ACS Lite Overview – NTOC Webinar Aug06 U.S. Department of Transportation Federal Highway...
-
Upload
katherine-sanchez -
Category
Documents
-
view
213 -
download
0
Transcript of ACS Lite Overview – NTOC Webinar Aug06 U.S. Department of Transportation Federal Highway...
![Page 1: ACS Lite Overview – NTOC Webinar Aug06 U.S. Department of Transportation Federal Highway Administration FHWA Contract No.DTFH61-02-C-00047 Slide 1 ACS-Lite.](https://reader036.fdocuments.in/reader036/viewer/2022070305/5513fa3b550346d8488b45bc/html5/thumbnails/1.jpg)
ACS Lite Overview – NTOC Webinar Aug06
U.S. Department of TransportationFederal Highway AdministrationFHWA Contract No.DTFH61-02-C-00047
Slide 1
ACS-LiteAdaptive Control Software for Closed-loop
Traffic Control Systems
Raj Ghaman, P.E.
Operations Team Leader
FHWA RD&T
![Page 2: ACS Lite Overview – NTOC Webinar Aug06 U.S. Department of Transportation Federal Highway Administration FHWA Contract No.DTFH61-02-C-00047 Slide 1 ACS-Lite.](https://reader036.fdocuments.in/reader036/viewer/2022070305/5513fa3b550346d8488b45bc/html5/thumbnails/2.jpg)
ACS Lite Overview – NTOC Webinar Aug06
U.S. Department of TransportationFederal Highway AdministrationFHWA Contract No.DTFH61-02-C-00047
Slide 2
Adaptive in the U.S. (FHWA)
• 1970s-1980s: UTCS / TRPS– Second by second central
• 1990s: Predictive control (ACS)– FHWA ACS: RHODES, OPAC, RTACL– Second by second distributed
• 2002: Controller-based Adaptive– FHWA ACS “Lite”– Leverage existing hardware / infrastructure– Download new controller parameters every five-fifteen minutes
![Page 3: ACS Lite Overview – NTOC Webinar Aug06 U.S. Department of Transportation Federal Highway Administration FHWA Contract No.DTFH61-02-C-00047 Slide 1 ACS-Lite.](https://reader036.fdocuments.in/reader036/viewer/2022070305/5513fa3b550346d8488b45bc/html5/thumbnails/3.jpg)
ACS Lite Overview – NTOC Webinar Aug06
U.S. Department of TransportationFederal Highway AdministrationFHWA Contract No.DTFH61-02-C-00047
Slide 3
FHWA Goals for ACS-Lite
• Low cost design• Leverage existing infrastructure
• Standard US-style actuated controllers and logic (rings, phases, splits, barriers, gap-out/extension, etc.)
• Standard fully-actuated detector layouts• Standard NTCIP Communications
• “Retro-fit” with major US signal system vendors
![Page 4: ACS Lite Overview – NTOC Webinar Aug06 U.S. Department of Transportation Federal Highway Administration FHWA Contract No.DTFH61-02-C-00047 Slide 1 ACS-Lite.](https://reader036.fdocuments.in/reader036/viewer/2022070305/5513fa3b550346d8488b45bc/html5/thumbnails/4.jpg)
ACS Lite Overview – NTOC Webinar Aug06
U.S. Department of TransportationFederal Highway AdministrationFHWA Contract No.DTFH61-02-C-00047
Slide 4
Project Team
![Page 5: ACS Lite Overview – NTOC Webinar Aug06 U.S. Department of Transportation Federal Highway Administration FHWA Contract No.DTFH61-02-C-00047 Slide 1 ACS-Lite.](https://reader036.fdocuments.in/reader036/viewer/2022070305/5513fa3b550346d8488b45bc/html5/thumbnails/5.jpg)
ACS Lite Overview – NTOC Webinar Aug06
U.S. Department of TransportationFederal Highway AdministrationFHWA Contract No.DTFH61-02-C-00047
Slide 5
Field trials
Peek/QuixoteBradenton
(St. Petersburg/Tampa), Florida
EconoliteGahanna
(Columbus), OhioEagle/SiemensHouston, Texas
McCainEl Cajon
(San Diego), California
![Page 6: ACS Lite Overview – NTOC Webinar Aug06 U.S. Department of Transportation Federal Highway Administration FHWA Contract No.DTFH61-02-C-00047 Slide 1 ACS-Lite.](https://reader036.fdocuments.in/reader036/viewer/2022070305/5513fa3b550346d8488b45bc/html5/thumbnails/6.jpg)
ACS Lite Overview – NTOC Webinar Aug06
U.S. Department of TransportationFederal Highway AdministrationFHWA Contract No.DTFH61-02-C-00047
Slide 6
Gahanna, OH field test results
0
1
2
3
4
Total A
LL
NB ALL
SB ALL
ALL AM
ALL PM
Before
After
Results - Number of Stops
![Page 7: ACS Lite Overview – NTOC Webinar Aug06 U.S. Department of Transportation Federal Highway Administration FHWA Contract No.DTFH61-02-C-00047 Slide 1 ACS-Lite.](https://reader036.fdocuments.in/reader036/viewer/2022070305/5513fa3b550346d8488b45bc/html5/thumbnails/7.jpg)
ACS Lite Overview – NTOC Webinar Aug06
U.S. Department of TransportationFederal Highway AdministrationFHWA Contract No.DTFH61-02-C-00047
Slide 7
Gahanna, OH field test results
1Peak hours = Average savings*(Average Corridor Peak Hour Volume*4 peak hours)
Unit Costs:• Total Delay – $12.10 per hour
• Stops – $0.014 per stop
• Fuel Consumed – $0.59 per liter ($2.25 per gallon)
Before(per veh)
After(per veh)
Savings(per veh)
Peak Hours(all vehs)
Peak Hours Savings
Total Delay (hour) 0.03761 0.03758 0.00003 0.15588 $1.89
Total Stops 3.5 2.9 0.6 3117.6 $43.65
Fuel (Liters) 0.390 0.373 0.017 89.287 $53.08
Peak Hours Benefit $98.61
Daily Benefit $340.03
Annual Benefit $88,500.00
![Page 8: ACS Lite Overview – NTOC Webinar Aug06 U.S. Department of Transportation Federal Highway Administration FHWA Contract No.DTFH61-02-C-00047 Slide 1 ACS-Lite.](https://reader036.fdocuments.in/reader036/viewer/2022070305/5513fa3b550346d8488b45bc/html5/thumbnails/8.jpg)
ACS Lite Overview – NTOC Webinar Aug06
U.S. Department of TransportationFederal Highway AdministrationFHWA Contract No.DTFH61-02-C-00047
Slide 8
Houston, TX field test results
Results - Travel Time
0
50
100
150
200
250
300S
econ
ds Before
After
![Page 9: ACS Lite Overview – NTOC Webinar Aug06 U.S. Department of Transportation Federal Highway Administration FHWA Contract No.DTFH61-02-C-00047 Slide 1 ACS-Lite.](https://reader036.fdocuments.in/reader036/viewer/2022070305/5513fa3b550346d8488b45bc/html5/thumbnails/9.jpg)
ACS Lite Overview – NTOC Webinar Aug06
U.S. Department of TransportationFederal Highway AdministrationFHWA Contract No.DTFH61-02-C-00047
Slide 9
Houston, TX field test results
Before(per veh)
After(per veh)
Savings(per veh)
Peak Hours(all vehs)
Peak Hours Savings
Total Delay (hour) 0.01856 0.01214 0.00642 39.16252 $473.87
Total Stops 1.7 1.2 0.5 3051.6 $42.72
Fuel (Liters) 0.490 0.455 0.035 214.837 $127.71
Peak Hours Benefit $644.30
Daily Benefit $2,221.72
Annual Benefit $577,648.12
Unit Costs:• Total Delay – $12.10 per hour
• Stops – $0.014 per stop
• Fuel Consumed – $0.59 per liter ($2.25 per gallon)