    Important Achievement of Track Design Directorate during Last Five Years

    SN Financial

    Year

    Broad Area of

    Achievement

    Title of Achievement Description of Achievement Likely Benefits urrent Status of

    Implementation

    1. 2007-08 Safety Development of ATwelding technologies with

    three piece molds and

    compressed air petrol

    preheating.

    !DS" sccessflly developed AT welding techni#es with threepiece mold and compressed air petrol preheating for $2 %g&'0(TS

    and higher rail sections. The se of this techni#e has )een made

    mandatory on *!.

    *mproved #ality of welds and inservice performance.

    *mplemented

    2. 2007-08 Safety 1. Development and trial

    of corrosion resistant +i-,r-, +,, !ails.

    The corrosion of rail is the very significant factor reslting in

    prematre renewal of rails. A new metallrgy was developed asreslt of stdy condcted in pro/ect on ,orrosion prevention of

    rails nder Technology mission on railway safety. This

    metallrgy has )een developed /ointly )y !DS" **T 3anpr and

    SA*4. 705T of these rails rolled )y 6S were pt nder limited

    field trial on i/aiwada-9dr section of S,!. The new metallrgy

    has shown )etter corrosion resistance.

    !edced corrosion of rails in corrosion

    prone coastal areas.

    :;tensive field trial in

    progress.

    elds is dependent on

    95T of the section. >ith introdction of higher a;le loads andincrease in traffic the traffic density on varios rotes has increased

    significantly. De to increased traffic density (S=D testing isre#ired to )e nderta%en more fre#ently reslting in increase of

    the wor%load of (S=D testing is manifold. To facilitate faster

    testing and mitigate the increased wor% load of (S=D testing!DS" developed Indian Railway standard specification for

    ultrasonic testing of rails/welds using vehicular system,

    Provisional, 2009and issed on 1$.0?.200'.

    *ntrodction of state-of-the Art

    ehiclar (S=D testing system on*ndian !ailways. This will also help in

    effective monitoring of flaw growthpattern.

    Tender nder progress at +!.

    $. 2010-11 Safety Development of =orged@nction !ail

    At locations of change of !ail Section in trac% the @nctionfishplates were sed. *t was not feasi)le to contine 4>! at sch

    location. !DS" developed the drawing and provisional specifi-

    cation of $2%g B0%g forged /nction rail. This will redce

    instances of =ailre of /nction fish plates and facilitate continance

    !edction in /nction weld failre *mplemented

  • 8/12/2019 Achievement-TDD for Website

    2/24

    of 4>!.

    B. 2011-12 Safety Development of trac% )ased

    gage face l)ricating

    system

    The gage face 4)rication is re#ired to enhance service life of

    !ails particlarly on sharp crves. *n order to assess sita)ility of

    mechaniCed l)ricators 12 imported 8 indigenos l)ricators

    were installed in ,! >,! and:,o! in 2008 with trial period of

    two years. 6ased pon the e;perience gained Draft specification for

    l)ricators has )een developed and s)mitted to !ailway 6oard for

    consideration.

    !edction in wear of rail gage face

    specially at crved locations.

    Draft Specification is nder

    !ailway 6oards

    considerations

    Achievements

    Development of recording facility for ultrasonic rail testing machines: RDSO successfully developed data logger for existing ultrasonic

    machines for testing of rails.

    Data Logger for Double Rail Tester

    Development of AT elding technologies ith three piece moulds and compressed air petrol preheating: RDSO successfully developed

    and implemented use of aluminothermic rail elding ith three piece mould and compressed air petrol preheating for !" #g$%&'TS andhigher rail sections to improve (uality of elds and in service performance.

    AT )elding ith * +iece ,ould- Single Shot rucible ith Auto Thimble

  • 8/12/2019 Achievement-TDD for Website

    3/24

    Development of digital ultrasonic rail testers: RDSO successfully developed digital single and double rail testers ith digital technology in

    association ith industry.

    +late: Digital Rail Tester and /A/ Scan Representation on the Screen

    Development of ,aximum ,oving Dimensions 0,,D1 and 2ixed Structure 3auge for Dedicated 2reight orridors 0D21: RDSO

    developed ,,D and fixed structure gauge for adoption on D2

    ,,D and 2ixed Structure 3auge for )estern and 4astern D2

    Development of specification for ultrasonic rail testing on outsourcing basis: RDSO developed technical specifications for ultrasonic testing

    of rails on outsourcing basis in order to maximise rail head scan area and mitigate or#load increase on account of operation of heavieraxle loads.

    Development of specification for ultrasonic testing of rails using vehicular test systems: RDSO developed technical specifications for

    ultrasonic testing of rails using vehicular tests systems to introduce state5of5 the art testing technology for rails. Trials on 6R is beingdone.

    Development of 77& 'TS rails: RDSO successfully developed 77& 'TS rails in association ith SA8L for use on the heavy axle load

    routes of 8R and D2. 2ield trials is yet to be done.

    +late: Rail ,anufacturing +rocess and 77& 'TS Rail Developed by RDSO

  • 8/12/2019 Achievement-TDD for Website

    4/24

    Development of corrosion resistant rails: RDSO developed corrosion resistant rails in association ith SA8L 0u5,o1 and another

    chemistry 06i5r5u1 in association ith 88T 9anpur. These rails are under trial presently. 2ield trial of 7&-&&&,T Rail has started.

    +late: orrosion of Rail and +erformance of Anti orrosive Rail Developed by RDSO

    Development of special rails: RDSO developed special rails such as niobium rails for improved fracture resistance and vanadium rails for

    better ear resistance. These rails are presently under trial.

    Revision of specifications of Rails 08RS5T57"1:RDSO revised specification of rails in order to incorporate developments in the technology of

    rail manufacturing.

    Revision of ,anual for 'ltrasonic testing of rail and elds: The ,anual for ultrasonic testing of rails and elds as upgraded and reprinted

    in order to ma#e rail testing more effective especially for detection of rolling contact fatigue defects in rails and half moon shaped defectsin elds.

    Rolling ontact 2atigue Defect in Rails

    Design of trac# structure for "!t axle load: The trac# structure for operation of "!t axle load as firmed up enabling operation of the same

    on 8ndian Railay.

    Design of +S sleepers for *".!t and "!t axle load: The design of +S sleepers for *".!t and "!t axle load has been done by RDSO for

    use on 8R. 2ield trial is going on.

  • 8/12/2019 Achievement-TDD for Website

    5/24

    +S Sleeper Designed by RDSO for *".! tonne Axle Load

    Design of fastening assembly for "!t and *".!t axle loads:The design of fastening assembly 0elastic rail clip- rubber pad and liner1 for "!t

    and *".!t axle load as completed.

    +late: 24 Analysis of 4R

    8mproved S4:The existing design of S4 has been improved upon for more service life- better riding (uality and lesser maintenance

    efforts for higher speed and heavier axle load.

    )eldable ,S crossing:The design- draings and specifications for 7 in 7" and 7 in ;.! eldable ,S crossings have been developed to

    facilitate continuation of L)R through points and crossings apart from other advantages.

    )eldable ,S rossing

  • 8/12/2019 Achievement-TDD for Website

    6/24

    Thic# )eb Sitch: 2or better riding comfort- enhanced service life- higher speed and heavier axle load design and draing of 7 in 7" and7 in ;.! thic# eb sitches have been developed.

    ,ovable Sitch Diamond:To improve safety on diamond crossings the design of 7 in 7& movable sitch diamond ith double slip- single

    slip and ithout slip on +S sleepers have been developed and put on trial.

    2an Shaped +S Layout for Turnouts on sharp curves:The +S sleeper arrangement for turnouts ta#ing off from main line on sharper

    curves has been developed.

    g and !"#g rails have been developed.

    Spring setting device:2or better housing of tongue rail ith stoc# rail spring setting device have been developed for 7 in 7" and 7 in ;.!

    turnouts.

    Development of draing for apron in station area:The development of draing of ballasted ashable apron on specially designed +Ssleeper and ballastless apron ith components as done for improving effectiveness of drainage and cleanliness in the station area.

    ,isc designs of +S sleepers: RDSO designed several types of +S sleepers for special applications such as sleeper for fish plated ?oint-

    rerailing ramp for !"#g running rail and !"#g guard rail- +S sleeper for !"#g$%&R running rail and !"#g$%&R chec# rail for ,3 levelcrossing and anti sabotage +S sleeper for >&9g rail.

  • 8/12/2019 Achievement-TDD for Website

    7/24

    Design of turnout sleepers: Design of turnout sleepers for ,3 7in ;.! turnout and =3 7 in ;.! and 7 in 7& diamond crossing ith movable

    sitch ithout$ith clip as completed.

    Design of S38 insert for use in +S sleeper for D2: 6e design of S38 insert for use in *".!t axle load sleeper in D2 ascompleted.

    Scrutiny of SOD of D,R for =3 and Standard 3auge: RDSO scrutini@ed the document from technical angle and submitted

    recommendations to Railay =oard.

    Development of specifications for improved AT elding technology: RDSO developed specifications for improved AT elding technology

    for enlistment of global leading firms ith significantly improved service performance of AT elds. orrection slip to AT elding ,anualand specifications has been sent to Railay =oard for approval.

    ,onitoring of Defect 3eneration Rate in rails and elds on higher axle load routes: RDSO monitored defect generation rate in rails and

    elds on routes having operation of "".;"t axle load and submitted three reports to Railay =oard on the sub?ect.

    o 8n /situ reconditioning of ,S crossing: RDSO is developing the techni(ue for in /situ reconditioning of ,S crossing as removal

    of crossing from trac# is avoided for reconditioning purpose.

  • 8/12/2019 Achievement-TDD for Website

    8/24

    Important Achievement of !otive "o#er Directorate during Last Five Years

    SN Financial

    Year

    Broad Area of

    Achievement

    Title of Achievement Description of Achievement Likely Benefits urrent Status of

    Implementation

    2007-08 ,rew comfort Development of ,a) Air,onditioning System forDiesel :lectric 4ocos

    ,a) air conditioning system incldes one A, nit inthe drivers ca) with inpt power spplied )y ana;iliary sorce. An inverter of $ 3A capacity istherefore re#ired to convert 72 D, to 2.

    2007-08 :conomy ,onversion of cast ETS,trc% frame of EE :5Dlocomotive in to fa)ricateddesign

    Design of fa)ricated version with high strength rolledplate

    ,ost redction !nning in service sinceDecem)er 200'

    2007-08 :;port Design develop-ment of1?00hp& 2D57locomotive for e;port

    ,onversion of old >D57 locomotive for cape gageapplication

    :;posre in e;port design and assettiliCation

    4ocomotive e;ported from9",

    2007-08 =reightThroghpt

    Development of >D5D? diesel locomotives.

    To save foreign e;change )y $0 F or more i As improvement insystem relia)ility modifiedwith gear pmp and 9D typevalves < nos. compressorare nder trial. ii "ne more

  • 8/12/2019 Achievement-TDD for Website

    9/24

    vendor is in nder process.

    2007-08 assengeramenities

    Development of D5DSBAdt locomotives

    The )ogie has )een designed with advancedsspension elements

    :ase of maintenance and cost redction !nning in service since2011

    11. 2007-08 !elia)ility Development of =lly

    5achined Dctile *ron ,ast:ngine 6loc%s along with5ain 6earing ,aps for A4,"2$1 1B cylinder Diesel:ngines

    Specification for procrement of flly machined

    dctile iron cast engine )loc%s along with main)earing caps for A4,o 2$1 diesel engines had )eenframed. Accordingly in a glo)al tender the wor% wasawarded to 5&s Sichan Gi)in sh 9rop ,o. 4td,hina for $0 nos.

    Strengthened engine )loc% for increased

    horse power of

  • 8/12/2019 Achievement-TDD for Website

    10/24

    passenger version of EElocomotiveK

    1$. 2007-08 Safety Development of >D?6

    ?$00 E locomotive in placeof >D? locomotive.

    *mproved driver visi)ility at long hood direction with

    wider ca)

    *mproved isi)ility *ncreased Tractive

    effort.

    Switched over this design

    from 200'

    1B. 2008-0' :conomy Development of low meanpore siCe fel filters toimprove the relia)ility andli fe of fel in/ectione#ipment as well as the lifeof the filter itself on A4,olocomotives.

    5ean pore siCe redced to 10-1B microns for rimaryand B-10 microns for Secondary filters respectively.4ife of the filter enhanced to ? months to coincidewith the e;isting #arterly schedle

    *mprovement in relia)ility of fel in/ectione#ipment and periodicity of replacementhas )een do)led.

    !ailways have started singlow mean pore siCe felfilters

    17. 2008-0' :conomy :nergy efficient =TT56lower

    The A,-D, A4,o locomotives have rectifier that iseither cooled )y air of plenm cham)er in view of thealternator monted rectifiers the air re#irementfrom the )lowers has redced and the )lowers have)een redesigned for '$00 cfm in place of e;isting12000 cfm.

    *n these designs redction in the )lowercapacity has lead to significant redction inits power consmption.

    !DS" has revised thespecification

    18. 2008-0' =reightThroghpt

    Design and development ofhigher capacity radiator fanfor ?$00 hp :5Dlocomotives followingsccessfl )enchmar%ing ofindigenos fans

    The :5D locomotives have )een pgraded to ?$009E , from the e;isting ?000 9E , Thisincrease in power reslts in increased thermal loadingof the engine. *t was decided to increase the sweep ofthe fans from $2 to $? to increase the air flowcapacity

    The increased air spply shall ena)leincreased E rating of ?$00.

    ,omplete switch over to the$? design has )een made.

    1'. 2008-0' *ndigenisation *ndigenos development ofcomplete D9 4ocomotives

    The complete traction control system of :5Dlocomotive comprising T,, :,, 1 2 < and the

    4,, has )een indigeniCed sccessflly.

    Addition of more sorces and redction incost.

    As per !DS"sspecification development

    and )ench testing of *96T-)ased T,, had )eencompleted

    20. 2008-0' assengeramenities

    69 D:5( for @3 Diesel :lectric 5ltiple nit for @3 section withspeed potential of 100%m&h has )een designed as per!DS"s Specification with the following featres.L owered )y 1?00hp diesel engine L rovisionto meet the cold climate of @3 L Aerodynamicdrivers ca) L ,oach layot similar to

    D:5( @3 has provided an economicefficient and relia)le spplement to thee;isting means of transportation to thepeople of 3ashmir alley.

    D:5( @3 was

    commissioned on11.10.2008. L So far BD,shas )een spplied )y *,=.

  • 8/12/2019 Achievement-TDD for Website

    11/24

    @anshata)di coaches.

    21. 2008-0' !elia)ility Design development o fEigh adhesion high speed

    EAES e#aliser less )ogiefor >D5D1 locomotive

    6ogie has )een designed with provision of r))erspring in secondary stage and wing type a;le )o;

    !eha)ilitation of old >D1 locomotives "ne locomotive has )eenmodified and rnning since@ne10

    2D9?

    *ndigenos development of wheel for EE:asy availa)ility of wheel discs

  • 8/12/2019 Achievement-TDD for Website

    12/24

    loco locomotive

    2'. 200'-10 assengeramenities

    Design of :5D family>D? variant locomotive

    with Eotel 4oad capa)ility

    *ndian !ailway has decided to eliminate power carfrom !a/dhani & Shata)di ra%es for releasing space to

    increase more revene-earning coach )y providinghotel load facility in the locomotives for spplyinghotel load to train.

    !edction in nm)er of power cars woldreslt in increased passenger throghpt.

    The first locomotive hasrecently )een deployed in

    commercial tr ia ls inpassenger train.

    D?D loco.

    rovision of ca) at )oth end. ,rew visi)ility improved *n the )othdirection.

    < 4ocomotives have )eenmanfactred and aresccessflly in the service.

  • 8/12/2019 Achievement-TDD for Website

    13/24

    Technology for procrement of +ew9eneration ower ac%%eeping in mind state-of Nthe- art emission control and

    fel in/ection system

    sanctioned against 6 item no 105= )ogie for passengerversion of EE locomotive

    6ogie has )een designed with optimised weight

    achieved throgh =:5 and low maintenance featreshave )een adapted

    :ase of maintenance (nder development process

    ?2. 2011-12 Safety Development of inter-opera)le Distri)ted ower,ontrol System D,S ofdiesel electric locomotives

    !DS" has developed D,S with the followingimportant featres i.e. interopera)ility across differentma%es of the D,S made possi)le with re#irementof common protocol for radio fre#encycommnications improved integration withlocomotive systems improved logic for loss ofcommnications improved software interloc%s for

    *ncreased throgh pt D,S to the olderspecification has )eendeployed on ?7 locomotives.L Sanction forimplementation on 2B0locomotives issed )y

  • 8/12/2019 Achievement-TDD for Website

    14/24

    increased safety and redction of operator errors andanalysis of failre modes effects and criticalityanalysis has )een made mandatory at the designstage. Additional software interloc%s have )een

    provided for improved safety.

    !ailway 6oard.

    Achievements$ Design Development of Traction Stock for I%

    >DS< Diesel 4ocomotive 69B$0 hp gross powerDal service i.e. main line shnting5AG6A,E 5D?

  • 8/12/2019 Achievement-TDD for Website

    15/24

    >D5

  • 8/12/2019 Achievement-TDD for Website

    16/24

    >DD9? ,lass Diesel :lectric 4ocomotiveJ =reight Service 6road 9ageJ 1B cylinder 2-stro%e fel efficient 71096 engineJ ?000 hp gross power J A;le load 21 tJ 5a;imm operating speed 100 %m&hJ Eigh Adhesion ETS, ,o-,o )ogieJ

  • 8/12/2019 Achievement-TDD for Website

    17/24

    >D? ,lass Diesel :lectric 4ocomotiveJ assenger Service 6road 9ageJ 1B cylinder 2-stro%e fel efficient 7109

  • 8/12/2019 Achievement-TDD for Website

    18/24

    Diesel Eydralic 5ltiple nitJ assenger Service 6road 9ageJ 700 hp gross power J Speed potential pto '$ %m&h J A;le load 17 tJ (nder-slng ,mmins engine and oith transmission

    J assenger capacity 8$? seating

  • 8/12/2019 Achievement-TDD for Website

    19/24

    !ail)sJ assenger Service 6road 9ageJ 1$2 hp gross powerJ Speed potential pto 70 %m&hJ A;le load 1? tJ =rame monted ,mmins engine hydralic transmissionJ assenger capacity 1$2 seating 7B standing 7B

    !ail)sJ assenger Service 5eter 9ageJ 120 hp gross power

    J Speed potential pto $$ %m&hJ A;le load 11 tJ =rame monted Asho% 4eyland engine hydralic transmissionJ assenger capacity 120 seating B0 standing B0

  • 8/12/2019 Achievement-TDD for Website

    20/24

    Diesel :lectric 5ltiple nitJ assenger Service 6road 9ageJ 1?00 hp gross powerJ Speed potential pto 100 %m&hJ Air springs on the )ogies for comfort ridingJ Transmission-electricalJ assenger capacity 10'2 seating

  • 8/12/2019 Achievement-TDD for Website

    21/24

    +D5B ,lass Diesel 4ocomotiveJ assenger Service on B10 mm +arrow 9ageJ 5anfactred for +eral - 5atheran hill Dar/eeling-Eimalayan sectionwith 1 in 20 grade 127P crve 1

  • 8/12/2019 Achievement-TDD for Website

    22/24

    Diesel 4ocomotive for 6angladeshJ 5eter 9ageJ 1?00 hp gross power J A;le load 12.$ tJ 5a;imm operating speed 80 %m&hJ A,-D, Transmission

    Diesel 4ocomotive for Srilan%aJ 6road 9ageJ 2B00 hp gross powerJ A;le load 1B.$ t

    J 5a;imm operating speed 80 %m&hJ +ew 6ogie design with shorter wheel)aseJ A,-D, Transmission

    Diesel 4ocomotive for 5alaysia& 5oCam)i#eJ 5eter 9age &,ape 9ageJ 2

  • 8/12/2019 Achievement-TDD for Website

    23/24

    Diesel 4ocomotive for ietnam 59J 5eter 9ageJ 1

  • 8/12/2019 Achievement-TDD for Website

    24/24

    1?0 t diesel hydralic 6rea%down ,rane ,owans Sheldon designJ A;le load 20t in train orderJ +m)er of a;les crane B match trc% ?J ropping )ase B meterJ +o. of otriggers ?J ,apacity 1?0 t at $.$ meter radisJ 5a;imm radis 1B meter minimm radis $.$ meterJ !ange of lift of main hoist a)ove rail level 17 meter )elow rail level?mJ "perating speed 100 %m&h