus on two pathway programs based on the Maryland

State Department of Education framework document for Business Management and

Finance. Each program includes rigorous academics, broad cluster knowledge and skills

as well as more advanced technical skills related to one of the specific pathways:

Business Administrative Services and Business Management. Each pathway consists of

four courses developed by business educators, postsecondary instructors, and business

partners to help prepare students for success in their chosen business pathway. Skills

for success, workplace readiness, computer applications, written and oral

communication skills, and math skills are all integrated throughout the coursework.

Industry certifications are incorporated where appropriate and opportunities are made

available for students to earn college credit through articulation agreements with local

colleges. Career planning and expectations are incorporated throughout. Each

program allows students to graduate with the skills and knowledge necessary to pursue

a variety of careers in industry and continue their education at postsecondary

institutions.

7

Page 12: Action-SS June 14, 2016 Attachments BOARD OF EDUCATION OF ...

Construction Development Cluster

Architectural Drafting and Design students learn the basics of mechanical drawing and

then progress to orthographic projections, sectional views, and pictorial plans for use

in engineering. Supplemental courses are drawing, drafting and design, physics,

architecture, and interior design.

Carpentry instruction is based on modules from the National Center for Construction

and Education and Research (NCCER) national standards and provides students with

instruction and hands-on experiences in the construction industry. Students master a

variety of construction skills and apply their knowledge and skills by participating in

both lab-based and work-based projects.

Electrical Construction is based on modules from the NCCER national standards, and

provides students with instruction and hands-on experiences. Students master a variety

of electrical skills in both residential and commercial wiring.

Heating, Air Conditioning and Refrigeration Mechanic (HVAC) is based on modules

from the NCCER national standards and provides students with instruction and hands-

on experiences learning about the industry as it relates to residential and commercial

building applications.

Welding provides students a variety of welding skills, such as oxyfuel cutting and

welding including Shielded Metal Arc Welding (SMAW). This course of study

correlates to modules from the NCCER national standards. NCCER meets the

American Welding Society (AWS) Entry Level Welder-Phase One and Phase Two

requirements of the AWS guidelines.

Consumer Services, Hospitality & Tourism Cluster

The ProStart-Food and Beverage Management program introduces high school

students to a wide variety of careers within the restaurant, food service, and hospitality

industry. Students study and practice professional food preparation, preparation of

international cuisines, food safety and sanitation, customer service relations,

accounting, cost control, marketing and an introduction to all aspects of lodging

management. Students will build strong culinary, business, management and work

place skills as a result of their participation in this program. The National Restaurant

Association Education Foundation (NRAEF) designed the program’s industry driven

curriculum.

8

Page 13: Action-SS June 14, 2016 Attachments BOARD OF EDUCATION OF ...

Careers in the Cosmetology program prepare individuals to care for and beautify hair,

skin and nails. Students are instructed in the art and science of cosmetology, as well as

all aspects of the industry. Emphasis is placed on hygiene, safety, and sanitation as well

as State Board of Cosmetologists’ rules and regulations. Related areas of instruction

include human anatomy and physiology; mathematics and measurement; analysis,

diagnosis and histology of hair, skin and nails; chemistry; fundamentals of electricity;

product knowledge; customer relations; and employability skills. Salon management is

an integral part of the classroom and clinical experience. The 1,500-hour program

includes classroom instruction, clinical experience, related mentored work-based

learning experience, and a senior capstone project. Upon successful completion and

the instructor’s recommendation, the student will be required to take the Maryland

State Board of Cosmetologists’ Examination.

The Culinary Arts program prepares students for successful careers in the food and

beverage industry with a focus on Culinary Arts or Professional Baking. The program

includes education in food production, professional cooking, baking, cost control,

nutrition, sanitation, and food marketing. When combined with science classes, this

program will provide the necessary skills for further education and career success.

Environmental, Agriculture & Natural Resources Cluster:

The Horticulture Services program is based on the Certified Professional Horticulturist

(CPH) certification that is used by the Maryland "Green Industry" and includes rigorous

academics, broad cluster knowledge and skills, as well as technical knowledge related

to the horticulture industry. Horticulture courses include Principles of

Plant/Animal/Environmental Science; Foundations of Horticulture; Plant Production;

Landscape Design and Management; and, Capstone Experience. Students are provided

opportunities to earn the CPH industry certification, and college credit through

articulation agreements with local colleges.

Health & Biosciences Cluster

The Academy of Health Professions prepares college-bound students for medical

careers. Students will learn to use technology to provide all aspects of health services.

The program includes classroom instruction as well as hands-on laboratory and clinical

experiences at local health care facilities. Students will also take courses such as

anatomy/physiology, nutrition, and speech. Students are expected to take multiple

science classes, including Advanced Placement Biology and Chemistry. Students at

North Point High School earn a Certified Nursing Assistant certification. Students

attending the program at Robert D. Stethem Educational Center are prepared to take

9

Page 14: Action-SS June 14, 2016 Attachments BOARD OF EDUCATION OF ...

the Pharmacy Technician Certification Board (PTCB) exam in the pharmacy technician

specialty course.

Biomedical Sciences, Project Lead the Way (PLTW), is based on the national standards

for science, mathematics, and English language arts, and the Accountability Criteria for

National Health Care Cluster Foundation Standards. The program consists of a

sequence of four courses: Principals of Biomedical Sciences; Human Body Systems;

Medical Interventions; and, Medical Innovations (science research). Students who

complete the program are prepared for employment and further education at two- and

four-year college levels.

Human Resource Services Cluster:

Education Careers in Early Childhood programs provides students with instruction that

supports careers such as daycare providers, school teachers, instructional assistants, and

school counselors as well as opportunities to earn college credits. Supplemental courses

include art, music, nutrition, and world language.

Criminal Justice prepares students for law enforcement careers. Students complete a

foundation-level course with a focus on addressing threats to public safety through

effective communication, preparedness, detection, prevention, response, and recovery.

Students practice critical thinking in “mock crime scene” activities. Courses in Spanish,

computers, art, speech, and photography are recommended to supplement the

curriculum.

Fire Science/Fire Fighting is offered through collaboration with the Maryland Fire and

Rescue Institute (MFRI) of the University of Maryland, local Fire and Rescue

Companies, and Charles County Public Schools. The program includes classroom

instruction as well as formal training at selected local fire companies. Students must be

members in good standing at their local fire company, complete a minimum of 138

hours of work-based learning, and take the seven certification exams. Successful

completion of this program can lead to MFRI certifications as well as college credits.

The Teacher Academy of Maryland (TAM) aligns with the Interstate New Teacher

Assessment and Support Consortium (INTASC) and the Maryland Essential Dimensions

of Teaching (EDoTs). The program focuses on teaching as a profession, human growth

and development, learning theory, and curriculum and instruction. Upon completion

of the program and passing the ParaPro assessment, high school graduates are ready for

entry level employment as an instructional aide in the teaching profession or can

continue their education at a four-year college.

10

Page 15: Action-SS June 14, 2016 Attachments BOARD OF EDUCATION OF ...

Information Technology Cluster

The CISCO Networking Academy prepares student for industry certification (CCNA)

and advanced study in information technology. Emphasis is placed on solving

networking problems through decision-making and problem-solving techniques,

involving applications of science, mathematics, and communication skills.

Manufacturing, Engineering & Technology Cluster:

The Manufacturing Technologies Program of Study provides students with the

knowledge and skills needed to program and operate Computerized Numerical Control

(CNC) machines in order to create designed products from raw materials.

Manufacturing includes a study of computer assisted drafting and design, engineering

concepts, and computer programming.

Project Lead the Way (PLTW) Pathway to Engineer Pre-Engineering program prepares

students for further education and careers in engineering and engineering technology.

Students complete foundation-level courses in Engineering, including Principles of

Engineering, Introduction to Engineering Design, and Digital Electronics. Students

then select an area of specialization, including Computer Integrated Manufacturing,

Civil Engineering and Architecture, Aerospace Engineering, or Biotechnical

Engineering. In the final course, students also complete an industry-mentored

capstone project in Engineering Design and Development.

Gateway to Technology (GTT) is the middle school pre-engineering program for

students exploring an engineering pathway as a possible career choice. The project-

based format is designed to appeal to learners who may not have considered careers in

science, mathematics, or engineering. This course is not a CTE Completer Program;

however, it is designed by PLTW as a precursor to their pre-engineering program.

Transportation Technologies Cluster

Collision Repair Technician combines technical, academic and workplace skills

through curriculum that is aligned with the Inter-Industry Conference on Auto

Collision Repair (I-CAR), National Automotive Technicians Education Foundation

(NATEF), including Automotive Service Excellence (ASE). Instruction prepares

students for careers and/or further education in collision repair and refinishing within

the Transportation Technology Cluster through the following courses: Non-Structural

Analysis and Damage Repair/ Plastics and Adhesives, Paint and Refinishing, and an

optional course Structural Analysis & Damage Repair.

11

Page 16: Action-SS June 14, 2016 Attachments BOARD OF EDUCATION OF ...

The Automotive Technician program incorporates the Automotive Service Excellence

(ASE) program certification standards and the National Automotive Technicians

Education Foundation (NATEF) task lists. The program prepares students for further

education and careers in the Transportation Equipment Pathway and automotive

technology. The program consists of eight courses: Suspension and Steering, Brakes,

Electrical/Electronic Systems, Engine Performance, Engine Repair, Heating and Air

Conditioning, Automatic Transmission and Transaxle, and Manual Drive Train.

H. EDUCATIONAL SUPPORT POLICIES

School counseling services are available at each school. Certified counselors can help

parents and students in areas of academic planning, personal decision making and

career development. Each high school also has a college and career advisor who assists

with these efforts. Counselors work with parents, administrators, teachers and

community resources to provide the best educational experiences for students.

School health service nurses update, maintain and implement medical plans for

medically fragile students, administer medications, review immunization records and

provide medical response for illness and injuries as needs arise for students and staff.

Vision and hearing technicians regularly screen students and re-screen upon requests

from parents or teachers.

Certified school psychologists provide crisis intervention, counseling for students and

groups of students, individual risk assessments, psychological assessments and

consultations with teachers, parents and administrators. This includes referrals to, and

consultations with, appropriate community agencies and professionals.

Pupil personnel workers act as liaisons between home, school and the community.

They investigate residence concerns and assist with attendance, behavior, enrollment,

and homeless issues.

Court liaisons work with the courts, Juvenile Services Department and the school

system to appropriately and effectively meet students' needs.

School Probation Officers (SPO’s) are employed by Department of Juvenile Services to

serve as mentors. They primarily work with students placed on probation by the court.

They devote time and attention to these and other students serving as positive role

models in prevention and early intervention programs.

School Resource Officers (SRO) are sworn police officers from the Sheriff’s Office. An

officer is assigned to each middle and high schools. Service is provided to elementary

schools as needed. When requested by the school, the SRO’s serves as mentors to the

12

Page 17: Action-SS June 14, 2016 Attachments BOARD OF EDUCATION OF ...

students and as consultants to the school administration and staff. They provide school

and personnel safety programs, teach DARE classes, counsel individual students, work

with parents, and carry out normal police duties when called upon to do so.

I. SCHOOL CLOSING PROCEDURES

Charles County Public Schools provide high quality education at an efficient and cost

effective level through an optimum use of facilities. The local growth rate is an added

challenge to this policy; whereas the closing of schools is a lesser demand. School

closings comply with state regulations (COMAR 13A.02.09). The Superintendent

appoints a standing committee to review population patterns and other factors bearing

on school operations. The analysis includes:

educational program quality

student enrollment trends

student body racial composition

age or condition of schools

means of transportation

student relocations

financial projections and economic costs

community impact of school closings

impacts to schools at other levels

Based on each school’s assessment, the committee submits recommendations to the

Superintendent, which could include school closures. From the committee’s

recommendations, the Superintendent develops alternatives for review by the Board of

Education. If a school closure is included, the Board holds a public hearing on both the

proposed closure and alternatives. The decision to close a school rests with the Board.

As with redistricting actions, a minimum of 90-days public notice is provided prior to

implementation to ensure orderly transitions.

J. CONCLUSION

The goals, standards and guidelines established for the Charles County Public Schools

system fulfill the stated mission of the Board of Education, which is to provide an

opportunity for all school-aged children to receive an academically challenging, quality

education that builds character, equips for leadership and prepares for life, in an

environment that is safe and conducive to learning.

g:\planning_&_construction\efmp\fy 2017\efmp2017 goals, standards, guidelines.docm

13

Page 18: Action-SS June 14, 2016 Attachments BOARD OF EDUCATION OF ...

CA

PAC

ITY

& P

RO

JEC

TED

EN

RO

LLM

ENT*

CO

MPA

RIS

ON

SC

HO

OLS

RA

TE

DP

RO

JE

XC

ES

SR

AT

ED

PR

OJ

EX

CE

SS

RA

TE

DP

RO

JE

XC

ES

SR

AT

ED

PR

OJ

EX

CE

SS

RA

TE

DP

RO

JE

XC

ES

SC

AP

.E

NR

OLL

(SH

OR

T)

CA

P.

EN

RO

LL(S

HO

RT

)C

AP

.E

NR

OLL

(SH

OR

T)

CA

P.

EN

RO

LL(S

HO

RT

)C

AP

.E

NR

OLL

(SH

OR

T)

ELE

ME

NT

AR

YC

. Pau

l Bar

nhar

t60

869

4.0

(86.

0)60

863

3.0

(25.

0)60

862

6.0

(18.

0)60

862

7.0

(19.

0)60

862

5.0

(17.

0)B

erry

656

875.

0(2

19.0

)65

685

6.0

(200

.0)

656

857.

0(2

01.0

)65

685

2.0

(196

.0)

656

860.

0(2

04)

Dr.

Gus

tavu

s B

row

n38

143

5.0

(54.

0)38

144

1.0

(60.

0)38

142

8.0

(47.

0)38

141

6.0

(35.

0)38

141

9.0

(38.

0)D

r. J

ames

Cra

ik40

645

7.0

(51.

0)40

647

9.0

(73.

0)40

647

2.0

(66.

0)40

646

8.0

(62.

0)40

647

2.0

(66)

Will

iam

A. D

iggs

816

742.

573

.581

673

3.5

82.5

816

735.

580

.581

674

1.5

74.5

816

745.

570

.5G

ale-

Bai

ley

438

361.

576

.543

838

7.5

50.5

438

384.

553

.543

838

1.5

56.5

438

386.

552

Dr.

Tho

mas

L. H

igdo

n44

743

3.0

14.0

447

453.

0(6

.0)

447

448.

0(1

.0)

447

443.

04.

044

744

2.0

5.0

Indi

an H

ead

404

456.

0(5

2.0)

404

451.

0(4

7.0)

404

459.

0(5

5.0)

404

463.

0(5

9.0)

404

460.

0(5

6)D

anie

l of S

t. T

hom

as J

enife

r49

558

4.0

(89.

0)49

567

4.0

(179

.0)

495

675.

0(1

80.0

)49

567

8.0

(183

.0)

495

687.

0(1

92.0

)M

alco

lm41

744

1.0

(24.

0)41

734

1.0

76.0

417

342.

075

.041

734

3.0

74.0

417

346.

071

T. C

. Mar

tin48

655

4.0

(68.

0)48

653

6.0

(50.

0)48

655

3.0

(67.

0)48

656

2.0

(76.

0)48

656

9.0

(83.

0)M

ary

H. M

atul

a55

469

4.0

(140

.0)

554

551.

03.

055

457

2.0

(18.

0)55

458

1.0

(27.

0)55

459

0.0

(36)

Art

hur

Mid

dlet

on43

943

2.0

7.0

439

466.

0(2

7.0)

439

454.

0(1

5.0)

439

451.

0(1

2.0)

439

452.

0(1

3.0)

Wal

ter

J. M

itche

ll60

667

1.0

(65.

0)60

665

2.0

(46.

0)60

665

3.0

(47.

0)60

664

9.0

(43.

0)60

664

5.0

(39)

Mt.

Hop

e/N

anje

moy

373

349.

024

.037

341

7.0

(44.

0)37

340

2.0

(29.

0)37

341

0.0

(37.

0)37

341

0.0

(37.

0)D

r. S

amue

l A. M

udd

343

387.

5(4

4.5)

343

392.

5(4

9.5)

343

404.

5(6

1.5)

343

403.

5(6

0.5)

343

407.

5(6

5)M

ary

Bur

gess

Nea

l79

174

1.0

50.0

791

673.

011

8.0

791

674.

011

7.0

791

667.

012

4.0

791

685.

010

6.0

J. C

. Par

ks65

665

6.0

0.0

656

752.

0(9

6.0)

656

759.

0(1

03.0

)65

676

3.0

(107

.0)

656

746.

0(9

0)J.

P. R

yon

656

703.

0(4

7.0)

656

545.

011

1.0

656

538.

011

8.0

656

544.

011

2.0

656

553.

010

3.0

Eva

Tur

ner

391

420.

0(2

9.0)

391

510.

0(1

19.0

)39

144

5.0

(54.

0)39

150

4.0

(113

.0)

391

498.

0(1

07)

Will

iam

B. W

ade

672

680.

0(8

.0)

672

801.

0(1

29.0

)67

279

7.0

(125

.0)

672

791.

0(1

19.0

)67

280

1.0

(129

.0)

New

Ele

men

tary

#22

N/A

N/A

---

N/A

N/A

---

758

N/A

758.

075

8N

/A75

8.0

758

N/A

758

New

Ele

men

tary

#23

N/ A

N/A

---N

/AN

/A---

N/A

N/A

---N

/AN

/A---

N/A

N/A

---

TO

TA

L E

LEM

EN

TA

RY

11,0

3511

,766

.5(7

31.5

)11

,035

11,7

44.5

(709

.5)

11,7

9311

,678

.511

4.5

11,7

9311

,738

.554

.511

,793

1179

9.5

(6.5

)

MID

DLE

The

odor

e G

. Dav

is1,

112

805.

030

7.0

1,11

287

5.0

237.

01,

112

911.

020

1.0

1,11

291

7.0

195.

01,

112

923.

018

9.0

John

Han

son

843

785.

058

.084

383

7.0

6.0

843

866.

0(2

3.0)

843

871.

0(2

8.0)

843

877.

0(3

4)M

atth

ew H

enso

n65

972

5.0

(66.

0)65

977

6.0

(117

.0)

659

809.

0(1

50.0

)65

981

5.0

(156

.0)

659

821.

0(1

62.0

)M

atta

wom

an89

090

4.0

(14.

0)89

092

6.0

(36.

0)89

096

5.0

(75.

0)89

096

9.0

(79.

0)89

097

3.0

(83)

Pic

cow

axen

544

429.

011

5.0

544

420.

012

4.0

544

427.

011

7.0

544

428.

011

6.0

544

430.

011

4.0

Gen

eral

Sm

allw

ood

659

549.

011

0.0

659

613.

046

.065

962

9.0

30.0

659

634.

025

.065

963

7.0

22M

ilton

M. S

omer

s80

21,

025.

0(2

23.0

)80

293

8.0

(136

.0)

802

971.

0(1

69.0

)80

297

7.0

(175

.0)

802

979.

0(1

77.0

)B

enja

min

Sto

dder

t71

168

5.0

26.0

711

743.

0(3

2.0)

711

751.

0(4

0.0)

711

757.

0(4

6.0)

711

762.

0(5

1)N

ew M

iddl

e #9

N/ A

N/A

---N

/AN

/A---

N/A

N/A

---N

/AN

/A---

N/A

N/A

---

TO

TA

L M

IDD

LE6,

220

5,90

7.0

313.

06,

220

6,12

8.0

92.0

6,22

06,

329.

0(1

09.0

)6,

220

6,36

8.0

(148

.0)

6220

6402

.0(1

82.0

)

HIG

HH

enry

E. L

acke

y1,

539

1,00

2.0

537.

01,

539

1,05

5.0

484.

01,

539

1,05

1.0

488.

01,

539

1,05

5.0

484.

015

3910

59.0

480.

0La

Pla

ta1,

162

1,08

0.0

82.0

1,16

21,

134.

028

.01,

162

1,21

5.0

(53.

0)1,

162

1,22

4.0

(62.

0)11

6212

34.0

(72)

Mau

rice

J. M

cDon

ough

1,20

089

8.0

302.

01,

200

864.

033

6.0

1,20

087

0.0

330.

01,

200

877.

032

3.0

1200

881.

031

9.0

Nor

th P

oint

1,

600

1,76

5.0

(165

.0)

1,60

01,

778.

0(1

78.0

)1,

600

1,84

6.0

(246

.0)

1,60

01,

857.

0(2

57.0

)16

0018

61.0

(261

)S

t.Cha

rles

1,51

11,

280.

023

1.0

1,51

11,

384.

012

7.0

1,51

11,

461.

050

.01,

511

1,46

9.0

42.0

1,51

114

78.0

33.0

Tho

mas

Sto

ne1,

513

1,23

5.0

278.

01,

513

1,14

0.0

373.

01,

513

1,13

1.0

382.

01,

513

1,13

9.0

374.

015

1311

48.0

365

Wes

tlake

1,20

31,

168.

035

.01,

203

1,21

4.0

(11.

0)1,

203

1,14

4.0

59.0

1,20

31,

151.

052

.012

0311

57.0

46.0

TO

TA

L H

IGH

9,72

88,

428.

01,

300.

09,

728

8,56

9.0

1,15

9.0

9,72

88,

718.

01,

010.

09,

728

8,77

2.0

956.

097

2888

1891

0.0

OT

HE

RS

teth

em E

duca

tiona

l Cen

ter

396

21.0

375.

039

621

.037

5.0

396

21.0

375.

039

621

.037

5.0

396

7032

6T

OT

AL

OT

HE

R21

.021

.021

.021

.070

GR

AN

D T

OTA

L *

26,9

8326

,122

.586

0.5

26,9

8326

,462

.552

0.5

27,7

4126

,746

.599

4.5

27,7

4126

,899

.584

1.5

2716

927

400

(231

)

* Eq

uiva

lent

Cou

nt (I

nclu

ding

Pre

-K E

quiv

.)G

:\Pla

nnin

g_&

_Con

stru

ctio

n\E

FM

P\F

Y20

17\S

prea

dshe

ets\

[Cap

acity

Pro

ject

ed E

nrol

lmen

t Com

paris

on _

Apr

il201

6.X

LS]S

Y15

1602

-May

-201

6

SY

16

- 17

SY

17

- 18

SY

18

- 19

SY

19

- 20

SY

20

- 21

14

Page 19: Action-SS June 14, 2016 Attachments BOARD OF EDUCATION OF ...

CA

PAC

ITY

& P

RO

JEC

TED

EN

RO

LLM

ENT*

CO

MPA

RIS

ON

SC

HO

OLS

RA

TE

DP

RO

JE

XC

ES

SR

AT

ED

PR

OJ

EX

CE

SS

RA

TE

DP

RO

JE

XC

ES

SR

AT

ED

PR

OJ

EX

CE

SS

RA

TE

DP

RO

JE

XC

ES

SC

AP

.E

NR

OLL

(SH

OR

T)

CA

P.

EN

RO

LL(S

HO

RT

)C

AP

.E

NR

OLL

(SH

OR

T)

CA

P.

EN

RO

LL(S

HO

RT

)C

AP

.E

NR

OLL

(SH

OR

T)

ELE

ME

NT

AR

YC

. Pau

l Bar

nhar

t60

862

9.0

(21.

0)60

863

2.0

(24.

0)60

863

2.0

(24.

0)60

863

5.0

(27.

0)60

864

3.0

(35.

0)B

erry

656

881.

0(2

25.0

)65

688

3.0

(227

.0)

656

882.

0(2

26.0

)65

688

5.0

(229

.0)

656

889.

0(2

33.0

)D

r. G

usta

vus

Bro

wn

381

423.

0(4

2.0)

381

430.

0(4

9.0)

381

430.

0(4

9.0)

381

431.

0(5

0.0)

381

437.

0(5

6.0)

Dr.

Jam

es C

raik

406

480.

0(7

4.0)

406

492.

0(8

6.0)

406

492.

0(8

6.0)

406

493.

0(8

7.0)

406

496.

0(9

0.0)

Will

iam

A. D

iggs

816

765.

550

.581

675

6.5

59.5

816

756.

559

.581

675

9.5

56.5

816

765.

550

.5G

ale-

Bai

ley

438

394.

543

.543

840

1.5

36.5

438

401.

536

.543

840

2.5

35.5

438

405.

532

.5D

r. T

hom

as L

. Hig

don

447

445.

02.

044

744

9.0

(2.0

)44

744

7.0

0.0

447

448.

0(1

.0)

447

451.

0(4

.0)

Indi

an H

ead

404

456.

0(5

2.0)

404

450.

0(4

6.0)

404

450.

0(4

6.0)

404

451.

0(4

7.0)

404

454.

0(5

0.0)

Jeni

fer

495

701.

0(2

06.0

)49

570

8.0

(213

.0)

495

708.

0(2

13.0

)49

571

1.0

(216

.0)

495

717.

0(2

22.0

)M

alco

lm41

736

0.0

57.0

417

354.

063

.041

735

4.0

63.0

417

355.

062

.041

735

8.0

59.0

T. C

. Mar

tin48

658

4.0

(98.

0)48

659

6.0

(110

.0)

486

596.

0(1

10.0

)48

660

1.0

(115

.0)

486

607.

0(1

21.0

)M

ary

H. M

atul

a55

460

6.0

(52.

0)55

461

2.0

(58.

0)55

461

2.0

(58.

0)55

461

4.0

(60.

0)55

462

0.0

(66.

0)A

rthu

r M

iddl

eton

439

455.

0(1

6.0)

439

461.

0(2

2.0)

439

461.

0(2

2.0)

439

462.

0(2

3.0)

439

468.

0(2

9.0)

Wal

ter

J. M

itche

ll60

665

3.0

(47.

0)60

666

0.0

(54.

0)60

666

0.0

(54.

0)60

666

3.0

(57.

0)60

666

9.0

(63.

0)M

t. H

ope/

Nan

jem

oy37

341

8.0

(45.

0)37

342

4.0

(51.

0)37

342

3.0

(50.

0)37

342

3.0

(50.

0)37

342

3.0

(50.

0)D

r. S

amue

l A. M

udd

343

410.

5(6

7.5)

343

413.

5(7

0.5)

343

413.

5(7

0.5)

343

412.

5(6

9.5)

343

415.

5(7

2.5)

Mar

y B

urge

ss N

eal

791

698.

093

.079

170

1.0

90.0

791

701.

090

.079

170

4.0

87.0

791

710.

081

.0J.

C. P

arks

656

746.

0(9

0.0)

656

740.

0(8

4.0)

656

740.

0(8

4.0)

656

743.

0(8

7.0)

656

749.

0(9

3.0)

J. P

. Ryo

n65

657

0.0

86.0

656

593.

063

.065

659

3.0

63.0

656

594.

062

.065

660

0.0

56.0

Eva

Tur

ner

391

494.

0(1

03.0

)39

149

0.0

(99.

0)39

149

0.0

(99.

0)39

149

0.0

(99.

0)39

149

6.0

(105

.0)

Will

iam

B. W

ade

672

801.

0(1

29.0

)67

280

8.0

(136

.0)

672

808.

0(1

36.0

)67

281

1.0

(139

.0)

672

817.

0(1

45.0

)N

ew E

lem

enta

ry #

2275

8N

/A75

8.0

758

N/A

758.

075

8N

/A75

8.0

758

N/A

758.

075

8N

/A75

8.0

New

Ele

men

tary

#23

N/ A

N/A

---N

/AN

/A---

766

N/A

766.

076

6N

/A76

6.0

766

N/A

766.

0T

OT

AL

ELE

ME

NT

AR

Y11

,793

11,9

70.5

(177

.5)

11,7

9312

,054

.5(2

61.5

)12

,559

12,0

50.5

508.

512

,559

12,0

88.5

470.

512

,559

12,1

90.5

368.

5

MID

DLE

The

odor

e G

. Dav

is1,

112

923.

018

9.0

1,11

291

5.0

197.

01,

112

928.

018

4.0

1,11

293

5.0

177.

01,

112

940.

017

2.0

John

Han

son

843

877.

0(3

4.0)

843

904.

0(6

1.0)

843

917.

0(7

4.0)

843

922.

0(7

9.0)

843

927.

0(1

16.0

)M

atth

ew H

enso

n65

982

1.0

(162

.0)

659

781.

0(1

22.0

)65

979

7.0

(138

.0)

659

799.

0(1

40.0

)65

980

4.0

20.0

Mat

taw

oman

890

973.

0(8

3.0)

890

1,02

3.0

(133

.0)

890

1,03

7.0

(147

.0)

890

1,04

6.0

(156

.0)

890

1,05

1.0

(253

.0)

Pic

cow

axen

544

430.

011

4.0

544

455.

089

.054

446

0.0

84.0

544

462.

082

.054

446

4.0

67.0

Gen

eral

Sm

allw

ood

659

637.

022

.065

957

7.0

82.0

659

589.

070

.065

959

4.0

65.0

659

599.

059

.0M

ilton

M. S

omer

s80

297

9.0

(177

.0)

802

989.

0(1

87.0

)80

21,

004.

0(2

02.0

)80

21,

010.

0(2

08.0

)80

21,

015.

0(2

16.0

)B

enja

min

Sto

dder

t71

176

2.0

(51.

0)71

176

3.0

(52.

0)71

177

9.0

(68.

0)71

177

8.0

(67.

0)71

178

2.0

(123

.0)

New

Mid

dle

#9N

/ AN

/A---

N/A

N/A

---N

/AN

/A---

940

N/A

940.

094

0N

/A94

0.0

TO

TA

L M

IDD

LE6,

220

6,40

2.0

(182

.0)

6,22

06,

407.

0(1

87.0

)6,

220

6,51

1.0

(291

.0)

7,16

06,

546.

061

4.0

7,16

06,

582.

019

8.0

HIG

HH

enry

E. L

acke

y1,

539

1,08

8.0

451.

01,

539

1,10

4.0

435.

01,

539

1,11

2.0

427.

01,

539

1,13

1.0

408.

01,

539

1,13

1.0

85.0

La P

lata

1,16

21,

263.

0(1

01.0

)1,

162

1,33

8.0

(176

.0)

1,16

21,

347.

0(1

85.0

)1,

162

1,35

8.0

(196

.0)

1,16

21,

358.

0(4

88.0

)M

auric

e J.

McD

onou

gh1,

200

910.

029

0.0

1,20

092

5.0

275.

01,

200

933.

026

7.0

1,20

094

2.0

258.

01,

200

941.

048

.0N

orth

Poi

nt1,

600

1,89

1.0

(291

.0)

1,60

02,

036.

0(4

36.0

)1,

600

2,04

8.0

(448

.0)

1,60

02,

060.

0(4

60.0

)1,

600

2,05

7.0

(792

.0)

St.C

harle

s 1,

511

1,51

0.0

1.0

1,51

11,

499.

012

.01,

511

1,51

3.0

(2.0

)1,

511

1,52

2.0

(11.

0)1,

511

1,51

9.0

(8.0

)T

hom

as S

tone

1,51

31,

179.

033

4.0

1,51

31,

214.

029

9.0

1,51

31,

215.

029

8.0

1,51

31,

207.

030

6.0

1,51

31,

204.

0(1

24.0

)W

estla

ke1,

203

1,18

9.0

14.0

1,20

31,

432.

0(2

29.0

)1,

203

1,44

2.0

(239

.0)

1,20

31,

454.

0(2

51.0

)1,

203

1,44

9.0

(579

.0)

TO

TA

L H

IGH

9,72

89,

030.

069

8.0

9,72

89,

548.

018

0.0

9,72

89,

610.

011

8.0

9,72

89,

674.

054

.09,

728

9,65

9.0

(250

.0)

Ste

them

Edu

catio

nal C

ente

r39

670

.032

6.0

396

70.0

326.

039

670

.032

6.0

396

70.0

326.

039

670

.032

670

.070

.070

.070

.070

.0

GR

AN

D T

OTA

L *

27,7

4127

,472

.526

8.5

27,7

4128

,079

.5(3

38.5

)28

,507

28,2

41.5

265.

529

,447

28,3

78.5

1,06

8.5

29,4

4728

,501

.594

5.5

* Eq

uiva

lent

Cou

nt (I

nclu

ding

Pre

-K E

quiv

.)G

:\Pla

nnin

g_&

_Con

stru

ctio

n\E

FM

P\F

Y20

17\S

prea

dshe

ets\

[Cap

acity

Pro

ject

ed E

nrol

lmen

t Com

paris

on _

Apr

il201

6.X

LS]S

Y15

1602

-May

-201

6

SY

22

- 23

SY

23

- 24

SY

24

- 25

SY

25

- 26

SY

21

- 22

15

Page 20: Action-SS June 14, 2016 Attachments BOARD OF EDUCATION OF ...

16

Page 21: Action-SS June 14, 2016 Attachments BOARD OF EDUCATION OF ...

Mid

dle

Sch

ools

* P

roje

cted

Enr

ollm

ent &

Cap

acit

y

6,35

963

9864

3264

3264

3765

4165

7666

12

5,91

45,

937

6,15

8

5,50

0

6,00

0

6,50

0

7,00

0

7,50

0

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

Sch

ool Y

ear

2015

Enr

ollm

ent

Tre

nd (

2012

Enr

ollm

ent)

* C

ount

y W

ide

6,25

6

+ I

dent

ifie

d F

utur

e N

eed

4/28

/201

6

Cap

acit

y

7,16

0

New

Mid

dle

Sch

ool #

9

+94

0

17

Page 22: Action-SS June 14, 2016 Attachments BOARD OF EDUCATION OF ...

Hig

h S

choo

ls*

Pro

ject

ed E

nrol

lmen

t & C

apac

ity

8,44

0

8,58

1

9699

9714

8,40

9

8,73

0

9650

8784

9588

9070

8858

8,00

0

8,20

0

8,40

0

8,60

0

8,80

0

9,00

0

9,20

0

9,40

0

9,60

0

9,80

0

10,0

00

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

Sch

ool Y

ear

2015

Enr

ollm

ent

Tre

nd (

2012

Enr

ollm

ent)

* C

ount

y-W

ide

8,21

7

9,72

8

+ I

dent

ifie

d F

utur

e N

eed

4/28

/201

6

Cap

acit

y

18

Page 23: Action-SS June 14, 2016 Attachments BOARD OF EDUCATION OF ...

FY

2016

FY

2017

FY

2018

FY

2019

FY

2020

FY

2021

FY

2022

FY

2023

FY

2024

FY

2025

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

Pla

nnin

gC

onst

ruct

ion

Sch

ool O

pens

Fun

ding

App

rove

dP

lann

ing

App

rove

d

FY

2017

Edu

catio

nal F

acili

ties

Mas

ter

Pla

nC

harle

s C

ount

y P

ublic

Sch

ools

Pro

ject

Sch

edul

e

PRO

JEC

T

Sto

dder

t MS

RT

U/B

oile

r S

R

Mar

y M

atul

a E

S F

DK

Add

n.

Dan

iel o

f St.

Tho

mas

Jen

ifer

ES

FD

K

New

Ele

men

tary

#22

Dr.

Sam

uel M

udd

ES

- R

enov

atio

n

Ber

ry E

S F

DK

Add

n.

Dr.

Jam

es C

raik

ES

FD

K A

ddn.

Dr.

Gus

tavu

s B

row

n E

S -

Ope

n S

pace

Mat

ula

ES

Roo

f SR

Tur

ner

ES

Roo

f/RT

U S

R

Eva

Tur

ner

ES

- R

enov

atio

n

Ben

jam

in S

todd

ert M

S -

Ren

ovat

ion

McD

onou

gh H

S -

Ren

ovat

ion,

Pha

se 1

Mat

thew

Hen

son

MS

Wat

erlin

e

Wes

tlake

HS

Roo

f SR

Indi

an H

ead

ES

Boi

ler

SR

LaP

lata

HS

- R

enov

atio

n, P

hase

1

T.C

. Mat

in E

S -

Ren

ovat

ion

J.P.

Ryo

n E

S F

DK

Add

n.

Mal

colm

ES

FD

K A

ddn.

Pic

cow

axen

MS

Boi

ler

SR

Mar

tin E

S R

oof/U

V/C

onde

nser

s S

R

Mile

ston

es S

impl

icity

Tria

l Ver

sion

(http

://w

ww

.kid

asa.

com

).

19

Page 24: Action-SS June 14, 2016 Attachments BOARD OF EDUCATION OF ...

FY

2016

FY

2017

FY

2018

FY

2019

FY

2020

FY

2021

FY

2022

FY

2023

FY

2024

FY

2025

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

Pla

nnin

gC

onst

ruct

ion

Sch

ool O

pens

Fun

ding

App

rove

dP

lann

ing

App

rove

d

FY

2017

Edu

catio

nal F

acili

ties

Mas

ter

Pla

nC

harle

s C

ount

y P

ublic

Sch

ools

Pro

ject

Sch

edul

e

PRO

JEC

T

Sm

allw

ood

MS

Chi

ll/H

&V

/UV

/Roo

f SR

Han

son

MS

Roo

f SR

Mat

taw

oman

MS

Roo

f SR

Ste

them

Edu

catio

nal C

ente

r S

R

New

Ele

men

tary

#23

Bar

nhar

t ES

Roo

f SR

Wal

ter

J. M

itche

ll E

S F

DK

Add

n.

J.C

. Par

ks E

S F

DK

Add

n.

Hen

son

MS

Mul

ti-zo

ne U

nit/H

eat P

ump

J.C

. Par

ks E

S F

DK

Add

n.

Wad

e E

S B

oile

r/C

hille

r S

R

Dr.

Hig

don

ES

Roo

f SR

New

Mid

dle

#9

Dr.

Tho

mas

Hig

don

ES

FD

K A

ddn.

Wad

e E

S F

DK

Add

n.

Ber

ry E

S R

oof S

R

Dr.

Hig

don

ES

RT

U/B

oile

r S

R

Mid

dlet

on R

oof S

R

Wad

e E

S R

TU

/Roo

f SR

Mat

ula

ES

Boi

ler

SR

JC P

arks

ES

Roo

f SR

Wes

tlake

HS

Boi

ler

SR

Mile

ston

es S

impl

icity

Tria

l Ver

sion

(http

://w

ww

.kid

asa.

com

).

20

Page 25: Action-SS June 14, 2016 Attachments BOARD OF EDUCATION OF ...

FY

2016

FY

2017

FY

2018

FY

2019

FY

2020

FY

2021

FY

2022

FY

2023

FY

2024

FY

2025

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

Pla

nnin

gC

onst

ruct

ion

Sch

ool O

pens

Fun

ding

App

rove

dP

lann

ing

App

rove

d

FY

2017

Edu

catio

nal F

acili

ties

Mas

ter

Pla

nC

harle

s C

ount

y P

ublic

Sch

ools

Pro

ject

Sch

edul

e

PRO

JEC

T

Hen

son

MS

Roo

f SR

Mat

ula

ES

RT

U/C

hille

r S

R

Mitc

hell

ES

Roo

f SR

Tho

mas

Sto

ne H

S R

oof S

R

Bar

nhar

t ES

Boi

ler

SR

Mile

ston

es S

impl

icity

Tria

l Ver

sion

(http

://w

ww

.kid

asa.

com

).

21

Page 26: Action-SS June 14, 2016 Attachments BOARD OF EDUCATION OF ...

SYSTEMIC RENOVATIONS

In addition to major renovations and additions, the existing school buildings in Charles

County have other needs that must be addressed. These needs are usually addressed as

systemic renovations funded through the IAC and/or as Capital Maintenance projects with

local capital or operating budget funding. A list of proposed projects for the next ten fiscal

years that is consistent with the Charles County Public Schools “Comprehensive Maintenance Plan” was developed and is included here for completeness of our facilities

needs. The projects potentially eligible for IAC funding are summarized on IAC/PSCP Form

101.3. The Key is as follows: Roof-Top-Unit (RTU), Unit Ventilator (UV), Heating &

Ventilation Unit (H&V), Air Handler Unit (AHU), and Variable Air Volume Unit (VAV).

* Local funds only.

SYSTEMIC RENOVATION PROJECTS

FY 2016

Dr. Gustavus Brown Elementary* RTU/Boiler Replacement

F. B. Gwynn Center* Roof/Boiler Replacement

Site Improvements (Various Schools) Asphalt/Concrete/Site

Elementary Playground Upgrades (Various Schools) Play Equipment & Site Upgrades FY 2017

Benjamin Stoddert Middle RTU/Boiler Replacement

Gale Bailey Elem. Site Improvements* Asphalt/Concrete/Site

Elementary Playground Upgrades (Various Schools)* Play Equipment & Site Upgrades

FY 2018

Mary Matula Elementary Roof Replacement

Eva Turner Elementary Roof /RTU Replacement

Site Improvements (Various Schools)* Asphalt/Concrete/Site

Elementary Playground Upgrades (Various Schools)* Play Equipment & Site Upgrades

FY 2019

Westlake High Roof Replacement

Indian Head Elementary Boiler Replacement

Dr. Gustavus Brown Elementary Open Space Enclosure

Matthew Henson Middle Waterline Extension

Site Improvements (Various Schools)* Asphalt/Concrete/Site

Elementary Playground Upgrades (Various Schools)* Play Equipment & Site Upgrades

22

Page 27: Action-SS June 14, 2016 Attachments BOARD OF EDUCATION OF ...

SYSTEMIC RENOVATION PROJECTS (Continued)

FY 2020

Piccowaxen Middle Boiler Replacement

T. C. Martin Elementary Roof/UV Replacement

General Smallwood Middle Chiller/UV/Roof Replacement

FY 2021

John Hanson Middle Roof Replacement

Mattawoman Middle Roof Replacement

Stethem Educational Center Boilers/RTU/AHU/

Roof Replacement

C. Paul Barnhart Elementary Roof Replacement

FY 2022

Matthew Henson Middle Multi-Zone/Heat Pump Replace.

William B. Wade Elementary Boiler/Chiller Replacement

Dr. Thomas Higdon Elementary Roof Replacement

Berry Elementary Roof Replacement

FY 2023

Dr. Thomas Higdon Elementary RTU/Boiler Replacement

Arthur Middleton Elementary Roof Replacement

William B. Wade Elementary RTU/Roof Replacement

Mary Matula Elementary Boiler Replacement

FY 2024

J.C. Parks Elementary Roof Replacement

Westlake High Boiler Replacement

Matthew Henson Middle Roof Replacement

FY 2025

Mary Matula Elementary RTU/Chiller Replacement

Walter J. Mitchell Elementary Roof Replacement

Thomas Stone High Roof Replacement

C. Paul Barnhart Elementary Boiler Replacement

G:\Planning_&_Construction\EFMP\FY2017\systemic renovation projects lists (STATE)June16.doc

23

Page 28: Action-SS June 14, 2016 Attachments BOARD OF EDUCATION OF ...

NEW CAPACITY AND RENOVATION/ADDITION

PROJECT DESCRIPTIONS FULL-DAY KINDERGARTEN ADDITIONS/RENOVATIONS – VARIOUS SCHOOLS: There is a need for

permanent space to support full-day kindergarten in the elementary schools. A study to

evaluate the existing conditions and recommend the most effective means of providing the

additional classrooms required to house a full-day kindergarten program is complete.

Planning approvals for 12 projects and construction funding for 10 projects were approved in

fiscal years 2007 through 2017. Planning approval and construction funds for additional

projects will be requested in FY 2018 and future years.

Planning and construction approvals:

C. Paul Barnhart Elementary School Gale-Bailey Elementary School

T. C. Martin Elementary School Mt. Hope/Nanjemoy Elementary School

Dr. Gustavus Brown Elementary School Eva Turner Elementary School

Indian Head Elementary School Arthur Middleton Elementary School

Mary H. Matula Elementary School Daniel of St. Thomas Jenifer Elementary

Berry Elementary School – Planning Dr. James Craik Elementary - Planning

Planning and construction requests:

Berry Elementary School - FY 2018 Construction

Dr. James Craik Elementary School - FY 2018 Construction

J. P. Ryon Elementary School – FY 2019 Planning/ FY 2020 Construction

Malcolm Elementary School - FY 2019 Planning/ FY 2020 Construction

Walter J. Mitchell Elementary School - FY 2021 Planning/ FY 2022 Construction

J. C. Parks Elementary School - FY 2021 Planning/ FY 2022 Construction

Dr. Thomas Higdon Elementary School - FY 2022 Planning/ FY 2023 Construction

William Wade Elementary School - FY 2022 Planning/ FY 2023 Construction

NEW ELEMENTARY SCHOOL #22: The need is for additional elementary school capacity in the

Waldorf area. Continued development in the county’s development district, will cause

enrollment at the elementary level to exceed the capacity of the existing schools serving that

area. Elementary #22 will be to be located on Billingsley Road in Waldorf, west of Route

301. The school will serve a population that includes students with special needs, students

with low English proficiency, and children eligible to participate in the free and reduced

meal program. The projected state rated capacity of the school will be 766. State Planning

was approved in FY 2016 and local design funds were approved in FY 2015. State and local

construction funds were approved in FY 2017. State and Local construction funds will

continue to be requested in FY 2018 and FY 2019.

24

Page 29: Action-SS June 14, 2016 Attachments BOARD OF EDUCATION OF ...

DR. SAMUEL MUDD ELEMENTARY SCHOOL MODERNIZATION/ADDITION: The need is for

modernization at Dr. Samuel Mudd Elementary School. The school was opened in 1967 and

major building systems have reached the end of their useful life. The modernization will

upgrade the mechanical and electrical systems to meet current standards and codes. All

existing spaces will be modernized and modified to meet current educational program

requirements. A new gymnasium addition and other programmatic spaces will be included

in the project to enhance the instructional program, including full-day kindergarten to meet

state mandates. The school is located in the Carrington neighborhood of Smallwood Village

in St. Charles and serves the development district. The school serves a population that

includes students with special needs, students with low English proficiency, and children

eligible to participate in the free and reduced meal program. The State approved Planning

for the school in FY 2016 and the County approved design funds in FY 2016. The projected

rated capacity will be 542. State and local construction funds were approved in FY 2017.

State and local construction funds will continue to be requested in FY 2018 and FY 2019.

EVA TURNER ELEMENTARY SCHOOL MODERNIZATION/ADDITION: The need is for modernization

and addition to Eva Turner Elementary School. The school was opened in 1979 and major

building systems have reached the end of their useful life. The school received a pre-

kindergarten addition in 1995 and an all-day kindergarten addition in 2011. The

modernization will upgrade the mechanical and electrical systems to meet current standards

and codes. The building will be modernized and expanded for increased enrollment and to

meet current educational program requirements. New individual classroom spaces will be

provided to replace existing open-space classrooms. The school is located in the Bannister

neighborhood of Smallwood Village in St. Charles and serves the development district. The

school serves a population that includes students with special needs, students with low

English proficiency, and children eligible to participate in the free and reduced meal

program. Local planning funds are requested in FY 2018. State and local construction funds

are requested in FY 2019 and FY 2020.

BENJAMIN STODDERT MIDDLE SCHOOL MODERNIZATION/ADDITION: The need is for

modernization and addition to Benjamin Stoddert Middle School. The school opened in

1976 and the major building systems have reached the end of their useful life. The school

has not had any previous renovations or additions. The modernization will upgrade the

mechanical and electrical systems to meet current standards and codes. The entire building

will be modernized and expanded for increased enrollment and to meet current educational

program requirements. New individual classroom spaces will be provided to replace existing

open-space classrooms. The school is located in the Bannister neighborhood of Smallwood

Village in St. Charles and serves the development district. The school serves a population

that includes students with special needs, students with low English proficiency, and

children eligible to participate in the free and reduced meal program. Local planning funds

25

Page 30: Action-SS June 14, 2016 Attachments BOARD OF EDUCATION OF ...

are requested in FY 2018. State and Local construction funds are requested in FY 2019 and

FY 2020.

MAURICE J. MCDONOUGH HIGH SCHOOL, PHASE I RENOVATION: The need is for modernization

at McDonough High School, which was built in 1977 and serves a portion of the

development district. The proposed Phase I may include; an elevator, stair modifications,

improved accessibility, new secure building entrance and administrative office, renovations

to convert the existing administrative spaces to program spaces, and enhancements to the

performing arts area. The school serves a population that includes students with special

needs, students with low English proficiency, and children eligible to participate in the free

and reduced meal program. Local funding to initiate planning will be requested in FY 2018.

State and local construction funding will be requested in FY 2019.

LA PLATA HIGH SCHOOL, PHASE I RENOVATION: The need is for modernization at La Plata

High School, which was built in 1979 and serves a portion of the development district. The

proposed Phase I may include; envelope stabilization, open space enclosure, new secure

building entrance and administrative office, and enhancements to special programs. The

school serves a population that includes students with special needs, students with low

English proficiency, and children eligible to participate in the free and reduced meal

program. Local funding to initiate planning will be requested in FY 2019. State and local

construction funding will be requested in FY 2020 and FY 2021.

T.C. MARTIN ELEMENTARY SCHOOL MODERNIZATION/ADDITION: The need is for modernization

and addition to T. C. Martin Elementary School. The school was opened in 1967 and major

building systems have reached the end of their useful life. The boilers were replaced in 2006

and the school received an all-day kindergarten addition in 2009. The modernization will

upgrade the mechanical and electrical systems to meet current standards and codes. The

building will be modernized and expanded for increased enrollment and to meet current

educational program requirements. The school serves a population that includes students

with special needs, students with low English proficiency, and children eligible to participate

in the free and reduced meal program. Local planning funds are requested in FY 2019. State

and local construction funds are requested in FY 2020 and FY 2021.

NEW ELEMENTARY SCHOOL #23: The need is for additional school capacity in the La Plata

area. Continued development in the incorporated town, both east and west of route 301,

will cause enrollment at the elementary level to exceed the capacity of the existing schools

serving that area. The school will serve a population that includes students with special

needs, students with low English proficiency, and children eligible to participate in the free

and reduced meal program. Planning approval will be requested in FY 2021. State and local

construction funding will be requested in FY 2022 and FY 2023.

26

Page 31: Action-SS June 14, 2016 Attachments BOARD OF EDUCATION OF ...

NEW MIDDLE SCHOOL #9: The need is for additional capacity at the middle school level in the

rapidly growing county development district. The county’s Comprehensive Plan calls for the

majority of growth in the county to be concentrated in the development district, including

those areas west of Route 301. Enrollment projections indicate the schools serving this area

will continue to experience increasing enrollment and overcrowded conditions. The

proposed school site location is not determined. A school with a rated capacity of 940 is

planned. The school will serve a population that includes students with special needs,

students with low English proficiency, and children eligible to participate in the free and

reduced meal program. Planning approval will be requested in FY 2022. State and local

construction funding will be requested in FY 2023 and FY 2024.

27

Page 32: Action-SS June 14, 2016 Attachments BOARD OF EDUCATION OF ...

SYSTEMIC RENOVATIONS

PROJECT DESCRIPTIONS

RTU/BOILER REPLACEMENT AT BENJAMIN STODDERT MIDDLE SCHOOL: The need is for a systemic

renovation at Stoddert Middle School, which opened in 1977 and is located in Smallwood

Village in St. Charles. The boilers and pumps and roof top units are original equipment

when the building was constructed and are approaching the end of their useful life. The

installations of new efficient units are proposed, which will increase overall efficiency of the

heating system and reduce operating costs. Planning approval was approved by the County

in FY 2015, construction funds were approved by the State and Local government in FY

2016. The balance of State construction funding was approved in FY2017.

ROOF REPLACEMENT AT MARY H. MATULA ELEMENTARY SCHOOL: The need is for a systemic

renovation at Matula Elementary School, located in the Town of La Plata and opened in

1992. The original roof will reach the end of its expected life in FY 2017. The installation of

a four-ply, built-up roof with positive drainage is proposed. A full roof investigation will be

performed by our consultant prior to design to address any unseen problems. Planning

approval will be requested in FY 2018. Construction funding will be requested in FY 2019.

ROOF/RTU REPLACEMENT AT EVA TURNER ELEMENTARY SCHOOL: The need is for a systemic

renovation at Turner Elementary School, which opened in 1979 and located in Smallwood

Village in St. Charles. The roof top units are over 30 years old. These units have outlived

their expected usefulness and no longer maintain a suitable environment within the school.

The school was re-roofed in 1992, and will reach the end of its expected life in FY 2017. The

installation of a four-ply, built-up roof with positive drainage is proposed. A full roof

investigation will be performed by our consultant prior to design to address any unforeseen

problems. Planning approval will be requested in FY 2018. Construction funding will be

requested in FY 2019. This project may be cancelled if a full renovation project is supported

by the State and local governments prior to FY 2018.

OPEN SPACE ENCLOSURE AT DR. GUSTAVUS BROWN ELEMENTARY SCHOOL: The need is for an

open space enclosure at Dr. Gustavus Brown Elementary School, located in the Smallwood

Village in St. Charles, within the development district. The original building opened in 1974

and designed with an open space floor plan and the need is for permanent enclosed

classrooms. This project will consist of constructing permanent classroom walls,

reconfiguring ductwork and lighting, electrical work, providing new drop ceiling, and new

floor finishes. Planning approval will be requested in FY 2018. Construction funding will be

requested in FY 2019.

28

Page 33: Action-SS June 14, 2016 Attachments BOARD OF EDUCATION OF ...

WATERLINE EXTENSION AT MATTHEW HENSON MIDDLE SCHOOL: The need is for a permanent

connection to the county owned and operated water system at Matthew Henson Middle

School, located in Bryans Road within the development district. Matthew Henson Middle

School opened in 1957 and was renovated in 1982. The school is currently operating on a

deep well and has experienced some issues with sediment in the water. This project will

consist of constructing a waterline and providing fire protection around the building with

additional hydrants. Planning approval will be requested in FY 2018. Construction funding

will be requested in FY 2019.

ROOF REPLACEMENT AT WESTLAKE HIGH SCHOOL: The need is for a systemic renovation at

Westlake High School, which opened in 1992 and located in Westlake Village in St. Charles.

The original roof will reach its life expectancy in FY 2017. The installation of a four-ply,

built-up roof with positive drainage is proposed. A full roof investigation will be performed

by our consultant prior to design to address any unforeseen problems. Planning approval

will be requested in FY 2019. Construction funding will be requested in FY 2020.

BOILER REPLACEMENT AT INDIAN HEAD ELEMENTARY SCHOOL: The need is for a systemic

renovation at Indian Head Elementary School, which opened in 1976 and is located in the

Town of Indian Head. The boiler and pump systems are over 30 years old and outlived their

expected usefulness. The installation of new efficient units is proposed to increase overall

efficiency of the heating system and reduce operating costs. Planning approval will be

requested in FY 2019. Construction funding will be requested in FY 2020.

BOILER REPLACEMENT AT PICCOWAXEN MIDDLE SCHOOL: The need is for a systemic renovation

at Piccowaxen Middle School, which opened in 1977. The boiler and pump systems are over

30 years old and outlived their expected usefulness. The installation of new efficient units is

proposed to increase the overall efficiency of the heating system and reduce operating cost.

Planning approval will be requested in FY 2020. Construction funding will be requested in

FY 2021.

ROOF/UV/CONDENSERS REPLACEMENT AT T. C. MARTIN ELEMENTARY SCHOOL: The need is for a

systemic renovation at Martin Elementary School, which opened in 1967 and located in

Bryantown. The condensers and all the classroom unit ventilators are in need of

replacement, due to their age and function. These units have outlived their expected

usefulness and no longer maintain a suitable environment within the school. The school was

re-roofed in 1988 and by FY 2017 the roof will reach its 20-year life expectancy. The

installation of a four-ply, built-up roof with positive drainage is proposed. A full roof

investigation will be performed by our consultant prior to design to address any unforeseen

problems. Planning approval will be requested in FY 2020. Construction funding will be

requested in FY 2021. This project may be cancelled if a full renovation project is supported

by the state and local governments prior to FY 2020.

29

Page 34: Action-SS June 14, 2016 Attachments BOARD OF EDUCATION OF ...

ROOF/CHILLER/H&V/UV REPLACEMENTS AT GENERAL SMALLWOOD MIDDLE SCHOOL: The need

is for a systemic renovation at Smallwood Middle School, which was renovated in 1979 and

serves a portion of the development district. The roof, heating and ventilation units, chiller

and all classroom unit ventilators were installed when the building was renovated in the

1970s and are approaching the end of their useful life. Approximately 40 H&V’s and UV’s

were replaced using the Aging Schools Program (ASP). The installation of a four-ply, built-

up roof with positive drainage is proposed. A full roof investigation will be performed by our

consultant prior to design to address any unseen problems. The installation of new efficient

units is proposed, which are environmentally friendly, and will increase the overall

efficiency of the heating cooling systems and reduce the operating costs. Planning approval

will be requested in FY 2019. Construction funding will be requested in FY 2020.

ROOF REPLACEMENT AT JOHN HANSON MIDDLE SCHOOL: The need is for a systemic renovation

at Hanson Middle School. Located in the Waldorf development district, this school opened

in 1972 and is the oldest operating middle school in Charles County. The building was re-

roofed in 1995 and will reach its expected 20-year life by FY 2017. The installation of a

four-ply, built-up roof with positive drainage is proposed. A full roof investigation will be

performed by our consultant prior to design to address any unforeseen problems. Planning

approval will be requested in FY 2021. Construction funding will be requested in FY 2022.

ROOF REPLACEMENT AT MATTAWOMAN MIDDLE SCHOOL: The need is for a systemic

renovation at Mattawoman Middle School, which opened in 1992 and located in the rapidly

growing route 228 corridor in Waldorf. The original roof will reach its life expectancy in FY

2017. The installation of a four-ply, built-up roof with positive drainage is proposed. A full

roof investigation will be performed by our consultant prior to design to address any

unforeseen problems. Planning approval will be requested in FY 2021. Construction

funding will be requested in FY 2022.

ROOF/BOILER/AHU/RTU REPLACEMENT AT ROBERT D. STETHEM EDUCATIONAL CENTER: The

need is for a systemic renovation at the Stethem Center. This school originally opened in

1977 as the Charles County Career & Technology Center. The air handler unit and rooftop

units are over 30 years old. These units have outlived their expected usefulness and no

longer maintain a suitable environment within the school. These roof top units are original

equipment when the building was constructed in the early 1970s and have approached the

end of their useful life expectancy. The installations of new units are proposed, which are

more efficient and would increase overall efficiency of the heating and cooling systems and

reduce operating costs. The multi-roof complex was re-roofed in 1995 and will reach its 20-

year life expectancy by FY 2017. Planning approval will be requested in FY 2021.

Construction funding will be requested in FY 2022.

30

Page 35: Action-SS June 14, 2016 Attachments BOARD OF EDUCATION OF ...

ROOF REPLACEMENT AT C. PAUL BARNHART ELEMENTARY SCHOOL: The need is for a systemic

renovation at Barnhart Elementary School, which opened in 1993 and is located in Westlake

Village in St. Charles. The original roof will reach its life expectancy in FY 2017. The

installation of a four-ply, built-up roof with positive drainage is proposed. A full roof

investigation will be performed by our consultant prior to design to address any unforeseen

problems. Planning approval will be requested in FY 2021. Construction funding will be

requested in FY 2022.

MULTI-ZONE UNIT/HEATPUMP REPLACEMENT AT MATTHEW HENSON MIDDLE SCHOOL: The need

is for a systemic renovation at Henson Middle School. The school was renovated in 1982 and

the multi-zone unit with Dx cooling and the water-cooled, heat pumps in the classrooms will

be over 30 years old and will have outlived their expected usefulness. The installation of

new units will increase overall efficiency of the heating system and reduce operating costs.

Planning approval will be requested in FY 2021. Construction funding will be requested in

FY 2022.

BOILER/CHILLER REPLACEMENT AT WILLIAM B. WADE ELEMENTARY SCHOOL: The need is for a

systemic renovation at Wade Elementary School, which opened in 1989 and is located in

Westlake Village in St. Charles. The boiler and pump systems and chiller are over 25 years

old and outlived their expected usefulness. The installation of new efficient units is proposed

to increase the overall efficiency of the heating and cooling systems and reduce operating

cost. Planning approval will be requested in FY 2022. Construction funding will be

requested in FY 2023.

ROOF REPLACEMENT AT DR. THOMAS L. HIGDON ELEMENTARY SCHOOL: The need is for a

systemic renovation at Higdon Elementary school, which was renovated in 1988. The school

was re-roofed as part of the renovation and the roof is past the 20-year life expectancy. The

installation of a four-ply, built-up roof with positive drainage is proposed. A full roof

investigation will be performed by our roof consultant prior to design to address any unseen

problems. Planning approval will be requested in FY 2022. Construction funding will be

requested in FY 2023.

ROOF REPLACEMENT AT BERRY ELEMENTARY SCHOOL: The need is for a systemic renovation at

Berry Elementary School, which opened in 1996 and located in the rapidly growing route

228 corridor in Waldorf. The original roof will reach its 20-year life expectancy in FY 2017.

The installation of a four-ply, built-up roof with positive drainage is proposed. A full roof

investigation will be performed by our consultant prior to design to address any unforeseen

problems. Planning approval will be requested in FY 2022. Construction funding will be

requested in FY 2023.

31

Page 36: Action-SS June 14, 2016 Attachments BOARD OF EDUCATION OF ...

RTU/BOILER REPLACEMENT DR. THOMAS L. HIGDON ELEMENTARY SCHOOL: The need is for a

systemic renovation at Higdon Elementary School. This school, located in Newburg and

services the southern part of the county, opened in 1988. The rooftop units and boilers are

original equipment when the building was renovated in the 1980s and no longer maintains a

suitable environment within the school. Installation of new units are proposed, which are

more efficient and would increase overall efficiency of the heating and cooling systems, to

reduce operating costs. Planning approval will be requested in FY 2023. Construction

funding will be requested in FY 2024.

ROOF REPLACEMENT AT ARTHUR MIDDLETON ELEMENTARY SCHOOL: The need is for a systemic

renovation at Middleton Elementary School. The school, which is located in Smallwood

Village in St. Charles and serves the development district, opened in 1973. The building was

re-roofed 1996 and will reach the end of its expected 20-year life by FY 2016. The

installation of a four-ply, built-up roof with positive drainage is proposed. A full roof

investigation will be performed by our consultant prior to design to address any unforeseen

problems. Planning approval will be requested in FY 2023. Construction funding will be

requested in FY 2024.

ROOF/RTU REPLACEMENT AT WILLIAM B. WADE ELEMENTARY SCHOOL: The need is for a

systemic renovation at Wade Elementary School, which was renovated in 1989 and is located

in Westlake Village in St. Charles. The original roof will have reached its 20-year life

expectancy. The installation of a four-ply, built-up roof with positive drainage is proposed.

A full roof investigation will be performed by our consultant prior to design to address any

unforeseen problems. The rooftop units are original equipment when the building was built

and have reached the end of their useful life. The installation of new efficient units is

proposed, which are environmentally friendly, and will increase the overall efficiency of the

heating cooling systems and reduce the operating costs. Planning approval will be requested

in FY 2023. Construction funding will be requested in FY 2024.

BOILER REPLACEMENT AT MARY H. MATULA ELEMENTARY SCHOOL: The need is for a systemic

renovation at Matula Elementary School, which opened in 1992 and is located in the Town

of La Plata. The boiler and pump systems are over 30 years old and outlived their expected

usefulness. Installations of new efficient units are proposed to increase overall efficiency of

the heating system and reduce operating costs. Planning approval will be requested in FY

2023. Construction funding will be requested in FY 2024.

ROOF REPLACEMENT AT J. C. PARKS ELEMENTARY SCHOOL: The need is for a systemic

renovation at Parks Elementary School, which opened in 1967 and located in the Bryans

Road Town Center Revitalization Area. The building was re-roofed in 1997 will have

exceeded its 20-year life expectancy in FY 2025. The installation of a four-ply, built-up roof

with positive drainage is proposed. A full roof investigation will be performed by our

32

Page 37: Action-SS June 14, 2016 Attachments BOARD OF EDUCATION OF ...

consultant prior to design to address any unforeseen problems. Planning approval will be

requested in FY 2024. Construction funding will be requested in FY 2025.

BOILER REPLACEMENT AT WESTLAKE HIGH SCHOOL: The need is for a systemic renovation at

Westlake High School, which opened in 1992 and is located in Westlake Village in St.

Charles. The boiler and pump systems are over 25 years old and will have outlived their

expected usefulness. Installations of new efficient units are proposed to increase overall

efficiency of the heating system and reduce operating costs. Planning approval will be

requested in FY 2024. Construction funding will be requested in FY 2025.

ROOF REPLACEMENT AT MATTHEW HENSON MIDDLE SCHOOL: The need is for a systemic

renovation at Henson Middle School. This school was renovated in 1982 and serves a

portion of the development district. The school was re-roofed as part of the 1982 renovation

and again in 1998 after a catastrophic failure of its single-ply membrane roof. The roof will

have exceeded its 20-year life expectancy by FY 2025. The installation of a four-ply, built-up

roof with positive drainage is proposed. A full roof investigation will be performed by our

consultant prior to design to address any unforeseen problems. Planning approval will be

requested in FY 2024. Construction funding will be requested in FY 2025.

RTU REPLACEMENT AT MARY H. MATULA ELEMENTARY SCHOOL: The need is for a systemic

renovation at Matula Elementary School, which opened in 1992 and located in the Town of

La Plata. The rooftop units are original equipment when the school was constructed and

have approached the end of their useful life. The installation of new efficient units is

proposed, which are environmentally friendly, and will increase the overall efficiency of the

heating cooling systems and reduce the operating costs. Planning approval will be requested

in FY 2025. Construction funding will be requested in FY 2026.

ROOF REPLACEMENT AT WALTER J. MITCHELL ELEMENTARY SCHOOL: The need is for a systemic

renovation at Mitchell Elementary School, which opened in 1965 and located in the Town of

La Plata. The roof is a combination of shingles and is a built-up roofing area. The

installation of a four-ply, built-up roof with positive drainage is proposed. A full roof

investigation will be performed by our consultant prior to design to address any unforeseen

problems. Planning approval will be requested in FY 2025. Construction funding will be

requested in FY 2026. ROOF REPLACEMENT AT THOMAS STONE HIGH SCHOOL: The need is for a systemic renovation

at Stone High School. This school was renovated in 1997 and serves several designated

revitalization areas. The school was re-roofed as part of the renovation and will exceed its

20-year life expectancy by FY 2025. The installation of a four-ply, built-up roof with

positive drainage is proposed. A full roof investigation will be performed by our consultant

33

Page 38: Action-SS June 14, 2016 Attachments BOARD OF EDUCATION OF ...

prior to design to address any unforeseen problems. Planning approval will be requested in

FY 2025. Construction funding will be requested in FY 2026.

BOILER REPLACEMENT AT C. PAUL BARNHART ELEMENTARY SCHOOL: The need is for a systemic

renovation at Barnhart Elementary School. This school opened in 1993, and is located in

Westlake Village in St. Charles. The boilers and pumps are original equipment when the

building was constructed and outlived their usefulness. The installation of a new efficient

heating system that will reduce operating costs is proposed. Planning approval will be

requested in FY 2025. Construction funding will be requested in FY 2026.

g:\planning_&_construction\efmp\fy2017\project descriptions.doc

34