SUBJECT FY 2017 Educational Facilities Master Plan (EFMP) OVERVIEW The EFMP is the first step in the state's school construction program process that leads to the development and approval of a state supported Capital Improvements Program (CIP). Revisions to the EFMP are submitted annually to the Maryland Department of Planning by July 1. This plan is an “identification of needs document.” The CIP is developed later in the fall of each year and addresses these needs with careful consideration to project costs and affordability discussions with county government. BUDGET IMPLICATIONS The EFMP is used to develop and prioritize both the state and local CIP. Funding consideration by the Interagency Committee on School Construction will be given to a local board's CIP only if a current EFMP is on file. STAKEHOLDERS INVOLVED To ensure our system's facilities’ needs are objectively identified for the Board of Education’s (BOE) programming consideration, central office and local government staffs assisted in the development and refinement of the EFMP documents. DESCRIPTION A synopsis of the required elements of the EFMP is included with this plan (attachment). Careful consideration was given to the long standing dialogue between the County Commissioners and the BOE relating to the Adequate Public Facilities Ordinance, and the responsiveness of the CIP to the county’s growth within the state and local anticipated revenues. The focus of the EFMP is reflected in the proposed project schedule along with the systemic renovations plan. This year’s update follows our normal review of maintenance records, systems normal life expectancy records, and growth in the county; but also includes consideration of the new System Wide Capital Improvements Program (educational survey and assessment by GWWO Architects). RECOMMENDATION/FUTURE DIRECTION That the BOE accept and approve the EFMP for FY 2017, as a working document, which will be submitted to the state by July 1, 2016. G:\Planning_&_Construction\EFMP\FY 2017\ ACTION ITEM.doc
FY 2017 EDUCATIONAL FACILITIES MASTER PLAN SYNOPSIS
The Educational Facilities Master Plan (EFMP) is the first of three phases in the state's public school construction program - the programming phase. With Interagency Committee on School Construction approval, the EFMP will serve as the basis for the state's capital improvements program. The preparation of this year's plan considers evolving planning data, identified through the ongoing collaboration by central office staff and county staff, ensuring careful consideration of the Board of Education (BOE) and the County Commissioners’ recommendations for future planning efforts. The plan excerpts listed below (elements of a more detailed document) outline the following changes as contrasted with last year's plan:
Goals, Standards and Guidelines Section - Updated to reflect changes that have occurred over the last year and updated with new information from the various departments.
New Enrollment Data - Includes new projected enrollment and redistricting data on
which all subsequent analysis has been based.
Facilities’ Needs Analysis - A major component focusing on future planning efforts in one composite document. This section includes: Project Schedule - Graphically displays the suggested planning and construction
programming for renovations and required new capacity. New capacity requirements are drawn from an analysis of area step charts by school level included with this report. The step charts on pages 16 – 18 depict projected enrollment as developed by our school system staff and approved by the Maryland Department of Planning in May 2016.
Systemic Renovations – The report includes a section that formalizes the tie with the
Comprehensive Maintenance Plan as it impacts systemic renovations, bringing planning and programming consideration before the BOE on a yearly basis.
Educational Facilities
Master Plan
FY 2017
Westlake High School
Charles County Public Schools
La Plata, Maryland
June 2016
i
Prepared
For
THE BOARD OF EDUCATION
OF CHARLES COUNTY
Virginia R. McGraw, Chairman
Michael Lukas, Vice Chairman
Jennifer S. Abell
Mark Crawford
Victoria T. Kelly
Margaret T. Marshall
Barbara S. Palko
Da’Juon Washington, Student Member
Kimberly A. Hill
Superintendent
Keith A. Hettel
Assistant Superintendent
for Supporting Services
David N. Clements
Supervisor of
Planning & Construction
June 2016
The Charles County public school system does not discriminate on the basis of race, color, religion, national origin, sex, sexual
orientation, age or disability in its programs, activities or employment practices. For inquiries, please contact Dr. Patricia Vaira, Title
IX Coordinator and Section 504 Coordinator (students), or Pamela Murphy, Section 504 Coordinator (employees/adults), at Charles
County Public Schools, Jesse L. Starkey Administration Building, P.O. Box 2770, La Plata, Maryland 20646; (301) 932-6610/870-3814.
For special accommodations call (301) 934-7230 or TDD 1-800-735-2258 two weeks prior to the event.
GOALS, STANDARDS AND GUIDELINES
Each school district in the State of Maryland prepares an annual Educational Facilities Master
Plan (EFMP) in order to receive funds from the state’s public school construction program.
Funds for specific schools are approved annually through the Capital Improvements Program
(CIP). The EFMP presents school resources and identifies needs; the subsequent CIP responds
to the identified needs by funding specific capital projects.
The state requires that each EFMP include a section on goals, standards and guidelines and
identifies eight policy areas to be addressed. Information for Charles County Public Schools
follows below.
A. GRADE ORGANIZATION PATTERN
Public schools in Charles County are organized into three levels: elementary schools
are from pre-K through grade 5; middle schools are grades 6 through 8; and high schools
are grades 9 through 12. The Stethem Educational Center houses alternative programs
for students at the middle and high school levels. At the six Title I schools a three-year
old full day program is also offered. The F.B. Gwynn Center houses programs serving
students from infants and toddlers through middle school.
Adult Education Services is comprised of several programs at the Lifelong Learning
Center, including the National External Diploma Program®, and is currently located
at the Robert D. Stethem Educational Center in Pomfret, as well as schools in the
Waldorf area. The National External Diploma Program® at the Lifelong Learning
Center is an alternative to the GED® exam based on skills achieved through life
experiences. The Lifelong Learning Center has several programs for adults, including
adult basic education, family literacy, GED® preparation, English language civics
classes, and English as a second language classes. Off-site classes include GED®,
NEDP®, Adult Basic Education, and ESL at John Hanson Middle School; ESL at two
Judy Centers/Title I school, ESL and GED® preparation at the County Detention
Center, and a GED® to college transition class at the College of Southern Maryland.
Six elementary schools (six school-wide) house Title I programs for three-year olds (C.
Paul Barnhart, Mt. Hope/Nanjemoy, Indian Head, J. P. Ryon, Dr. Samuel Mudd, and
Eva Turner).
B. STUDENT STAFFING RATIOS
A low student-teacher ratio provides a more individualized instructional program.
Presently, Charles County Public Schools average 25 pupils or less for every one
1
teacher. In addition to classroom teachers, other professionals staff the system’s pre-
school, library, guidance, reading, special education, and gifted education programs.
Itinerant staff is deployed on an as-needed basis including pupil personnel workers,
school psychologists, speech therapists, nursing personnel, and special education
specialists. Specific program needs may also impact student-teacher ratios such as
recent initiatives in reading, high school assessments, state testing, and the three-year
old program.
C. TRANSPORTATION POLICIES
The transportation department operates a safe, efficient and reliable bus service with a
policy to hold busing to a minimum in terms of time and distance. Every effort is made
to keep student travel times less than one hour, especially in the rural areas of the
county. As development occurs, bus routes may change in order to meet the growing
number of students in current subdivisions and from new developments.
D. ATTENDANCE ZONES AND REDISTRICTING POLICIES
Each school has a geographically-based attendance area or zone. Students living within
a zone attend the designated school with certain exceptions for children attending
special education programs or other designated exceptions. A transportation link on
the school system’s website (www.ccboe.com) identifies the appropriate attendance
zone upon entry of a street address.
Changing enrollment patterns and the opening of new schools cause redistricting.
School enrollment boundaries are adjusted in order to promote uniform and efficient
use of school facilities and resources. The redistricting policy, adopted in 1997 and
amended in 2012, requires staff to annually review enrollment data of individual
schools. When a boundary line adjustment becomes necessary, the Superintendent
establishes an advisory committee on redistricting. The factors reviewed during
redistricting include:
school capacity
impact on educational program quality
student enrollment trends
age or condition of buildings
transportation
impact on the community
limiting movement in elementary/middle schools to once in three years
limiting movement after enrollment in ninth grade.
2
The redistricting committee develops two proposals and holds at least one public
hearing. From the committee’s report and initial public input, the Superintendent
presents a redistricting proposal to the Board of Education. The Board holds at least
one public hearing on the Superintendent's redistricting proposal. The final decision
is made by the Board with at least 90 days’ notice prior to implementation. There were
no school boundary changes during the 2015-2016 school year.
E. GIFTED EDUCATION SERVICES
Gifted education provides advanced academic experiences for students who perform or
show the potential to perform at high levels of accomplishment. A learning resource
teacher who works directly with the gifted education program is part of the
instructional leadership team at each elementary and middle school, sharing an office
with the instructional specialist/math resource teacher and reading resource teacher.
Students identified for gifted services in reading/language arts and mathematics work
with the learning resource teacher in the classroom and in small group settings. In
addition, the learning resource teacher collaborates with classroom teachers and
provides staff development for small and large groups.
F. SPECIAL EDUCATION
Special education is customized at each grade level through the Individualized
Education Program (IEP) process with the focus of keeping students in regular
classroom settings. Every school has an IEP room or office for testing, meetings, and
services, where confidential student files are centralized.
Special Education services for preschool age students are delivered in a variety of ways
and are determined by the needs of the students and their families. Many of our
students attend Preschool Special Education Programs that are located in most
elementary schools; these programs include a strong philosophy and a co-teaching
model.
Students with Autism Spectrum Disorder at the elementary school are served through
the Multiple Intensity Teaching (MIT) program. This is a regionalized program
designed to address the academic, social, and behavioral needs of students with severe
communication and behavior disorders. The program serves students beginning at age
three and ending at fourth grade. The classrooms operate using the principles of an
applied behavior analysis model. Students learn skills necessary to function
independently across academic, social, and behavior domains. Students in grades
kindergarten through fourth grade are provided with inclusion opportunities as
3
specified in their IEP. Placement in MIT is determined by the student’s IEP team.
Students at the secondary level are currently provided academic, social, and behavioral
support through the use of autism resource teachers. The teachers provide professional
development for school-based staff in best practices regarding the instruction of
students with autism spectrum disorders.
The Emotional Adjustment Program (EAP) is a highly structured, self-contained
therapeutic program with mainstreaming opportunities for those students who have
difficulty accessing the academic curriculum in the general education setting due to
emotional/behavioral dysregulation. The program is regionalized with school sites at
the elementary, middle, and high school settings. The program provides students with
academic, behavior, and psychological services support for the acquisition of essential
self-regulatory, social, and academic skills. The program continues to support those
students who are able to maintain appropriate behavior as they return to the
mainstream setting. Ultimately, these therapeutic supports are intended to assist the
student in achieving emotional/behavioral stability and academic success without the
need for such extensive supports.
The Life Skills Program provides an alternate curriculum at each grade level for
students with moderate, severe, or profound disabilities. Functional academics,
communications, decision-making skills, and behavior modifications are addressed.
Instruction is community-based in that students work on their IEP goals in community
settings. Within the school setting, students are included with non-disabled peers in
both instructional and social activities.
Transition Academic Adaptive Skills Classes (TAASC) meet the needs of students ages
5-18 with moderate disabilities who require an instructional program designed to
develop skills essential to achieving the highest level of independent functioning in
academics, daily living, work, and community access. Each student’s IEP drives
instruction.
IEP goals and objectives are developed in the following areas:
Academics: the development of math, reading, and writing skills to develop
proficiency with grade level standards.
Personal Management: the development of skills in the areas of personal
hygiene, independent living, and time management.
Community Access: the development of skills in the areas of transportation,
utilization of stores and services, and appropriate integration into the
school/community.
Communication: the development of skills in the areas of receptive and
expressive communication, social interactions, and making choices.
4
Socialization: the development of skills in the areas of interactions with peers
and adults in one-on-one, group, and community settings.
All classes are located in elementary, middle, and high schools within the county, thus
ensuring that students are educated within the least restricted environment. Each
student will be regularly included with their same age peers in daily activities and
instruction, as appropriate.
Some students in the TAASC program pursue a certificate of completion upon
graduation from high school; however, most students will pursue a high school
diploma. These students must fulfill all graduation requirements as determined by the
Maryland State Department of Education and Charles County Public Schools.
Formal transition planning from school to adult life begins when students are 14 years
old. These plans are refined as students get older and school and community based
vocational experiences are provided to students in high school classes, as appropriate.
During the 2015-2016 school year, TAASC programs were held in 14 elementary
schools, 4 middle schools, 2 high schools, and at the F.B. Gwynn Center.
G. CAREER AND TECHNOLOGY EDUCATION
Career and Technology Education (CTE) prepares students for a wide range of careers
through programs that promote both academic and technical achievement. Students
enrolled in CTE program courses can enter careers that require varying levels of
education: high school diplomas, post-secondary certificates, apprenticeships, military
service, or college degrees. Additionally, CTE Programs of Study provide opportunities
to earn industry-recognized credentials and college credit while still in high school.
Students learn skills and develop attitudes that support career employment, college
readiness, and life-long learning.
Business Education courses provide students with opportunities to acquire business
knowledge, skills, and attitudes needed to function effectively in many career
pathways. The foundation and advanced course sequence support continuing education
in business administration, management, finance and marketing. Learning experiences
are designed to support critical thinking skills and effective communication.
Computer Science courses prepare students for success in computer science and related
informational technology degrees, as well as related fields such as engineering. Courses
cover topics such as computer programming and computational thinking, web
development, network technologies, and PC troubleshooting and repair. Students use
5
a variety of programming languages, including Java, virtual robots, animation software,
and professional web development applications such as Adobe CS 5.5.
Family and Consumer Sciences (FACS) courses offered at the high school level prepare
students to become capable individuals, family members, and citizens managing the
challenges of living and working in a diverse global society. FACS programs include
Architecture and Interior Design, Fashion Design, Fashion Merchandising and
Marketing, Food and Nutrition Science and Intercultural Foods, Retail Merchandising,
and Textiles and Apparels.
Financial Literacy courses prepare students with the knowledge and skills necessary to
meaningfully plan for their financial future, manage their money, and evaluate choices
to make informed decisions. The courses cover a wide variety of financial literacy
topics such as credit card usage, credit scores and reports, buying a car, preparing a
budget, checking and savings accounts, investing, and income considerations. All
freshmen entering high school in 2011 and beyond must earn one credit in financial
literacy.
Junior Reserve Officers Training Corps (JROTC) is a service specific student leadership
program that instills the values of citizenship, community service, personal
responsibility, character, and self-discipline. Air Force, Army or Navy (Sea Service-
Navy, Marine, and Coast Guard) programs are offered at each high school. The
programs are staffed with a minimum of one retired officer and one retired
noncommissioned officer.
Technology Education is a comprehensive experienced-based curriculum based on the
Maryland State Technology Education Standards. The Foundations of Technology
course, offered at all high schools is a graduation requirement. Advanced technology
education courses are also available for students interested in this subject matter.
Students are taught technological literacy by exploring the ways in which ingenuity,
processes, materials, devices, science, and mathematics are applied to solving practical
and perennial problems of a designed world. Laboratory activities include the safe use
of tools, machines, and materials.
Career Technology Education Completer Programs by Career Clusters
Career Technology Education Completer Programs provide high school students with
an opportunity to pursue sequential technical and academic programs of study leading
to a career. CTE Programs of Study prepare students for college and careers.
6
The Career Research and Development (CRD) Program of Study prepares students with
academic, technical, and workplace skills necessary to seek further education and
employment in a career field of their interest. The program consists of a classroom
instructional component and a paid or unpaid workplace component.
Arts, Media and Communication Cluster
Graphic Communications – The PrintEd Program of Study is designed to give students
an overall understanding of the industry and its major operations while teaching
competencies that lead to PrintEd certification. Students can gain technical skills in
three areas: Introduction to Graphic Communication, Digital File Preparation, and
Press Operations. Students may also earn college credits through an articulation
agreement with the College of Southern Maryland.
The Interactive Media Production Program of Study includes a strong foundation in
arts and communication with particular emphasis on graphic and media
communications, interactive technologies, and project development. Students
complete courses in Arts, Media and Communication and Interactive Media Production
and Advanced Media Production.
Business Management and Finance Cluster
Business Education courses focus on two pathway programs based on the Maryland
State Department of Education framework document for Business Management and
Finance. Each program includes rigorous academics, broad cluster knowledge and skills
as well as more advanced technical skills related to one of the specific pathways:
Business Administrative Services and Business Management. Each pathway consists of
four courses developed by business educators, postsecondary instructors, and business
partners to help prepare students for success in their chosen business pathway. Skills
for success, workplace readiness, computer applications, written and oral
communication skills, and math skills are all integrated throughout the coursework.
Industry certifications are incorporated where appropriate and opportunities are made
available for students to earn college credit through articulation agreements with local
colleges. Career planning and expectations are incorporated throughout. Each
program allows students to graduate with the skills and knowledge necessary to pursue
a variety of careers in industry and continue their education at postsecondary
institutions.
7
Construction Development Cluster
Architectural Drafting and Design students learn the basics of mechanical drawing and
then progress to orthographic projections, sectional views, and pictorial plans for use
in engineering. Supplemental courses are drawing, drafting and design, physics,
architecture, and interior design.
Carpentry instruction is based on modules from the National Center for Construction
and Education and Research (NCCER) national standards and provides students with
instruction and hands-on experiences in the construction industry. Students master a
variety of construction skills and apply their knowledge and skills by participating in
both lab-based and work-based projects.
Electrical Construction is based on modules from the NCCER national standards, and
provides students with instruction and hands-on experiences. Students master a variety
of electrical skills in both residential and commercial wiring.
Heating, Air Conditioning and Refrigeration Mechanic (HVAC) is based on modules
from the NCCER national standards and provides students with instruction and hands-
on experiences learning about the industry as it relates to residential and commercial
building applications.
Welding provides students a variety of welding skills, such as oxyfuel cutting and
welding including Shielded Metal Arc Welding (SMAW). This course of study
correlates to modules from the NCCER national standards. NCCER meets the
American Welding Society (AWS) Entry Level Welder-Phase One and Phase Two
requirements of the AWS guidelines.
Consumer Services, Hospitality & Tourism Cluster
The ProStart-Food and Beverage Management program introduces high school
students to a wide variety of careers within the restaurant, food service, and hospitality
industry. Students study and practice professional food preparation, preparation of
international cuisines, food safety and sanitation, customer service relations,
accounting, cost control, marketing and an introduction to all aspects of lodging
management. Students will build strong culinary, business, management and work
place skills as a result of their participation in this program. The National Restaurant
Association Education Foundation (NRAEF) designed the program’s industry driven
curriculum.
8
Careers in the Cosmetology program prepare individuals to care for and beautify hair,
skin and nails. Students are instructed in the art and science of cosmetology, as well as
all aspects of the industry. Emphasis is placed on hygiene, safety, and sanitation as well
as State Board of Cosmetologists’ rules and regulations. Related areas of instruction
include human anatomy and physiology; mathematics and measurement; analysis,
diagnosis and histology of hair, skin and nails; chemistry; fundamentals of electricity;
product knowledge; customer relations; and employability skills. Salon management is
an integral part of the classroom and clinical experience. The 1,500-hour program
includes classroom instruction, clinical experience, related mentored work-based
learning experience, and a senior capstone project. Upon successful completion and
the instructor’s recommendation, the student will be required to take the Maryland
State Board of Cosmetologists’ Examination.
The Culinary Arts program prepares students for successful careers in the food and
beverage industry with a focus on Culinary Arts or Professional Baking. The program
includes education in food production, professional cooking, baking, cost control,
nutrition, sanitation, and food marketing. When combined with science classes, this
program will provide the necessary skills for further education and career success.
Environmental, Agriculture & Natural Resources Cluster:
The Horticulture Services program is based on the Certified Professional Horticulturist
(CPH) certification that is used by the Maryland "Green Industry" and includes rigorous
academics, broad cluster knowledge and skills, as well as technical knowledge related
to the horticulture industry. Horticulture courses include Principles of
Plant/Animal/Environmental Science; Foundations of Horticulture; Plant Production;
Landscape Design and Management; and, Capstone Experience. Students are provided
opportunities to earn the CPH industry certification, and college credit through
articulation agreements with local colleges.
Health & Biosciences Cluster
The Academy of Health Professions prepares college-bound students for medical
careers. Students will learn to use technology to provide all aspects of health services.
The program includes classroom instruction as well as hands-on laboratory and clinical
experiences at local health care facilities. Students will also take courses such as
anatomy/physiology, nutrition, and speech. Students are expected to take multiple
science classes, including Advanced Placement Biology and Chemistry. Students at
North Point High School earn a Certified Nursing Assistant certification. Students
attending the program at Robert D. Stethem Educational Center are prepared to take
9
the Pharmacy Technician Certification Board (PTCB) exam in the pharmacy technician
specialty course.
Biomedical Sciences, Project Lead the Way (PLTW), is based on the national standards
for science, mathematics, and English language arts, and the Accountability Criteria for
National Health Care Cluster Foundation Standards. The program consists of a
sequence of four courses: Principals of Biomedical Sciences; Human Body Systems;
Medical Interventions; and, Medical Innovations (science research). Students who
complete the program are prepared for employment and further education at two- and
four-year college levels.
Human Resource Services Cluster:
Education Careers in Early Childhood programs provides students with instruction that
supports careers such as daycare providers, school teachers, instructional assistants, and
school counselors as well as opportunities to earn college credits. Supplemental courses
include art, music, nutrition, and world language.
Criminal Justice prepares students for law enforcement careers. Students complete a
foundation-level course with a focus on addressing threats to public safety through
effective communication, preparedness, detection, prevention, response, and recovery.
Students practice critical thinking in “mock crime scene” activities. Courses in Spanish,
computers, art, speech, and photography are recommended to supplement the
curriculum.
Fire Science/Fire Fighting is offered through collaboration with the Maryland Fire and
Rescue Institute (MFRI) of the University of Maryland, local Fire and Rescue
Companies, and Charles County Public Schools. The program includes classroom
instruction as well as formal training at selected local fire companies. Students must be
members in good standing at their local fire company, complete a minimum of 138
hours of work-based learning, and take the seven certification exams. Successful
completion of this program can lead to MFRI certifications as well as college credits.
The Teacher Academy of Maryland (TAM) aligns with the Interstate New Teacher
Assessment and Support Consortium (INTASC) and the Maryland Essential Dimensions
of Teaching (EDoTs). The program focuses on teaching as a profession, human growth
and development, learning theory, and curriculum and instruction. Upon completion
of the program and passing the ParaPro assessment, high school graduates are ready for
entry level employment as an instructional aide in the teaching profession or can
continue their education at a four-year college.
10
Information Technology Cluster
The CISCO Networking Academy prepares student for industry certification (CCNA)
and advanced study in information technology. Emphasis is placed on solving
networking problems through decision-making and problem-solving techniques,
involving applications of science, mathematics, and communication skills.
Manufacturing, Engineering & Technology Cluster:
The Manufacturing Technologies Program of Study provides students with the
knowledge and skills needed to program and operate Computerized Numerical Control
(CNC) machines in order to create designed products from raw materials.
Manufacturing includes a study of computer assisted drafting and design, engineering
concepts, and computer programming.
Project Lead the Way (PLTW) Pathway to Engineer Pre-Engineering program prepares
students for further education and careers in engineering and engineering technology.
Students complete foundation-level courses in Engineering, including Principles of
Engineering, Introduction to Engineering Design, and Digital Electronics. Students
then select an area of specialization, including Computer Integrated Manufacturing,
Civil Engineering and Architecture, Aerospace Engineering, or Biotechnical
Engineering. In the final course, students also complete an industry-mentored
capstone project in Engineering Design and Development.
Gateway to Technology (GTT) is the middle school pre-engineering program for
students exploring an engineering pathway as a possible career choice. The project-
based format is designed to appeal to learners who may not have considered careers in
science, mathematics, or engineering. This course is not a CTE Completer Program;
however, it is designed by PLTW as a precursor to their pre-engineering program.
Transportation Technologies Cluster
Collision Repair Technician combines technical, academic and workplace skills
through curriculum that is aligned with the Inter-Industry Conference on Auto
Collision Repair (I-CAR), National Automotive Technicians Education Foundation
(NATEF), including Automotive Service Excellence (ASE). Instruction prepares
students for careers and/or further education in collision repair and refinishing within
the Transportation Technology Cluster through the following courses: Non-Structural
Analysis and Damage Repair/ Plastics and Adhesives, Paint and Refinishing, and an
optional course Structural Analysis & Damage Repair.
11
The Automotive Technician program incorporates the Automotive Service Excellence
(ASE) program certification standards and the National Automotive Technicians
Education Foundation (NATEF) task lists. The program prepares students for further
education and careers in the Transportation Equipment Pathway and automotive
technology. The program consists of eight courses: Suspension and Steering, Brakes,
Electrical/Electronic Systems, Engine Performance, Engine Repair, Heating and Air
Conditioning, Automatic Transmission and Transaxle, and Manual Drive Train.
H. EDUCATIONAL SUPPORT POLICIES
School counseling services are available at each school. Certified counselors can help
parents and students in areas of academic planning, personal decision making and
career development. Each high school also has a college and career advisor who assists
with these efforts. Counselors work with parents, administrators, teachers and
community resources to provide the best educational experiences for students.
School health service nurses update, maintain and implement medical plans for
medically fragile students, administer medications, review immunization records and
provide medical response for illness and injuries as needs arise for students and staff.
Vision and hearing technicians regularly screen students and re-screen upon requests
from parents or teachers.
Certified school psychologists provide crisis intervention, counseling for students and
groups of students, individual risk assessments, psychological assessments and
consultations with teachers, parents and administrators. This includes referrals to, and
consultations with, appropriate community agencies and professionals.
Pupil personnel workers act as liaisons between home, school and the community.
They investigate residence concerns and assist with attendance, behavior, enrollment,
and homeless issues.
Court liaisons work with the courts, Juvenile Services Department and the school
system to appropriately and effectively meet students' needs.
School Probation Officers (SPO’s) are employed by Department of Juvenile Services to
serve as mentors. They primarily work with students placed on probation by the court.
They devote time and attention to these and other students serving as positive role
models in prevention and early intervention programs.
School Resource Officers (SRO) are sworn police officers from the Sheriff’s Office. An
officer is assigned to each middle and high schools. Service is provided to elementary
schools as needed. When requested by the school, the SRO’s serves as mentors to the
12
students and as consultants to the school administration and staff. They provide school
and personnel safety programs, teach DARE classes, counsel individual students, work
with parents, and carry out normal police duties when called upon to do so.
I. SCHOOL CLOSING PROCEDURES
Charles County Public Schools provide high quality education at an efficient and cost
effective level through an optimum use of facilities. The local growth rate is an added
challenge to this policy; whereas the closing of schools is a lesser demand. School
closings comply with state regulations (COMAR 13A.02.09). The Superintendent
appoints a standing committee to review population patterns and other factors bearing
on school operations. The analysis includes:
educational program quality
student enrollment trends
student body racial composition
age or condition of schools
means of transportation
student relocations
financial projections and economic costs
community impact of school closings
impacts to schools at other levels
Based on each school’s assessment, the committee submits recommendations to the
Superintendent, which could include school closures. From the committee’s
recommendations, the Superintendent develops alternatives for review by the Board of
Education. If a school closure is included, the Board holds a public hearing on both the
proposed closure and alternatives. The decision to close a school rests with the Board.
As with redistricting actions, a minimum of 90-days public notice is provided prior to
implementation to ensure orderly transitions.
J. CONCLUSION
The goals, standards and guidelines established for the Charles County Public Schools
system fulfill the stated mission of the Board of Education, which is to provide an
opportunity for all school-aged children to receive an academically challenging, quality
education that builds character, equips for leadership and prepares for life, in an
environment that is safe and conducive to learning.
g:\planning_&_construction\efmp\fy 2017\efmp2017 goals, standards, guidelines.docm
13
CA
PAC
ITY
& P
RO
JEC
TED
EN
RO
LLM
ENT*
CO
MPA
RIS
ON
SC
HO
OLS
RA
TE
DP
RO
JE
XC
ES
SR
AT
ED
PR
OJ
EX
CE
SS
RA
TE
DP
RO
JE
XC
ES
SR
AT
ED
PR
OJ
EX
CE
SS
RA
TE
DP
RO
JE
XC
ES
SC
AP
.E
NR
OLL
(SH
OR
T)
CA
P.
EN
RO
LL(S
HO
RT
)C
AP
.E
NR
OLL
(SH
OR
T)
CA
P.
EN
RO
LL(S
HO
RT
)C
AP
.E
NR
OLL
(SH
OR
T)
ELE
ME
NT
AR
YC
. Pau
l Bar
nhar
t60
869
4.0
(86.
0)60
863
3.0
(25.
0)60
862
6.0
(18.
0)60
862
7.0
(19.
0)60
862
5.0
(17.
0)B
erry
656
875.
0(2
19.0
)65
685
6.0
(200
.0)
656
857.
0(2
01.0
)65
685
2.0
(196
.0)
656
860.
0(2
04)
Dr.
Gus
tavu
s B
row
n38
143
5.0
(54.
0)38
144
1.0
(60.
0)38
142
8.0
(47.
0)38
141
6.0
(35.
0)38
141
9.0
(38.
0)D
r. J
ames
Cra
ik40
645
7.0
(51.
0)40
647
9.0
(73.
0)40
647
2.0
(66.
0)40
646
8.0
(62.
0)40
647
2.0
(66)
Will
iam
A. D
iggs
816
742.
573
.581
673
3.5
82.5
816
735.
580
.581
674
1.5
74.5
816
745.
570
.5G
ale-
Bai
ley
438
361.
576
.543
838
7.5
50.5
438
384.
553
.543
838
1.5
56.5
438
386.
552
Dr.
Tho
mas
L. H
igdo
n44
743
3.0
14.0
447
453.
0(6
.0)
447
448.
0(1
.0)
447
443.
04.
044
744
2.0
5.0
Indi
an H
ead
404
456.
0(5
2.0)
404
451.
0(4
7.0)
404
459.
0(5
5.0)
404
463.
0(5
9.0)
404
460.
0(5
6)D
anie
l of S
t. T
hom
as J
enife
r49
558
4.0
(89.
0)49
567
4.0
(179
.0)
495
675.
0(1
80.0
)49
567
8.0
(183
.0)
495
687.
0(1
92.0
)M
alco
lm41
744
1.0
(24.
0)41
734
1.0
76.0
417
342.
075
.041
734
3.0
74.0
417
346.
071
T. C
. Mar
tin48
655
4.0
(68.
0)48
653
6.0
(50.
0)48
655
3.0
(67.
0)48
656
2.0
(76.
0)48
656
9.0
(83.
0)M
ary
H. M
atul
a55
469
4.0
(140
.0)
554
551.
03.
055
457
2.0
(18.
0)55
458
1.0
(27.
0)55
459
0.0
(36)
Art
hur
Mid
dlet
on43
943
2.0
7.0
439
466.
0(2
7.0)
439
454.
0(1
5.0)
439
451.
0(1
2.0)
439
452.
0(1
3.0)
Wal
ter
J. M
itche
ll60
667
1.0
(65.
0)60
665
2.0
(46.
0)60
665
3.0
(47.
0)60
664
9.0
(43.
0)60
664
5.0
(39)
Mt.
Hop
e/N
anje
moy
373
349.
024
.037
341
7.0
(44.
0)37
340
2.0
(29.
0)37
341
0.0
(37.
0)37
341
0.0
(37.
0)D
r. S
amue
l A. M
udd
343
387.
5(4
4.5)
343
392.
5(4
9.5)
343
404.
5(6
1.5)
343
403.
5(6
0.5)
343
407.
5(6
5)M
ary
Bur
gess
Nea
l79
174
1.0
50.0
791
673.
011
8.0
791
674.
011
7.0
791
667.
012
4.0
791
685.
010
6.0
J. C
. Par
ks65
665
6.0
0.0
656
752.
0(9
6.0)
656
759.
0(1
03.0
)65
676
3.0
(107
.0)
656
746.
0(9
0)J.
P. R
yon
656
703.
0(4
7.0)
656
545.
011
1.0
656
538.
011
8.0
656
544.
011
2.0
656
553.
010
3.0
Eva
Tur
ner
391
420.
0(2
9.0)
391
510.
0(1
19.0
)39
144
5.0
(54.
0)39
150
4.0
(113
.0)
391
498.
0(1
07)
Will
iam
B. W
ade
672
680.
0(8
.0)
672
801.
0(1
29.0
)67
279
7.0
(125
.0)
672
791.
0(1
19.0
)67
280
1.0
(129
.0)
New
Ele
men
tary
#22
N/A
N/A
---
N/A
N/A
---
758
N/A
758.
075
8N
/A75
8.0
758
N/A
758
New
Ele
men
tary
#23
N/ A
N/A
---N
/AN
/A---
N/A
N/A
---N
/AN
/A---
N/A
N/A
---
TO
TA
L E
LEM
EN
TA
RY
11,0
3511
,766
.5(7
31.5
)11
,035
11,7
44.5
(709
.5)
11,7
9311
,678
.511
4.5
11,7
9311
,738
.554
.511
,793
1179
9.5
(6.5
)
MID
DLE
The
odor
e G
. Dav
is1,
112
805.
030
7.0
1,11
287
5.0
237.
01,
112
911.
020
1.0
1,11
291
7.0
195.
01,
112
923.
018
9.0
John
Han
son
843
785.
058
.084
383
7.0
6.0
843
866.
0(2
3.0)
843
871.
0(2
8.0)
843
877.
0(3
4)M
atth
ew H
enso
n65
972
5.0
(66.
0)65
977
6.0
(117
.0)
659
809.
0(1
50.0
)65
981
5.0
(156
.0)
659
821.
0(1
62.0
)M
atta
wom
an89
090
4.0
(14.
0)89
092
6.0
(36.
0)89
096
5.0
(75.
0)89
096
9.0
(79.
0)89
097
3.0
(83)
Pic
cow
axen
544
429.
011
5.0
544
420.
012
4.0
544
427.
011
7.0
544
428.
011
6.0
544
430.
011
4.0
Gen
eral
Sm
allw
ood
659
549.
011
0.0
659
613.
046
.065
962
9.0
30.0
659
634.
025
.065
963
7.0
22M
ilton
M. S
omer
s80
21,
025.
0(2
23.0
)80
293
8.0
(136
.0)
802
971.
0(1
69.0
)80
297
7.0
(175
.0)
802
979.
0(1
77.0
)B
enja
min
Sto
dder
t71
168
5.0
26.0
711
743.
0(3
2.0)
711
751.
0(4
0.0)
711
757.
0(4
6.0)
711
762.
0(5
1)N
ew M
iddl
e #9
N/ A
N/A
---N
/AN
/A---
N/A
N/A
---N
/AN
/A---
N/A
N/A
---
TO
TA
L M
IDD
LE6,
220
5,90
7.0
313.
06,
220
6,12
8.0
92.0
6,22
06,
329.
0(1
09.0
)6,
220
6,36
8.0
(148
.0)
6220
6402
.0(1
82.0
)
HIG
HH
enry
E. L
acke
y1,
539
1,00
2.0
537.
01,
539
1,05
5.0
484.
01,
539
1,05
1.0
488.
01,
539
1,05
5.0
484.
015
3910
59.0
480.
0La
Pla
ta1,
162
1,08
0.0
82.0
1,16
21,
134.
028
.01,
162
1,21
5.0
(53.
0)1,
162
1,22
4.0
(62.
0)11
6212
34.0
(72)
Mau
rice
J. M
cDon
ough
1,20
089
8.0
302.
01,
200
864.
033
6.0
1,20
087
0.0
330.
01,
200
877.
032
3.0
1200
881.
031
9.0
Nor
th P
oint
1,
600
1,76
5.0
(165
.0)
1,60
01,
778.
0(1
78.0
)1,
600
1,84
6.0
(246
.0)
1,60
01,
857.
0(2
57.0
)16
0018
61.0
(261
)S
t.Cha
rles
1,51
11,
280.
023
1.0
1,51
11,
384.
012
7.0
1,51
11,
461.
050
.01,
511
1,46
9.0
42.0
1,51
114
78.0
33.0
Tho
mas
Sto
ne1,
513
1,23
5.0
278.
01,
513
1,14
0.0
373.
01,
513
1,13
1.0
382.
01,
513
1,13
9.0
374.
015
1311
48.0
365
Wes
tlake
1,20
31,
168.
035
.01,
203
1,21
4.0
(11.
0)1,
203
1,14
4.0
59.0
1,20
31,
151.
052
.012
0311
57.0
46.0
TO
TA
L H
IGH
9,72
88,
428.
01,
300.
09,
728
8,56
9.0
1,15
9.0
9,72
88,
718.
01,
010.
09,
728
8,77
2.0
956.
097
2888
1891
0.0
OT
HE
RS
teth
em E
duca
tiona
l Cen
ter
396
21.0
375.
039
621
.037
5.0
396
21.0
375.
039
621
.037
5.0
396
7032
6T
OT
AL
OT
HE
R21
.021
.021
.021
.070
GR
AN
D T
OTA
L *
26,9
8326
,122
.586
0.5
26,9
8326
,462
.552
0.5
27,7
4126
,746
.599
4.5
27,7
4126
,899
.584
1.5
2716
927
400
(231
)
* Eq
uiva
lent
Cou
nt (I
nclu
ding
Pre
-K E
quiv
.)G
:\Pla
nnin
g_&
_Con
stru
ctio
n\E
FM
P\F
Y20
17\S
prea
dshe
ets\
[Cap
acity
Pro
ject
ed E
nrol
lmen
t Com
paris
on _
Apr
il201
6.X
LS]S
Y15
1602
-May
-201
6
SY
16
- 17
SY
17
- 18
SY
18
- 19
SY
19
- 20
SY
20
- 21
14
CA
PAC
ITY
& P
RO
JEC
TED
EN
RO
LLM
ENT*
CO
MPA
RIS
ON
SC
HO
OLS
RA
TE
DP
RO
JE
XC
ES
SR
AT
ED
PR
OJ
EX
CE
SS
RA
TE
DP
RO
JE
XC
ES
SR
AT
ED
PR
OJ
EX
CE
SS
RA
TE
DP
RO
JE
XC
ES
SC
AP
.E
NR
OLL
(SH
OR
T)
CA
P.
EN
RO
LL(S
HO
RT
)C
AP
.E
NR
OLL
(SH
OR
T)
CA
P.
EN
RO
LL(S
HO
RT
)C
AP
.E
NR
OLL
(SH
OR
T)
ELE
ME
NT
AR
YC
. Pau
l Bar
nhar
t60
862
9.0
(21.
0)60
863
2.0
(24.
0)60
863
2.0
(24.
0)60
863
5.0
(27.
0)60
864
3.0
(35.
0)B
erry
656
881.
0(2
25.0
)65
688
3.0
(227
.0)
656
882.
0(2
26.0
)65
688
5.0
(229
.0)
656
889.
0(2
33.0
)D
r. G
usta
vus
Bro
wn
381
423.
0(4
2.0)
381
430.
0(4
9.0)
381
430.
0(4
9.0)
381
431.
0(5
0.0)
381
437.
0(5
6.0)
Dr.
Jam
es C
raik
406
480.
0(7
4.0)
406
492.
0(8
6.0)
406
492.
0(8
6.0)
406
493.
0(8
7.0)
406
496.
0(9
0.0)
Will
iam
A. D
iggs
816
765.
550
.581
675
6.5
59.5
816
756.
559
.581
675
9.5
56.5
816
765.
550
.5G
ale-
Bai
ley
438
394.
543
.543
840
1.5
36.5
438
401.
536
.543
840
2.5
35.5
438
405.
532
.5D
r. T
hom
as L
. Hig
don
447
445.
02.
044
744
9.0
(2.0
)44
744
7.0
0.0
447
448.
0(1
.0)
447
451.
0(4
.0)
Indi
an H
ead
404
456.
0(5
2.0)
404
450.
0(4
6.0)
404
450.
0(4
6.0)
404
451.
0(4
7.0)
404
454.
0(5
0.0)
Jeni
fer
495
701.
0(2
06.0
)49
570
8.0
(213
.0)
495
708.
0(2
13.0
)49
571
1.0
(216
.0)
495
717.
0(2
22.0
)M
alco
lm41
736
0.0
57.0
417
354.
063
.041
735
4.0
63.0
417
355.
062
.041
735
8.0
59.0
T. C
. Mar
tin48
658
4.0
(98.
0)48
659
6.0
(110
.0)
486
596.
0(1
10.0
)48
660
1.0
(115
.0)
486
607.
0(1
21.0
)M
ary
H. M
atul
a55
460
6.0
(52.
0)55
461
2.0
(58.
0)55
461
2.0
(58.
0)55
461
4.0
(60.
0)55
462
0.0
(66.
0)A
rthu
r M
iddl
eton
439
455.
0(1
6.0)
439
461.
0(2
2.0)
439
461.
0(2
2.0)
439
462.
0(2
3.0)
439
468.
0(2
9.0)
Wal
ter
J. M
itche
ll60
665
3.0
(47.
0)60
666
0.0
(54.
0)60
666
0.0
(54.
0)60
666
3.0
(57.
0)60
666
9.0
(63.
0)M
t. H
ope/
Nan
jem
oy37
341
8.0
(45.
0)37
342
4.0
(51.
0)37
342
3.0
(50.
0)37
342
3.0
(50.
0)37
342
3.0
(50.
0)D
r. S
amue
l A. M
udd
343
410.
5(6
7.5)
343
413.
5(7
0.5)
343
413.
5(7
0.5)
343
412.
5(6
9.5)
343
415.
5(7
2.5)
Mar
y B
urge
ss N
eal
791
698.
093
.079
170
1.0
90.0
791
701.
090
.079
170
4.0
87.0
791
710.
081
.0J.
C. P
arks
656
746.
0(9
0.0)
656
740.
0(8
4.0)
656
740.
0(8
4.0)
656
743.
0(8
7.0)
656
749.
0(9
3.0)
J. P
. Ryo
n65
657
0.0
86.0
656
593.
063
.065
659
3.0
63.0
656
594.
062
.065
660
0.0
56.0
Eva
Tur
ner
391
494.
0(1
03.0
)39
149
0.0
(99.
0)39
149
0.0
(99.
0)39
149
0.0
(99.
0)39
149
6.0
(105
.0)
Will
iam
B. W
ade
672
801.
0(1
29.0
)67
280
8.0
(136
.0)
672
808.
0(1
36.0
)67
281
1.0
(139
.0)
672
817.
0(1
45.0
)N
ew E
lem
enta
ry #
2275
8N
/A75
8.0
758
N/A
758.
075
8N
/A75
8.0
758
N/A
758.
075
8N
/A75
8.0
New
Ele
men
tary
#23
N/ A
N/A
---N
/AN
/A---
766
N/A
766.
076
6N
/A76
6.0
766
N/A
766.
0T
OT
AL
ELE
ME
NT
AR
Y11
,793
11,9
70.5
(177
.5)
11,7
9312
,054
.5(2
61.5
)12
,559
12,0
50.5
508.
512
,559
12,0
88.5
470.
512
,559
12,1
90.5
368.
5
MID
DLE
The
odor
e G
. Dav
is1,
112
923.
018
9.0
1,11
291
5.0
197.
01,
112
928.
018
4.0
1,11
293
5.0
177.
01,
112
940.
017
2.0
John
Han
son
843
877.
0(3
4.0)
843
904.
0(6
1.0)
843
917.
0(7
4.0)
843
922.
0(7
9.0)
843
927.
0(1
16.0
)M
atth
ew H
enso
n65
982
1.0
(162
.0)
659
781.
0(1
22.0
)65
979
7.0
(138
.0)
659
799.
0(1
40.0
)65
980
4.0
20.0
Mat
taw
oman
890
973.
0(8
3.0)
890
1,02
3.0
(133
.0)
890
1,03
7.0
(147
.0)
890
1,04
6.0
(156
.0)
890
1,05
1.0
(253
.0)
Pic
cow
axen
544
430.
011
4.0
544
455.
089
.054
446
0.0
84.0
544
462.
082
.054
446
4.0
67.0
Gen
eral
Sm
allw
ood
659
637.
022
.065
957
7.0
82.0
659
589.
070
.065
959
4.0
65.0
659
599.
059
.0M
ilton
M. S
omer
s80
297
9.0
(177
.0)
802
989.
0(1
87.0
)80
21,
004.
0(2
02.0
)80
21,
010.
0(2
08.0
)80
21,
015.
0(2
16.0
)B
enja
min
Sto
dder
t71
176
2.0
(51.
0)71
176
3.0
(52.
0)71
177
9.0
(68.
0)71
177
8.0
(67.
0)71
178
2.0
(123
.0)
New
Mid
dle
#9N
/ AN
/A---
N/A
N/A
---N
/AN
/A---
940
N/A
940.
094
0N
/A94
0.0
TO
TA
L M
IDD
LE6,
220
6,40
2.0
(182
.0)
6,22
06,
407.
0(1
87.0
)6,
220
6,51
1.0
(291
.0)
7,16
06,
546.
061
4.0
7,16
06,
582.
019
8.0
HIG
HH
enry
E. L
acke
y1,
539
1,08
8.0
451.
01,
539
1,10
4.0
435.
01,
539
1,11
2.0
427.
01,
539
1,13
1.0
408.
01,
539
1,13
1.0
85.0
La P
lata
1,16
21,
263.
0(1
01.0
)1,
162
1,33
8.0
(176
.0)
1,16
21,
347.
0(1
85.0
)1,
162
1,35
8.0
(196
.0)
1,16
21,
358.
0(4
88.0
)M
auric
e J.
McD
onou
gh1,
200
910.
029
0.0
1,20
092
5.0
275.
01,
200
933.
026
7.0
1,20
094
2.0
258.
01,
200
941.
048
.0N
orth
Poi
nt1,
600
1,89
1.0
(291
.0)
1,60
02,
036.
0(4
36.0
)1,
600
2,04
8.0
(448
.0)
1,60
02,
060.
0(4
60.0
)1,
600
2,05
7.0
(792
.0)
St.C
harle
s 1,
511
1,51
0.0
1.0
1,51
11,
499.
012
.01,
511
1,51
3.0
(2.0
)1,
511
1,52
2.0
(11.
0)1,
511
1,51
9.0
(8.0
)T
hom
as S
tone
1,51
31,
179.
033
4.0
1,51
31,
214.
029
9.0
1,51
31,
215.
029
8.0
1,51
31,
207.
030
6.0
1,51
31,
204.
0(1
24.0
)W
estla
ke1,
203
1,18
9.0
14.0
1,20
31,
432.
0(2
29.0
)1,
203
1,44
2.0
(239
.0)
1,20
31,
454.
0(2
51.0
)1,
203
1,44
9.0
(579
.0)
TO
TA
L H
IGH
9,72
89,
030.
069
8.0
9,72
89,
548.
018
0.0
9,72
89,
610.
011
8.0
9,72
89,
674.
054
.09,
728
9,65
9.0
(250
.0)
Ste
them
Edu
catio
nal C
ente
r39
670
.032
6.0
396
70.0
326.
039
670
.032
6.0
396
70.0
326.
039
670
.032
670
.070
.070
.070
.070
.0
GR
AN
D T
OTA
L *
27,7
4127
,472
.526
8.5
27,7
4128
,079
.5(3
38.5
)28
,507
28,2
41.5
265.
529
,447
28,3
78.5
1,06
8.5
29,4
4728
,501
.594
5.5
* Eq
uiva
lent
Cou
nt (I
nclu
ding
Pre
-K E
quiv
.)G
:\Pla
nnin
g_&
_Con
stru
ctio
n\E
FM
P\F
Y20
17\S
prea
dshe
ets\
[Cap
acity
Pro
ject
ed E
nrol
lmen
t Com
paris
on _
Apr
il201
6.X
LS]S
Y15
1602
-May
-201
6
SY
22
- 23
SY
23
- 24
SY
24
- 25
SY
25
- 26
SY
21
- 22
15
16
Mid
dle
Sch
ools
* P
roje
cted
Enr
ollm
ent &
Cap
acit
y
6,35
963
9864
3264
3264
3765
4165
7666
12
5,91
45,
937
6,15
8
5,50
0
6,00
0
6,50
0
7,00
0
7,50
0
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
Sch
ool Y
ear
2015
Enr
ollm
ent
Tre
nd (
2012
Enr
ollm
ent)
* C
ount
y W
ide
6,25
6
+ I
dent
ifie
d F
utur
e N
eed
4/28
/201
6
Cap
acit
y
7,16
0
New
Mid
dle
Sch
ool #
9
+94
0
17
Hig
h S
choo
ls*
Pro
ject
ed E
nrol
lmen
t & C
apac
ity
8,44
0
8,58
1
9699
9714
8,40
9
8,73
0
9650
8784
9588
9070
8858
8,00
0
8,20
0
8,40
0
8,60
0
8,80
0
9,00
0
9,20
0
9,40
0
9,60
0
9,80
0
10,0
00
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
Sch
ool Y
ear
2015
Enr
ollm
ent
Tre
nd (
2012
Enr
ollm
ent)
* C
ount
y-W
ide
8,21
7
9,72
8
+ I
dent
ifie
d F
utur
e N
eed
4/28
/201
6
Cap
acit
y
18
FY
2016
FY
2017
FY
2018
FY
2019
FY
2020
FY
2021
FY
2022
FY
2023
FY
2024
FY
2025
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
Pla
nnin
gC
onst
ruct
ion
Sch
ool O
pens
Fun
ding
App
rove
dP
lann
ing
App
rove
d
FY
2017
Edu
catio
nal F
acili
ties
Mas
ter
Pla
nC
harle
s C
ount
y P
ublic
Sch
ools
Pro
ject
Sch
edul
e
PRO
JEC
T
Sto
dder
t MS
RT
U/B
oile
r S
R
Mar
y M
atul
a E
S F
DK
Add
n.
Dan
iel o
f St.
Tho
mas
Jen
ifer
ES
FD
K
New
Ele
men
tary
#22
Dr.
Sam
uel M
udd
ES
- R
enov
atio
n
Ber
ry E
S F
DK
Add
n.
Dr.
Jam
es C
raik
ES
FD
K A
ddn.
Dr.
Gus
tavu
s B
row
n E
S -
Ope
n S
pace
Mat
ula
ES
Roo
f SR
Tur
ner
ES
Roo
f/RT
U S
R
Eva
Tur
ner
ES
- R
enov
atio
n
Ben
jam
in S
todd
ert M
S -
Ren
ovat
ion
McD
onou
gh H
S -
Ren
ovat
ion,
Pha
se 1
Mat
thew
Hen
son
MS
Wat
erlin
e
Wes
tlake
HS
Roo
f SR
Indi
an H
ead
ES
Boi
ler
SR
LaP
lata
HS
- R
enov
atio
n, P
hase
1
T.C
. Mat
in E
S -
Ren
ovat
ion
J.P.
Ryo
n E
S F
DK
Add
n.
Mal
colm
ES
FD
K A
ddn.
Pic
cow
axen
MS
Boi
ler
SR
Mar
tin E
S R
oof/U
V/C
onde
nser
s S
R
Mile
ston
es S
impl
icity
Tria
l Ver
sion
(http
://w
ww
.kid
asa.
com
).
19
FY
2016
FY
2017
FY
2018
FY
2019
FY
2020
FY
2021
FY
2022
FY
2023
FY
2024
FY
2025
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
Pla
nnin
gC
onst
ruct
ion
Sch
ool O
pens
Fun
ding
App
rove
dP
lann
ing
App
rove
d
FY
2017
Edu
catio
nal F
acili
ties
Mas
ter
Pla
nC
harle
s C
ount
y P
ublic
Sch
ools
Pro
ject
Sch
edul
e
PRO
JEC
T
Sm
allw
ood
MS
Chi
ll/H
&V
/UV
/Roo
f SR
Han
son
MS
Roo
f SR
Mat
taw
oman
MS
Roo
f SR
Ste
them
Edu
catio
nal C
ente
r S
R
New
Ele
men
tary
#23
Bar
nhar
t ES
Roo
f SR
Wal
ter
J. M
itche
ll E
S F
DK
Add
n.
J.C
. Par
ks E
S F
DK
Add
n.
Hen
son
MS
Mul
ti-zo
ne U
nit/H
eat P
ump
J.C
. Par
ks E
S F
DK
Add
n.
Wad
e E
S B
oile
r/C
hille
r S
R
Dr.
Hig
don
ES
Roo
f SR
New
Mid
dle
#9
Dr.
Tho
mas
Hig
don
ES
FD
K A
ddn.
Wad
e E
S F
DK
Add
n.
Ber
ry E
S R
oof S
R
Dr.
Hig
don
ES
RT
U/B
oile
r S
R
Mid
dlet
on R
oof S
R
Wad
e E
S R
TU
/Roo
f SR
Mat
ula
ES
Boi
ler
SR
JC P
arks
ES
Roo
f SR
Wes
tlake
HS
Boi
ler
SR
Mile
ston
es S
impl
icity
Tria
l Ver
sion
(http
://w
ww
.kid
asa.
com
).
20
FY
2016
FY
2017
FY
2018
FY
2019
FY
2020
FY
2021
FY
2022
FY
2023
FY
2024
FY
2025
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
Pla
nnin
gC
onst
ruct
ion
Sch
ool O
pens
Fun
ding
App
rove
dP
lann
ing
App
rove
d
FY
2017
Edu
catio
nal F
acili
ties
Mas
ter
Pla
nC
harle
s C
ount
y P
ublic
Sch
ools
Pro
ject
Sch
edul
e
PRO
JEC
T
Hen
son
MS
Roo
f SR
Mat
ula
ES
RT
U/C
hille
r S
R
Mitc
hell
ES
Roo
f SR
Tho
mas
Sto
ne H
S R
oof S
R
Bar
nhar
t ES
Boi
ler
SR
Mile
ston
es S
impl
icity
Tria
l Ver
sion
(http
://w
ww
.kid
asa.
com
).
21
SYSTEMIC RENOVATIONS
In addition to major renovations and additions, the existing school buildings in Charles
County have other needs that must be addressed. These needs are usually addressed as
systemic renovations funded through the IAC and/or as Capital Maintenance projects with
local capital or operating budget funding. A list of proposed projects for the next ten fiscal
years that is consistent with the Charles County Public Schools “Comprehensive Maintenance Plan” was developed and is included here for completeness of our facilities
needs. The projects potentially eligible for IAC funding are summarized on IAC/PSCP Form
101.3. The Key is as follows: Roof-Top-Unit (RTU), Unit Ventilator (UV), Heating &
Ventilation Unit (H&V), Air Handler Unit (AHU), and Variable Air Volume Unit (VAV).
* Local funds only.
SYSTEMIC RENOVATION PROJECTS
FY 2016
Dr. Gustavus Brown Elementary* RTU/Boiler Replacement
F. B. Gwynn Center* Roof/Boiler Replacement
Site Improvements (Various Schools) Asphalt/Concrete/Site
Elementary Playground Upgrades (Various Schools) Play Equipment & Site Upgrades FY 2017
Benjamin Stoddert Middle RTU/Boiler Replacement
Gale Bailey Elem. Site Improvements* Asphalt/Concrete/Site
Elementary Playground Upgrades (Various Schools)* Play Equipment & Site Upgrades
FY 2018
Mary Matula Elementary Roof Replacement
Eva Turner Elementary Roof /RTU Replacement
Site Improvements (Various Schools)* Asphalt/Concrete/Site
Elementary Playground Upgrades (Various Schools)* Play Equipment & Site Upgrades
FY 2019
Westlake High Roof Replacement
Indian Head Elementary Boiler Replacement
Dr. Gustavus Brown Elementary Open Space Enclosure
Matthew Henson Middle Waterline Extension
Site Improvements (Various Schools)* Asphalt/Concrete/Site
Elementary Playground Upgrades (Various Schools)* Play Equipment & Site Upgrades
22
SYSTEMIC RENOVATION PROJECTS (Continued)
FY 2020
Piccowaxen Middle Boiler Replacement
T. C. Martin Elementary Roof/UV Replacement
General Smallwood Middle Chiller/UV/Roof Replacement
FY 2021
John Hanson Middle Roof Replacement
Mattawoman Middle Roof Replacement
Stethem Educational Center Boilers/RTU/AHU/
Roof Replacement
C. Paul Barnhart Elementary Roof Replacement
FY 2022
Matthew Henson Middle Multi-Zone/Heat Pump Replace.
William B. Wade Elementary Boiler/Chiller Replacement
Dr. Thomas Higdon Elementary Roof Replacement
Berry Elementary Roof Replacement
FY 2023
Dr. Thomas Higdon Elementary RTU/Boiler Replacement
Arthur Middleton Elementary Roof Replacement
William B. Wade Elementary RTU/Roof Replacement
Mary Matula Elementary Boiler Replacement
FY 2024
J.C. Parks Elementary Roof Replacement
Westlake High Boiler Replacement
Matthew Henson Middle Roof Replacement
FY 2025
Mary Matula Elementary RTU/Chiller Replacement
Walter J. Mitchell Elementary Roof Replacement
Thomas Stone High Roof Replacement
C. Paul Barnhart Elementary Boiler Replacement
G:\Planning_&_Construction\EFMP\FY2017\systemic renovation projects lists (STATE)June16.doc
23
NEW CAPACITY AND RENOVATION/ADDITION
PROJECT DESCRIPTIONS FULL-DAY KINDERGARTEN ADDITIONS/RENOVATIONS – VARIOUS SCHOOLS: There is a need for
permanent space to support full-day kindergarten in the elementary schools. A study to
evaluate the existing conditions and recommend the most effective means of providing the
additional classrooms required to house a full-day kindergarten program is complete.
Planning approvals for 12 projects and construction funding for 10 projects were approved in
fiscal years 2007 through 2017. Planning approval and construction funds for additional
projects will be requested in FY 2018 and future years.
Planning and construction approvals:
C. Paul Barnhart Elementary School Gale-Bailey Elementary School
T. C. Martin Elementary School Mt. Hope/Nanjemoy Elementary School
Dr. Gustavus Brown Elementary School Eva Turner Elementary School
Indian Head Elementary School Arthur Middleton Elementary School
Mary H. Matula Elementary School Daniel of St. Thomas Jenifer Elementary
Berry Elementary School – Planning Dr. James Craik Elementary - Planning
Planning and construction requests:
Berry Elementary School - FY 2018 Construction
Dr. James Craik Elementary School - FY 2018 Construction
J. P. Ryon Elementary School – FY 2019 Planning/ FY 2020 Construction
Malcolm Elementary School - FY 2019 Planning/ FY 2020 Construction
Walter J. Mitchell Elementary School - FY 2021 Planning/ FY 2022 Construction
J. C. Parks Elementary School - FY 2021 Planning/ FY 2022 Construction
Dr. Thomas Higdon Elementary School - FY 2022 Planning/ FY 2023 Construction
William Wade Elementary School - FY 2022 Planning/ FY 2023 Construction
NEW ELEMENTARY SCHOOL #22: The need is for additional elementary school capacity in the
Waldorf area. Continued development in the county’s development district, will cause
enrollment at the elementary level to exceed the capacity of the existing schools serving that
area. Elementary #22 will be to be located on Billingsley Road in Waldorf, west of Route
301. The school will serve a population that includes students with special needs, students
with low English proficiency, and children eligible to participate in the free and reduced
meal program. The projected state rated capacity of the school will be 766. State Planning
was approved in FY 2016 and local design funds were approved in FY 2015. State and local
construction funds were approved in FY 2017. State and Local construction funds will
continue to be requested in FY 2018 and FY 2019.
24
DR. SAMUEL MUDD ELEMENTARY SCHOOL MODERNIZATION/ADDITION: The need is for
modernization at Dr. Samuel Mudd Elementary School. The school was opened in 1967 and
major building systems have reached the end of their useful life. The modernization will
upgrade the mechanical and electrical systems to meet current standards and codes. All
existing spaces will be modernized and modified to meet current educational program
requirements. A new gymnasium addition and other programmatic spaces will be included
in the project to enhance the instructional program, including full-day kindergarten to meet
state mandates. The school is located in the Carrington neighborhood of Smallwood Village
in St. Charles and serves the development district. The school serves a population that
includes students with special needs, students with low English proficiency, and children
eligible to participate in the free and reduced meal program. The State approved Planning
for the school in FY 2016 and the County approved design funds in FY 2016. The projected
rated capacity will be 542. State and local construction funds were approved in FY 2017.
State and local construction funds will continue to be requested in FY 2018 and FY 2019.
EVA TURNER ELEMENTARY SCHOOL MODERNIZATION/ADDITION: The need is for modernization
and addition to Eva Turner Elementary School. The school was opened in 1979 and major
building systems have reached the end of their useful life. The school received a pre-
kindergarten addition in 1995 and an all-day kindergarten addition in 2011. The
modernization will upgrade the mechanical and electrical systems to meet current standards
and codes. The building will be modernized and expanded for increased enrollment and to
meet current educational program requirements. New individual classroom spaces will be
provided to replace existing open-space classrooms. The school is located in the Bannister
neighborhood of Smallwood Village in St. Charles and serves the development district. The
school serves a population that includes students with special needs, students with low
English proficiency, and children eligible to participate in the free and reduced meal
program. Local planning funds are requested in FY 2018. State and local construction funds
are requested in FY 2019 and FY 2020.
BENJAMIN STODDERT MIDDLE SCHOOL MODERNIZATION/ADDITION: The need is for
modernization and addition to Benjamin Stoddert Middle School. The school opened in
1976 and the major building systems have reached the end of their useful life. The school
has not had any previous renovations or additions. The modernization will upgrade the
mechanical and electrical systems to meet current standards and codes. The entire building
will be modernized and expanded for increased enrollment and to meet current educational
program requirements. New individual classroom spaces will be provided to replace existing
open-space classrooms. The school is located in the Bannister neighborhood of Smallwood
Village in St. Charles and serves the development district. The school serves a population
that includes students with special needs, students with low English proficiency, and
children eligible to participate in the free and reduced meal program. Local planning funds
25
are requested in FY 2018. State and Local construction funds are requested in FY 2019 and
FY 2020.
MAURICE J. MCDONOUGH HIGH SCHOOL, PHASE I RENOVATION: The need is for modernization
at McDonough High School, which was built in 1977 and serves a portion of the
development district. The proposed Phase I may include; an elevator, stair modifications,
improved accessibility, new secure building entrance and administrative office, renovations
to convert the existing administrative spaces to program spaces, and enhancements to the
performing arts area. The school serves a population that includes students with special
needs, students with low English proficiency, and children eligible to participate in the free
and reduced meal program. Local funding to initiate planning will be requested in FY 2018.
State and local construction funding will be requested in FY 2019.
LA PLATA HIGH SCHOOL, PHASE I RENOVATION: The need is for modernization at La Plata
High School, which was built in 1979 and serves a portion of the development district. The
proposed Phase I may include; envelope stabilization, open space enclosure, new secure
building entrance and administrative office, and enhancements to special programs. The
school serves a population that includes students with special needs, students with low
English proficiency, and children eligible to participate in the free and reduced meal
program. Local funding to initiate planning will be requested in FY 2019. State and local
construction funding will be requested in FY 2020 and FY 2021.
T.C. MARTIN ELEMENTARY SCHOOL MODERNIZATION/ADDITION: The need is for modernization
and addition to T. C. Martin Elementary School. The school was opened in 1967 and major
building systems have reached the end of their useful life. The boilers were replaced in 2006
and the school received an all-day kindergarten addition in 2009. The modernization will
upgrade the mechanical and electrical systems to meet current standards and codes. The
building will be modernized and expanded for increased enrollment and to meet current
educational program requirements. The school serves a population that includes students
with special needs, students with low English proficiency, and children eligible to participate
in the free and reduced meal program. Local planning funds are requested in FY 2019. State
and local construction funds are requested in FY 2020 and FY 2021.
NEW ELEMENTARY SCHOOL #23: The need is for additional school capacity in the La Plata
area. Continued development in the incorporated town, both east and west of route 301,
will cause enrollment at the elementary level to exceed the capacity of the existing schools
serving that area. The school will serve a population that includes students with special
needs, students with low English proficiency, and children eligible to participate in the free
and reduced meal program. Planning approval will be requested in FY 2021. State and local
construction funding will be requested in FY 2022 and FY 2023.
26
NEW MIDDLE SCHOOL #9: The need is for additional capacity at the middle school level in the
rapidly growing county development district. The county’s Comprehensive Plan calls for the
majority of growth in the county to be concentrated in the development district, including
those areas west of Route 301. Enrollment projections indicate the schools serving this area
will continue to experience increasing enrollment and overcrowded conditions. The
proposed school site location is not determined. A school with a rated capacity of 940 is
planned. The school will serve a population that includes students with special needs,
students with low English proficiency, and children eligible to participate in the free and
reduced meal program. Planning approval will be requested in FY 2022. State and local
construction funding will be requested in FY 2023 and FY 2024.
27
SYSTEMIC RENOVATIONS
PROJECT DESCRIPTIONS
RTU/BOILER REPLACEMENT AT BENJAMIN STODDERT MIDDLE SCHOOL: The need is for a systemic
renovation at Stoddert Middle School, which opened in 1977 and is located in Smallwood
Village in St. Charles. The boilers and pumps and roof top units are original equipment
when the building was constructed and are approaching the end of their useful life. The
installations of new efficient units are proposed, which will increase overall efficiency of the
heating system and reduce operating costs. Planning approval was approved by the County
in FY 2015, construction funds were approved by the State and Local government in FY
2016. The balance of State construction funding was approved in FY2017.
ROOF REPLACEMENT AT MARY H. MATULA ELEMENTARY SCHOOL: The need is for a systemic
renovation at Matula Elementary School, located in the Town of La Plata and opened in
1992. The original roof will reach the end of its expected life in FY 2017. The installation of
a four-ply, built-up roof with positive drainage is proposed. A full roof investigation will be
performed by our consultant prior to design to address any unseen problems. Planning
approval will be requested in FY 2018. Construction funding will be requested in FY 2019.
ROOF/RTU REPLACEMENT AT EVA TURNER ELEMENTARY SCHOOL: The need is for a systemic
renovation at Turner Elementary School, which opened in 1979 and located in Smallwood
Village in St. Charles. The roof top units are over 30 years old. These units have outlived
their expected usefulness and no longer maintain a suitable environment within the school.
The school was re-roofed in 1992, and will reach the end of its expected life in FY 2017. The
installation of a four-ply, built-up roof with positive drainage is proposed. A full roof
investigation will be performed by our consultant prior to design to address any unforeseen
problems. Planning approval will be requested in FY 2018. Construction funding will be
requested in FY 2019. This project may be cancelled if a full renovation project is supported
by the State and local governments prior to FY 2018.
OPEN SPACE ENCLOSURE AT DR. GUSTAVUS BROWN ELEMENTARY SCHOOL: The need is for an
open space enclosure at Dr. Gustavus Brown Elementary School, located in the Smallwood
Village in St. Charles, within the development district. The original building opened in 1974
and designed with an open space floor plan and the need is for permanent enclosed
classrooms. This project will consist of constructing permanent classroom walls,
reconfiguring ductwork and lighting, electrical work, providing new drop ceiling, and new
floor finishes. Planning approval will be requested in FY 2018. Construction funding will be
requested in FY 2019.
28
WATERLINE EXTENSION AT MATTHEW HENSON MIDDLE SCHOOL: The need is for a permanent
connection to the county owned and operated water system at Matthew Henson Middle
School, located in Bryans Road within the development district. Matthew Henson Middle
School opened in 1957 and was renovated in 1982. The school is currently operating on a
deep well and has experienced some issues with sediment in the water. This project will
consist of constructing a waterline and providing fire protection around the building with
additional hydrants. Planning approval will be requested in FY 2018. Construction funding
will be requested in FY 2019.
ROOF REPLACEMENT AT WESTLAKE HIGH SCHOOL: The need is for a systemic renovation at
Westlake High School, which opened in 1992 and located in Westlake Village in St. Charles.
The original roof will reach its life expectancy in FY 2017. The installation of a four-ply,
built-up roof with positive drainage is proposed. A full roof investigation will be performed
by our consultant prior to design to address any unforeseen problems. Planning approval
will be requested in FY 2019. Construction funding will be requested in FY 2020.
BOILER REPLACEMENT AT INDIAN HEAD ELEMENTARY SCHOOL: The need is for a systemic
renovation at Indian Head Elementary School, which opened in 1976 and is located in the
Town of Indian Head. The boiler and pump systems are over 30 years old and outlived their
expected usefulness. The installation of new efficient units is proposed to increase overall
efficiency of the heating system and reduce operating costs. Planning approval will be
requested in FY 2019. Construction funding will be requested in FY 2020.
BOILER REPLACEMENT AT PICCOWAXEN MIDDLE SCHOOL: The need is for a systemic renovation
at Piccowaxen Middle School, which opened in 1977. The boiler and pump systems are over
30 years old and outlived their expected usefulness. The installation of new efficient units is
proposed to increase the overall efficiency of the heating system and reduce operating cost.
Planning approval will be requested in FY 2020. Construction funding will be requested in
FY 2021.
ROOF/UV/CONDENSERS REPLACEMENT AT T. C. MARTIN ELEMENTARY SCHOOL: The need is for a
systemic renovation at Martin Elementary School, which opened in 1967 and located in
Bryantown. The condensers and all the classroom unit ventilators are in need of
replacement, due to their age and function. These units have outlived their expected
usefulness and no longer maintain a suitable environment within the school. The school was
re-roofed in 1988 and by FY 2017 the roof will reach its 20-year life expectancy. The
installation of a four-ply, built-up roof with positive drainage is proposed. A full roof
investigation will be performed by our consultant prior to design to address any unforeseen
problems. Planning approval will be requested in FY 2020. Construction funding will be
requested in FY 2021. This project may be cancelled if a full renovation project is supported
by the state and local governments prior to FY 2020.
29
ROOF/CHILLER/H&V/UV REPLACEMENTS AT GENERAL SMALLWOOD MIDDLE SCHOOL: The need
is for a systemic renovation at Smallwood Middle School, which was renovated in 1979 and
serves a portion of the development district. The roof, heating and ventilation units, chiller
and all classroom unit ventilators were installed when the building was renovated in the
1970s and are approaching the end of their useful life. Approximately 40 H&V’s and UV’s
were replaced using the Aging Schools Program (ASP). The installation of a four-ply, built-
up roof with positive drainage is proposed. A full roof investigation will be performed by our
consultant prior to design to address any unseen problems. The installation of new efficient
units is proposed, which are environmentally friendly, and will increase the overall
efficiency of the heating cooling systems and reduce the operating costs. Planning approval
will be requested in FY 2019. Construction funding will be requested in FY 2020.
ROOF REPLACEMENT AT JOHN HANSON MIDDLE SCHOOL: The need is for a systemic renovation
at Hanson Middle School. Located in the Waldorf development district, this school opened
in 1972 and is the oldest operating middle school in Charles County. The building was re-
roofed in 1995 and will reach its expected 20-year life by FY 2017. The installation of a
four-ply, built-up roof with positive drainage is proposed. A full roof investigation will be
performed by our consultant prior to design to address any unforeseen problems. Planning
approval will be requested in FY 2021. Construction funding will be requested in FY 2022.
ROOF REPLACEMENT AT MATTAWOMAN MIDDLE SCHOOL: The need is for a systemic
renovation at Mattawoman Middle School, which opened in 1992 and located in the rapidly
growing route 228 corridor in Waldorf. The original roof will reach its life expectancy in FY
2017. The installation of a four-ply, built-up roof with positive drainage is proposed. A full
roof investigation will be performed by our consultant prior to design to address any
unforeseen problems. Planning approval will be requested in FY 2021. Construction
funding will be requested in FY 2022.
ROOF/BOILER/AHU/RTU REPLACEMENT AT ROBERT D. STETHEM EDUCATIONAL CENTER: The
need is for a systemic renovation at the Stethem Center. This school originally opened in
1977 as the Charles County Career & Technology Center. The air handler unit and rooftop
units are over 30 years old. These units have outlived their expected usefulness and no
longer maintain a suitable environment within the school. These roof top units are original
equipment when the building was constructed in the early 1970s and have approached the
end of their useful life expectancy. The installations of new units are proposed, which are
more efficient and would increase overall efficiency of the heating and cooling systems and
reduce operating costs. The multi-roof complex was re-roofed in 1995 and will reach its 20-
year life expectancy by FY 2017. Planning approval will be requested in FY 2021.
Construction funding will be requested in FY 2022.
30
ROOF REPLACEMENT AT C. PAUL BARNHART ELEMENTARY SCHOOL: The need is for a systemic
renovation at Barnhart Elementary School, which opened in 1993 and is located in Westlake
Village in St. Charles. The original roof will reach its life expectancy in FY 2017. The
installation of a four-ply, built-up roof with positive drainage is proposed. A full roof
investigation will be performed by our consultant prior to design to address any unforeseen
problems. Planning approval will be requested in FY 2021. Construction funding will be
requested in FY 2022.
MULTI-ZONE UNIT/HEATPUMP REPLACEMENT AT MATTHEW HENSON MIDDLE SCHOOL: The need
is for a systemic renovation at Henson Middle School. The school was renovated in 1982 and
the multi-zone unit with Dx cooling and the water-cooled, heat pumps in the classrooms will
be over 30 years old and will have outlived their expected usefulness. The installation of
new units will increase overall efficiency of the heating system and reduce operating costs.
Planning approval will be requested in FY 2021. Construction funding will be requested in
FY 2022.
BOILER/CHILLER REPLACEMENT AT WILLIAM B. WADE ELEMENTARY SCHOOL: The need is for a
systemic renovation at Wade Elementary School, which opened in 1989 and is located in
Westlake Village in St. Charles. The boiler and pump systems and chiller are over 25 years
old and outlived their expected usefulness. The installation of new efficient units is proposed
to increase the overall efficiency of the heating and cooling systems and reduce operating
cost. Planning approval will be requested in FY 2022. Construction funding will be
requested in FY 2023.
ROOF REPLACEMENT AT DR. THOMAS L. HIGDON ELEMENTARY SCHOOL: The need is for a
systemic renovation at Higdon Elementary school, which was renovated in 1988. The school
was re-roofed as part of the renovation and the roof is past the 20-year life expectancy. The
installation of a four-ply, built-up roof with positive drainage is proposed. A full roof
investigation will be performed by our roof consultant prior to design to address any unseen
problems. Planning approval will be requested in FY 2022. Construction funding will be
requested in FY 2023.
ROOF REPLACEMENT AT BERRY ELEMENTARY SCHOOL: The need is for a systemic renovation at
Berry Elementary School, which opened in 1996 and located in the rapidly growing route
228 corridor in Waldorf. The original roof will reach its 20-year life expectancy in FY 2017.
The installation of a four-ply, built-up roof with positive drainage is proposed. A full roof
investigation will be performed by our consultant prior to design to address any unforeseen
problems. Planning approval will be requested in FY 2022. Construction funding will be
requested in FY 2023.
31
RTU/BOILER REPLACEMENT DR. THOMAS L. HIGDON ELEMENTARY SCHOOL: The need is for a
systemic renovation at Higdon Elementary School. This school, located in Newburg and
services the southern part of the county, opened in 1988. The rooftop units and boilers are
original equipment when the building was renovated in the 1980s and no longer maintains a
suitable environment within the school. Installation of new units are proposed, which are
more efficient and would increase overall efficiency of the heating and cooling systems, to
reduce operating costs. Planning approval will be requested in FY 2023. Construction
funding will be requested in FY 2024.
ROOF REPLACEMENT AT ARTHUR MIDDLETON ELEMENTARY SCHOOL: The need is for a systemic
renovation at Middleton Elementary School. The school, which is located in Smallwood
Village in St. Charles and serves the development district, opened in 1973. The building was
re-roofed 1996 and will reach the end of its expected 20-year life by FY 2016. The
installation of a four-ply, built-up roof with positive drainage is proposed. A full roof
investigation will be performed by our consultant prior to design to address any unforeseen
problems. Planning approval will be requested in FY 2023. Construction funding will be
requested in FY 2024.
ROOF/RTU REPLACEMENT AT WILLIAM B. WADE ELEMENTARY SCHOOL: The need is for a
systemic renovation at Wade Elementary School, which was renovated in 1989 and is located
in Westlake Village in St. Charles. The original roof will have reached its 20-year life
expectancy. The installation of a four-ply, built-up roof with positive drainage is proposed.
A full roof investigation will be performed by our consultant prior to design to address any
unforeseen problems. The rooftop units are original equipment when the building was built
and have reached the end of their useful life. The installation of new efficient units is
proposed, which are environmentally friendly, and will increase the overall efficiency of the
heating cooling systems and reduce the operating costs. Planning approval will be requested
in FY 2023. Construction funding will be requested in FY 2024.
BOILER REPLACEMENT AT MARY H. MATULA ELEMENTARY SCHOOL: The need is for a systemic
renovation at Matula Elementary School, which opened in 1992 and is located in the Town
of La Plata. The boiler and pump systems are over 30 years old and outlived their expected
usefulness. Installations of new efficient units are proposed to increase overall efficiency of
the heating system and reduce operating costs. Planning approval will be requested in FY
2023. Construction funding will be requested in FY 2024.
ROOF REPLACEMENT AT J. C. PARKS ELEMENTARY SCHOOL: The need is for a systemic
renovation at Parks Elementary School, which opened in 1967 and located in the Bryans
Road Town Center Revitalization Area. The building was re-roofed in 1997 will have
exceeded its 20-year life expectancy in FY 2025. The installation of a four-ply, built-up roof
with positive drainage is proposed. A full roof investigation will be performed by our
32
consultant prior to design to address any unforeseen problems. Planning approval will be
requested in FY 2024. Construction funding will be requested in FY 2025.
BOILER REPLACEMENT AT WESTLAKE HIGH SCHOOL: The need is for a systemic renovation at
Westlake High School, which opened in 1992 and is located in Westlake Village in St.
Charles. The boiler and pump systems are over 25 years old and will have outlived their
expected usefulness. Installations of new efficient units are proposed to increase overall
efficiency of the heating system and reduce operating costs. Planning approval will be
requested in FY 2024. Construction funding will be requested in FY 2025.
ROOF REPLACEMENT AT MATTHEW HENSON MIDDLE SCHOOL: The need is for a systemic
renovation at Henson Middle School. This school was renovated in 1982 and serves a
portion of the development district. The school was re-roofed as part of the 1982 renovation
and again in 1998 after a catastrophic failure of its single-ply membrane roof. The roof will
have exceeded its 20-year life expectancy by FY 2025. The installation of a four-ply, built-up
roof with positive drainage is proposed. A full roof investigation will be performed by our
consultant prior to design to address any unforeseen problems. Planning approval will be
requested in FY 2024. Construction funding will be requested in FY 2025.
RTU REPLACEMENT AT MARY H. MATULA ELEMENTARY SCHOOL: The need is for a systemic
renovation at Matula Elementary School, which opened in 1992 and located in the Town of
La Plata. The rooftop units are original equipment when the school was constructed and
have approached the end of their useful life. The installation of new efficient units is
proposed, which are environmentally friendly, and will increase the overall efficiency of the
heating cooling systems and reduce the operating costs. Planning approval will be requested
in FY 2025. Construction funding will be requested in FY 2026.
ROOF REPLACEMENT AT WALTER J. MITCHELL ELEMENTARY SCHOOL: The need is for a systemic
renovation at Mitchell Elementary School, which opened in 1965 and located in the Town of
La Plata. The roof is a combination of shingles and is a built-up roofing area. The
installation of a four-ply, built-up roof with positive drainage is proposed. A full roof
investigation will be performed by our consultant prior to design to address any unforeseen
problems. Planning approval will be requested in FY 2025. Construction funding will be
requested in FY 2026. ROOF REPLACEMENT AT THOMAS STONE HIGH SCHOOL: The need is for a systemic renovation
at Stone High School. This school was renovated in 1997 and serves several designated
revitalization areas. The school was re-roofed as part of the renovation and will exceed its
20-year life expectancy by FY 2025. The installation of a four-ply, built-up roof with
positive drainage is proposed. A full roof investigation will be performed by our consultant
33
prior to design to address any unforeseen problems. Planning approval will be requested in
FY 2025. Construction funding will be requested in FY 2026.
BOILER REPLACEMENT AT C. PAUL BARNHART ELEMENTARY SCHOOL: The need is for a systemic
renovation at Barnhart Elementary School. This school opened in 1993, and is located in
Westlake Village in St. Charles. The boilers and pumps are original equipment when the
building was constructed and outlived their usefulness. The installation of a new efficient
heating system that will reduce operating costs is proposed. Planning approval will be
requested in FY 2025. Construction funding will be requested in FY 2026.
g:\planning_&_construction\efmp\fy2017\project descriptions.doc